1 ENT Submitted: August 10, 2015 Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY Tel John A. Ventosa Site Vice President Administration August 12, 2013 NL U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Rockville Pike, TWFN-2 F1 Rockville, MD United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) ASLBP #: LR-BD01 Docket #: Exhibit #: ENT BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn: Rejected: Stricken: Other: SUBJECT: Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H Indian Point Unit Number 2 License No. DPR-26 REFERENCES: 1. NRC Administrative Letter 97-04, "NRC Staff Approval For Changes to 10 CFR 50, Appendix H, Reactor Vessel Surveillance Specimen 2. ASTM Standard E , "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels". Dear Sir or Madam: Entergy Nuclear Operations, Inc. (Entergy) hereby requests NRC approval of a revision to the reactor vessel surveillance capsule withdrawal schedule pursuant to 10 CFR 50, Appendix H, Section III.B.3 which requires that withdrawal schedules be submitted in accordance with 10 CFR 50.4 and that the proposed schedule must be approved by the NRC prior to implementation. Reference 1 allows NRC approval of the proposed changes to the withdrawal schedule without a license amendment if the changes conform with the American Society for Testing and Materials (ASTM) Standard Practice E (Reference 2). The proposed changes comply with the recommendations of ASTM Standard Practice E as discussed in. Indian Point Unit 2 applied for a twenty year extension to the current operating license which is still under review. This letter proposes to change the surveillance capsule withdrawal schedule to cover the additional twenty year period of extended operation. As a result of this change, Entergy proposes to revise the withdrawal date for the next capsule from the end of life to refueling outage 28, currently scheduled for March This is consistent with the requirements of ASTM E for a sixty year operating period. Additional details are provided in.
2
3 ATTACHMENT 1 TO NL PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE PER 10 CFR 50 APPENDIX H ENTERGY NUCLEAR OPERATIONS, INC. INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO
4 Page 1 of REQUIREMENTS Appendix H of 10 CFR 50 (Reference 1) describes reactor vessel material surveillance program requirements. Paragraph (lll)(b)(3) requires "A proposed withdrawal schedule must be submitted with a technical justification as specified in Section The schedule must be approved prior to implementation." Reference 2 allows NRC approval of the proposed changes to the withdrawal schedule without a license amendment if the changes conform with the American Society for Testing and Materials (ASTM) standard E 185 (Reference 3). 2.0 PROPOSED CHANGES The proposed change revises the withdrawal schedule for one of the surveillance capsules which remain in the reactor vessel by revising the withdrawal date from the end of life to RFO 28 currently scheduled for March It also makes an administrative change to delete the Capsule S note since the 2RFO19 is past. The current schedule and proposed changes are identified in Tables 1 and 2, respectively. The current surveillance capsule withdrawal was submitted by Entergy in references 5 and 6 and it was approved by the NRC in reference 7. Table 1 - Current Withdrawal Schedule Capsule Location Lead Factor Withdrawal Date T End of Cycle 1 Y End of Cycle 2 Z End of Cycle 5 V End of Cycle 8 S Retired in Place ** U* Spare W* End of Life *** X* Spare *The withdrawal schedule of these capsules is interchangeable due to common materials and lead factors. ** Capsule S may be withdrawn during RFO 19 if modified tooling is capable of removing the capsule is available. If not withdrawn, no capsule is required. If withdrawn, testing will be coordinated with industry to optimize the usefulness of the test data. *** At the end of life as currently licensed, Capsule W (or U or X) will be withdrawn. The proposed revised schedule based on a 60 year operating term is provide in Table 2 below and includes a change to the Capsule W withdrawal schedule from End of Life to End of Cycle 28. This revised schedule allows capsule W to be subjected to a fluence which corresponds to the peak vessel fluence at the clad/base metal interface at the end of the 60 year operating term.
