SUBJECT: ANNUAL ASSESSMENT LETTER - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION (REPORT 50-498, 499/01-01)



Similar documents
March 6, 2013 BABCOCK AND WILCOX, LICENSEE PERFORMANCE REVIEW OF LICENSED ACTIVITIES (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 70-27/ )

March 5, 2015 NUCLEAR FUEL SERVICES, INC., LICENSEE PERFORMANCE REVIEW (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT / )

July 31, Dear Dr. Biegalski:

May 23, 2006 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

May 5, Mr. Brian Almon Public Utility Commission of Texas 1701 N. Congress Avenue P.O. Box Austin, Texas

u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing

April 15, Dear Dr. Williams:

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

OFFICIAL USE ONLY SECURITY-RELATED INFORMATION January 25, 2008 ENERCON SERVICES, INC. - NRC EVENT FOLLOWUP INSPECTION REPORT /

August 31, 2007 REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRIC GENERATING PLANT UNITS, 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

June 8, SUBJECT: NOTICE OF VIOLATION (NRC Inspection Report No )

May 2, 2003 SUBJECT: NRC SPECIAL INSPECTION: INSPECTION REPORT /03-08; PRELIMINARY WHITE FINDING - CALLAWAY PLANT

March 20, On Wednesday, March 7, 2012, the U.S. Nuclear Regulatory Commission s staff held a public

South Texas Project Units 1 and 2 Docket Nos.: STN , STN Evidence of Financial Protection

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

January 3, 2007 EA

October 20, 2004 LOUISIANA ENERGY SERVICES - REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING PLAN

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C July 7, 2015

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant

This occurrence is considered to be of no significance with respect to the health and safety of the public.

Sara Brock Counsel for NRC Staff

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C March 3, 2011

NEI 06-13A [Revision 2] Template for an Industry Training Program Description

1/ff~. Schanz Inspector General. March 26, 2015

ORDER OF THE SUPREME COURT OF TEXAS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C November 13, 2012

ER OF THE SUPREME COURT OF TEXAS

Ifred M. P~aglia Manager, Nuclear Licensing. March 14, 2013 NND

ATTACHMENT I TO IPN RELATED TO LOAD TESTING AND,24 MONTH OPERATING CYCLES

November 13, 2002 SUMMARY OF CONFERENCE CALLS WITH FLORIDA POWER AND LIGHT REGARDING REACTOR VESSEL HEAD INSPECTION RESULTS (TAC NO.

U.S. Nuclear Regulatory Commission Public Meeting Summary. November 6, 2015

1J,4Zc6 * CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Texas Engineering Experiment Station/Texas A&M University System

June 25, FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Veterans Health Administration (VHA) Update for Oversight for Uses of Radioactive Materials. Frank A. Miles

November 3, Subject: CALLAWAY PLANT - NRC INTEGRATED INSPECTION REPORT /

ORDER OF THE SUPREME COURT OF TEXAS

August 10, BWR Projects Branch Division of New Reactor Licensing Office of New Reactors

August 27, 2007 Advice Letter 2146-E. Advice Letter 2146-E is effective August 31, Thank you for your time.

VAAS CONNECTICUT YANKEE ATOMIC POWER COMPANY ~HADDAM. March 2, 2016 CY CFR (e)

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013

Executive Director for Operations AUDIT OF NRC S CYBER SECURITY INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS (OIG-14-A-15)

June 29, Members of the Legislative Audit Committee:

Washington Storage Service Update to Lists of Buyers Docket No. RP07-

MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4

How To Improve Safety At A Nuclear Power Plant

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 22, 2015

Electronic Signatures. Ashley Cockerham Medical Radiation Safety Team

Florida Gas Transmission Company, LLC Docket No. RP

1st Session ALTO LEE ADAMS, SR., UNITED STATES COURTHOUSE

AGENCY: Federal Emergency Management Agency, DHS. SUMMARY: Comments are requested on proposed flood hazard determinations, which

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

Executive Director for Operations STATUS OF RECOMMENDATIONS: AUDIT OF NRC S PROCESS FOR ENSURING INTEGRITY IN SCIENTIFIC RESEARCH (OIG-15-A-08)

STATEMENT OF NATURE, REASONS AND BASIS

CLASSIFICATION APPEALS WITHIN THE MARKETING AND REGULATORY PROGRAMS MISSION AREA. a. AMS Directive 310.1, Classification of Positions, dated 4/15/91.

