Guidance on Critical Path Analysis



Similar documents
Project Planning and Scheduling

Programmes. Unit 3: P lanning construction work processes and efficient use of resources in construction and the built environment.

Goals of the Unit. spm adolfo villafiorita - introduction to software project management

Use project management tools

Leaving Certificate Technology. Project Management. Student Workbook

Critical Path Analysis & PERT Charts (taken from

02 Project planning. There are two approaches to identifying the components of a project: productbased and work- or activity-based.

Operational Research. Project Menagement Method by CPM/ PERT

Chapter 2: Project Time Management

Precedence Diagram Method. CSTM 462 Planning & Scheduling

Leaving Certificate Technology. Project Management. Teacher Notes

A GUIDE TO NETWORK ANALYSIS by MICHAEL C GLEN

Cambridge International AS and A Level Computer Science

Project Time Management

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

CRITICAL PATH ANALYSIS AND GANTT CHARTS

Time Planning and Control

Notes on the Critical Path Method for project planning and management.

25Project management

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

Project Time Management

technical tips and tricks

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

BCS THE CHARTERED INSTITUTE FOR IT BCS HIGHER EDUCATION QUALIFICATIONS. BCS Level 5 Diploma in IT APRIL 2013 IT PROJECT MANAGEMENT EXAMINERS REPORT

Systems Analysis and Design

Project Planning. Lecture Objectives. Basic Reasons for Planning. Planning. Project Planning and Control System. Planning Steps

Network Calculations

Chapter 6: Project Time Management

EdExcel Decision Mathematics 1

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration

ME 407 Mechanical Engineering Design Spring 2016

Scheduling Glossary Activity. A component of work performed during the course of a project.

Lecture 26 CPM / PERT Network Diagram

Review on Using Packages to Enhance the Teaching of Critical Path Networks

Project Scheduling: PERT/CPM

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur

Chapter-6. Developing a Project Plan

A Generalized PERT/CPM Implementation in a Spreadsheet

CSSE 372 Software Project Management: Software Project Scheduling

Priori ty

PROJECT EVALUATION REVIEW TECHNIQUE (PERT) AND CRITICAL PATH METHOD (CPM)

ECDL / ICDL Project Planning Syllabus Version 1.0

Microsoft Project 2010

Scheduling. Anne Banks Pidduck Adapted from John Musser

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MECH 896 Professional Development for MEng Students. Homework Discussion. Scheduling Overview. Winter 2015: Lecture #5 Project Time Management

Project Scheduling: PERT/CPM

A Short Introduction to Project Management

Critical Path Analysis

CRITICAL PATH METHOD (CEE 320 VDC SEMINAR)

Basic CPM Calculations

Gantt Chart/Diagram Excel Template User Guide

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort

Decision Mathematics D1 Advanced/Advanced Subsidiary. Tuesday 5 June 2007 Afternoon Time: 1 hour 30 minutes

Chapter 4: Project Time Management

A-1. Chapter 1. Project planning. Chapter 1. Festo Didactic Mechatronics

Work Breakdown Structure & Schedules

Large Scale Systems Design G52LSS

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose

Unit 1: Project Planning and Scheduling

PERT/CPM. Network Representation:

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY

ECDL / ICDL Project Planning Project Management Software Level 2. Syllabus Version 1.0 (UK)

SE351a: Software Project & Process Management

10 Project Management with PERT/CPM

Project Management Glossary

Project Management Fact Sheet: Developing a Gantt Chart

Project Scheduling. Introduction

Software Engineering. Pert and Gantt exercises. Lecturer: Giuseppe Santucci

Learning Objectives. Learning Objectives (continued) Importance of Project Schedules

Information Technology Solutions

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza

Time Management. Part 5 Schedule Development. Richard Boser

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

Critical Path Method (CPM)

Lecture 6: Project Time Management By: Prof. Lili Saghafi. Information Technology Project Management, Fifth Edition

Chapter 1.7 Project Management. 1. Project financing is one of the step of project management- State True or False

LECTURE 5: SOFTWARE PROJECT MANAGEMENT. Software Engineering Mike Wooldridge

Construction Planning, Equipment and Methods ENGI 8749 Fall Semester, 2008 Tutorial #2 Resource Leveling using MS Project

The work breakdown structure can be illustrated in a block diagram:

Topic: The easiest way to calculate Critical Path, Total Float, Free Float, Early Start, Early Finish, Late Start, and Late Finish.

