7It 21/8-10 1-~ // 88. 6-110 /1j. PMn -3 OGC. IA~/ t6/ 8. cc w/ enclosures: See next page Office: Surname: Date: Office: Surname: PK~~t'zer.



Similar documents
April 15, Dear Dr. Williams:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C November 13, 2012

In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1.

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant

u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

0SEP FPL_ 10 CFR CFR IL

Apr; 1 5, CFR U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C

How To Clean Up A Reactor Water Cleanup

ATTACHMENT I TO IPN RELATED TO LOAD TESTING AND,24 MONTH OPERATING CYCLES

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C March 3, 2011

AoDI. December 9, 2015 NOC-AE CFR U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC

Nuclear Power Plant Electrical Power Supply System Requirements

RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER G: INSTRUMENTATION AND CONTROL

Should you have any questions in regard to this submittal, please contact Ms. Margaret Earle at

This occurrence is considered to be of no significance with respect to the health and safety of the public.

March 31, Dear Mr. Marion:

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

January 3, 2007 EA

July 31, Dear Dr. Biegalski:

Nuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C July 7, 2015

October 22, 2015 EA

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC July 17, 2012

Sara Brock Counsel for NRC Staff

A-Ow INDIA NA MICHIGAN POW!ER. September 18, 2015 AEP-NRC CFR Docket No.:

NRC INSPECTION MANUAL INSPECTION PROCEDURE 88045

NEI 06-13A [Revision 2] Template for an Industry Training Program Description

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

Pressurized Water Reactor B&W Technology Crosstraining Course Manual. Chapter 9.0. Integrated Control System

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC June 16, 2011

Ch. 227 ANALYTICAL X-RAY EQUIPMENT 25

7.1 General Events resulting in pressure increase 5

March 5, 2015 NUCLEAR FUEL SERVICES, INC., LICENSEE PERFORMANCE REVIEW (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT / )

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 22, 2015

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

TABLE OF CONTENT

Enclosed are two minor source permits issued pursuant to our review of your application (Approval Nos & 2196).

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 8.4 (Draft was issued as DG-8036, dated April 2010)

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C June 1, 2005

1 General Responsibility. 1.1 Participants. 1.2 Documentation. 1.3 Lockout/Tagout

GPS BLOCK IIF RUBIDIUM FREQUENCY STANDARD LIFE TEST

Enclosure 3. Reactor Oversight Process Task Force FAQ Log March 18, 2015

WordPerfect Document Compare Summary

MATERIALS LICENSE. 1. Honeywell International, Inc. 3. License Number: SUB-526, Amendment 6-1

October 20, 2004 LOUISIANA ENERGY SERVICES - REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING PLAN

Government Degree on the Safety of Nuclear Power Plants 717/2013

UNIFIED FACILITIES GUIDE SPECIFICATIONS

2. ASTM Standard E , "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels".

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE (Draft was issued as DG-1226, dated August 2009)

March 27, Massachusetts Institute of Technology Research Reactor

Bypass transfer switch mechanisms

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION

TC-9102 Series Surface Mount Temperature Controllers

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, 2014

Dynamic Behavior of BWR

MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4

STATE OF RHODE ISLAND DEPARTMENT OF BUSINESS REGULATION DIVISION OF BANKING 233 RICHMOND STREET, SUITE 231 PROVIDENCE, RHODE ISLAND 02903

The Narragansett Electric Company d/b/a National Grid, Filing to Amend Terms and Conditions for Distribution Service Docket No.

T0118 T2118 T3118. Instruction Manual

SWITCHGEAR. EGP Switchgear

Rev. 02. STD DEP T (Table and Figures 7.6-1, 7.6-2, 7.6-4a) STD DEP (Table and Figures 7.6-1, 7.6-2)

Product Guide. Low voltage grounding system. Answers for industry.

