CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM



Similar documents
CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM

CHAPTER 4 CONCRETE TRAINING AND QUALIFICATIONPROGRAM

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

Quality Assurance Program. June by Texas Department of Transportation (512) all rights reserved

Quality Assurance Program for Design-Bid-Build Projects. January by Texas Department of Transportation 512/ All Rights Reserved

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

A Commentary on FDOT Technician Certification Program

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM

Hot Mix Asphalt Test Result Verification and Dispute Resolution

Inspections: Central Laboratory of the Regions

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

Standard for GDOT Hot Mix Asphalt Technician Training and Qualification Program. Developed from AASHTO DESIGNATION: R

Shotcrete Quality Control and Testing for an Underground Mine in Canada

Table of Contents. Introduction and Purpose Technician Certification Programs... 4

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

Section 5.6 QUALITY CONTROL PROGRAM

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

Chapter 8 Design of Concrete Mixes

ADMINISTRATIVE MANUAL FOR CONSTRUCTION TECHNICIAN TRAINING AND CERTIFICATION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT

MATERIALS CERTIFICATION SCHOOLS

Sieve Analysis of Aggregates

CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

AGGREGATE TECHNICIAN TRAINING MANUAL

MATERIALS CERTIFICATION SCHOOLS

SECTION 334 (Pages ) is deleted and the following substituted: SECTION 334 SUPERPAVE ASPHALT CONCRETE

MATERIALS CERTIFICATION SCHOOLS 2016

ASPHALT, CONCRETE, SOILS

SPECIFIC GRAVITY OF COARSE AGGREGATE AASHTO T 85

Geotechnical Investigation Test Report

STANDARD INSPECTION & TEST PLAN (ITP) FOR CIVIL WORKS :

Quality control: Annex-A.

Office of Construction and Innovative Contracting Technical Certification Unit. Technical Certification Handbook 2016

LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES

INDEX DESCRIPTION MATERIALS APPROVAL OF SUBBASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

Kentucky Transportation Center

SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES

Division 2 Section Section 02795

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Advancements in Permeable Pavements

Soils and Aggregates Division

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

Example Specification for Concrete using Current Building Code Requirements

MID-ATLANTIC REGION TECHNICIAN CERTIFICATION PROGRAM. Maryland State Highway Administration Technician Certification Renewal Policy January 2006

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

LOCAL PUBLIC AGENCY (LPA) QUALITY ASSURANCE PROGRAM

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

QUALITY ASSURANCE PROGRAM

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES FOP FOR AASHTO T 27 (11)

PROPERTIES AND MIX DESIGNATIONS

Construction Management Program

Section 10.8 AUGER CAST PILES

AMERICAN CONCRETE INSTITUTE. Certification Policies for Concrete Field Testing Technician B Grade I

COST SAVINGS INITIATIVE PROPOSAL

Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way.

Standard Test Procedures Manual

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

ODOT Inspection Certification Program

In-situ Density Determination by Sand Replacement Method

MID-ATLANTIC REGION TECHNICIAN CERTIFICATION PROGRAM

The University of Toledo Soil Mechanics Laboratory

MoDOT Technician Certification Course Calendar MoDOT Technician Certification Program (TCP)

MEDICATION AIDE KANSAS ADMINISTRATIVE REGULATIONS

AGREGADOS RECICLADOS MITOS Y REALIDADES

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Quality Assurance Concepts. Outline

Apr 17, 2000 LAB MANUAL PARTICLE SIZE ANALYSIS OF SOILS AASHTO Designation T 88 (Mn/DOT Modified)

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia

:: ARTIFICIAL SAND :: Zone One Sand : Zone Two Sand :

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

Effect of basalt aggregates and plasticizer on the compressive strength of concrete

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Section 100 Contractor Quality Control Program

Laboratory and Technician Certification. by Nabil Kamel, M.A.Sc., P.Eng. CCIL Program Manager

Stabilization of Soil with Self-Cementing Coal Ashes

CONSTRUCTION MATERIAL TESTING

Hot Mix Asphalt Level II Quality Control Technician Certification Study Guide September 2005

Transcription:

Topic No. 700-000-001 Construction Training and Qualification Manual Effective: July 1, 2002 Aggregate Technician Training and Qualification Program Revised: DRAFT May 6September 3, 2008 CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM 2.1 PURPOSE The purpose of this section is to describe the Aggregate Technician Training and Qualification Program. This qualification program is for persons responsible for the manufacture, monitoring, sampling, testing, reporting and inspection of mineral aggregates incorporated as components of various structures; (i.e., asphalt, concrete, base courses, bank and shore protection) and up to and including any use specified in contract documents on Florida Department of Transportation (Department) highway construction projects. This procedure shall list the details of the qualification program including the associated training courses. 2.2 AUTHORITY Code of Federal Regulations, Quality Assurance Procedures for Construction, 23 CFR 637 Sections 334.044(82)(3), Florida Statutes (F.S.) Subsection 6-3, FDOT Standard Specifications for Road and Bridge Construction. Chapter 14-103, Florida Administrative Code, "Aggregate Source Approval" 2.3 REFERENCE The following manuals isare included with this procedure for projects requiring Aggregate Testing. Topic No. 675-000-000, Materials Manual Construction Aggregate Manual (Produced by the State Materials Office) Aggregate Technician Training and Qualification Program 2-1

Topic No. 700-000-001 Construction Training and Qualification Manual Effective: July 1, 2002 Aggregate Technician Training and Qualification Program Revised: DRAFT May 6September 3, 2008 2.4 BACKGROUND The Department has had the producers performing their own Quality Control( QC) tests for a number of years. The reliability of test results that are generated by the producers, FDOT and private laboratories for mineral aggregates are of great importance for asphaltic concrete, Portland Cement Concrete and all other end use products and therefore must have qualified personnel performing the various Quality Control, Verification and Independent Assurance functions. The Department uses a combination of American Concrete Institute (ACI) certifications and other elements to make up its Aggregate aggregate qualification requirements. In January 2008 ACI discontinued its programs for Aggregate Field Testing and Aggregate Lab Testing and replaced them with Aggregate Testing Technician (ATT) Levels I and II, and Aggregate Base Testing Technician (ABTT). The Department has adjusted its program to adopt ATT Level I and ABTT. The Department will continue to recognize the qualifications of any who qualified with the earlier ACI certifications until those qualifications expire. 2.5 QUALIFICATIONS There are four aggregate qualifications: (1) Aggregate Testing Technician (2) Aggregate Base Testing Technician (3) Qualified Sampler Technician (4) Limerock Bearing Ratio (LBR) Technician 2.5.1 General Aggregate Qualification Requirements Certain qualifications in the aggregate program require ACI certification. In these instances, it will be the responsibility of the technician seeking qualification to submit an Application for Qualification Form to the CTQP administrator along with the ACI certification (wallet card) number. This form is available from the CTQP administrator at http://www.ctqpflorida.com. The date of qualification will Aggregate Technician Training and Qualification Program 2-2

Topic No. 700-000-001 Construction Training and Qualification Manual Effective: July 1, 2002 Aggregate Technician Training and Qualification Program Revised: DRAFT May 6September 3, 2008 be the date the administrator receives notification that all requirements have been met. All Aaggregate Qualifications qualifications require watching the FDOT Department training video on sampling aggregates. This video is shown in all aggregate courses delivered by CTQP providers. Technicians who challenge exams, or obtain ACI certificates outside the CTQP program must certify that they viewed the video and submit the Video Viewing Certification, Form No. 700-000-08 to the CTQP administrator on the application for qualification. This video can be viewed online at http://www.ctqpflorida.com/course_preparation_materials.asp 2.5.2 Aggregate Testing Technician Qualification Requirements The objective of this qualification is to ensure all test methods for coarse and fine aggregate materials acceptance are completed in accordance with contract documents. All trainees seeking the Aggregate Testing Technician qualification must: (1) Obtain the ACI Aggregate Testing Technician Level 1 certification. After a trainee has successfully completed all qualification requirements, the trainee's qualification date shall be added to the CTQP database. The date of qualification shall be the date the last qualification requirement was satisfied. The CTQP qualification shall expire on the date of expiration of the ACI Aggregate Testing Technician Level 1 Certification. 2.5.2.1 ACI Aggregate Testing Technician Level 1Training Course This course is an ACI certification course and can be obtained through your local ACI sponsoring agent ( in Florida this is Construction Materials Engineering Council Inc. @ www.cmec.org). Information about the course content, prerequisites and examination requirements can be found at http://www.concrete.org/certification/cert_prog.asp 2.5.3 Aggregate Base Testing Technician Qualification Aggregate Technician Training and Qualification Program 2-3

