NORTHERN LIGHTS, INC. SINGLE PHASE APPLICATION CHECKLIST

Similar documents
REQUEST FOR ELECTRIC SERVICE Commercial

4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information

Electric Service Guide for Residential Construction

New Electric Connection Application Packet Commercial and Industrial. City of Plummer P.O. Box B, Plummer, ID (208)

Electric Service Guide for Residential Construction

Electric Service Guide for Commercial Construction

your electric service: from overhead to underground

How To Get A Power Line Extension

Tucson Electric Power Company Rules and Regulations

Step 1: Application Instructions

Temporary Electric Service

Electric Service Conversion Overhead-to-Underground. Minnesota

Floyd County Department of Inspections 120 West Oxford Street PO Box 218 Floyd, VA Phone: Fax:

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013

Policy and Guidelines for Electric Service

Underground Commercial Electric Service

Application for. Commercial New Service

New Residential Service Requiring Construction

Applying For New or Revised Electric Service

Electric Service Requirement Handbook

New Water/Sewer Connection Application Packet Residential. City of Plummer P.O. Box B, Plummer, ID (208)

New Commercial Service Application

NEW SERVICE INSTALLATION STEPS. Common Slow Downs. Other Necessary Steps

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS

RESIDENTIAL ELECTRICAL ONLY PERMIT PACKET

TERMS AND CONDITIONS

COMMERCIAL CONDUIT RULES AND REGULATION

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

MLGW Contact Numbers. Memphis Light, Gas and Water Division P.O. Box 430. Memphis, TN

Residential Electric Service Handbook

Builder/developer gas service application

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Wellesley Municipal Light Plant. Standard Requirements for Electric Service

We look forward to serving you!

Bureau Veritas Contact Information

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

Questions Regarding Proposed Utility Undergrounding in Kensington

- Natural Gas Service Application Checklist -

Please check with your local inspection authority for any additional requirements before installation.

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

BGE Service Application Guidelines Commercial & Industrial Projects

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

2015 Service Guide XCEL ENERGY. Minnesota North Dakota South Dakota Natural Gas and Electric Installation Information for Residential Contractors

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

ELECTRIC SCHEDULE LS-2 Sheet 1 CUSTOMER-OWNED STREET AND HIGHWAY LIGHTING

Please Refer to Attached Sample Form

APPLICATION FOR CONDITIONAL USE PERMIT PROPOSED USES WITHIN EXISTING BUILDING

Manufactured Home Application Packet

STATE OF FLORIDA DEPARTMENT OF HEALTH APPLICATION FOR CONSTRUCTION PERMIT Permit Application Number

ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS

Section 801 Driveway Access Onto Public Right-of-Ways

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

SERVICE - GENERAL Residential, Commercial, Industrial

Gas Meter Clearances and Service Installation Requirements

RESIDENTIAL DRIVEWAYS

COLUMBIA POWER & WATER SYSTEMS RULES & REGULATIONS

APPLICATION FOR TENTATIVE MAPS

City of St. Petersburg Development Services. February Driveways for Residential Properties

INSTRUCTIONS FOR COMPLETING MONTANA BOARD OF HOUSING REVERSE ANNUITY MORTGAGE LOAN APPLICATION

DESCRIPTION OF WORK:

Mortgage Basics 101. Talk to your CIBC Mobile Mortgage Advisor today.

ELECTRICITY [CH

Ferry County Out Building Application

Hardwick Electric Department PO Box 516 Hardwick, Vermont (802) (802) Fax (802)

Incentive Policies for Housing and Economic Development

Right-Of-Way Acquisition Information

Development Variance Permit Application Package

LAKE PARK PUBLIC UTILITIES ELECTRIC RATES

ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Case 1:01-cv BLW Document Filed 01/18/11 Page 111 of 152 EXHIBIT H TELECOMMUNICATIONS CABLE SYSTEM EASEMENT DEED

PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.

LONG TERM RENTAL REGISTRATION APPLICATION All sections are required to be completed. Please print, type, or apply through portal.