5 Page 2 of 4 Table 2 - Proposed Revised Withdrawal Schedule Capsule Location Lead Factor Withdrawal Date T End of Cycle 1 Y End of Cycle 2 Z End of Cycle 5 V End of Cycle 8 S Retired in Place U* Spare W* End of Cycle 28 X* Spare *The withdrawal schedule of these capsules is interchangeable due to common materials and lead factors. The following table provides detailed fluence levels for each of the capsules. Capsule Capsule Lead Withdrawal Withdrawal Capsule Location Factor Outage EFPY (vessel) Fluence (n/cm 2 ) T RFO x Y RFO x Z RFO x V RFO x S Retired in place N/A N/A U* Spare Spare N/A W* RFO28 Approx x EFPY X* Spare Spare N/A Notes: *The withdrawal schedule for these three capsules is interchangeable due to the common lead factor and the common materials in the capsules. 3.0 TECHNICAL ANALYSIS This request proposes to revise the surveillance capsule withdrawal schedule to add the removal and testing of one additional capsule during the period of extended operation when it reaches a capsule fluence of at least one times the peak vessel, end of extended life fluence as required by ASTM E It also administratively deletes the note to capsule S since it was not withdrawn in RFO 19. Removal and testing of one additional capsule during the
6 Page 3 of 4 period of extended operation will provide additional reactor vessel material embrittlement information which will be incorporated into the 10CFR50.61 and Appendix G evaluations. As listed in Table 1 above, Indian Point Unit 2 has previously removed and tested four capsules and has four additional capsules remain in the vessel. However, capsule S has been retired in place since previous attempts to remove this capsule were unsuccessful given its location in the vessel and the adjacent interferences which prevent the capsule removal tool from directly (i.e. vertically) accessing the capsule. The three remaining capsules available for removal are identical in that they contain similar material specimens and similar lead factors and therefore are interchangeable. Based on fluence calculations provided in Reference 4, the Indian Point 2 reactor vessel is projected to reach a peak fluence at the clad/base metal interface of approximately x n/cm 2 (E >1.0 MeV) by the end of extended operation (i.e. 60 calendar years or 48 Effective Full Power Years, EFPY). At the current projected flux for the period of extended operation, the three remaining capsules are projected to reach the vessel peak fluence of x n/cm 2 (E >1.0 MeV) at approximately 40 EFPY. Since the three remaining capsules have a lead factor of approximately 1.2, a capsule fluence of x n/cm 2 (E >1.0 MeV) corresponds to a peak vessel fluence of approximately x n/cm 2 (E >1.0 MeV). Assuming that the duration of future fuel cycles remain constant at approximately 1.81 EFPY per fuel cycle, the fluence for the remaining capsules is projected to reach x n/cm 2 (E >1.0 MeV) at approximately refueling outage 27 (i.e. 2R27). To ensure that the next capsule has been exposed to a minimum of x n/cm 2 (E >1.0 MeV), the proposed schedule will require removal of the next capsule during refueling 28 (2R28) currently scheduled for March 2028 resulting in a capsule fluence of approximately 2.0 x n/cm 2 (E >1.0 MeV). 10CFR50, Appendix H requires that the surveillance capsule program must meet the requirements of the edition of ASTM E 185 that is current on the issue date of the ASME Code to which the reactor vessel was purchased. For IP2, this is the 1966 Edition of ASTM E 185. Appendix H also requires that For each capsule withdrawal, the test procedures and reporting requirements must meet the requirements of ASTM E to the extent practicable for the configuration of the specimens in the capsule. Therefore, for IP2 the surveillance capsule withdrawal schedule is based on the 1966 Edition of ASTM E 185 although the IP2 schedule has been upgraded to meet the requirements of the 1982 Edition of ASTM E 185 to the extent practicable. Since the peak ΔRT PTS increase due to fluence exceeds F, ASTM E 185 requires that five capsules be withdrawn. To date, four capsules have been withdrawn (capsules T, Y, Z and V) with four capsules (i.e. capsules S, U, W and X) remaining in the vessel. Capsule W is currently scheduled to be the fifth capsule and therefore satisfy the withdrawal requirements of ASTM E 185.