PMLP s Net Metering Procedure

Safety Analysis for Nuclear Power Plants

FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS -

August 15, Docket No License No Control No

Safety Requirements Specification Guideline

Ammonia Detection System Codes and Design Specifications

KRASKIN, LESSE &. COSSON,

318 DECREE. of the State Office for Nuclear Safety of 13 June 2202,

Improving regulatory practices through the OECD-NEA Stress Corrosion Cracking and Cable Ageing Project (SCAP)

Regulatory Guide Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants

DECEMBER 21, Sincerely, Jeffrey D. Wiese Associate Administrator for Pipeline Safety

Understanding Emergency Power Off (EPO)

August 27, Docket No License No Control No

MATERIALS LICENSE. Docket or Reference Number Maximum Amount that Licensee May Possess at Any One Time Under This License: Source

IPX AUTOMATIC IP NETWORK LOSS BACKUP A/B SWITCH INSTRUCTION BOOK IB

Casestudy of conformity of telecommunications terminal equipment in Japan

May 23, 2006 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

L.S. de Carvalho, J. M de Oliveira Neto 1. INTRODUCTION IAEA-CN-164-5P01

Order No. EA RS

Electrical Safety-Related Work Practices; Electric Power Generation, Transmission, and

DEFENSE NUCLEAR FACILITIES SAFETY BOARD

Improving reactor safety systems using component redundancy allocation technique

CODE/NAME ENCL CODE/NAME ENCL

Lockout / Tagout Program

1200 New Jersey Avenue, SE of Transportation Washington, D.C Pipeline and Hazardous Materials Safety. ocr

RADIATION MONITORING SYSTEMS

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Planned and Emergency Utility Outage Guidelines

BWC Division of Safety and Hygiene

How To Write A Contract For Software Quality Assurance

December 26, Docket No License No Control No

Transcription:

_., May 18, 1989 Docket Nos. 50-266 and 50-301 Mr. C.W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 West Michigan Street, oom 308 Milwaukee, Wisconsin 53201 Distribution Docket Files NC PD Local PD PDIII-3 r/f PDIII Gray File MVirgilio PKreutzer WSwenson JHannon OCG-Bethesda DHagan EJordon JPartlow TMeek(8) WandaJones EButcher SNewberry ACS(IO) GPA/PA AM/LFMB Dear Mr. Fay: SUBJECT: AMENDMENT NOS. 121 LICENSE NOS. DP-24 AND 124 AND DP-27 TO FACILITY OPEATING (TAC NOS. 64688/64689) The Commission has issued the enclosed Amendment Nos. 121 and Facility Operating License Nos. DP-24 and DP-27 for the Point Plant, Unit Nos. 1 and 2. The amendments consist of changes to Specifications in response to your application dated January 6, clarified by your letters dated April 14 and May 15, 1987. 124 to Beach Nuclear the Technical 1987, as These amendments incorporate a change to Technical Specification Table 15.4.1-1, "Minimum Frequencies for Checks, Calibrations and Tests of Instrument Channels," clarifying the requirements for reactor coolant flow logic testing. A copy of the Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's next biweekly Federal egister notice. Sincerely, /s/ Warren H. Swenson, Project Manager Project Directorate 111-3 Division of eactor Projects - III, IV, V and Special Projects Office of Nuclear eactor egulation Enclosures: 1. Amendment No. 121 2. Amendment No. 124 3. Safety Evaluation cc w/ enclosures: See next page Office: Surname: Date: Office: Surname: Date: LA/PDIII-3 PK~~t'zer IA~/ t6/ 8 SICB SNeWb rry 5/ /o /88 to DP-24 to DP-27 PMn -3 OGC 21/8-10 1-~ // 88 D/PDII I-3 Hannon 6-110 /1j 7It :3905240397 890518 PD ADOCK 05000266 P PLIC

Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc: Mr. Bruce Churchill, Esq. Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W. Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear oad Two ivers, Wisconsin 54241 Town Chairman -Town of Two Creeks oute 3 Two ivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 egional Administrator, egion III U.S. Nuclear egulatory Commission Office of Executive Director for Operations 799 oosevelt oad Glen Ellyn, Illinois 60137 esident Inspector's Office U.S. Nuclear egulatory Commission 6612 Nuclear oad Two ivers, Wisconsin 54241

o UNITED STATES NUCLEA EGULATOY COMMISSION WASHINGTON, D. C. 20555 0 WISCONSIN ELECTIC POWE COMPANY DOCKET NO. 50-266 POINT BEACH NUCLEA PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPEATING LICENSE Amendment No. 121 License No. DP-24 I. The Nuclear egulatory Commission (the Commission) has found that: A. The application for amendment by Wisconsin Electric Power Company (the licensee) dated January 6, 1987, as clarified by letters dated April 14 and May 15, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CF Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CF Part 51 of the Commission's regulations and all applicable requirements have been satisfied. 6 9 20 4o O K pdi5

