Practice Note for Authorized Persons, Buildings Department Registered Structural Engineers and APP-13 Registered Geotechnical Engineers



Similar documents
Computer Programs for Use in Structural and Geotechnical Design

Guidance Notes for Applicants on Registration as General Building Contractors / Specialist Contractors

Application for Registration as Authorized Persons, Registered Structural Engineers, Registered Geotechnical Engineers and Registered Inspectors

Demolition Works Measures for Public Safety

Buildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors

Design and Construction of Cantilevered Reinforced Concrete Structures

Site Auditing for Building Works. This practice note provides details of the strategy on auditing building works by the Buildings Department (BD).

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations

Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)

Amenity Features. encouraging efficient and effective building management; enhancing the quality of life for residents and users;

Buildings Department Practice Note for Registered Contractors 69. Minor Works Contractors Registration

THE LAND REGISTRY E-ALERT SERVICE - APPLICATION FOR CHANGE OF PARTICULARS

43/F Immigration Tower, 7 Gloucester Road, Hong Kong. (for official use) Tel : Fax : wsdinfo@wsd.gov.

Building Approval Process

Practice Note

CODE OF PRACTICE FOR SITE SUPERVISION 2009

CONDITIONS OF TENDER TENDER DESCRIPTION : THE CONSTRUCTION, MANAGEMENT AND OPERATION OF READY-MIX CONCRETE BATCHING PLANT AT

Water Supply and Wells

BUILDING AND CONSTRUCTION AUTHORITY SINGAPORE CONDITIONS OF TENDER

Gas Water Heaters Regulation 35A of Building (Planning) Regulations

APPLICATION FOR RENEWAL OF LICENCE TO USE OR OPERATE AN ELECTRICAL INSTALLATION (Please read Explanatory Notes before completing the Forms)

1 RCNY CHAPTER 100

PLANT VARIETIES PROTECTION ACT (CHAPTER 232A, SECTION 54) PLANT VARIETIES PROTECTION RULES

Lift and Escalator Installations

I/We, , (the borrower ) being registered as owner of

G. Common Defects in Buildings - Leakage

LPCB Red Book Listed Products and Passive Fire Protection Installer Schemes Answering the needs of the market

professional engineers board singapore

Building Design to Foster a Quality and Sustainable Built Environment

- 5 - Table1. Maximum Compartment Volumes

DRUG DEPENDENT PERSONS TREATMENT AND REHABILITATION CENTRES (LICENSING) ORDINANCE (CAP. 566)

Construction and Demolition Waste

Loss Prevention Standard

MORTGAGE REF. NO. FREEHOLD LEASEHOLD (check ( ) appropriate box)

Code of Practice. for. Mandatory Building Inspection Scheme. and. Mandatory Window Inspection Scheme

APPLICATION FOR BUILDING WARRANT

State of Connecticut REGULATION of

Chapter 4 Section 2 - Emergency Excavation Permit Administration Procedure

BUILDING MANAGEMENT (THIRD PARTY RISKS INSURANCE) REGULATION CONTENTS

RESIDENTIAL MORTGAGE LENDING SOLICITOR S UNDERTAKING LAW SOCIETY APPROVED FORM (2011 EDITION)

THIRD SUPPLEMENT TO THE GIBRALTAR GAZETTE No. 4,167 of 7th May, 2015

Appendix 23. Sample of Invitation Letter for Submission of Fee Proposal for Acting as a Project Consultant for Maintenance and Improvement Works

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

APPLICATION FOR APPROVAL TO OPERATE PRIVATE MEDICAL LABORATORY

Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) *

A form to be filled in by every applicant for reappointment to one of the positions mentioned above.

Guidelines Importation of Radio Communications and Broadcasting Equipment REPUBLIC OF RWANDA RWANDA UTILITIES REGULATORY AGENCY P.O.

Company Formation. 1. Promotion 2. Incorporation 3. Capital Subscription 4. Commencement of business

The Danish Enterprise and Construction Authority to inspect CE marking of windows and pedestrian doors

Practice Notes in Force

CHAPTER MECHANICAL CODE HEATING, AIR CONDITIONING, VENTILATING AND REFRIGERATION DIVISION 2 - APPEALS

INDEPENDENT STATE OF PAPUA NEW GUINEA. Companies Regulation ARRANGEMENT OF SECTIONS.

