Antamina Closure Plan: A Top Level Practice. Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010



Similar documents
Water resources management at the mining industry in Chile

Earthworks Fact Sheet: Hardrock Mining and Acid Mine Drainage. pubs/fs_amd.pdf

Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know!

WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE

UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Summary of Commitments

Proposed Terms of Reference for EIA studies

COVER SYSTEMS FOR MINE CLOSURE AND REHABILITATION TWO CASE STUDIES

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa

RESEARCH ON GEOTECHNICAL EARTHQUAKE IN THE HUMAN SETTLEMENT OF LIMA-PERU RICARDO PALMA UNIVERSITY FACULTY OF ENGINEERING

Mine Plan of Operations Reclamation Bond Checklist

Inovagri: International Workshop on Technology Innovations in Irrigation Theme 2, Round Table 4: Engineering of Land Drainage

Golder Associates Profile

MANAGEMENT STANDARD CLOSURE PLANNING

How To Conduct An Environmental Impact Assessment

Minerals production in Hungary (Mtons) - source: Hungarian Office for Mining and Geology

Proposed Cerro Blanco Mining Project Preliminary Comments On the Environmental Impact Analysis. 25July 2012 Wheat Ridge, CO USA

BUSINESS PLAN FOR THE MINERAL PROJECT FOR [NAME(S) OF PERIMETER(S)] SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES/RWANDA

COAL SERVICES AUSTRALASIA

PROCESL, Engenharia Hidráulica e Ambiental, Lda.

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.

Environmental Impact Assessment Systems in Latin America and the Caribbean 1,2

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ENERGY LANDSCAPES IN CASTILLA Y LEON. Abstract: The development of renewable energy is a key factor in the changing landscape of Castilla y Leon

Food Security and Water in Central America in the context of Climate Change: Maureen Ballestero Chair GWP Costa Rica

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

PROPOSED TERMS OF REFERENCE

PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY

Environmental risk managements of mine wastes (from planning to aftercare) Marja Liisa Räisänen ELY-centre for Kainuu

edms 5. THAILAND 5.1 Water Resources Management Policies and Actions

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

GUIDE TO THE MINE APPROVAL PROCESS IN NEW BRUNSWICK

Massive Landslide of Waste Pile Site at Veladero in Argentina (Barrick Gold)

2.2. Hazards in mining and steps in risk assessment


720 Contour Grading. General. References. Resources. Definitions

Environmental Policy (English Version)

Experiences in the application of Espoo Convention Spain

PARAMOS Enhancing capacities and coordination to cope with climate change effects

Avison Management Services Ltd. COMPANY PROFILE

CHILE. Investment projects portfolio. Foreign Investment Committee

Presentation from the 2013 World Water Week in Stockholm

Expectations and Future Direction of MOP Guidelines Matthew Newton, Principal Officer Rehabilitation Standards Division of Resources & Energy

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

recursos naturales e infraestructura

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

PROPOSED TERMS OF REFERENCE

Mizuho Bank. Environmental and Social Checklist (Mining)

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

RESUME Lee A. Knuppel, P.E.

Proposed Terms of Reference for EIA studies

Technical Note 4 A Comparison of Indemnity and Index Insurances. Insurance for Climate Change Adaptation Project

MINERALS LAW OF MONGOLIA June 5, 1997 Ulaanbaatar CHAPTER ONE. General Provisions

Plan Requirement Guidance for Quartz Mining Projects

Water Security Agency. Plan for saskatchewan.ca

EUROPARC-Spain and the Spanish system of Protected Areas

Candelaria and Ojos del Salado Chile

Water resources. The main problems of pollution that need to be addressed in the country are the following:

Sustainability courses available at Florida State University

Adaptive Management Measures under the Canadian Environmental Assessment Act

Re: Teck Frontier Oil Sands Mine Project: Responses to Supplemental Information Requests (SIRs)

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Natural Resource Management Profile

Incident Reporting Requirements

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

The Wismut Rehabilitation Project: Present State, Outlook and Lessons Learned

Historical Background of the Operation, Closure and Monitoring of Andra s CSM Disposal Facility

Case study from Ukraine

EN Official Journal of the European Union L 102/15

How To Manage Water Resources

United States-Peru Environmental Cooperation Work Program

Tailings Management at Porgera

Section 25.2 provides an overview of the area of influence and reviews legal and other requirements relevant to closure (1).

Disaster Management Cycle

Environmental aspects of water fluoridation

E&P in Brief. A Wintershall Fact Sheet. Wintershall in Argentina. Annual production in Argentina approx. 25 million barrels of oil equivalent

GoldSim: Engineering and Environmental Simulation Software for the Mining Industry

Alternatives in water resources management in Marina Baja district (Alicante province, Spain)

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Project Management Institute (PMI); member number International Mine Water Association (IMWA); member number 804

APPENDIX I. (See Paragraph-6) FORM 1

2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant.

Water remediation: Passive Treatment Technologies

Transcription:

Antamina Closure Plan: A Top Level Practice Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010

Content Evolution of Environmental Regulation Closure Process Antamina Closure

Evolution of Environmental Regulation

Current Regulation Peruvian Environmental Regulatory Development Ley de Áreas Naturales Protegidas / Orgánica para el aprovechamiento sostenible de los recursos naturales Ley del Sistema Nacional de Evaluación y Fiscalización Ambiental (SINEFA) / Rgto. de la Ley del SNEIA / Política Nacional del Ambiente Environmental Code Ley de Tierras Ley Gral. de RRSS ECA s Aire Ley del Sistema EIA (SNEIA) Ley Gral. del Patrimonio Cultural de la Nación Ley General del Ambiente Law establishing the Ministry of Environment / National Water Authority / Implement Water% Air Quality Standards Nueva Ley de Recursos Hídricos / Implementan ECA s Agua Reglamento Ley de Recursos Hídricos 1990 1993 1996 1998 2002 2003 2005 2007 2008 2009 2010 Reglamento Ambiental de Actividades Minero metalúrgicas LMP para efluentes y emisiones mineras (2010) Reglamento Ambiental Actividades de Exploración Minera (2008) Public Participation Regulations (2008) Compromiso Previo con el Desarrollo Sostenible / Mine Closure Law Mine Closure Regulations / Environmental Legacies New regulation for Closure Plan and Mining Exploration Fiscalización Minera OSINERGMIN (2010) Medidas para Remediación Ambiental New Maximum Permissible Limits for mining effluents OEFA Environmental Regulatory Development in the Mining Sector

