Customer-Led Network Revolution Electrical Energy Storage Cost Analysis

Similar documents
A Review of Engineering Recommendations P15, P17 and P27 (Transformers, Cables and Overhead Lines)

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd.

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

NIA Project Registration and PEA Document

Construction (Design and Management) Regulations 2007

Distribution Substation Manual (DSM) Section I - Introduction

Sample Micro Hydro Initial Report

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6

TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015

We appreciate your feedback

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

Alternative data center power

EXAMPLE OF A DATA CENTRE BUILD

Cost Allocation Method

Data Center Consolidation Trends & Solutions. Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert

REAL PROPERTY MANAGEMENT: Applying Best Practices Can Improve Real Property Inventory Management Information

Japan s Largest Photovoltaic Power Plant

IUCN Project Budgeting Guidelines

Energy saving technology to deliver the fastest returns. Top 10 energy saving options

Electrical Services. Electrical engineering excellence for electrical services

A comparative analysis of Lithium Iron Phosphate and Lead-Acid (flooded, gel and AGM) battery technology for marine applications

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

AGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES

Transmission Related Station Power Use at Substations

STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK

AREVA: supply chain network principles and company s vision

Photovoltaic Incentive Program

Temperature Monitoring Windfarm Cable Circuits

Estimation of electrical losses in Network Rail Electrification Systems

THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge

NPT s fixed long-run incremental cost (LRIC) model

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy

Exceptional... Everytime!

Request for Proposal. Solar Power Purchase Agreement

ELECTRICAL ENGINEERING ASSOCIATE, 7525

Utilities and existing services

Re: Connection to the Electricity Distribution System at: [GV_SINGLE_LINE_ADDR_PREM]

CONTINGENCY PLANNING FOR DISRUPTED ELECTRIC POWER: The Case for Partnering with a Strong Rental Power Supplier

Addendum #2 Contract UK-11-13

SCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks

UPS Applications and VRLA Battery Sizing

GUIDELINES FOR AUGUST 1995

Allianz Insurance plc. Erection All Risks. Product Information. This information is for intermediaries only

Skyrocketing Electricity Cost in Denmark

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff. Risk Allocation in Construction Contracts

Planning, Organisation and Control of Resources in Construction and the Built Environment

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

Principles of Distribution charging:

Councillor David Chambers Date of Decision/Referral to O & S REPORT OF: STRATEGIC DIRECTOR (CORPORATE) SDC/08/37

Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW

Design of electrical power system for a 1000MW nuclear power generating station

CONTRACT CONDITIONS FOR LOGISTICS (2014)

How To Manage A Business Continuity Strategy

Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks.

Finance and Resources Committee

Electricity network services. Long-term trends in prices and costs

Best Practice Guide BPGCS007

Co-location Arrangements for Interconnecting Canadian Carriers

NEC Users Group Workshop Defined Cost

Standard Electricity Prices and Charges *

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

E N G I N E E R I N G

ST HELENA TELECOMMUNICATIONS ORDINANCE, CAP 106 LICENCE TO OPERATE BROADCASTING STATIONS AND TO BROADCAST SERVICES (TELEVISION BROADCASTING LICENCE)

National Fund for Environmental Protection and Water Management. activities in climate protection

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

Developing a framework model of Supply Chain Management : A case study on a Mega construction project in Myanmar.

EXAM EXEMPLAR QUESTIONS

An Uninterruptible Power Supply Topology to Manage the Arrival of Big Data Kenny Green

RCP2 Portfolio Overview Document

STANDARD ELECTRICITY PRICES AND CHARGES *

Mechanical Engineering and Material Handling Aspects of NSDF

An insurance package suitable for small to medium sized businesses in the construction industry with a:-

Brochure. Electric generators to power the world

GAS INDUSTRY ACT 2001 COST RECOVERY ORDER IN COUNCIL

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Comparing the cost of alternative waste treatment options

FREE iphone APP Get our FREE OPEX SAVER CALCULATOR iphone App scan code to go direct to App Store.