COLLEGE OF OCCUPATIONAL THERAPISTS OF ONTARIO

CONTRACTORS COMBINED SUPPLEMENTARY PROPOSAL FORM THE RIGHT TOOL FOR THE JOB

Who Can Apply (A or B)

Fire Safety Requirements for Child Care Centre

INDUSTRIAL INSPECTORATE ACT CAP. 180 L.F.N ACT CAP I8 L.F.N Establishment and composition of Industrial Inspectorate Division.

QUALIFICATION OF SUB-CONTRACTORS FOR FIRE DETECTION AND ALARM SYSTEM FOR CFC STANBIC BANK REF: 2014/15-06

BELIZE LIMITED LIABILITY PARTNERSHIPS ACT CHAPTER 258 REVISED EDITION 2003 SHOWING THE SUBSIDIARY LAWS AS AT 31ST OCTOBER, 2003

ORDINANCE NO. 15- THEREFORE, THE CITY COUNCIL OF THE CITY OF COSTA MESA DOES HEREBY ORDAIN AS FOLLOWS:

(A K Chatterjee ) Sc. F & Head, BIS-DSBO

Small Business Permit Service

Directive No. SIB/1/1994

APPENDIX A - CHARTER ORDINANCES

APPLICATION FOR CITY OF PORT COLBORNE DOWNTOWN CENTRAL BUSINESS DISTRICT COMMUNITY IMPROVEMENT RESIDENTIAL GRANT

FIRE SAFETY INFORMATION FACT SHEET

BERMUDA INSURANCE RETURNS AND SOLVENCY REGULATIONS 1980 BR 16 / 1980

How To Get An Insurance License In Neepal

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

BUILDING SURVEY Terms and Conditions Please Return

Estonie Loi sur la signature électronique Entrée en vigueur le 15 décembre 2000

Drainage By-law. WM-4 Consolidated April 18, This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada

AFRICAN REGIONAL INTELLECTUAL PROPERTY ORGANIZATION (ARIPO)

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

OCCUPATIONAL RETIREMENT SCHEMES ORDINANCE GUIDANCE NOTES ON APPLICATION FOR AN EXEMPTION CERTIFICATE

Fire Doors Explained. Presented by - Peter Barker

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

I would like to apply for an Occupation Certificate now. I will apply for an Occupation Certificate at a later date.

Singapore Diamond Investment Exchange Pte Ltd SDiX Depository Pte Ltd Application for Membership -- Approved Supplier

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

PROPOSAL FORM ENGINEERING DETERIORATION OF STOCK. Basic Information. Policy Information. Company Name

Ordinance Number 564 Page 2

GRTGAZ NETWORK TRANSMISSION CONTRACT

Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

Commercial Applications

BERMUDA TRUSTS (REGULATION OF TRUST BUSINESS) EXEMPTION ORDER 2002 BR 38 / 2002

APPLICATION FOR GRANT OF PATENT

DATED 2013 THE COUNCIL OF THE CITY OF WAKEFIELD. and WAKEFIELD WASTE PFI LIMITED. and YORKSHIRE WATER SERVICES LIMITED DEED OF GRANT OF EASEMENT

REPUBLIC OF KENYA DEPARTMENT OF INSURANCE. FORM NO. INS FIRST SCHEDULE (SS.30 & 188(2) and rr.5 & 48)

DEPARTMENT OF TRANSPORT

BUILDING CERTIFICATE APPLICATION FORM Made under the Environmental Planning and Assessment Act 1979 (s149d)

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

General Conditions of Tender

ARMAGH BANBRIDGE AND CRAIGAVON DISTRICT COUNCIL CINEMAS (NORTHERN IRELAND) ORDER 1991

CLIENT / PROJECT MANAGER AGREEMENT

TRADE UNIONS ACT (CHAPTER 333, SECTION 55) TRADE UNIONS REGULATIONS

Introduction to cable fire stopping

HONG KONG INSTITUTE OF CERTIFIED PUBLIC ACCOUNTANTS

Pneumoconiosis and Mesothelioma (Compensation) (Assessment of Levy) Regulations (6 of 2008 s. 31) (Cap 360 section 47)