DATED: FEB 6, 1992; SIGNED BY CARLTON KAMMERER. Barbara DeBuono, M.D., M.P.H. Director Department of Health 3 Capitol Hill Providence, RI 02908

ORAL ARGUMENT IN CASE NO SCHEDULED FOR NOVEMBER 21, Case Nos and

May 27, Version

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

Sara E. Brock Office of the General Counsel Mail Stop 0-15 D21 US Nuclear Regulatory Commission Washington, DC Dear Ms.

MISC Docket Nov 99m 90,25

M0okc. OPower. -Nuclear. February 6,

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C June 1, 2005

October 22, 2015 EA

Transcontinental Gas Pipe Line Company, LLC Rate Schedule S-2 Tracking Filing

US-APWR Human Performance Monitoring Implementation Plan

ORDER OF THE SUPREME COURT OF TEXAS

TALEN ~ SEP ENERGY. U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC CFR 50.

NRC INSPECTION MANUAL

Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC Compliance Filing Docket No.

MATERIALS LICENSE. 1. Honeywell International, Inc. 3. License Number: SUB-526, Amendment 6-1

FOLLOW-UP REPORT Change Management Practices

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

ORDER OF THE SUPREME COURT OF TEXAS. Misc Docket No. 97-_go I

ORDER OF THE SUPREME COURT OF TEXAS. MiSC Docket N m J^- A 1

U.S. Nuclear Regulatory Commission. Customer Service Plan

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs

Proposal to Consolidate Post-Fukushima Rulemaking Activities

MATERIALS LICENSE. Docket or Reference Number Maximum Amount that Licensee May Possess at Any One Time Under This License: Source

RE: License #: DC Advanced Technology Academy G.S.R.P Oakman Blvd. Dearborn, MI 48126

September 15, Docket No General License (10 CFR 31.5)

Misc. Docket No. Il Appointment of a District Judge to Preside in a State Bar Disciplinary Action

STATUS OF RECOMMENDATIONS: INFORMATION SYSTEMS SECURITY EVALUATION OF REGION III LISLE, IL (OIG-09-A-15)

OFFICE OF INSURANCE AND SAFETY FIRE COMMISSIONER

ORDER OF THE SUPREME COURT OF TEXAS

ORDER OF THE SUPREME COURT OF TEXAS

[SOE LETTERHEAD] July 12, 1990

g061. IctiN LFLADV ER S E REPORT Entered 7/26/11 CL 11L DWM/11 - Janinie J. Edmonds

South Texas/Louisiana Service Center

U. S. DEPARTMENT OF EDUCATION OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES REHABILITATION SERVICES ADMINISTRATION WASHINGTON, DC 20202

Docket No. R-14 19, RIN 7100-AD76 Electronic Fund Transfers

MATERIALS LICENSE. 3. License number SUC-1593 is amended in. 4. Expiration date: March 21, 2026

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Case 5:11-cv OLG-JES-XR Document 1312 Filed 05/13/15 Page 1 of 6

UNITED STATES OF AMERICA Before the SECURITIES AND EXCHANGE COMMISSION

QUALITY CONTROL REVIEW REPORT

DEFENSE NUCLEAR FACILITIES SAFETY BOARD

This grant of accreditation includes the following site and programs: 7 Roszel Road Princeton, NJ (609) jeff.santilli@berlitz.