7 Page 4 of REFERENCES CFR 50, Appendix H, "Reactor Vessel Material Surveillance Program Requirements." 2. NRC Administrative Letter 97-04, "NRC Staff Approval For Changes to 10 CFR 50, Appendix H, Reactor Vessel Surveillance Specimen Withdrawal Schedules," dated September 30, ASTM Standard E185-82, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels". 4. WCAP NP, Indian Point 2 Heatup and Cooldown Limit Curves for Normal Operation, Revision 0 dated January Entergy letter NL , Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50, Appendix H, dated March 4, Entergy letter NL , Revised Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50, Appendix H, dated March 8, NRC Letter, Indian Point Nuclear Generating Unit No. 2 Reactor Vessel Surveillance Capsule Withdrawal Schedule Change (TAC No. ME3477), Dated March 15, 2010.
NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63
CAROLINA POWER & LIGHT COMPANY NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE 1. The Nuclear Regulatory Commission
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. November 13, 2012
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 13, 2012 Vice President, Operations Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station P.O. Box 250 Governor
Criteria for Development of Evacuation Time Estimate Studies
United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc. In the Matter of: (Indian Point Nuclear Generating Units 2 and 3) ASLBP #: 07-858-03-LR-BD01 Docket
1J,4Zc6 * CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT 06424-3099
* CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT 06424-3099 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
CODE/NAME ENCL CODE/NAME ENCL
CATEGORY REGULORY INFORMATION DISTRIBUTi SYSTEM (RIDS) ACCESSION NBR:9804140321 DOC.DATE: 98/04/06 NOTARIZED: NO DOCKET # FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co. 05000269 50-270 '0conee
New Trustee for NFS Standby Trust Agreement
-- -~-... -..._,_ TM ---===ail NUCLEAR FUEL SERVICES, INC.. 1205 banner hill road erwin, tn 37650 phone 423.743.9141 a BWX Technologies. Inc. company Director Office of Nuclear Material Safety and Safeguards
MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4
NRC FORM 374 U.S. NUCLEAR REGULATORY COMMISSION Page 1 of 8 Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974 (Public Law 93-438), and Title 10, Code of Federal
ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE 6901 WISCONSIN AVENUE BETHESDA, MARYLAND 20669 5603
ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE 6901 WISCONSIN AVENUE BETHESDA, MARYLAND 20669 5603 March 23, 2016 U.S. Nuclear Regulatory Commission Document Control Desk 115 5 5 Rockville Pike Rockville,
A-Ow INDIA NA MICHIGAN POW!ER. September 18, 2015 AEP-NRC-201 5-86 10 CFR 50.90. Docket No.: 50-315
INDIA NA MICHIGAN POW!ER A unit of American Electric Power indiana Michigan Power Cook Nuclear Plant One Cook Place Indiana MichiganPower.com September 18, 2015 AEP-NRC-201 5-86 10 CFR 50.90 Docket No.:
MATERIALS LICENSE. Docket or Reference Number 40-9089 Maximum Amount that Licensee May Possess at Any One Time Under This License: Source
PAGE 1 OF 6 PAGES Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974 (Public Law 93-438), and the applicable parts of Title 10, Code of Federal Regulations, Chapter
In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1.
