TELUS Quebec Intelligent Internet Data Center, Canada



Similar documents
Adjutantti, Finland. Case Study 95

Green House, Hungary

Data Centre Outsourcing a Buyer s Guide

Overview of Green Energy Strategies and Techniques for Modern Data Centers

Modular Chiller Plants for data centers. Downtime isn t acceptable

Scalable. Affordable. Flexible. Fast.

DATA CENTERS BEST IN CLASS

NetApp Data Center Design

Traditional Data Centers

Questions to be responded to by the firm submitting the application. Why do you think this project should receive an award? How does it demonstrate:

Data Centers: Definitions, Concepts and Concerns

HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget

Zen Internet Case Study

1. Data Centre Environment Why focus on Data Centres? Hitachi Eco-Friendly Data Centre Solutions

Challenges In Intelligent Management Of Power And Cooling Towards Sustainable Data Centre

World s Greenest High Performance Data Center

High-density modular data center making cloud easier. Frank Zheng Huawei

THE WORLD S MOST EFFICIENT DATA CENTER

Modular Data Centre. Flexible, scalable high performance modular data centre solutions. Data Centre Solutions...energy efficient by design

How To Benchmark Power Production

ICT and the Green Data Centre

AIRAH Presentation April 30 th 2014

Huawei Data Center Facility Integration Solution

Excool Indirect Adiabatic and Evaporative Data Centre Cooling. World s Leading Indirect Adiabatic and Evaporative Data Centre Cooling

Common mistakes in datacentre planning

Data Centers in Hong Kong Powering business success

Case Study Nottingham Trent University

GREEN FACTS. Marina Bay Sands

Specialty Environment Design Mission Critical Facilities

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Premium Data Centre Europe Pricing, Business Model & Services

Skanska s Green Approach

Direct Fresh Air Free Cooling of Data Centres

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

Enabling an agile Data Centre in a (Fr)agile market

EMC DURHAM CLOUD DATA CENTER

Managing Data Centre Heat Issues

Three Steps To Perfectly Green

Datacenter Efficiency

Physical Infrastructure Management Solutions

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

Green Data Centre Design

Heat Recovery from Data Centres Conference Designing Energy Efficient Data Centres

ALWAYS ON GLOBALSWITCH.COM

Data Centers That Deliver Better Results. Bring Your Building Together

Data Center Infrastructure Management. optimize. your data center with our. DCIM weather station. Your business technologists.

Simplifying Data Center Design/Build

Bytes and BTUs: Holistic Approaches to Data Center Energy Efficiency. Steve Hammond NREL

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences

Increasing Energ y Efficiency In Data Centers

Minimising Data Centre Total Cost of Ownership Through Energy Efficiency Analysis

The Mission Critical Data Center Understand Complexity Improve Performance

Distributed versus centralized power backup strategies

European Code of Conduct for Data Centre. Presentation of the Awards 2016

Data center upgrade proposal. (phase one)

HPC TCO: Cooling and Computer Room Efficiency

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

Data Centre Solutions... energy efficient by design. APC by Schneider Electric Elite Data Centre Partner. APC s leading Elite Data Centre Solutions

HOT & COLD. Basic Thermodynamics and Large Building Heating and Cooling

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

Delivering Sustainability through Affordability, Efficiency, and Durability. A New Era In Housing

Pacnet Hong Kong CloudSpace2 Technical Specifications. Upholding the Principles of Efficiency and Sustainability in Data Center Design

POD S in Data Centres. The Frame Group Pty Ltd

Sustainable Building Policy

Renewable Choice Energy

AIR-SITE GROUP. White Paper. Green Equipment Room Practices

Data Center Lifecycle and Energy Efficiency

Seven Steps to Maximizing Central Plant Efficiency

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

Rittal White Paper 508: Economized Data Center Cooling Defining Methods & Implementation Practices By: Daniel Kennedy

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

Essential NCPI Management Requirements for Next Generation Data Centers

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

DATA CENTRE DESIGN AND

SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Energy efficient data centre cooling. InRack Cooling & The Intelligent Cooling System. aircold.dk

SUSTAINABILITY REPORT 2010

Transcription:

Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support noel.morrin@skanska.se TELUS Quebec Intelligent Internet Data Center, Canada Case Study 105 Aspects of Sustainability This project highlights the following: The TELUS Quebec Intelligent Internet Data Center (IIDC), constructed in Canada, uses Skanska-developed solutions to realize substantial guaranteed energy and financial savings. The data center is pursuing LEED (Leadership in and Environmental Design) Gold level. Green Aspects Local Impacts Social Aspects Human Resources Corporate Community Involvement Business Ethics Health and Safety Skanska Color Palette Click here for more information The agile design approach with Skanska has provided TELUS with the required flexibility in a constantly changing IT world we can optimize capital deployment and minimize total cost of ownership while ensuring required reliability, security, and scalability. Lloyd Switzer, SVP Network Transformation, TELUS Project Introduction TELUS is a Canadian telecommunications company that is in the process of upgrading its national technical infrastructure. TELUS has opted for Skanska s state-of-the-art next-generation solutions to upgrade its data centers, which provide more efficient and sustainable operations, whilst being able to accommodate increases in capacity over time to optimize space and cost. Skanska Canadian Construction Services Inc. led the integrated, collaborative design and build process for a new prototype IIDC in Quebec for TELUS. The US$ 65 million Quebec facility was completed in August 2012, and Skanska will complete a second TELUS IIDC in British Columbia in June 2013. The data centers include a central utilities building, an office and administration building and server modules that are connected by a central access spine. The data hall containing the server modules was fully prefabricated, and was shipped to the site in 64 pieces and assembled onsite in four weeks. Skanska s Mission Critical Center of Excellence and its technology partner Inertech have developed innovative ecomb modular infrastructure solutions, which enable a just-in-time modular deployment to increase server capacity. Inertech is Skanska s technology partner that also developed and its technology partner Inertech, who highly efficient eopti-trax cooling technology. The ecomb modular solution allows future capacity to be delivered over the multi-year Quebec agreement, from a 2.7 MW capacity in phase 1

to a 25+ MW capacity and a total facility area of 11,613 m2 by phase 7 through a series of modular expansions. Skanska managed the entire design and build process, which allows it to underwrite and guarantee the performance of the IIDCs for the client. The Quebec site will be able to reduce its overall costs by 40 percent by lowering up-front investment through the modular deployment approach and by enhancing energy efficiency. The new TELUS IIDCs are pursuing LEED Gold certification with the Canadian Green Building Council (CaGBC). LEED is a voluntary certification process intended to encourage and guide the construction of more sustainable and energy efficient buildings. The highly efficient nature of the IIDC aligns with TELUS sustainability commitments, including its 10- year climate change strategy and its objective to eliminate over half a billion kwh in energy waste Contributing Toward Sustainable Development The TELUS Quebec IIDC uses around 80 percent less power for cooling and over 80 percent less water than a conventional data center to realize significant financial savings over its lifespan. Highly efficient eopti-trax cooling and ecomb modular technologies developed by Inertech were incorporated into the project, along with Skanska s intelligent energy management tools and software. Furthermore, Skanska guaranteed the performance of the IIDC as part of a long-term agreement with TELUS. Skanska s modular solution also allows the just-in-time deployment of server capacity, which promotes flexibility and reduces costs. Skanska worked closely with the client and project partners from the outset to adapt its efficient technological solutions to TELUS requirements. During construction, a significant proportion of construction waste was diverted from landfill, high standards of health and safety were achieved, and regional workers and construction materials were used that promoted local economic benefit. Green Aspects efficiency The Skanska/Inertech eopti-trax cooling platform and ecomb modular solution ensure that the TELUS IIDCs use around 80 percent less power for cooling than conventional data centers. The Quebec site has an industry leading system-wide annualized Power Usage Effectiveness (PUE) of 1.15, compared with a conventional newly constructed data center of around 1.6. The PUE is the ratio of total amount of power used by a data center to the power delivered to the computing equipment, whereby an ideal PUE is 1.0. Skanska s ecomb or ehive aisle containment systems have self-contained IT and mechanical systems within the modules that track and optimize internal environmental conditions, which ensures they are significantly more efficient than conventional facility-wide data center mechanical systems. The ultra-efficient eopti-trax cooling involves liquid refrigerant coil-cooled technology, which uses significantly less energy than conventional energy intensive

raised-floor fan-assisted cooling. eopti-trax cooling only requires 0.3 W to cool a 300 W server, compared with 90 W required by a conventional server cooling system. eopti-trax technology also extends a data center s free cooling zone. Conventional data centers can only utilize free cooling when outdoor temperatures are less than 7 C, whereas eopti-trax can use free cooling when temperatures are under 29 C. eopti-trax data centers can therefore be located in warmer climates and still benefit from long periods of free cooling. In the case of the Quebec data center, the IIDC can use free cooling almost every day of the year. In fact, TELUS estimates that the facility will only require 40 hours of mechanical cooling per year. In addition, highly efficient LED (Light Emitting Diode) lighting and T8 florescent fixtures were used throughout the facility to promote energy efficiency. Intelligent energy management The Quebec IIDC was equipped with an advanced Data Center Intelligence Platform (DCIP), which was developed by Skanska and its partners. The DCIP combines conventional building management tools with sophisticated data tracking and analysis capabilities into a single user-friendly dashboard. Performance Guarantee (EPG) Skanska guaranteed the performance of the Quebec IIDC and backed that guarantee with a commitment to pay the difference for any electrical cost in excess of the guaranteed level directly to TELUS. The entire performance risk has therefore been transferred entirely to Skanska. The longterm agreement is known as an improvement guarantee, whereby Skanska must also ensure the facility becomes increasingly efficient throughout its lifespan. Reduced operational carbon emissions The Quebec IIDC emits around 30 percent less carbon during operation than a conventional data center. The 2.7 MW facility (phase 1) will emit around 255 tco2e, compared with a conventional data center with a 1.6 PUE that would emit approximately 1,170 tco2e (figures based on Quebec s 95 percent hydro power and 5 percent natural gas energy mix). Waste management during construction 71 percent of construction waste was diverted from landfill in total. The remote nature of the