Re: Heldt et al. v. Payday Financial et. Al Case No. 3:13-cv-3023-RAL

Texas. DeVry Impact. Summary Statistics. Earnings by Education Level. Total Wage Growth Over Studied Period. 65% Growth $44, % Growth $39,478

Transcription:

STP.wpd Page UNITE D S TA TES NUCLEAR REGULATORY C OM MI S SION RE GIO N IV 6 RYAN PLAZA D RIVE, SU ITE 400 AR LINGTON, TEXAS 760-8064 May 29, 200 William T. Cottle, President and Chief Executive Officer STP Nuclear Operating Company SUBJECT: ANNUAL ASSESSMENT LETTER - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION (REPORT 50-498, 499/0-0) Dear Mr. Cottle: On May 7, 200, the NRC staff completed its end-of-cycle plant performance assessment of South Texas Project Electric Generating Station, Units and 2, facility. The end-of-cycle review for South Texas Project Electric Generating Station involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period April 2, 2000, to March 300. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities. Overall, South Texas Project Electric Generating Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through May 3002, with one exception. We will conduct an Operational Safeguards Response Evaluation (OSRE) based on the time since the last OSRE, changes made to your security program, and past performance. As discussed in our February 28, 200, letter to you, your request to postpone the OSRE was approved. Accordingly, the OSRE was rescheduled from the week of April 6, 200, to the week of November 5, 200. We will continue with OSRE inspections until the industry proposed Safeguards Performance Assessment Program is approved by the NRC staff as an acceptable substitute for the OSRE inspections. The enclosure details the scheduled inspections that will occur through May 3002. The inspection plan is provided to minimize the resource impact on your staff and to allow for

STP.wpd Page 2 STP Nuclear Operating Co.-2- scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. For your information, the NRC is in the process of aligning the inspection and assessment cycle with the calender year. In order to transition to a calender year cycle (January through December 3), the next inspection and assessment cycle will consist of only three quarters (i.e., the second, third, and fourth calendar quarters of CY 200). As a result, a quarterly review will be conducted for the third calendar quarter (July through September 30) in lieu of a midcycle review. The impact on the inspection plan, which is included as an enclosure, is minimal. Activities planned for the transition cycle represent only 60-80 percent of those activities that would be accomplished during a typical 2-month inspection and assessment cycle. In accordance with 0 CFR 2.790 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/nrc/adams/index.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 87/860-84 with any questions you may have regarding this letter or the inspection plan. Dockets: 50-498 50-499 Licenses: NPF-76 NPF-80 Sincerely, /RA/ David N. Graves, Chief Project Branch A Division of Reactor Projects Enclosure: South Texas Project Electric Generating Station Inspection/Activity Plan cc w/enclosure: J. J. Sheppard, Vice President Engineering & Technical Services STP Nuclear Operating Company S. M. Head, Supervisor, Licensing Quality & Licensing Department

STP.wpd Page 3 STP Nuclear Operating Company A. Ramirez/C. M. Canady City of Austin Electric Utility Department 72 Barton Springs Road Austin, Texas 78704 M. T. Hardt/W. C. Gunst City Public Service Board P.O. Box 77 San Antonio, Texas 78296 D. G. Tees/R. L. Balcom Houston Lighting & Power Company P.O. Box 700 Houston, Texas 7725 Jon C. Wood Matthews & Branscomb 2 E. Pecan, Suite 00 San Antonio, Texas 78205 A. H. Gutterman, Esq. Morgan, Lewis & Bockius 800 M. Street, N.W. Washington, D.C. 20036-5869 G. E. Vaughn/C. A. Johnson Central Power & Light Company Mail Code: N502 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957 Bureau of Radiation Control State of Texas 00 West 49th Street Austin, Texas 78756 Jim Calloway Public Utility Commission STP Nuclear Operating Co.-3-

STP.wpd Page 4 William B. Travis Building P.O. Box 3326 70 North Congress Avenue Austin, Texas 7870-3326 John L. Howard, Director Environmental and Natural Resources Policy Office of the Governor P.O. Box 2428 Austin, Texas 787-389 Judge, Matagorda County Matagorda County Courthouse 700 Seventh Street Bay City, Texas 7744 Mayor, City of Bay City City Hall 90 Fifth Street Bay City, Texas 7744 Mayor, City of Palacios P.O. Box 845 Palacios City Hall Palacios, Texas 77465 James Mitchell, Sheriff Matagorda County 2323 Avenue E Bay City, Texas 7744 Federal Emergency Management Agency Gary Jones, Acting Regional Director Region VI, Federal Center 800 North Loop 288 Denton, Texas 7620-3698 Office of the Governor Director, Environmental Policy State Liaison Officer P.O. Box 2428 Austin, TX 78756-389 STP Nuclear Operating Co.-4-