Jon A. Franke Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 [email protected] TALEN ~ ENERGY SEP 2 1 2015 U.S. Nuclear Regulatory
REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL CONTROL AND ACCOUNTING SYSTEMS FOR NUCLEAR POWER PLANTS
U.S. NUCLEAR REGULATORY COMMISSION June 2013 Revision 2 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL
[Docket No. FAA-2009-0136; Directorate Identifier 2008-NM-171-AD; Amendment 39-16022; AD 2009-19-05]
[Federal Register: September 22, 2009 (Volume 74, Number 182)] [Rules and Regulations] [Page 48138-48141] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr22se09-2] DEPARTMENT
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction
NUCLEAR REGULATORY COMMISSION [EA-14-193; NRC-2015-0289] In the Matter of Northern States Power Company, Minnesota
This document is scheduled to be published in the Federal Register on 01/11/2016 and available online at http://federalregister.gov/a/2016-00322, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION
Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA
Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA ASME Vice President, Conformity Assessment and Vice Chairman of Committee on Nuclear Certification 2nd NRC Workshop on Vendor
ORNL/TM-2004/44 ARN-Atucha-I Reactor Pressure-Vessel Embrittlement March 2004 Jy-An Wang
Prepared by DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge: Web site: http://www.osti.gov/bridge Reports
ARE VA AREVA INC. August 31, 2015 NRC:15:035. U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852
A ARE VA August 31, 2015 NRC:15:035 U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Request for Review and Approval of ANP-10337P, "PWR Fuel Assembly Structural
NEI 06-13A [Revision 2] Template for an Industry Training Program Description
NEI 06-13A [Revision 2] Template for an Industry Training Program Description NEI 06-13A [Revision 2] Nuclear Energy Institute Template for an Industry Training Program Description ACKNOWLEDGEMENTS This
MATERIALS LICENSE. 1. Honeywell International, Inc. 3. License Number: SUB-526, Amendment 6-1
NRC FORM 374 U.S. NUCLEAR REGULATORY COMMISSION Page 1 of 5 Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974 (Public Law 93-438), and Title 10, Code of Federal
This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and
This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and suppliers. It is transmitted to you in confidence and trust,
Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 37
Vito A. Kaminskas Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.6515 Fax: 734.586.4172 Email: [email protected] DTE Ensergy- 10 CFR 54 September 24,
Licensing a Repository at Yucca Mountain
2008 Licensing a Repository at Yucca Mountain DOE PROJECTED SCHEDULE FOR LICENSING A GEOLOGIC REPOSITORY Churchill County Nuclear Waste Oversight Program 85 North Taylor St., Fallon, NV 89406 Licensing
Crystal River Unit 3 License Transfer Notification of Transfer Date
Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 Docket 50-302 Operating License No. DPR-72 10 CFR 50.90 October 05, 2015 3F1015-01 U.S. Nuclear Regulatory Commission Attn:
October 1, 2015. Exemption No. 11797A Regulatory Docket No. FAA 2015 1053
October 1, 2015 Mr. Jeffrey J. Antonelli Counsel for Leading Edge Technologies, Inc. Antonelli Law 100 North LaSalle Street, Suite 2400 Chicago, IL 60602 Dear Mr. Antonelli: Exemption No. 11797A Regulatory
March 25, 2015. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426
March 25, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Tuscarora Gas Transmission Company 700 Louisiana Street, Suite 700 Houston,
AoDI. December 9, 2015 NOC-AE-1 5003318 10 CFR 50.90. U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Nuclear Operating Company South Texas Project Electric Generating Station PO. Box 289 W/adsworth, Texas 77483 v/v - December 9, 2015 NOC-AE-1 5003318 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attention:
DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)
U.S. NUCLEAR REGULATORY COMMISSION October 2006 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 DRAFT REGULATORY GUIDE Contact: W.S. Raughley (301) 415-7577 DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision
A Regulatory Approach to Cyber Security
A Regulatory Approach to Cyber Security Perry Pederson Security Specialist (Cyber) Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 1 Agenda Overview Regulatory Framework
