County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION



Similar documents
SCC NO AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

Total Cost of the Building Permit. Total Valuation*

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity

CITY OF MIAMI FEE ORDINANCE

Frequently Asked Questions

BUILDNG PERMIT FEES Resolution # Effective October 1, 2011

ARTICLE 22: FEE SCHEDULE

Building and Other Permits Fee Schedule Effective Date: July 1, 2016 BUILDING PERMIT FEE

Answers to Commonly Asked Questions

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

Placement of Manufactured Homes on Private Property

Building Permit & Plan Check Fees

BUILDING INSPECTION DEPARTMENT FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

9. Does the County of San Diego keep home plans on file for existing homes?

d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section Green Building Standards Code

Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings

Guideline for Implementation of California Civil Code Sections Water-Conserving Plumbing Fixtures

CITY OF BAYTOWN Building Inspections

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

ORDINANCE NO (NEW SERIES) AN ORDINANCE REPEALING AND REENACTING THE COUNTY ELECTRICAL CODE

BUILDING DIVISION CONSTRUCTION PERMIT FEES

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

RIGHT OF ENTRY PERMIT (For providing Debris Removal on Private Property)

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Schedule A. Residential and Seasonal Dwellings. for estimating value of construction in the Township of North Kawartha

CITY OF CHICAGO DEPARTMENT OF BUILDINGS RULES AND REGULATIONS for CERTIFICATES OF OCCUPANCY

WHEN IS A PERMIT REQUIRED?

STATE OF CALIFORNIA DEPARTMENT OF INSURANCE 45 Fremont Street, 21st Floor San Francisco, California AMENDED TEXT OF REGULATION

ORDINANCE NO (N.S.)

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION

Building Permit, Fire Inspection and Operating Permit Fee Schedule

Single-Family Permit Handbook. City of Bellevue. Welcome! When is a permit required? Development Services Handout P-1

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

STATE OF CALIFORNIA DEPARTMENT OF INSURANCE 45 Fremont Street, 21st Floor San Francisco, California FINAL TEXT OF REGULATION

FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS

Chapter 5. Code Enforcement

Computer Data Center Program (Established under A.R.S ) INSTRUCTIONS FOR APPLICATION FOR CDC CERTIFICATION 1

Application for Tax Abatement for Rehabilitation of Property in a Local Historic District

How To Write A Building Code In Kendall County

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

TITLE 9 CONSTRUCTION CODES AND FIRE CODE*

Fill out all sections or mark with N/A (not applicable)

SUMMIT TOWNSHIP SIGN PERMIT PROCESS

City of Riverside. Building & Safety Division Phone: (951)

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

RESIDENTIAL WINDOW REPLACEMENT

The Board of Supervisors of the County of Riverside ordain as follows:

dpd Seattle Permits CAM Establishing an Accessory Dwelling Unit (ADU) What is an ADU?

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

ACKNOWLEDGEMENT OF RECEIPT OF THE CITY OF DUBLIN CONSTRUCTION AND DEMOLITION DEBRIS ORDINANCE INFORMATION PACKET

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

Chapter EDITION. Plumbers Insurance required of certain providers of low-flow showerheads or faucet aerators

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

ORDINANCE NO. THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

SECTION 1 - BUILDING CODE

CONSTRUCTION CONTRACTORS, OWNER BUILDERS AND SPECULATIVE BUILDERS

Moving a House in Pasadena

Who Can Apply (A or B)

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

TRANSFORMATION HOME LOAN 2016 Application Package

CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

Schedule B to By-law

City of Miramar Building Division

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

dpd Seattle Permits CAM Establishing an Attached Accessory Dwelling Unit (ADU) What is an ADU?