STP.wpd Page 5 Electronic distribution from ADAMS by RIV: Regional Administrator (EWM) DRP Director (KEB) DRS Director (ATH) Senior Resident Inspector (NFO) Branch Chief, DRP/A (DNG) Senior Project Engineer, DRP/A (DBA) Section Chief, DRP/TSS (PHH) J. Isom, NRR (JAI) RidsNrrDipmIipb STP Nuclear Operating Co.-5- S:\DRP\DRPDIR\EOC 5-0\STP.wpd RIV:SPE:DRP/A C:DRP/A OE:NRR/IIPB D:DRS D:DRP C:DRP/A DBAllen;tbh;dlf DNGraves JAIsom ATHowell KEBrockman Signature /RA/ /RA/ E-DNGraves for /RA/ /RA/ DNGraves 05/5/0 05/5/0 05/2/0 05/8/0 05/24/0 05/29/0 OFFICIAL RECORD COPYT=Telephone E=E-mail F=Fax

Page of South Texas Project 06/0/200 4:36:0 Inspection / Activity Plan 05/27/200-05/3/2002 Unit Number Inspection Activity Title No. of Staff on Site Planned Dates Start End Inspection Type OB-PIR - PROBLEM ID INSP 3 IP 752 Identification and Resolution of Problems 06/04/200 06/5/200 - HX PERF IP 707B Heat Sink Performance 06//200 06/5/200 PSB-RP - RAD MONITORING INSTRUMENTATION IP 7203 Radiation Monitoring Instrumentation 06/25/200 06/29/200 OB-RQ - REQUAL INSP 2 IP 7B Licensed Operator Requalification 08/06/200 08/0/200 OB-EXAMS - RO/SRO EXAMS 4 X022 SOUTH TEXAS-UNIT - INITIAL EXAM (09/200) 09/04/200 09/07/200 Not Applicable X022 SOUTH TEXAS-UNIT - INITIAL EXAM (09/200) 09/7/200 09/2/200 Not Applicable 2 X0222 SOUTH TEXAS-UNIT 2 - INITIAL EXAM (09/200) 09/7/200 09/2/200 Not Applicable PSB-RP3 - ALARA PLANNING AND CONTROLS (3) IP 7202 ALARA Planning and Controls 09/0/200 09/4/200 PSB-RP2 - ACCESS CONTROL TO RAD SIGN AREAS & PIV IP 720 Access Control to Radiologically Significant Areas 0/5/200 0/9/200 IP 75 Performance Indicator Verification 0/5/200 0/9/200 - SSD&PCI 9 IP 72 Safety System Design and Performance Capability /05/200 /09/200 IP 72 Safety System Design and Performance Capability 2/03/200 2/07/200-50.59 IP 702 Evaluation of Changes, Tests, or Experiments /05/200 /09/200 PSB-S - OSRE AND RESP TO CONT EVENTS 6 IP 73003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy) /05/200 /09/200 IP 80 Operational Safeguards Response Evaluation (OSRE) /05/200 /09/200 Regional Initiative PSB-S2 - ACCESS AUTH/CONTROL, SEC PLAN & PIV IP 7300 Access Authorization Program (Behavior Observation Only) 2/0/200 2/4/200 IP 73002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization) 2/0/200 2/4/200 IP 73004 Security Plan Changes 2/0/200 2/4/200 IP 75 Performance Indicator Verification 2/0/200 2/4/200 - PERM MODS 2 IP 77B Permanent Plant Modifications 0/4/2002 0/8/2002 RP-2 - ALARA IP 7202 ALARA Planning and Controls 02/0/2002 02/4/2002 - TRIENNIEL FIRE PROTECTION INSPECTION 5 IP 705T Fire Protection 04/29/2002 05/03/2002 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.