site complicated waste management efforts. For example, waste drywall had to be transported around 6 hours to Montreal to be recycled. efficiency The Quebec IIDC uses around 80 percent less water in total than a conventional data center. Skanska s eopti-trax technology is responsible for the majority of the facility s water savings. The solution involves the use of a closed circuit cooling tower system, which can reduce water use compared with a conventional open loop chiller. Conventional systems cool the air through constant evaporation and therefore consume large amounts of water. In contrast, Skanska s closed loop system reuses the refrigerant as it repeatedly changes from a gas to a liquid. The only water loss from the eopti-trax system occurs when the outdoor temperature exceeds 29 C. Social Aspects Project partner cooperation Skanska worked closely together with project partners and the client from the design phase to develop the necessary solutions capable of guaranteeing significant energy and water savings. TELUS scheduled a three-day programming charrette early in the design process, which involved an intensive collaborative session with 25 participants to identify the most efficient and cost-effective solutions to meet the project s requirements. Skanska led the programming and design process, to develop an integrated and collaborative design model and to verify that all project components met the client s objectives. TELUS Electrical and Mechanical engineers were integral in this design process, including decisions regarding the selection various project components, such as technology and vendors. Occupational health and safety There were no lost time accidents during construction. 96,852 hours were worked in total on the project. Healthy indoor environments Skanska s eopti-trax solution significantly improves the indoor environment in the server rooms of the data center by avoiding the creation of hot aisles that are typical to conventional data centers. eopti-trax ensures that the hot aisle is no warmer than adjacent spaces as the hot air from the servers is instantaneously neutralized as it passes over the cooling coils. The solution therefore creates a more pleasant environment for data center employees who are not exposed to extreme temperature swings as in conventional data centers. Functional and flexible data center The Quebec IIDC has been independently assessed to meet Tier 3 data center requirements, which incorporates dual-powered IT equipment and provides over 99.999 percent uptime. The facility also supports high rack densities of up to 60 kw/rack, while ensuring rack access. The Quebec facility is a flexible and dynamic data center that is designed to allow the addition of Just-In-Time data center capacity to meet the client s projected future growth requirements. The installation of an additional self-contained ecomb module to the facility s central access spine takes around 16 weeks, which allows the client to quickly respond to changing business needs and anticipated customer demands, and provides maximum flexibility within TELUS future load

growth profile. Skanska s ecomb modular data center solution is consequently much more flexible than conventional solutions, which typically require large initial investments to establish the infrastructure to accommodate future capacity from the outset. Furthermore, the addition of modules does not disrupt ongoing operations, and individual ecomb modules can be upgraded over time in order to adapt to and incorporate the benefits of evolving technology during the facility s lifetime. Skanska modular data center solutions are tailored to the client s evolving IT strategy, and are fully customizable to the industry, location and unique specifications. Economic Aspects Regional construction workforce and materials Approximately 300 trades people worked on the project in total. Over 90 percent of the workers were from the local area. Locally extracted, manufactured and sourced materials included the sand, gravel, concrete masonry units, steel, paving, asphalt, exterior metal wall panel system, doors and windows used on the project. Efficiency financial savings Skanska and TELUS developed a detailed capital and cash flow analysis for the lifespan of the Quebec project, which was based on a phased build-out plan designed to provide maximum flexibility, in order to respond to the inevitable changes in TELUS future load growth profile. A key objective was to optimize capital deployment whilst minimizing Total Cost of Ownership (TCO). The final solution delivered a US$ 60 million saving on day one compared with a conventional data center, as the Quebec facility is designed to meet TELUS current capacity demand and capacity can be gradually increased over time to ensure that future demands are met. These up-front capital savings resulted from the modular nature of Skanska s solution, which avoids the need to construct a full capacity data center from the outset. The modular solution allows infrastructure costs to be minimized during each phase of expansion, whilst increasing the facility s overall reliability and efficiency. Learning From Good Practice Skanska was able to underwrite and guarantee the entire facility s performance for the client by overseeing the entire design, build and improvement contracts over a 20-year period. This holistic and long-sighted approach allows Skanska to capitalize on its expertise and make significant financial and environmental savings throughout the facility s lifespan.