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES

Maximum Floor Area and Maximum Development Area

CITY OF ST. HELENA PLANNING DEPARTMENT 1480 MAIN STREET- ST. HELENA, CA PLANNING COMMISSION SEPTEMBER 15, 2015

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

MINNESOTA COMMERCIAL LEASE AGREEMENT. This lease is made between, herein called Lessor, and

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

Development Services Guidelines

Botetourt County, Virginia. Frequently Asked Questions

C I T Y O F P E A R S A L L

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) Fax: (508)

LAND ASSEMBLAGE REDEVELOPMENT AUTHORITY ("LARA") REQUEST FOR PROPOSALS ("RFP") FOR AFFORDABLE HOUSING DEVELOPMENT

ARTICLE V ADMINISTRATION AND ENFORCEMENT

BUSINESS USE PERMIT APPLICATION

Residential Building Permit & Plan Review Application. Yes, I would like to contribute $75.00 to the Rio Rancho Economic Development Corporation.

Contractor Information 2011

a. A person whose sole function in the work is to perform labor under the supervision or direction of a building contractor.

Transcription:

County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION (Effective 09/15/2013) The following fees shall be paid to the Planning & Development Services for the processing of the following permits and applications: SCHEDULE OF BUILDING CONSTRUCTION PERMIT FEES PERMIT TYPE FY 13/14 Plan Review Fee 5510 OVERLAND AVE, SUITE 110, SAN DIEGO, CA 92123 (858) 565-5920 (888) 336-7553 HTTP://WWW.SDCPDS.ORG PDS 613 REV.: 09/17/2013 PAGE 1 of 6 Permit Fee Single Family Dwelling/Duplex $1,696 + $0.211/sf $1,633 + $0.127/sf One & Two Family Tract Model Phase $1,943 + $0.139/sf $687 + $0.130/sf One & Two Family Tract Subsequent Phase $681 minimum for each unique floor plan. See $568 + $0.095/sf subsection (d), Item 1 Guest House/Second Dwelling Unit $1,562 + $0.313/sf $1,037 + $0.349/sf Cabana/Pool House $1,562 + $0.313/sf $1,037 + $0.349/sf Barn, Ag Bldg. Acc to SFD for OTC Review $336 $604 Barn, Ag Bldg. Acc to SFD Requiring Plan Check Submittal $1,278 + $0.207/sf $604 M-H Permanent on Foundation System (Private Lot) $1,025 $702 + $0.263/sf M-H on Piers (Private Lot) (Misc fee applies - $123) $303 Swimming Pool/Spa $169 $590 Misc Permit OTC. Minor int. SFD remodel / repair-no structural change, patio, carport, canopy, fence, re-roof, stairs, radio tower, antenna, etc. $123 $341 Misc. Permit Requiring Plan Check Submittal $1,552 $341 Commercial Misc. OTC (antenna, canopy, racks) $151 $575 Commercial Misc. Requiring Plan Check Submittal $1,854 $575 Major SFD Remodel, No Additional Square Footage $1,617 $1,171 Retaining Wall OTC (other than County std) $137 $458 Retaining Wall Requiring Plan Check Submittal $1,184 $458 Addition to SFD/Duplex (1 to 100 sf) $241 $777 Addition to SFD/Duplex Simple Enough for OTC Review (larger than 100 sf) $323 + $0.411/sf $906 + $0.469/sf Addition to SFD/Duplex Requiring Plan Check Submittal (larger than 100 sf) $1,394 + $0.362/sf $906 + $0.469/sf Residential Garage or Storage Bldg. Simple Enough for OTC review $165 + $0.307/sf $809 + $0.070/sf

PERMIT TYPE FY 13/14 Plan Review Fee Permit Fee Residential Garage, Carport or Storage Bldg. Requiring Plan Check Submittal $1,423 + $0.090/sf $809 + $0.070/sf Demolition Permit N/A $132 Compliance Survey N/A $238 Move-On House 25% of the fee for a site built dwelling Electrical Only N/A $247 Plumbing Only N/A $247 Mechanical Only N/A $247 Electrical and Plumbing N/A $320 Residential Solar Photovoltaic N/A $275 Residential Wind Turbine N/A $414 Electrical and Mechanical N/A $320 Plumbing and Mechanical Only N/A $320 Electrical, Plumbing, and Mechanical N/A $458 Grading $427 $505 Stormwater-Supplement as Fee for High Priority Projects N/A $575 Temporary Construction Power N/A $126 Temporary Construction Trailer N/A $126 Temporary Occupancy Permits N/A $126 Re-Inspection/Progress Inspection Fee N/A $126 Permit Research Verification Fee N/A $25 Appeal to Building Construction or Fire Appeals Board N/A $819 Transfer of Plan Review to Different Parcel $409 N/A New Plan Check Number When Plan Review is Complete (no changes to code) $409 N/A Landscape Plan Check Short Form (less than 5,000 sf) N/A $50 Missed Appointment Fee $184 N/A Microfilming/Records Retention Fee $8.20 Base Fee $2.10 per page N/A Plans $40.00 flat fee Letter and Legal Size Documents Pre-Application Conference Time & Materials N/A 75% of the fee for a site built dwelling, plus a compliance survey fee PDS 613 REV.: 09/17/2013 PAGE 2 of 6