0 P4 UNITED STATES NUCLEA EGULATOY COMMISSION Z. WASHINGTON, D. C. 20555 WISCONSIN ELECTIC POWE COMPANY DOCKET NO. 50-301 POINT BEACH NUCLEA PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPEATING LICENSE Amendment No. 124 License No. DP-27 1. The Nuclear egulatory Commission (the Commission) has found that: A. The application for amendment by Wisconsin Electric Power Company (the licensee) dated January 6, 1987, as clarified by letters dated April 14 and May 15, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CF Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CF Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

-2-2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DP-27 is hereby amended to read as follows: B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 124, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications. 3. This license amendment is effective immediately upon issuance. The Technical Specifications are to be implemented within 20 days from the date of issuance. FO THE NUCLEA EGULATOY COMMISSION Attachment: Changes to the Technical Specifications Date of Issuance: May 18, 1989 John N. Hannon, Director Project Directorate 111-3 Division of eactor Projects.- III, IV, V and Special Projects Office of Nuclear eactor egulation

ATTACHMENT TO LICENSE AMENDMENT NOS. 121 AND 124 TO FACILITY OPEATING LICENSE NOS. DP-24 AND DP-27 DOCKET NOS. 50-266 AND 50-301 evise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by amendment number and contains marginal lines indicating the area of change. EMOVE INSET Table 15.4.1-1 (1 of 4) Table 15.4.1-1 (1 of 4)

C: r.. ~... I I C+) C) c--m-i Q..CL o+ o It3 No. MINIMUM FEQUENCIES FO CHECKS, Channel Description 1. Nuclear Power ange 2. Nuclear Intermediate ange 3. Nuclear Source ange 4. eactor Coolant Temperature 5. eactor Coolant Flow 6. 7. 8. 9. Pressurizer Water Level Pressurizer Pressure 4 Kv Voltage Analog od Position TABLE 15.4.1-1 (l of 4) Check S(O)** M*(3)**(4) S(1)** s(1) S N.A. * By means of the movable in-core detector system. CALIBATIONS AND TEST OF INSTUMENT CHANNELS Calibrate D(l)** Q*(3)**(4) N. A. N. A. Test P(2) P(2) M(l)** (2) M**(l ) (2) emar~s (1) Heat Balance (2) Signal to AT; bistable action (permissive, rod stop, trips) (3) Upper and lower chambers for axial off-set (4) Compare incore to excore axial flux difference. ecalibrate( if the absolute difference is greater than or equal to 3 percent. (1) Once/shift when in service (2) Log level; bistable action (permissive, rod stop, trips) (1) (2) (1) (2) Once/shift when in service Bistable action (alarm, trips) Overtemperature-AT Overpower - AT (1) Analog and single loop loss of-flow logic testing. (2) Logic channel testing for reactor trip on loss of reactor coolant flow in both loops shall be performed each refueling interval. eactor protection circuits only (1) With step counters ** Not required during periods of refueling shutdown, but must be performed prior to starting up if it has not been performed during the previous surveillance period. Tests of permissive and low power trip bistable setpoints which cannot be done during power operations shall be conducted prior to startup if not done in the previous two weeks.

