Human Factors in Design and Construction Regulatory Perspective



Similar documents
IAEA Safety Standards for Regulatory Activities

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006

Ensuring Quality Going Down the Supply Chain

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY

C-41 (May 13) Procurement Engineering and Supply Chain Guidelines in Support of Operation and Maintenance of Nuclear Facilities

Olkiluoto 3 Experience

INTEGRATED REGULATORY REVIEW SERVICE (IRRS)

ENEC Management System and Quality Assurance Program

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G A, Appendix A, )

Office for Nuclear Regulation

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

NOT PROTECTIVELY MARKED

ASTRAZENECA GLOBAL POLICY QUALITY AND REGULATORY COMPLIANCE

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

Executive Director for Operations AUDIT OF NRC S CYBER SECURITY INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS (OIG-14-A-15)

US-APWR Human Performance Monitoring Implementation Plan

SCHOOL OF NUCLEAR KNOWLEDGE MANAGEMENT

Human Resource Management in Nuclear Safety

AP1000 European 18. Human Factors Engineering Design Control Document

Safety Analysis for Nuclear Power Plants

IAEA-TECDOC Effective corrective actions to enhance operational safety of nuclear installations

Technical Meeting on Fire Protection Approaches and Experiences in Nuclear Power Plants

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013

CORDEL Cooperation in Reactor Design Evaluation and Licensing

How To Write A Contract For Software Quality Assurance

MDEP Generic Common Position No DICWG 02

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

Announcement of a new IAEA Co-ordinated Research Programme (CRP)

ENIQ position on. NDE Personnel Re-qualification or a Need to Maintain Proficiency. ENIQ publication no. 49. December 2014

Options for Cyber Security. Reactors. April 9, 2015

Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system

NRC INSPECTION MANUAL

Licensing Process for New Nuclear Power Plants in Canada. INFO-0756 (Revision 1)

Regulatory Requirements and Licensing of OPG s DGR Project

Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities. IAEA Headquarters Vienna, Austria

Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2

IAEA-TECDOC Training the staff of the regulatory body for nuclear facilities: A competency framework

Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director

ABSTRACT. The Guidelines Section A is related to the general requirements of NSQ100 (Chapters 0, 1, 4, 5 and 6). Summary

STS Federal Government Consulting Practice IV&V Offering

Safety Analysis Probabilistic Safety Assessment (PSA) for Nuclear Power Plants REGDOC-2.4.2

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

International Conference on Human Resource Development for Nuclear Power Programmes: Building and Sustaining Capacity

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI

DRAFT REGULATORY GUIDE

How To Decommission A Nuclear Plant

Regulatory Information and Data Quality Assurance Policy

DIRECTIVE TRANSMITTAL

Quality Management System-A Revision 7 (NRC-approved Version)

IMPLEMENTING THE REGULATORY AUTHORITY INFORMATION SYSTEM (RAIS)

Environmental Protection Policies, Programs and Procedures at Class I Nuclear Facilities and Uranium Mines and Mills

The Role of Nuclear Knowledge Management

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

The World Nuclear Supply

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

RENCEE SAFETY MARIES

SAFETY SOFTWARE QUALITY ASSURANCE FUNCTIONAL AREA QUALIFICATION STANDARD. DOE Defense Nuclear Facilities Technical Personnel

IAEA-TECDOC-1328 Solutions for cost effective assessment of software based instrumentation and control systems in nuclear power plants

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

NNB GENERATION COMPANY LTD

TYPES OF REGULATORY DOCUMENTS

IAEA-TECDOC Assuring the competence of nuclear power plant contractor personnel

NRC INSPECTION MANUAL INSPECTION PROCEDURE 88045

Quality Assurance Program Plan. July U.S. Department of Energy Office of Legacy Management

How To License A Nuclear Plant

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR)

Implementation of a Quality Management System for Aeronautical Information Services -1-

Business Management System Manual. Context, Scope and Responsibilities

Training in Emergency Preparedness and Response

REGULATORY GUIDE (Draft was issued as DG-1207, dated August 2012)

Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA

Government Degree on the Safety of Nuclear Power Plants 717/2013

Joint ICTP-IAEA School of Nuclear Energy Management November Nuclear Security Fundamentals Module 9 topic 2