Swalley Fees, Fines, & Assessment Policy 2016

Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) or call (800) Date Faxed: 1

Hyperlinks are Inactive

- Natural Gas Service Application Checklist -

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

Electric Service Guide. Residential Subdivision

ORDINANCE NO AN ORDINANCE AMENDING AND ESTABLISHING THE FEE SCHEDULE FOR SERVICES PROVIDED BY THE ELKHART COUNTY BUILDING DEPARTMENT

Relocation Assistance

City of Cincinnati Pamphlet Residential Lease Option Contract

NEW YORK STATE ELECTRIC & GAS CORPORATION SCHEDULE FOR ELECTRIC SERVICE. Applicable

RATES AND RULES GOVERNING THE FURNISHING OF NATURAL GAS SERVICE TO RETAIL GAS CUSTOMERS

NOW LEASING! Must be income eligible (annual income not to exceed $33,150 for. Pets welcome (please ask management for details)

Please Refer to Attached Sample Form

Considering UNDERGROUND. tampaelectric.com

Housing Opportunities for Native Americans & Alaska Natives NativeNatives

POPLAR BLUFF MUNICIPAL UTILITIES AND CITY CABLE

GENERAL INFORMATION AND CHARGES. Buried Service Line Installation Fees: Local Service Monthly Charges Rates

Condo Project Approval Documentation Requirements

ZONING HEARING BOARD APPLICATION CHECKLIST

Developer s Guide To Turnkey Subdivisions. The Saskatchewan Turnkey Program

Your Rights and Responsibilities as a Customer of Rockland Electric Company

2-Party Shared Well Users Agreement (If Applicable)

Last Name First Name Middle Initial. I elect payment of all funds directly to me. (Mandatory 20% Federal tax withholding applies)

ACQUISITION. Real Property Acquisition For Kansas Highways, Roads, Streets and Bridges

Be wattsmart and earn cash back.

Comanche Trail Pipeline Project. September 2015

Transcription:

NORTHERN LIGHTS, INC. SINGLE PHASE APPLICATION CHECKLIST SUBDIVISIONS, MULTI-FAMILY, LARGE COMMERCIAL AND 3-PHASE PROJECTS NEED TO USE OUR DEVELOPER S APPLICATION ITEMS NEEDED BEFORE PROJECT IS ENGINEERED: Applications will not be processed until all requested information is provided. COMPLETED APPLICATION COPY OF DEED MANDATORY SITE PLAN (showing landmarks, roads, nearest neighbors, driveway, house site, driveway, closest power, etc.) APPLICATION/ENGINEERING FEES: $500.00 for Single phase, single family dwelling, and industrial loads less than 100 KVA and service changes. Valid for 1 year from the date the application is received in our office. ITEMS NEEDED AFTER ENGINEERING VISIT TO YOUR SITE: STATE ELECTRIC PERMIT State Inspector will inspect the meter base you install and that NLI will connect to. (MT 406-841-2047, https://app.mt.gov/permit/ & ID 208-769- 1579, http://dbs.idaho.gov/electrical/forms/ef300.pdf) PLANNING PERMIT AN ENERGIZING PERMIT IN Cities of Dover, Ponderay, Kootenai and Sandpoint BUILDING LOCATION PERMIT IN Bonner Co. (208-265-1458) EASEMENTS Needed for NLI to install and maintain the new powerline ESTIMATED COSTS FOR PROJECT Cost calculated by engineer based on attached line extension schedule (valid for one year from application date) Note: Applications are valid for one year from the time they are submitted to Northern Lights, Inc. (NLI). Projects that have not been completed within one year of the application date for reasons beyond NLI s control may be canceled by NLI in January of each year. Fees paid by the applicant that exceed costs incurred by NLI on the project will be refunded to the applicant. Applications to reinstate projects that have been canceled previously will be subject to NLI s policies and fees in effect at the time of the latest application.