NUCLEAR REGULATORY COMMISSION. [Docket Nos. 50-382; NRC- 2015-0205] Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3
This document is scheduled to be published in the Federal Register on 09/08/2015 and available online at http://federalregister.gov/a/2015-22553, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION
SMitsui USA. Aug 6, 2001
SMitsui USA To: Nuclear Regulatory Commission Office of International Programs Attn: Ms. Betty Wright CC: Ms. Carlotta Coates, Ms. Janis Owens Mitsui & Co. (U.S.A.), Inc. Corporate Headquarters Tel (212)878-4131
NRC INSPECTION MANUAL INSPECTION PROCEDURE 88045
NRC INSPECTION MANUAL INSPECTION PROCEDURE 88045 NMSS/FCSS EFFLUENT CONTROL AND ENVIRONMENTAL PROTECTION PROGRAM APPLICABILITY: 2600 88045-01 INSPECTION OBJECTIVES The objectives of this procedure are
Westinghouse. Westinghouse Electric Company
Westinghouse Nuclear Power Plants Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Directtel: 412-374-6202 ATTENTION: Document Control
August 24, 2009 NRC INSPECTION REPORT 99901364/2009-201 AND NOTICE OF VIOLATION TO JAPAN STEEL WORKS
August 24, 2009 Mr. Masanobu Maruoka, Deputy Manager Quality Assurance Group JSW, LTD. 4, Chatsumachi, Muroran Hokkaido, Japan 051-08505 SUBJECT: NRC INSPECTION REPORT 99901364/2009-201 AND NOTICE OF VIOLATION
Risk Evaluation and Mitigation Strategies: Modifications and Revisions Guidance for Industry
Risk Evaluation and Mitigation Strategies: Modifications and Revisions Guidance for Industry The portion of this guidance document setting forth the submission procedures for risk evaluation and mitigation
Annex B. The Proposed Amendments AMENDMENTS TO NATIONAL INSTRUMENT 21-101 MARKETPLACE OPERATION
Annex B The Proposed Amendments AMENDMENTS TO NATIONAL INSTRUMENT 21-101 MARKETPLACE OPERATION 1. National Instrument 21-101 Marketplace Operation is amended by this Instrument. 2. National Instrument
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
NRCR000161 Submitted: August 10, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) ENTERGY NUCLEAR OPERATIONS, INC. ) Docket
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. March 3, 2011
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 3, 2011 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick,
A Role-Based Access Control (RBAC) Schema for REAP
ORNL/TM-2013/45085 A Role-Based Access Control (RBAC) Schema for REAP September 2013 Prepared by H.B. Klasky, P.T. Williams, S.K. Tadinada, B.R. Bass ORNL DOCUMENT AVAILABILITY Reports produced after January
Rules on Southern Companies Energy Auction Participation
Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies
Quality Management System-A Revision 7 (NRC-approved Version)
Westinghouse Non-Proprietary Class 3 2013 Westinghouse Electric Company LLC. All Rights Reserved. Quality Management System-A (NRC-approved Version) Westinghouse Electric Company Quality Management System
78776 Federal Register / Vol. 80, No. 242 / Thursday, December 17, 2015 / Notices
78776 Federal Register / Vol. 80, No. 242 / Thursday, December 17, 2015 / Notices Title: Hexavalent Chromium (Cr(VI)) Standards for General Industry (29 CFR 1910.1026), Shipyard Employment (29 CFR 1915.1026),
NUCLEAR REGULATORY COMMISSION. [Docket No. 04000341; NRC-2014-0231] Defense Logistics Agency; DLA Strategic Materials
[7590-01-P] NUCLEAR REGULATORY COMMISSION [Docket No. 04000341; NRC-2014-0231] Defense Logistics Agency; DLA Strategic Materials AGENCY: Nuclear Regulatory Commission. ACTION: License amendment application;
2880 International Circle Colorado Springs, CO 80910 Telephone 719-327-2880. Executive Summary. 2011 Pikes Peak Regional Building Code Revisions
2880 International Circle Colorado Springs, CO 80910 Telephone 719-327-2880 Web address www.pprbd.org Executive Summary 2011 Pikes Peak Regional Building Code Revisions October 21 st 2015 This document
u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing
I u gust 23, 1983 Docket No. 50-293 Mr. William D. Harrington Senior Vice President, Nuclear 800 Boylston Street Boston, Massachusetts 02199 Dear Mr. Harrington: The Commission has requested the Office
August 15, 2007. Docket No. 03036490 License No. 45-30875-01 Control No. 140749
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 15, 2007 Docket No. 03036490 License No. 45-30875-01 Control No. 140749 Frans A.
Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors DC/COL-ISG-020
Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors DC/COL-ISG-020 1.0 Purpose For the licensing process in Title 10 of the Code of
Regulatory Guide 1.169 Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants
Regulatory Guide 1.169Configuration Managemen... Page 1 of 10 September 1997 Regulatory Guide 1.169 Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power
Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.
Exelon Generation 200 Exelo11 Way Kennett Square. PA 19348 www.pxeloncoroi.c cm 10 CFR 50.55a August 13, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Peach
Part 1 General and Administrative Information. Part 3 Applicant s Environmental Report Combined License Stage
Part 16 South Carolina Electric and Gas V. C. Summer Nuclear Station, Units 2 & 3 COL Application COLA Table of Contents Navigation Page Part 1 General and Administrative Information Part 2 Final Safety
Standard CIP 003 1 Cyber Security Security Management Controls
A. Introduction 1. Title: Cyber Security Security Management Controls 2. Number: CIP-003-1 3. Purpose: Standard CIP-003 requires that Responsible Entities have minimum security management controls in place
July 31, 2015. Dear Dr. Biegalski:
July 31, 2015 Dr. Steven Biegalski, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Rd, Bldg 159 Austin, Texas 78758 SUBJECT: UNIVERSITY OF TEXAS AT AUSTIN
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008
Mr. Larry Meyer Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 December 10, 2008 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008404(DRS); 5000301/2008404(DRS)
LETTER OF TRANSMITTAL
LETTER OF TRANSMITTAL This letter of transmittal (this Letter of Transmittal ), together with the exchange forms attached hereto (each, an Exchange Form, ), relate to the offer to deliver (the U.S. Exchange
TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES
TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES Approved By: Senior Manager: Mpho Phaloane Created By: Field Manager: John Ndalamo Date of Approval:
Deregulation, Consolidation, and Efficiency: Evidence from U.S. Nuclear Power
ONLINE DATA APPENDIX Deregulation, Consolidation, and Efficiency: Evidence from U.S. Nuclear Power Lucas W. Davis UC Berkeley and NBER Catherine Wolfram UC Berkeley and NBER February 2012 This study is
SWITCH KIT. Switching is as easy as 1-2-3
SWITCH KIT Switching is as easy as 1-2-3 1. Open up a checking and/or savings account 2. We will help you complete the necessary forms to have your automatic deposits and withdrawals switched to your new
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001. July 7, 2015
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 July 7, 2015 Mr. Randall K. Edington Executive Vice President Nuclear and Chief Nuclear Officer Arizona Public Service Company P.O.
EXHIBIT A. Rule Asset Duration/ Close Time Action Effective Date
EXHIBIT A Rule Asset Duration/ Close Time Action Effective Date 1.1 Definitions N/A Add definitions for Foreign Bank and Correspondent Account; remove subsection indexing 3.1 Trading Members Applications,
Fission fragments or daughters that have a substantial neutron absorption cross section and are not fissionable are called...
KNOWLEDGE: K1.01 [2.7/2.8] B558 Fission fragments or daughters that have a substantial neutron absorption cross section and are not fissionable are called... A. fissile materials. B. fission product poisons.
NRC INSPECTION MANUAL
NRC INSPECTION MANUAL NSIR/DPR INSPECTION PROCEDURE 71114.02 ALERT AND NOTIFICATION SYSTEM EVALUATION PROGRAM APPLICABILITY: 2515 71114.02-01 INSPECTION OBJECTIVE To evaluate the licensee s compliance
U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls
U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN NUREG-0800 BRANCH TECHNICAL POSITION 7-14 GUIDANCE ON SOFTWARE REVIEWS FOR DIGITAL COMPUTER-BASED INSTRUMENTATION AND CONTROL SYSTEMS REVIEW RESPONSIBILITIES