Topic No. 700-000-001 Construction Training and Qualification Manual Effective: July 1, 2002 Aggregate Technician Training and Qualification Program Revised: DRAFT May 6September 3, 2008 Requirements The objective of this qualification is to ensure all test methods for soils and base materials acceptance are completed in accordance with contract documents. All trainees seeking Aggregate Base Testing Technician qualification must: (1) Obtain ACI Certification as an Aggregate Base Testing Technician. After a trainee has successfully met all qualification requirements, the trainee's qualification date shall be added to the CTQP database. The date of qualification shall be the date the last qualification requirement was satisfied. The CTQP qualification shall expire on the date of expiration of the ACI Base Testing Technician Certification. 2.5.3.1 ACI Aggregate Base Testing Technician Training Course This course is an ACI certification course and can be obtained through your local ACI sponsoring agent ( in Florida this is the Construction Materials Engineering Council Inc. @ www.cmec.org). Information about the course content, prerequisites and examination requirements can be found at http://www.concrete.org/certification/cert_prog.asp 2.5.4 Qualified Sampler Technician Qualification Requirements The objective of this qualification is to ensure all materials tested for acceptance are sampled in accordance with contract documents. All trainees seeking Qualified Sampler Technician qualification must: (1) a) Pass the Qualified Sampler Technician written examination. b) Pass the Qualified Sampler Technician proficiency examination. OR (2) Have either an Aggregate Testing Technician or Aggregate Base Testing Aggregate Technician Training and Qualification Program 2-4

Topic No. 700-000-001 Construction Training and Qualification Manual Effective: July 1, 2002 Aggregate Technician Training and Qualification Program Revised: DRAFT May 6September 3, 2008 Technician Qualification. After a trainee has successfully met all of these qualification requirements, the trainee's qualification date will be added to the training database. The expiration date shall be 5 years (60) months from the date the last Qualified Sampler Examination was passed, or the expiration of the ACI certification. 2.5.4.1 Qualified Sampler Technician Course This course consists of a one day training class with a written examination (1 hour, multiple choice) and proficiency exam. Emphasis will be on presenting techniques to those who have very little sampling experience. Subjects to be covered in this course are included in Attachment 2-7. Attendance at the training course is encouraged but it is not required for qualification. 2.5.4.1.1 Qualified Sampler Technician Course Prerequisites There are no prerequisites for this course. 2.5.4.1.2 Qualified Sampler Technician Written Examination A written examination (1 hour) is administered at the end of the course. The examinations are electronically graded by the CTQP. A passing grade for this examination shall be 70%. Two weeks should be allowed for grading and posting of the examination results. 2.5.4.1.3 Qualified Sampler Technician Proficiency Examination Each trainee will correctly demonstrate skills in conducting applicable FDOT tests in a proficiency examination (usually 2 hours).. Each trainee will be given two chances to pass each test. Should a trainee fail any one test, two times, this will constitute Aggregate Technician Training and Qualification Program 2-5

Topic No. 700-000-001 Construction Training and Qualification Manual Effective: July 1, 2002 Aggregate Technician Training and Qualification Program Revised: DRAFT May 6September 3, 2008 failure of the proficiency examination. 2.5.5 LBR Technician Qualification Requirements The objective of this qualification shall be to ensure that personnel responsible for testing or inspecting mineral aggregates and soils are proficient and knowledgeable with FDOT Department testing methods. All trainees seeking LBR qualification must: (1) Pass the LBR Technician written examination. (2) Pass the proficiency examination. (3) Be Aggregate Base Testing Technician qualified at the time of qualification. After a trainee has successfully met all of these qualification requirements, the trainee's qualification date will be added to the CTQP database. The date of qualification shall be the date the last qualification requirement was satisfied. The CTQP qualification shall expire in 5 years (60) months or the date of expiration of the Aggregate Base Testing Technician Qualification (whichever is earlier). 2.5.5.1 LBR Technician Qualification Training Course This course shall consist of a one day training class with a written examination (usually 1 hour). A proficiency examination (usually 2 hours) will be given following the written examination. Subjects to be covered in this course are included in the LBR Technician Qualification Training Course, Attachment 2-8. Although attendance at the training course is encouraged, it is not required for qualification. 2.5.5.1.1 LBR Course Prerequisites There are no prerequisites for this course. Aggregate Technician Training and Qualification Program 2-6