For ease of reference the clauses are arranged in 12 sections as follows:-

Transcription:

Customer-Led Network Revolution Electrical Energy Storage Cost Analysis DOCUMENT NUMBER CLNR-L249 AUTHORS Ian Lloyd, Gayle Faine, Northern Powergrid ISSUE DATE 22/12/2014 Copyright Northern Powergrid (Northeast) Limited, Northern Powergrid (Yorkshire) Plc and EA Technology Limited, 2014

Document Purpose The following report shows a breakdown of the costs attributed to the fleet of battery systems as deployed at six of Northern Powergrid s substations on the CLNR project. The costs consist of the combination of equipment and resources deployed on the Rise Carr 2.5MVA/5MWh battery, the two 100kVA/200kWh systems at High Northgate and Wooler Ramsey, and the three 50kVA/100kWh systems at Harrowgate Hill, Wooler St Mary and Elgar Drive. The cost categories have been chosen to best illustrate the areas of work undertaken to safely install and commission the equipment on a UK DNO owned substation. The total Northern Powergrid project cost for EES was just over 6,818k. A breakdown of the costs is presented in the charts below. 1

The table below shows the total costs for all six Electrical Energy Storage units as per the category headings for the project. Cost Categories Original Budget Total Spend to Date Budget v Spend Variance % Primary Equipment 5,558,767 Civils 393,991 Engineering / Commissioning 185,503 Installation 178,612 Enabling 85,457 Labour 52,337 Other 14,098 Consultancy 6,301 Total Storage Unit Costs 5,566,000 6,475,067 16% EATL contractor 146,000 102,905-30% Technical Engineer 114,000 240,108 111% Contingency Capex 1,002,000 - -100% Total 6,828,000 6,818,080 0% 2

Primary Equipment The primary equipment category captures the actual costs associated with the contract tendered to achieve the installation, delivery and deployment of the specified network technology by NEC Energy Solutions (NECES, formally known as A123 Systems Inc.) The equipment contract comprises of the battery systems engineering design and chemistry (consisting of lithium ion, iron, nano-phosphate), its control systems, the ABB and Dynapower power conversion systems, containment security, fire protection and suppression systems, internal and interconnection wiring, the heating and ventilation systems, installation and commissioning, warranty, three year limited parts and labour service contract, logistics, crane usage, delivery duty and project management. There were variations to the original order to either modify the battery unit to comply with Northern Powergrid policies on both safety and protection, or to facilitate its integration with the remote control platform. The total cost of the variations across the battery fleet was 150k 3% of the total primary equipment costs. Civils The civil works aspect is heavily affected by the site at which the system is deployed. Post site assessment surveys and base prices were achieved which are indicative of what the actual costs would be to redeploy similar systems elsewhere. These costs consist of ground works, drainage capacity increase and diversion, access route extension and strengthening, cable trenching, foundation casting, plinth erection, cable raceway and ducting manufacture, gantry design, fabrication and installation, existing building modifications and fire prevention measures. The fabrication of gantries was required so the site complied with Northern Powergrid s flood prevention scheme. Of the total 394k spent on civils, 337k related solely to the Rise Carr site. Variations to the original contract for the Rise Carr site were caused by load bearing improvements and the removal of contaminated waste (including asbestos) costing the project just over 304k. 3