NORTHERN LIGHTS LINE EXTENSION FEE SCHEDULE 2010 Service Change Applications and Relocations: $500.00 application/engineering fee; PLUS: Total estimated cost of the change. *Adjustments: Costs may be shared between the Cooperative and the member, the Engineer shall determine and recommend to management the ratio of sharing based on the benefits derived by each party if there is cost sharing. If threephase power is being requested, you will need to fill out the developer s application instead of this one. Single Phase, Line Extension One Transformer Up to 25 KVA and a 200 or 400 Amp (Non-CT) Meter $500.00 application/engineering fee - required before the Cooperative will perform field work related to a line extension (serves to offset a portion of the costs of processing the application and engineering the project). PLUS $500 Mobilization Fee, PLUS $1855 Hookup/Impact Fee per meter, PLUS $8.00 per foot, *(for projects over 1000 ft see Adjustments ) PLUS defined additional charges (see below). Payment of all construction costs are due prior to releasing a job for construction. Applicant shall: Provide and install the meter base that NLI will connect our cable & meter into. Provide and install conduit and pull rope for underground secondary lines of 10 feet or greater. Provide the necessary right-of-way clearing for construction of the new power line. Additional charges may be assessed for items such as, but not limited to: Change of existing NLI facilities to accommodate extension Dig-ins on existing cable, or inserts within existing overhead lines Poles, junction huts or additional transformers or meters Conversion from overhead to underground or vice versa Road bores or pushes Temporary services Extra-ordinary construction costs due to conditions such as (but not limited to): Terrain, rock, railroad, highways, roads, rivers, creeks, etc. Any permit fees for encroachments (i.e. railroads, county roads, highways, State, or Federal land) Transformers greater than 25 KVA Meters other than 200 amp or 400 amp (non-ct) Engineering time over eight (8) total man-hours Installations between November 1 st and March 31 st as construction during winter months can greatly increase the final true up costs. (These extra costs, also estimates, may need to be paid before NLI crews begin construction.) Additional work resulting from requested changes beyond the original scope of the project, or from site conditions caused by the member or others. *Adjustments: If soil and terrain conditions warrant, the Cooperative may adjust the footage charge for the portion of underground extensions that exceeds 1,000 feet in length. NLI shall determine the feasibility of installing electric facilities based on criteria such as terrain, soil conditions, safety, engineering practices, accessibility, and future maintenance; NLI shall cooperate with applicants to determine locations and routes for electric facilities. The applicant shall agree to pay the cost of professional engineering or consulting services to develop a work plan for installation of electric facilities if NLI determines that such services are necessary. NLI reserves the right to deny an applicant s request if acceptable locations and routes for the facilities cannot be established and agreed upon by NLI and the applicant. NLI will not install underground cable in roadways. For underground cable, the applicant will provide a 15-foot wide, cleared and stumped corridor along the side of the roadway, or other route acceptable to NLI. Job cancellations If construction has not been completed within one (1) year after the date of application, the project may be canceled at the discretion of NLI. If requested, NLI may grant a time extension; however, the applicant shall pay the line extension rates in effect at the time of construction. Page 1