Topic No. 700-000-001 Construction Training and Qualification Manual Effective: July 1, 2002 Aggregate Technician Training and Qualification Program Revised: DRAFT May 6September 3, 2008 2.5.5.1.2 LBR Written Examination A written examination (usually 1 hour) is administered at the end of the course. The examinations are electronically graded by the CTQP. A passing grade for this examination shall be 70%. Two weeks should be allowed for grading and posting of the examination results. 2.5.5.1.3 LBR Proficiency Examination A proficiency examination (usually 4 hours) is administered on the second day of the course. Each trainee will be expected to correctly demonstrate skills in conducting applicable Florida Method of Tests. Each trainee will be allowed two chances to pass each test. Should a trainee fail any one test, two times, this will constitute failure of the proficiency examination. 2.6 QUALIFICATION REQUIREMENTS BY JOB FUNCTION Job functions for each aggregate qualification are contained in the CTQP Qualification by Job Function, Attachment 2-9. 2.7 REQUALIFICATION In order to maintain qualification, technicians must be requalified. Requalification may require the applicant to pass a written and proficiency examination for each specialized aggregate area. Extensions past the qualification period will not be granted. An application for requalification should begin after 54 months. Extensions past the 60 month qualification period will not be granted. Applicants for requalification will be required to pass the course examination and any applicable proficiency demonstration. Requalification requirements for aaggregate qualifications arequalifications are the same as initial qualification. Aggregate Technician Training and Qualification Program 2-7

Attachment 2-1 Revised: 4/10/08 AGGREGATE TESTING TECHNICIAN QUALIFICATION FLOWCHART Begin Complete the application and pay the fee. Schedule and attend an ACI Aggregate Testing Technician Level I course, and/or exams (written and proficiency). Is applicant ACI Aggregate Testing Technician certified? No Yes Enter qualification date in the TQDBS & issue the certificate. Note: This flow chart is produced to aid the applicant in seeing the relationship between the written procedure and the process leading to qualification. Should a conflict exist between the written text and the flow chart, the written text shall govern. Aggregate Technician Training and Qualification Program 2-8

Attachment 2-2 Revised: 4/10/08 AGGREGATE BASE TESTING TECHNICIAN QUALIFICATION FLOWCHART Begin Complete the application and pay the fee. Schedule and attend an ACI Aggregate Base Testing Technician course, and/or exams (written and proficiency). Is applicant ACI Aggregate Base Testing Technician certified? No Yes Enter qualification date in the TQDBS Note: This flow chart is produced to aid the applicant in seeing the relationship between the written procedure and the process leading to qualification. Should a conflict exist between the written text and the flow chart, the written text shall govern. Aggregate Technician Training and Qualification Program 2-9

Attachment 2-3 Revised: 4/10/08 QUALIFIED SAMPLER TECHNICIAN QUALIFICATION FLOWCHART Begin Complete the application and pay the fee. Applicant must certify that the sampling video has been watched. Applicant must choose one of these two paths to qualification. OR Schedule and attend a Qualified Sampler Technician course and/or exams (written and proficiency). Course is optional, exams and video are not. Is applicant CTQP Aggregate Testing (or BaseTesting) Technician Qualified? No See flow chart for Aggregate Testing Technician or Aggregate Base Testing Technician Yes No Did applicant pass/ fail the Qualified Sampler Technician exam and/or the proficiency exam? Pass both Enter qualification in the TQDBS Note: This flow chart is produced to aid the applicant in seeing the relationship between the written procedure and the process leading to qualification. Should a conflict exist between the written text and the flow chart, the written text shall govern. Aggregate Technician Training and Qualification Program 2-10