The Limited Liability Companies Act Dissolving a Solvent Limited Liability Company under Section 11A

Transcription:

Practice Note for Authorized Persons, Buildings Department Registered Structural Engineers and APP-13 Registered Geotechnical Engineers Submission of Certificate of Completion of Building Works Application for Occupation Permit and Submission of Record Plans and Information Submission of Certificate of Completion of Building Works Upon the completion of building works, a certificate of completion of building works not resulting in a new building (Form BA14/14A and/or Form MW02/04) or resulting in a new building (Form BA12/13) should be submitted in accordance with regulation 25 of the Building (Administration) Regulations (B(A)R). While there is no statutory time limit under the Buildings Ordinance (BO) for processing such certificates, the Buildings Department (BD) will generally provide a reply to Form BA14/14A within 28 days advising the acceptance of the completed works or the outstanding issues to be rectified. As a certificate of completion of new buildings and application for an occupation permit (OP) are usually submitted together in Form BA12/13, they will be processed together within 14 days in accordance with section 21 of the BO. 2. If the same contractor is employed for both the foundation works and the superstructure works for a new building or in the alteration and addition works to an existing building, where spread footing foundation with excavation depth not exceeding 4.5m is adopted, the certification of completion of both the spread footing and superstructure works in such cases may be made in the Form BA12/13 or a single Form BA14, as the case may be, and a separate Form BA14 for completion of the spread footing works is not required. Simultaneous Submission of Amended Building Plans and Application for OP 3. A Form BA12/13 is sometimes submitted at or about the same time as the submission of amended plans for approval. This would complicate the processing of an application for OP. In line with the declaration in the Form BA12/13 that the new building has been erected in accordance with the plans approved, the Building Authority (BA) takes the view that authorized persons (AP) / registered structural engineers (RSE) / registered geotechnical engineers (RGE) should submit and secure approval of amendment plans in advance of an application for OP. The exception is that minor positional deviations from the approved plans which do not contravene the BO and Regulations may be acceptable. /Submission..

- 2 - Submission of Record Plans 4. Where several alterations have been made to the original design, the BA may require, under regulation 46 of the B(A)R, the submission of "new plans" showing the building as completed. 5. However, for those projects where amendments to the original building plans have subsequently been approved, the AP should submit a set of general building plans with the application for OP, amalgamating all the plans approved by the BA and thereby representing the building as completed. Each of those plans should bear either the signed and dated approval chop applied by the BA or a chop giving the AP's personal certification of the plans being identical to those approved by the BA on the date specified. To limit the volume of paper, the BA would accept plans photographically reduced to not less than a ratio of 1:200. 6. Record plans should not contain any amendments which have not been approved. 7. In addition, the Commissioner of Rating and Valuation (CRV) has requested that, for all newly completed buildings, one set of record plans be supplied to him for rating purposes. As record plans are now mostly produced from computer softwares such as AutoCAD or Microstation, the CRV would welcome if the AP could also submit, on a voluntary basis, a CD-ROM containing the softcopy of the record plans in AutoCAD or Microstation format. The CRV has committed that the CD-ROM and the softcopy of the record plans will only be used for relevant rating purposes and will not be released to other Departments or parties. If the AP is willing to facilitate CRV in discharging his duty, the additional set of plans, together with the CD-ROM (the frontage is marked with CD-ROM containing plans for the CRV ) if any, may be included in the submission to the BD for transmission to the CRV. Submission of Schedule of Building Materials and s 8. Under the BO, the AP, RSE, RGE and registered contractor (RC) have responsibilities to supervise building works including the selection and application of building materials and to certify compliance with relevant provisions of the BO upon completion of works. To expedite the processing of an application for OP, the BA requires the submission of a schedule under regulation 44 of the B(A)R, confirming the use of accepted building materials and products in construction. 9. The schedule should be submitted with an application for OP. The AP should confirm and certify in the schedule the application and performance of building materials and products in compliance with the relevant provisions of the BO and regulations; the RC should confirm the use of those building materials and products in construction. Except for regularly used building materials, the schedule should cover all /materials..