NORTHERN LIGHTS LINE EXTENSION FEE SCHEDULE 2010 Monthly Billings After Construction: Upon completion of a service by NLI, the applicant shall pay the monthly electric rates pursuant to NLI s policies and rate schedules, whether or not the meter entrance has been energized. For line extensions that exceed 1500 feet in length, the Cooperative may require a minimum revenue agreement which exceeds the standard monthly rate. Financing for line extension projects is available through Horizon Credit, 520 N. Fifth Ave., Sandpoint, ID 83864, (208)263-7525. If you are interested in a financial package for construction costs, please contact Horizon Credit and ask their loan officers for further information. (Loans limited to $10,000.00) Northern Lights also accepts all major credit cards. Service Installation after a meter has been retired: When re-connection of a previously retired service is requested and only the meter was retired, a $200.00 application and inspection fee will be billed and a service change application will be completed. If, after inspection by NLI personnel, it appears that more than a single meter installation is required, the project will be considered a new service and will be billed accordingly and additional paperwork and permits will also be required. The applicant will be notified in a fee letter from NLI. Temporary Services - Construction temps for single phase projects (as in single family dwellings): Applicants will be assessed full cost of the project all the way in to the permanent service, PLUS a $500 Temporary Fee. For underground services the applicant will be required to provide and install conduit and pull rope to the permanent location. Temporaries must be converted to their permanent location within one year, from the date they were energized, or NLI will consider the temporary pedestal their permanent service. After a job is canceled it will be necessary to apply for a Service Change and pay additional charges to move the service to a new location. True-Up Calculation: After a project has been completed the actual project costs will be calculated, if the applicant paid more than 100% of the project costs (including application/engineering fee), that overpayment will be refunded. Excluded from this refundable amount is any refund that is less than $25.00, and the Hookup/Impact fees. The application fees for canceled jobs are evaluated the same way. (Processing time is approximately two - three months from the date of installation.) Yard light services - Applications for NLI owned and maintained yard light service will be accepted if the requested yard light is more than 500 feet from the member s metered electrical service. Applicants for NLI owned and maintained yard lights shall pay 100% of the actual cost of the installation and agree to pay for said lighting service under provisions of the appropriate Rate Schedule for a minimum of 36 months. If the member cancels the yard light service before the three years are up, said member will be billed for the remainder of the contract in one lump sum. REMEMBER ALWAYS CALL BEFORE YOU DIG. THE NATIONAL ONE CALL NUMBER IS 811. One call is free, easy and a way to protect you from injury and expense. (Policy effective 1/1/10 12/31/10) Page 2

PO Box 269 Please be sure to attach a copy of your deed that indicates 421 Chevy Street the legal description and the ownership of the property. Sagle ID 83860 1(800)326-9594 or (208)263-5141 The application and application fee are valid for one year from Fax (208) 263-0220 the date that your application is received by our office. Name: SS#: DOB Co-Applicant Name: SS#: DOB Business Name: Mailing Address: Tax ID#: PO Box / Street City State Zip Code Home Phone: Cell Phone: Co-Applicant Cell Phone: E-Mail Address: Co-Applicant E-Mail Address: Employer: If self-employed, please include your business name Work Phone: Co-Applicant Employer: If self-employed, please include your business name Work Phone: Physical Address of Property - Street/Road (not lot or block desc.) Is your property in a subdivision? If yes - Subdivision Name: Lot & Block: Have you ever been a member of NLI? Yes No If yes, name on account or account #: NAME OF YOUR NEAREST NEIGHBOR SERVED BY NLI: (It may be yourself) Estimate distance from nearest existing powerline to new metered site: ft. Is it: Overhead or Underground Nearest pole and transformer #: Do you want?: Overhead Underground IF THE POWERLINE WILL CROSS ANY PROPERTY OTHER THAN YOUR OWN, PLEASE PROVIDE INFORMATION BELOW: Property owner s name and address: Will powerline cross any? What type of service are you planning? What type of heating system will you use? County Road Residential (please state use below) Electric State Highway (house/shop/barn, etc?) Gas USFS property Commercial Propane State Property Other (use?): Wood Railroad Other: Gas Pipeline What size electrical service entrance? Creek/Swamp 200 amp (standard) What type of water heater do you intend Other (specify size) to install? Electric Gas Propane Please note that the homeowner or a licensed electrician must submit an electrical inspection permit to NLI in order for the project to be placed on the construction schedule. All construction charges must be paid and other required paperwork and/or county/state permits must be submitted prior to construction scheduling. Signature of Applicant(s) Date: If you are out of the area and are having a local person act as your representative, please include their information below: Contact person: Contact E-Mail: Contact phone: Contact Cell #: YOU MUST COMPLETE THE SECOND PAGE OF APPLICATION OR ATTACH A SITE PLAN DRAWING

NLI Application - Page 2 Please draw a site plan sketch below showing existing and proposed structures, landmarks, roads, nearest neighbors, house site, driveway, powerlines, etc. NLI USE ONLY Meter #: Line Location: Work Order #: Transformer #: KVA: Adequate for new load? Yes No