Below is a table of costs for the Rise Carr site Rise Carr Civils What Comment Electrical and civil design drawings 24,000 130,000 120,000 50,000 13,000 Next Time Would be cheaper next time due to the avoidance of rework and lessons learnt 12,000 Initial civil works at Rise Carr substation Survey works and desktop feasibility study would stay the same 130,000 Contract variations for unusual site These should be expected - e.g. foundations, specific issues accessibility 120,000 Contract variations for unusual site Soil contamination and waste management specific issues (incl. asbestos) - Small costs incurred for CLNR trial purposes Would not be required as part of BaU - 337,000 262,000 Based on the table above the civils costs would decrease to 262k from 337k a reduction of 22%. This would not apply to the smaller batteries where the costs were quite small and the sites would generally require a small amount of modification. Thus the cost of EES 1 would fall by 65k next time Engineering and Commissioning This category includes the 3 rd party engineering effort and project management of the battery systems installation. This work includes the detailed hazard identification and operability study (HAZID and HAZOP) process that was deployed to consider what role technology specific aspects played in our site risk assessments across the entire battery fleet. The engineering and commissioning cost were 185k for the project, we estimate that these costs were increased by the delays encountered on the project and that these costs would be reduced by around 30% to 130k. Installation Installation costs are those combined activities associated with the physical installation of the equipment at the substation that were not covered by the primary equipment contract and not performed by Northern Powergrid. This work forms part of integration between the new control system, the battery system and the existing infrastructure at each site. Typical examples would be the routing of the alarm system outputs from the battery system to our Scada remote terminal unit and associated scheme design, wiring and installation labour from 3 rd party suppliers. The installation costs of 179k included both protection and control equipment that would be required again, following the CLNR learning these system costs would be cheaper next time we expect we would not need the NVD therefore this would reduce the costs by 20% to 143k. 4

Enabling The prime enabling activities that were carried out on the sites and the network technology consist of site surveys work with mobile generation companies, leasing fees, solicitors fees, and interaction with security companies, local authorities, the local community and the emergency services. Key examples were: the diversion of the 33kv feeder which passed beneath the intended battery system footprint at Rise Carr costing the project around 58k; and the upgrade to the existing primary substation auxiliary transformer for the added burden of the battery systems auxiliary supplies. Security improvements at higher risk substations allowed the development of temporary wayleave agreements and improvements to perimeter protection. Noise surveys and improvements were required at the smaller rural sites and these were conducted by a 3 rd party attenuation expert at a cost of just under 20k. Due to the enabling costs relating to the diversion of a 33kV cable, we expect none of this work would be required again. Rise Carr s specific site layout caused this rerouting, and it would be highly unlikely that this work would need to take place elsewhere. Technical Engineer These costs were for the engineering works associated with the systems design, redesign and debugging of the first of a kind product or technology. Costs were heavily affected by multiple visits to each deployed site and would reduce considerably for subsequent sites. Of the 240k technical engineer costs, we estimate a large proportion of these are first in class costs plus any extra time spent on the project caused by delays and over scoping, we would estimate that these costs would be reduced by 60% to 96k. EATL Contractor The EATL contractor costs relate solely to fees incurred during the preparation for procurement, contract drafting and execution. The 103k EATL contractor costs were incurred as this was a trial and would not be required for BaU, therefore these costs would not be incurred in future. Labour This is the measure of the amount of activity performed by Northern Powergrid employees that covers the activities of Northern Powergrid s program delivery department; it is inclusive of work done by field engineers, fitters, jointers, linesmen, craft attendants, safety auditors, supervisors and quality inspectors. Importantly it is not inclusive of the engineering works associated with the systems design, redesign and debugging of the first of a kind product or technology that are included in the Technical Engineer category. The labour costs of 52k were inflated due to the project delays and also the nature of the work being first in class. We would estimate a very small reduction in costs (10%) as the actual time lost was not great. 5