0 UNITED STATES NUCLEA EGULATOY COMMISSION WASHINGTON, D. C. 20555 INTODUCTION SAFETY EVALUATION BY THE OFFICE OF NUCLEA EACTO EGULATION ELATED TO AMENDMENT NOS. 121 AND 124 TO FACILITY OPEATING LICENSE NOS. DP-24 AND DP-27 WISCONSIN ELECTIC POWE COMPANY POINT BEACH NUCLEA PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-266 AND 50-301 By letter dated January 6, 1987, Wisconsin Electric Power Company, the licensee for Point Beach Units 1 and 2 proposed a change to the plants' Technical Speci fication Table 15.4.1-1 to increase the period of the logic channel test of the reactor trip resulting from low reactor coolant flow being simultaneously detected in both reactor coolant loops. Specifically, the frequency of logic channel testing for this condition is changed from monthly to each (annual) refueling outage. Supplemental information related to the January 6 letter was provided in a May 15, 1987, letter from the licensee in response to a staff request for additional information. A clarification to the proposed change was made by the licensee in a letter dated April 14, 1987. EVALUATION To protect the core from departure from nucleate boiling (DNB) due to a loss of adequate reactor coolant flow, the Point Beach Units 1 and 2 protection systems include a reactor trip initiated by low reactor coolant flow signals in each reactor coolant loop. Low flow in both loops initiates a reactor trip when the plant is above approximately 10% power (the P-7 interlock setpoint) but less than 50% power. Above approximately 50% power (the P-8 interlock setpoint), low flow in any reactor coolant loop initiates the reactor trip. To develop the signals for the low reactor coolant flow reactor trip, three flow sensing channels are installed in each loop. Each of the instrument channels consists of a flow sensor which provides an input to a bistable. On a low flow condition, the bistable de-energizes a corresponding relay in each of the two protection logic trains. Within each logic train, contacts from the three corresponding relays are combined in two-out-of-three logic to de-energize two parallel relays. Above P-8, the reactor will trip when both parallel relays in either loop de-energize. Above P-7 but below P-8, the reactor will only trip when the parallel relays in both loops de-energize. Currently, under Functional Unit 5 in Table 15.4.1-1 of the plants' Technical Specifications, a monthly logic channel test of the above relays/contacts which initiate the reactor trip on low reactor coolant flow is required. =90524040-/ 890518 PD ADIOCK 0!:5000266 P PDC:

-2- The circuitry (test switches, etc.) used to perform the logic channel test of the relays/contacts was designed to only test the parallel relays associated with one loop at a time. Because of this design, a test of the contacts from the parallel relays which initiate a trip on simultaneous low flow in both loops cannot be performed unless bistables are placed in the trip conditions. Since bistable outputs are shared by both logic trains, this ultimately would lead to a reactor trip since only one reactor trip bypass breaker can be used at a time. Based on this, the licensee has requested that the surveillance interval for the channel logic associated with low flow in both loops be increased from monthly to each refueling outage. The surveillance interval for the logic channel test of the relays/contacts which initiate the trip on low reactor coolant flow in any loop will remain monthly. Since all bistables and relay coils will still be tested monthly, the net effect of the proposed technical specification change would beto increase the risk due to the increased interval (each refueling outage versus monthly) during which operability of the specific relay contacts which initiate the trip on simultaneous low flow in both loops is not demonstrated. Although a numerical quantification of the increase in risk has not been performed, the staff concludes that it would be quite small since the event of concern would require two contact failures (one in each train) between refueling cycles and a loss of flow condition occurring while the reactor is between 10% and 50% power which is, according to the licensee, a rare occurrence. Furthermore, the most likely cause for loss of flow in both reactor coolant loops is due to electrical failure. If the reactor trip on loss of flow in both loops were to fail between 10% and 50% power, backup trips on underfrequency and under voltage remain in effect. Simultaneous loss of flow in both loops due to broken coolant pump shafts or locked-rotor accidents are considered incredible events. Based on this, the staff concludes that a circuit modification to allow at-power testing of the relay contacts which trip the reactor on simultaneous low flow in both loops is not warranted and that the requested technical specification is acceptable. ENVIONMENTAL CONSIDEATION These amendments involve a change in the installation or use of facility component located within the restricted area as defined in 10 CF Part 20 or changes an inspection or surveillance requirement. The staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupa tional radiation exposure. The Commission has previously published a proposed finding that these amendments involve no significant hazards consideration and there has been no public comment on such finding. Accordingly, these amendments meet the eligibility criteria for categorical exclusion set forth in 10 CF 51.22(c)(9). Pursuant to 10 CF 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of these amendments.

-3 CONCLUSION The staff has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations, and the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor: Dated: May 18, 1989 Fred Burrows