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls

Safety Culture and Organizational Change Management

ISO 14001:2004 vs. ISO 14001:2015

Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents

English text only NUCLEAR ENERGY AGENCY COMMITTEE ON NUCLEAR REGULATORY ACTIVITIES

SAFETY and HEALTH MANAGEMENT STANDARDS

Regulatory Guide Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants

8 Emergency Operating Procedures (EOPs) and Severe Accident Management Guidelines (SAMGs) - Issue 06

Security and Safeguards Considerations in Radioactive Waste Management. Canadian Nuclear Safety Commission

Committed to Environment, Health, & Safety

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, November 2011

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

ABOUT CLP. CLP Group HSSE Management System Standard About CLP

Issue No. 02 BOBS May, 2008 Effective Date: UNCONTROLLED WHEN DOWNLOADED/PRINTED

QUALITY ASSURANCE GUIDE FOR PROJECT MANAGEMENT

Transcription:

Further needs in the Area of management systems Safety culture, leadership and preoperational stages of nuclear projects Human Factors in Design and Construction Regulatory Perspective Technical Meeting, 3 April 2008, Vienna Adriana Nicic, RAS, IAEA

Overview Human Factors (HF) Program Management System and Human Factors Program HF in NPP life cycle Regulatory Oversight of HF Programmes Regulatory challenges Conclusions

Human Factors Program There are many factors influencing Human Performance in a complex system Human Factors factors that influence human performance as it relates to the safety of a nuclear facility or activity throughout the lifecycle of the facility

Goal of the Human Factors Program To ensure that licence applicants and licensees minimize the potential for human error by addressing factors that may influence human performance

Elements of Human Factors Program Human Factors (HF) Programs are one of the safety areas/ elements considered by regulators Regulatory requirements/ guidance and criteria should exist Establishment of HF program should be accompanied by adequate Human Performance programs IAEA Safety Standards do not prescribe the elements of HF program There is a general consensus regarding the elements of a HF program, but regulatory requirements are country specific

Elements of Human Factors Program- US NRC Human Factors Engineering Program Management Operating Experience Review Functional Requirements Analysis and Function Allocation Task Analysis Staffing and Qualifications Human Reliability Analysis

Elements of Human Factors Program - US NRC Procedure Development Training program Development Human-System Interface Design Human Factors Verification and Validation Design Implementation Human performance Monitoring

Elements of Human Factors Program - CNSC Organizational and management structures, policies and programs Allocation of functions between humans and automation User interface design Staffing and job design Shift work systems

Elements of Human Factors Program - CNSC Design of written procedures Physical work environment Human reliability Event investigation and root cause analysis (human performance focused) Training Safety Culture

Management System and Elements of Human Factors Program Quality Assurance and Management System requirements contain many Human Factors related elements: Organizational aspects, roles and responsibilities Training, qualification, competence Safety Culture Human Performance Communication Management of organizational changes

Management System and Elements of Human Factors Program Regulations and licence / licence conditions contain references to specific QA/ management systems (e.g. ISO, GS-R-3, national / industry QA, etc) In general, HF programmes elements are contained in the regulations in more general terms (e.g. sufficient number of qualified personnel, fitness for duty, etc.)

Human Factors - IAEA Consideration of Human Factors Program elements are included in : Legally binding instruments (e.g. Convention on Nuclear Safety) IAEA Safety Standards Other IAEA publications Requirements are specific to the stage of the lifetime of the facility

Human Factors - IAEA Convention on Nuclear Safety (CNS): Each Contracting Party shall take the appropriate steps to ensure that the capabilities and limitations of human performance are taken into account throughout the life of a nuclear installation.