- 3 - materials and products not specified on the approved plans, the application of which would involve the structural integrity and fire safety of the building, and the cast iron pipes and fittings as stipulated in Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-133. Where appropriate, a schedule should be submitted on completion of alteration and addition works not resulting in a new building or minor works. Sample schedules for building works and minor works are provided at Appendices A and B respectively. 10. Where the building works involve the installation of fire dampers, the fire dampers may be installed by the registered general building contractor (RGBC) of the project or by a registered specialist contractor in the ventilation works category (RSC(V)) appointed for such purpose. For fire dampers installed by RGBC, a RSC(V) should be engaged to inspect and certify that the fire dampers are in safe and efficient working order pursuant to Clause E8.3 of the Code of Practice for Fire Safety in Buildings. For fire dampers installed by RSC(V), the same RSC(V) could inspect and certify the fire dampers. The AP in submitting the certification on fire dampers should include an inspection certificate on fire dampers by RSC(V). This requirement takes immediate effect except for buildings or building works which are being carried out or consent to which has been given on or before 9 September 2013. For the avoidance of doubt, the relevant consent refers to the first consent for superstructure works in respect of new buildings or the first consent for building (alteration and addition) works. ( AU Choi-kai ) Building Authority Ref. : BD GP/BORD/10 (V) BD GR/BORD/93 (II) BD GR/OP/4/M BD GR/OA/177 This PNAP is previously known as PNAP 53 First issue July 1978 Last revision December 2010 This revision September 2013 (AD/NB1) (General revision and para. 10 added)

Appendix A Certificate of Accepted Building Materials and s BD Ref. : Date : Re : (*Address of development site/location of alteration and addition works) To the Building Authority, Part A (to be certified by authorized person) I, (name in full), authorized person, confirm that accepted building materials and products have been specified in the above building construction. Pursuant to regulation 44 of the Building (Administration) Regulations, I duly endorse the attached Schedule of Building Materials and s (Annex A. 1 & A. 2). 2. I hereby certify that the building materials and products listed in the attached Schedule are acceptable products under relevant building regulations and that I am satisfied with the application and performance of these products. Certificate of Registration No. : Date of expiry of registration : Signature of authorized person Part B (to be certified by registered contractor) 3. *I/We, (name in full), *registered general building contractor/registered specialist contractor in the ** category, hereby confirm that the accepted building materials and products listed in the attached Schedule have been used and properly applied in the above building construction. authorized signatory Certificate of Registration No. : Date of expiry of registration : Signature of registered contractor /Part C... - 1 -

Part C (to be certified by registered specialist contractor in the ventilation works category) *I/We, (name in full), registered specialist contractor in the ventilation works category, have inspected every fire damper installed in the above building construction on (completion date of inspection) and hereby certify that all the fire dampers are in safe and efficient working order pursuant to Clause E8.3 of the Code of Practice for Fire Safety in Buildings. *I/We, (name in full), registered specialist contractor in the ventilation works category, hereby confirm that the fire dampers listed in the attached Schedule have been properly installed in the above building construction. *I/We have inspected every fire dampers installed in the above premises on (completion date of inspection) and hereby certify that all the fire dampers are in safe and efficient working order pursuant to Clause E8.3 of the Code of practice for Fire Safety in Buildings. authorized signatory Signature of registered specialist contractor Certificate of Registration No. : Date of expiry of registration : In accordance with the registration record Enter in the appropriate box * Delete whichever is inapplicable ** Enter the name of the sub-register for the category of specialized work (Rev. 9/2013) - 2 -

(A) Fire Resisting s Building Name a) Fire resisting doorset b) Lift landing door c) Fire resisting glazing ^ ^ ^ d) Fire-stop or sealing system in wall/floor/curtain wall, etc e) Fire dampers Schedule of Building Materials and s Re : (*Address of development site/location of alteration and addition works) Manufacturer and Place of Manufacture (City and Country) Fire Resisting Performance @ (minutes) Integrity Insulation Compliance with Relevant Building Regulations & Codes of Practice f) Others (e.g. proprietary products, fire shutter, etc) @ The performance on stability has to be demonstrated where applicable. ^ Corresponding legend in approved plan should be specified where applicable. Part C of Certificate of Accepted Building Materials and s should be completed by RSC(V). In accordance with the registration record. * Delete whichever is inapplicable. laboratory accreditation body Details of Test or Assessment Report laboratory / assessing organization Date Report no. Date of test / assessment report Validity date Annex A. 1 Remarks/ Comments Signature of authorized person - 1 -