Attachment 2-4 Revised: 4/10/08 LBR QUALIFICATION FLOWCHART Begin Complete the application and pay the fee. Schedule and attend a LBR course and/or exam and/or proficiency exam. The LBR Course is optional. Note: The taking of the CTQP exams and the ACI exams does not have to follow any order. Fail one or both Did the applicant pass/ fail the LBR exam and/ or proficiency exam? Pass both Schedule and attend an ACI Aggregate Base Testing Technician course, and / or exams (written & proficiency). Is applicant ACI Aggregate Base Testing Technician certified? No Yes Enter qualification in the TQDBS. Note: This flow chart is produced to aid the applicant in seeing the relationship between the written procedure and the process leading to qualification. Should a conflict exist between the written text and the flow chart, the written text shall govern. Aggregate Technician Training and Qualification Program 2-11

Attachment 2-5 AGGREGATE TESTING TECHNICIAN TRAINING COURSE Subjects to be covered in this course include: (AASHTO/ASTM) T2 / D75 Sampling of Aggregates T248 / C702 Reducing Samples of Aggregate to Testing Size T11 / C117 Materials Finer Than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing T27 / C136 Sieve Analysis of Fine and Coarse Aggregates T85 / C127 Specific Gravity and Absorption of Coarse Aggregate T84 / C128 Specific Gravity and Absorption of Fine Aggregate T255 / C566 Total Evaporable Moisture Content of Aggregate by Drying T21 / C40 Organic Impurities in Fine Aggregates for Concrete Attachment 2-6 AGGREGATE BASE TESTING TECHNICIAN TRAINING COURSE Subjects to be covered in this course include: (AASHTO/ASTM) T2 / D75 Sampling of Aggregates T248 / C702 Reducing Samples of Aggregate to Testing Size T87 / D421 Dry Preparation of Disturbed Soil and Soil Aggregate Samples for Test T89 / D4318 Determining the Liquid Limit of Soils T90 / D4318 Determining the Plastic Limit and Plasticity Index of Soils T88 / D422 Particle Size Analysis of Soils T265 Laboratory Determination of the Moisture Content of Soils T180 / D1557 Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in) Drop T99 / D698 Moisture-Density Relations of Soils Using a 2.5-kg (5.5-lb) Rammer and a 305-mm (12-in) Drop Attachment 2-7 QUALIFIED SAMPLER QUALIFICATION TRAINING COURSE Subjects to be covered in this course include: (AASHTO/ASTM) T2 / D75 Sampling of Aggregates T248 / C702 Reducing Samples of Aggregate to Testing Size Aggregate Technician Training and Qualification Program 2-12

Attachment 2-8 LBR TECHNICIAN QUALIFICATION TRAINING COURSE Subjects to be covered in this course include: FM 5-515 Limerock Bearing Ratio Aggregate Technician Training and Qualification Program 2-13

AGGREGATE TESTING TECHNICIAN Attachment 2-9 CTQP Qualification by Job Function This is the technician, private lab, or contractor employee who is qualified to perform acceptance tests such as Sampling, Gradation, Minus 200, Specific Gravity and Absorption of Coarse / Fine Aggregates. A technician working in a coarse aggregate, sand plant or Redistribution Terminal needs this qualification. Department employees performing or inspecting these tests should obtain this qualification. AGGREGATE BASE TESTING TECHNICAIN This is the technician, private lab, or contractor employee who is qualified to perform acceptance tests such as Sampling, Preparation of Samples, Atterberg Limits, Sieve Analysis, and Standard and Modified Proctors.. Department employees performing these tests should obtain this qualification. QUALIFIED SAMPLER This is the technician directing the front-end loader operator, plant or mine employee who obtains an acceptance sample for testing. If the front-end loader operator does the sampling solely, that operator must be a qualified sampler. LBR TECHNICIAN This is the technician, private lab, or contractor employee who is qualified to perform acceptance tests for Limerock Bearing Ratio on Base or sub grade. Department employees performing or inspecting the LBR test should obtain this qualification. Aggregate Technician Training and Qualification Program 2-14