SCHEDULE OF STREET NAME AND ADDRESSING FEES Application Name Authority Fee - Address Assignment with building permit 79.106 C.C. $116.00 - Address Assignment without building permit 79.106 C.C. $128.00 - Private Street Naming (No Hearing) 79.104 C.C. $128.00 - Hearing for Name or Change of Names 79.104 C.C. $1,854.00 PROJECT TYPES NOT LISTED IN THE TABLES ABOVE: When a project is not specifically listed in the Schedule of Building Construction Permit Fees table or the Schedule of Street Naming and Addressing Fees table above, the fee shall be calculated based on the valuation as described in this section. SCHEDULE OF BUILDING PERMIT FEES BASED ON VALUATION TOTAL VALUATION PERMIT FEE $1.00 to $50,000.00 $374.50 for the first $10,000.00 plus $1.00 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $414.50 for the first $50,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $639.50 for the first $100,000.00 plus $3.50 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 $2,039.50 for the first $500,000.00 plus $3.00 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up $3,539.50 for the first $1,000,000.00 plus $2.00 for each additional $1,000.00 or fraction thereof. PLAN REVIEW FEES: When a plan or other data is required or requested pursuant to the code, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be 65% of the building permit fee. DISABLED ACCESSIBILITY REVIEW FEES: The fee for conducting a review of plans for compliance with the disabled accessibility standards found at Title 24 of the California Code of Regulations, to be assessed at the time of application for plan review, shall be an additional 10% of the plan review fee. The fee for conducting an inspection for compliance with said disabled accessibility standards, to be assessed at the time of issuance of a building permit, shall be an additional 10% of the building permit fee. PDS 613 REV.: 09/17/2013 PAGE 3 of 6

ADDITIONAL NOTES PLAN REVIEW FEES FOR RESIDENTIAL TRACTS. When a plan is registered with the Building Official as a Master Plan, all subsequent plan reviews for that Master Plan will be charged the fee listed in the Schedule of Building Construction Permit Fees. The minimum fee will be charged for each unique floor plan in the phase regardless of the total number of dwelling units in the phase. If more than two hours is required to intake and review each unique floor plan, the time in excess of two hours will be charged at the Time and Material Rate described in the County Code. Minor, nonstructural changes to Master Plans are acceptable, however, all additional staff time spent processing any plan changes will be added to the plan review fee. EXTENSION OF AN EXPIRED PLAN REVIEW: When plans are submitted subsequent to plan review expiration, as permitted by the County Code, the plan review extension fee shall be 25 percent of the plan review fee prescribed above for newly submitted plans. PLAN CHANGES, ADDITIONS, REVISIONS OR INCOMPLETE PLANS: Additional plan review required by plan changes, additions, or revisions to approved plans or because the plans are incomplete shall be charged at the time and material labor rate and the minimum charge shall be one-half hour. FEE REDUCTION FOR BUILDINGS USING SUSTAINABLE BUILDING PRACTICES: For building permit applicants who voluntarily participate in the County of San Diego Green Building Program, as established by Board of Supervisors Policy F-50, the plancheck and permit fees shall be reduced by 7.5%. To qualify for this fee reduction, the project shall use one of the following sustainable building practices: a) Energy Conservation: The project shall exceed California Energy Commission Standards by 15% or more for residential and 25% or more for commercial and industrial developments. b) Natural Resource Conservation: The project shall incorporate straw bale construction for all exterior walls or use recycled content in the building system. To be eligible for the fee reduction by using recycled content, the applicant must demonstrate to the satisfaction of the Building Official that 20% or more of the primary materials being used in the building system contain 20% or more post-consumer recycled content. Any reused materials will be found to satisfy the 20% post-consumer recycled content requirement. A fee reduction may also be approved when the applicant demonstrates to the satisfaction of the Building Official that at least one primary building material (e.g. roofing material) is 50% or more post-consumer recycled content. c) Water Conservation: The project shall include the installation of a gray water system. A permit is required from the Department of Environmental Health for the gray water system in addition to the building permit issued by Planning & Development Services. PDS 613 REV.: 09/17/2013 PAGE 4 of 6