Annex A.2 Schedule of Building Materials and s (cont d) (B) Other Building Materials and s Building Name Manufacturer and Place of Manufacture (City and Country) Compliance with Details of Test or Assessment Report Relevant Building Regulations & Codes laboratory laboratory / Report no. Date of test / of Practice accreditation body assessing organization assessment report Validity date Remarks/ Comments a) Glazing barrier b) Cast iron pipes and fittings c) Others I confirm that the above mentioned building products have been tested or assessed as stated and hereby certify that the application and performance of these products comply with the relevant Building Regulations. Date Signature of authorized person In accordance with the registration record (Rev. 9/2013) - 2 -

Appendix B Certificate of Accepted Building Materials and s for Minor Works Minor works submission no. (if available) : MW Location or address of the minor works (if minor works submission no. is not available): To the Building Authority, Part A : to be certified by the Authorized Person appointed (for minor works with prescribed building professionals appointed) 1. I, (name in full), authorized person, confirm that accepted building materials and products have been specified in the carrying out of minor works in the above-mentioned submission no. Pursuant to section 56 of the Building (Minor Works) Regulation, I duly endorse the attached Schedule of Building Materials and s for Minor Works (Annex B.1 & B.2). 2. I hereby certify that the building materials and products listed in the attached Schedule are acceptable products under relevant building regulations and that I am satisfied with the application and performance of these products. Certificate of Registration No. Date of expiry of Date Signature of authorized person registration Part B : to be certified by the Prescribed Registered Contractor appointed I/We, (name in full), prescribed registered contractor, confirm that the accepted building materials and products listed in the attached Schedule of Building Materials and s for Minor Works (Annex B.1 & B.2) have been used and properly applied in the carrying out of minor works in the above-mentioned submission no. (For minor works without prescribed building professional appointed) Pursuant to section 56 of the Building (Minor Works) Regulation, I/we (name in full), prescribed registered contractor, duly endorse the attached Schedule and hereby certify that the building materials and products listed in the attached Schedule are acceptable products under relevant building regulations and that I am/we are satisfied with the application and performance of these products. Certificate of Registration No. Signature of prescribed registered contractor Date of expiry of Date authorized signatory registration In accordance with the registration record Enter in the appropriate box (Rev. 9/2013)

Schedule of Building Materials and s for Minor Works Annex B.1 (A) Fire Resisting s Building a) Service lift landing door ^ Name Manufacturer & Place of Manufacture (City & Country) Fire Resisting Performance @ (minutes) Integrity Insulation Compliance with Relevant Building Regulations & Codes of Practice laboratory accreditation body Details of Test or Assessment Report laboratory / assessing organization Report no. Date of test / assessment report Validity date Remarks/ Comments b) Fire resisting glazing ^ c) Fire-stop or sealing system in wall, floor, etc. d) Others @ The performance on stability has to be demonstrated where applicable. ^ Corresponding legend in prescribed plans or plans should be specified where applicable. In accordance with the registration record Enter in the appropriate box Date - 1 - Signature of authorized person (for minor works with prescribed building professionals appointed) prescribed registered contractor (for minor works without prescribed building professional appointed)

Schedule of Building Materials and s for Minor Works (cont d) Annex B.2 (B) Other Building Materials and s Building a) Glazing barrier Name Manufacturer & Place of Manufacture (City & Country) Compliance with Relevant Building Regulations & Codes of Practice laboratory accreditation body Details of Test or Assessment Report laboratory / assessing organization Report no. Date of test / assessment report Validity date Remarks/ Comments b) Cast iron pipes & fittings c) Others I/We confirm that the above mentioned building products have been tested or assessed as stated and hereby certify that the application and performance of these products comply with the relevant Building Regulations. In accordance with the registration record Enter in the appropriate box Date Signature of authorized person (for minor works with prescribed building professionals appointed) prescribed registered contractor (for minor works without prescribed building professional appointed) (Rev. 9/2013) - 2 -