Environmental management in mining Monitoring Preliminary Environmental Assessment - EVAP Creation of the Adjustment Programme and Environmental Management Presentation and approval of PAMA Mining PAMA Mining PEMA Running of PAMA in smelters and refineries Environmental Impact Assessment Closure Plans Public Participation New Maximum Permissibble Limits for mining effluents 1993 1994 1995 1997 1999 2001 2003 2005 2007 2009 1996 1998 2000 2002 2004 2006 2008 2010 Life of mine

Closure Process

Closure Regulation According to Closure Regulation each mine must choice Authorized Consultant to develop a closure plan Klohn Crippen Berger Consultants elaborated the Antamina Closure Plan DS No. 039-2005-MEM/AAM.

Closure Objectives Safety for local people Geotechnical Stability for mining facilities; Reclamation of landscape Water protection of receiving water from mining process Post closure land uses as comparable as preoperational uses

Main Steps of Closure Closure plan has these main steps: i) Progressive Closure, during the life of mine; ii) Temporary Closure, in case of temporary stop of activities. iii) Final Closure, Activities to guarantee the best performance when the mining activities ceased. iv) Post - Closure, Monitoring of performance after closure. No less than five years.

Objectives of Closure The Final Closure objective is to recovery all the impacted areas and check the following items: a) Physical Stability in Long Term. b) Chemical Stability in Long Term. c) Reclamation of impacted areas. d) Alternative uses of recovery areas of facilities. e) Evaluate the future options of recovery area and facilities.

Peruvian regulation about Closure Guarantees According to the Mine Closure Regulation, financial guarantees for the closure plan are: a) Letters of guarantee or other equivalent financial mechanisms b) Bond Policies and other insurance, without benefit of discussion, issued by top level national or foreign entities c) Third-party joint bond d) A combination of these.

Antamina Closure Plan

Antamina Location Punta Lobitos Minesite Mine site : Located in the Peruvian Andes, Callejón de Conchucos, district of San Marcos, province of Huari, region of Ancash. 270 Km. North-east of Lima. Lima Altitude: 4100 to 4700 meters above sea level. Port Facility: Punta Lobitos Pacific Coastline 300 km North of Lima.

Project History Long history of artisan mining operation 1996 Privatization process 1996 Exploring Assessment 1997 Metallurgical Pilot Plan 1998 Project Start Up 2001 Operations begins - May 2001 Commercial Goal October

Main Closure objectives The closure goals include: General Accomplish of Peruvian regulation. Accomplish of additional EIA commitments Accomplish of additional commitments with communities and other third parties. As far as possible, the design of the closure plan will offer a "passive" closure condition and will minimize the care and maintenance requirements to.

Closure Criteria Open Pit The pit will not be filled out at closure. Waste Rock Dump Rock dump overall slope should be stable in the long term. Tailings Dam Verify that the slope stability of the dam is sufficient to withstand the maximum credible earthquake. Criterion for the Geochemical Stabilization The objectives of water quality for site effluents are the maximum permissible levels of mining effluent discharge, set out in the effective legislation.

Closure Criteria Criteria for Revegetation Revegetation is carried out according to defined land use at closure. Criteria for Aquatic Habitat Rehabilitation Maintain the quality of surface water bodies located near the project area. Social Programs Includes the development of optimal social programs in order to mitigate and / or prevent potential negative social impacts related to project closure. Community participation in the implementation of land use at closure is important to ensure sustainability of the ecological environment.

Closure Criteria Table 1.8 Design criteria for physical stability

Closure Criteria Criteria for Revegetation We will be able to update the water Quality standards according to new regulation

Post-Closure Criteria Criteria for Post-Closure stage Implementing monitoring programs of surface water and groundwater. Passive maintenance of reshaping works after the first rainy season. Surveillance of the study area during the monitoring and maintenance. Social monitoring of the surrounding communities and the radius of influence of the study area. Evaluation of environmental quality results in soil and water components after the first year of remediation of environmental legacies.

Antamina approach Antamina is developing the following researches: Waste Rock Research In collaboration with The University of British Columbia and Teck. Geochemical and hydrological behavior of waste rock. Antamina has implemented a research with field experimental waste rock piles and field cells under site conditions. Input to improve the waste management during the operational activities. Cover Study Research To identify the most efficient cover to reduce the oxygen diffusion and water infiltration. Test Plots Study To identify the best option for revegetation using the less tick of top soil to be used during closure

Waste Rock Study

Test Plot

Antamina approach To prevent failures in the closure plan, Antamina has decided to: Identify the components of greatest impact on the closure plan: Tailings dam Physical impact / Chemical impact Waste Dumps Physical impact / Chemical impact Open pit Physical impact / Chemical impact Develop studies and activities required to manage the physical impact: likely to be built and maintained in the long term. Develop self-research to control the chemical impact of the closure plan. Confirm the sustainability of activities in the long term.

Closure Components

Financial Guarantee of Closure According to the Mine Closure Law It is the duty of the mining companies to provide financial guarantees for the closure of mines.