Consultancy These are charges that have been incurred overcoming the financial crisis of chapter 11 bankruptcy experienced by A123 systems Inc., the primary equipment contractor. We estimate that there would be a small amount of legal consultancy costs that would be incurred as part of BaU ( 2k). Other The other category is the consolidation of much smaller costs incurred on the project that relate to haulage, and safety. Operational Expenditure (OPEX) No specifically identifiable operational expenditure has been incurred. This work is currently carried out under the original tendered contract with NECES. However in the future there would be costs relating to the ongoing maintenance of the asset and the associated labour costs to support the full maintenance program in place with NECES. Any losses incurred due to parasitic loss of both round trip efficiency and auxiliary supplies supplying HVAC and system operational power. CLNR has not run long enough to comment on battery lifetime. The manufacturers estimate for the battery system lifetime is 18-20 years. We would assume one full battery change after 10 years i.e. our current estimate of about 1.2 M over a 20 year period plus 50k for remote support, general maintenance and site visits over the same 20 year period. The coordination of the system with a remote controller reduces the need for routine site attendance that assists the maintenance burden. Battery round trip efficiency of energy imported vs energy exported less the loads required to maintain the battery and the site in its ready state are important to factor into the systems ongoing operational costs. The loads required to maintain the site are primarily parasitic, with consumption of power used to maintain the site integrity and security, but more so to operate and control the environment systems (air conditioning etc.) in which the battery and inverter unit sit. System Parameter EES 1 (Rise Carr) EES 2 (High Northgate) EES 3 (Harrowgate Hill) Capacity of energy storage system 5000 kwh (nominal) 200.3 kwh (measured) 105.9 kwh (measured) Round Trip Efficiency 83.2% 86.4 % 83.6 % (excluding parasitic losses) Average Parasitic Load 29.5 kw 2.50 kw 1.77 kw (losses of the system auxiliaries) Round Trip Efficiency including parasitic losses, assuming one charge/discharge cycle per day 69.0% 56.3% 41.2% 6

2.5MVA 5MWh Electrical Energy Storage Unit The total Northern Powergrid project cost for EES 2.5MVA was just under 4,623k. A breakdown of the costs is presented in the charts below. 7

The table below shows the cost of a 2.5MVA 5MWh Electrical Energy Storage Unit. Cost Categories Original Budget Total spend to date Budget v Spend Variance % Primary Equipment 3,755,366 Civils 337,734 Engineering / Commissioning 146,548 Installation 104,251 Enabling 67,593 Labour 27,151 Other 13,322 Consultancy 6,301 Total Storage Unit Costs 4,646,000 4,458,266-4% EATL contractor 60,000 50,000-17% Technical Engineer 44,350 114,538 158% Contingency Capex 919,200 - -100% Total 5,669,550 4,622,804-18% 8

100kVA 200kWh Electrical Energy Storage Units The total Northern Powergrid project cost for EES 100kVA battery was just under 980k for two. A breakdown of the costs is presented in the charts below. 9

The table below show the average cost for one 100kVA Electrical Energy Storage unit. Cost Categories Original Budget Total Spend to Date Budget v Spend Variance % Primary Equipment 405,835 Civils 12,679 Engineering / Commissioning 7,792 Installation 6,995 Enabling 6,162 Labour 5,987 Other 204 Total Storage Unit Costs 268,010 445,654 66% EATL contractor 27,000 16,435-39% Technical Engineer 22,110 27,845 26% Contingency Capex 23,800 - -100% Total 340,920 489,934 35% 10

50kVA 100kWh Electrical Energy Storage Units The total Northern Powergrid project cost for EES 50kVA was just under 1,232k for three. A breakdown of the costs is presented in the charts below. 11

The table below show the average cost for one 50kVA Electrical Energy Storage unit. Cost Categories Original Budget Total Spend to Date Budget v Spend Variance % Primary Equipment 330,577 Installation 20,124 Civils 10,300 Engineering / Commissioning 7,790 Labour 4,404 Enabling 5,540 Other 1,847 Total Storage Unit Costs 384,046 380,581-1% EATL contractor 32,000 6,678-79% Technical Engineer 25,099 23,293-7% Contingency Capex 35,405 - -100% Total 476,549 410,553-14% 12

For enquires about the project contact info@networkrevolution.co.uk www.networkrevolution.co.uk 13