Aras Corporation Aras Corporation. All rights reserved. Notice of Rights. Notice of Liability

Graphical Project Planning Techniques: An Overview of Gantt, PERT, and CPM Charts Prepared for groups in ECE480 1/6/02, D. Grover

Project Management Chapter 3

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

SECTION CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Scheduling Best Practices

Guidelines for Accessing and Using the VDOT Scheduling Application (Primavera P6)

A Computer Application for Scheduling in MS Project

SCT AND MCAS MIRAMAR FOTS SOUTHERN CALIFORNIA TRACON

Earned Value Analysis Exercise

A. O. Odior Department of Production Engineering University of Benin, Edo State.

CRITICAL PATH METHOD (CPM) SCHEDULES

Level 3 Project management software (PM )

Devising new Software Project Risk Management Model: MARUNA

CPM-200: Principles of Schedule Management

Transcription:

Guidance on Critical Path Analysis OCR GCE in Applied Business Unit F248 (Unit 9): Strategic Decision Making As part of the assessment for Unit F248 Strategic Decision-Making the examination may contain questions concerning critical path analysis. Candidates are likely to be asked one or more of the following: 1. To complete a network diagram from data given in a gantt chart or table 2. To complete a network diagram by filling-in the EST and LFT entries for the remaining nodes 3. To calculate the float time for a given activity 4. To determine the shortest time in which a project can be completed 5. To identify a critical path 6. To analyse a network diagram 7. To evaluate the usefulness of critical path as a decision-making tool. All questions require the candidate to have a sound understanding of the mechanics of critical path analysis in order to access the available marks. In the examination the network diagram will be presented according to common convention: Nodes will be labelled by number and tasks by letter. Nodes will be shown as circles and elapsed time by arrows. The EST (earliest start time for an activity) is to be positioned in the top right quadrant of the node and the LFT (latest finish time) in the bottom right quadrant. In the notation diagram which follows (units in days): The node number is 3. The earliest start time for the following tasks is day 16. The latest finish time for the preceding tasks is day 21. The task which follows node 3 is labelled task D and will take 6 days.

days In the examination the network diagram itself will vary in composition depending on the number, dependence and concurrency of tasks in the project being illustrated. In all cases, however, candidates should be taught to begin by inserting the EST for each task into the appropriate node working in order from left to right. Only when the final node is reached should candidates insert the LFT entries, this time working in order from right to left. The shortest length of time that a project can be completed by is shown in the final node (farthest right). The critical path can be identified by following the path where the EST and LFTs are the same. The formula for calculating the total float for a task is: LFT at end of task duration of task EST at start of task. Worked example: Racoons Restaurant has decided to carry out some market research to find out existing customers and local residents attitudes to the proposed extension of its opening hours. The tasks involved are shown in the table below. Task Description Order/Logic Duration A Plan primary research To be completed first 1 week B Prepare postal questionnaire Start when A is complete 3 weeks C Prepare email survey Start when A is complete 2 weeks D Post questionnaires and wait for replies Start when B is complete 3 weeks E Send email surveys and wait for replies Start when C is complete 3 weeks F Analyse results Start when D and E are complete 4 weeks

Network diagram: Required: (a) Complete the network diagram by inserting the EST (earliest start time) and LFT (latest finish time) for each node on the diagram. (b) Calculate the total float for task C. (c) Identify the critical path. (d) Identify the shortest length of time it can take to complete this market research.

Method: (a) (i) First enter the ESTs for all nodes from left to right beginning with node 1. (ii) Then enter the LFTs for all nodes from right to left beginning with node 6.

(b) Formula for total float for activity C is LFT at end of task C duration of task C EST at start of task C. EST at start of task C Duration of task C LFT at end of task C Total float for activity C is, therefore: 4 2 1 = 1 week (c) The network diagram shows that all nodes have equal EST and LFTs apart from node 4. The critical path is, therefore, A B D F (d) The shortest length of time it can take to complete the market research is shown in the final node, node 6. Shortest time to completion = 11 weeks