Human Performance - IAEA Safety Fundamentals: To prevent human and organizational failures, human factors have to be taken into account and good performance and good practices have to be supported How can we do this? Regulatory requirements/ guidance and criteria for Human Performance Programmes should exist

Human Factors - IAEA Safety Fundamentals: where control measures or operator actions are called on to maintain safety, an initial safety assessment has to be carried out to demonstrate that the arrangements are robust and that they can be relied on

HF Programmes Human Factors issues should be assessed as an integral component of all stages of the licensing process, including : application for reviews for an initial license license renewal, and periodic assessment of licensee performance Human factors considerations are relevant to all phases of a nuclear activity, including design, construction, commissioning, operation, maintenance, and decommissioning

HF in Design of NPPs CNS the design and construction of a nuclear installation provides for several reliable levels and methods of protection (defense in depth) the design of a nuclear installation allows for reliable, stable and easily manageable operation, with specific consideration of human factors and the man-machine interface

HF in Design of NPPs GS-R-1 Regulatory body shall review and assess: Competence and capability of the applicant Quality assurance organization and programmes of the applicant/ vendors

HF in Design of NPPs NS-R-1 Human Factors Design for optimal operator performance : design limits effects of human error plant layout and procedures should facilitate planoperator interaction application of ergonomic principles human-machine interface verification and validation of HF aspects criteria for information display to consider operator s dual role (manager and operator)

HF in Design of NPPs design at promoting success of human actions (response time, physical and psychological demands) escape routes and means of communications main and supplementary control room automatic control of safety actions and protection system availability for taking correct operator actions in design basis accidents human reliability analysis as part of PSA

Regulatory Review and Assessment Examples of documents to be submitted by the applicant, as part of the safety case: Human Factors Engineering Programme Plans Verification and Validation Plans QA programme applied to design activities Regulatory approval is necessary What if design was completed by the vendor country, based on country regulatory requirements, which may be different of those in the buyer country?

HF in Construction of NPPs GS-R-1 Regulatory body shall review and assess: Adequacy of operating instructions and procedures (e.g. administrative, operating, emergency, etc.) Arrangements for ensuring training and qualifications of personnel, including staffing levels and fitness for duty Quality assurance organization and programme for operation

HF in Construction of NPPs Human Performance Programmes in support of operational phase should be required and established during the construction phase How should regulators determine the requirements of such programmes and how could they be validated when the facility is not fully operational? How to create and support safety culture during construction and commissioning? Verification and validation of operational procedures are a critical activity at the end of construction phase How much should be the regulator involved in V&V?

HF in Operation of NPPs CNS: demonstration that the installation, as constructed, is consistent with design and safety requirements operation, maintenance, inspection and testing of a nuclear installation are conducted in accordance with approved procedures procedures are established programmes to collect and analyse operating experience are established.

HF in Operation of NPPs GS-R-1 The regulatory body shall review and assess significant safety related modifications (including organizational changes) Regulatory assessment of safety factors and completed periodic safety review Periodic Safety Review contains several safety factors related to Human Factors program elements NS-R-2 contains multiple requirements for HF in operation

Regulatory Oversight of HF Programmes Regulatory activities related to HF Programmes should include: Development of specific Human Factors and Human Performance regulatory requirements ( balance between flexibility and clarity) Compliance activities Promotion Verification (review and assessment, inspection/ audit, assessment of performance indicators, licensee s events reports, etc.) Enforcement

Regulatory Oversight of HF Programmes Different regulatory approaches (compliance-based, performance-based, process-based) can be used for conducting the regulatory oversight of licensee s HF Program Regulatory body should identify HF elements for each licensing phase and incorporate them into the overall regulatory inspection programme Management System audit/ inspections are related to and contribute to ensuring an adequate regulatory oversight of HF programmes

Regulatory Challenges Develop HF and HP requirements/ guidance for each licensing phase Assessment of HF elements for new NPP design (lack of operational feedback, V&V, organizational issues, etc) Awareness and incorporation of R& D in regulatory framework Incorporate HF elements in assessment and inspection activities Develop performance measurements and indicators for HF and HP Interference between HF requirements and other laws in the country ( e.g. for fitness for duty programmes)

Conclusions Various IAEA Safety Standards include Human Factors related requirements and guidance Human Factors should be considered early in the design stage and applied through the lifecycle of the facility Regulatory body should develop requirements and guidance for applicant s/ licensee s Human Factors Programmes

Conclusions Regulatory process and criteria for HF assessment should be developed Regulatory oversight should include specific verification activities aimed at ensuring that licensee s HF programmes are effectively implemented Lessons learned from Human Performance Improvements in existing NPPs should be collected systematically and used for regulatory purposes