EXPEDITED PLAN REVIEW: When requested by the applicant and approved by the Building Official staff may use overtime to expedite a plan review. An additional fee shall be charged for this service. The fee amount shall be determined using the time and material labor rate multiplied by the amount of time staff spends on expedited plan review. INSPECTIONS OUTSIDE OF NORMAL BUSINESS HOURS: When the Building Official approves inspections outside of normal business hours the fee shall be charged hourly at the rate of one and one-half times the standard time and material labor rate described in the County Code. The minimum time charged shall be two hours. REFUNDS: An applicant who has paid the applicable plan review or permit fees may withdraw the application by submitting a written request to the Director of Planning & Development Services. The Department shall discontinue work on such application, except when the application involves a violation of a County Ordinance. The Director of Planning & Development Services shall not authorize the refund of any fee and/or deposit(s) paid except upon written application filed by the original applicant, received not later than one year after the date of fee payment. When no work has been done under a permit issued pursuant to this chapter the building official may refund up to 80 percent of the permit and shall withhold at least 20 percent of the fee paid but not less than $10 to offset the County's administrative cost. The building official may authorize a refund of up to 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done and shall withhold at least 20 percent of the fee paid but not less than $10 to offset the County's administrative cost. The building official shall not authorize a refund of any fee paid except upon written application filed by the original permittee not later than one year after the fee was paid. A refund shall not be authorized if the total refundable amount after deduction of County administrative cost is less than $10. The Administrative Authority may authorize the full refund of any fee paid hereunder which is erroneously collected by the County. Refund of fees shall be made in accordance with County Code. PDS 613 REV.: 09/17/2013 PAGE 5 of 6

VIOLATIONS: When a violation of any County code includes or results from the failure to obtain a required permit, a violation fee may be assessed as prescribed in the County Code. In all cases the additional violation fee or deposit amount shall be treated as a non-refundable flat fee, even if the initial amount is a deposit. CHARGES FOR TECHNICAL REPORTS: Information, circulars, reports of technical work, and other reports prepared by the Planning & Development Services when supplied to other government agencies, individuals or groups requesting copies of same may be charged for by the Department in a sum not to exceed the cost of publication and distribution of such documents. HOMEOWNER AND BUSINESS OWNERS RELIEF: See form PDS 612 for detailed explanation of fees related to the Homeowner and Business Owner Relief Act. STANDARD HOURLY RATES: The fee for items not listed in the above fee schedules or those designated "Time and Materials" shall be determined by the actual costs incurred by Planning & Development Services. The cost will be determined by using the labor rates specified in Time and Material Rate described in the County Code. MISSED APPOINTMENT FEE. The Building Official may charge this fee when an applicant does not show up for a scheduled plan submittal appointment or cancels the appointment less than 24 hours in advance. FEE WAIVER FOR STRUCTURES DAMAGED OR DESTROYED BY NATURAL DISASTER: Notwithstanding the fees otherwise specified, the plan check review fee and the permit fee may be waived for an applicant who is rebuilding legally built structures which have been damaged or destroyed by a wildfire or other natural disaster and which are located within the boundaries of a geographic area which has been declared by resolution of the Board of Supervisors to be eligible for this fee waiver. The fee waiver shall not apply to any portion of a new structure which exceeds the square footage of the structure which is being replaced. FEE ORDINANCE INFORMATION: Additional information on fees can be found in the San Diego County Code of Regulatory Ordinances online at: http://www.amlegal.com/sandiego_county_ca/ PDS 613 REV.: 09/17/2013 PAGE 6 of 6