Example ESD Control Program Document Based on ANSI/ESD S20.20-2007



Similar documents
W ant to accomplish something

The Prevention and Control of Electrostatic Discharge (ESD) (AN )

ACL 395 Resistivity Meter

The Prevention and Control of Electrostatic Discharge (ESD) (AN )

ACL 800 MEGOHMMETER OPERATION MANUAL

Test Reports with Ameriworx Conductive Vinyl Tile ANSI ANSI ESD S7.1 ESD STM97.1 ESD STM97.2

Guidelines how to set up an ESD Protected Area (EPA)

Tech Brief Surface Resistance Test Kit Operation and Maintenance

Use ESD Control Products Correctly Or You Can Do More Harm Than Good

Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)

CHARLESWATER ESD AWARENESS BOOKLET

Self-Audit Checklist

Best Methods for Safe Hipot Testing

Replacing the Gateway M675 Keyboard

Replacing the Gateway M320 Keyboard

VERIFICATION OF ESD ENVIRONMENT IN PRODUCTION PHILOSOPHY, METHODOLOGY AND TOOLS

APPLICATION NOTES FOR SMD LEDs

THE 7 SINS OF ESD CONTROL CERTIFICATION TEST (DVD-78C)

Automotive Electronics Council Component Technical Committee

FUNDAMENTALS OF ESD. A Primer on Electro-Static Discharge

ACL 600 Stati-Check Meter

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23

Contractor Connect Scheme Electrical Contractor and Worker Handbook

PPG SUPPLIER DEVELOPMENT ASSESSMENT

Chapter 4: Disassembly and Power

Page85. Lock-out Tag-out Plan

PART 1 - INTRODUCTION...

Refer installation of power supplies to qualified service personnel.

Copyright 2006 Quality Excellence for Suppliers of Telecommunications Forum

5-Slot Housing and FrameSaver 9000 Series Access Carrier AC Power Supply Installation Instructions

Dielectric Withstand Testing in a Production Environment

Additional information: -OSHA Instruction CPL 2.103, Field Inspection Reference Manual, Chapter IV, Section A -29 CFR 1910, Subpart I, Appendix B

ASBESTOS MANAGEMENT PROGRAM

Replacing Redundant AC Power Supplies in an EX4500 Ethernet Switch Without Disrupting Service

Supplier Quality Requirements and Clauses

OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE

TECHNICAL DATASHEET #TD1404AX PWM CONTROLLED SOLENOID DRIVER

SAFE ELECTRICAL WORK PRACTICES & 2015 NFPA 70E

OHM-STAT CT-8700 OWNERS MANUAL & OPERATION GUIDE

TELEDYNE BATTERY PRODUCTS. INSTRUCTIONS FOR CONTINUED AIRWORTHINESS and COMPONENT MAINTENANCE MANUAL. For

PROPER SELECTION OF CONTROL CIRCUIT TRANSFORMERS WHITE PAPER BULLETIN 1497, 1497A, AND 1497B

Small form factor bay converter and hard drive installation

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

Quality Assurance Provisions

Installation Guide. Wyse D Class 4-GB RAM Upgrade Option Kit. Products: D90D7, D90DW. Issue: PN: L Rev. A

Express5800/120Ed. Rack Mount Kit Installation Procedures PN:

ASBESTOS MANAGEMENT PROGRAM

TC Grounding and Bonding for Telecommunications Systems

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

Electrical Hazards. Power Tools. Extension Cords

I.T. CHAPTER 2. Which three computer components contain hazardous materials and require special handling for disposal? (Choose three.

Test Before Touch Easier Said Than Done. Ken Crawford, DuPont Kent Haggerty, Dupont

Intel NUC Kit DC3217IYE User Guide. Intel NUC Kit DC3217IYE

LABORATORY SAFETY INSPECTION CHECKLIST

HP SATA/SAS hard drive and Solid State Drive installation

PS4-24 OWNERS MANUAL 24 VAC 90 WATT WALL MOUNTED CCTV POWER SUPPLY

QUALITY MATTERS. Quality Assurance.

Video Camera Installation Guide

Electricity and Power Supplies Chapter #4

ABBVIE C-TPAT SUPPLY CHAIN SECURITY QUESTIONNAIRE

Internal USB port kit installation

7 FUNCTION DIGITAL MULTIMETER

SEMME3012 Installing marine lighting, alarm, detection and monitoring equipment and systems

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Technical Note Series

Periodic Verification System Model 775PVS

UNCONTROLLED COPY FOR REFERENCE ONLY

PowerFlex 700S and 700H Frame 12 DC Bus Connector Kit

Model 1756 Test Lead Kit

BX7000 Multi-Access Gateway Getting Started Guide

Yoke harness color code: Horizontal: Red & Blue. Vertical: Yellow & Brown, or Yellow & Green, or Violet and Brown.

Auditing Contract Manufacturing Processes

INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS FOR EXHEAT INDUSTRIAL IMMERSION HEATERS (INCLUDING FLAMEPROOF)

Rutgers Environmental Health and Safety

WORLDWIDE. GW400k SERIES MAINTENANCE MANUAL PROVEN PERIMETER PROTECTION

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5

BOWLING CENTER INSPECTIONS MANUAL

StorTrends 3400 Hardware Guide for Onsite Support

Customs -Trade Partnership Against Terrorism (C-TPAT) Vendor Participation Overview

XYZ Contract Company Industrial Hygiene Program

Discussion Leaders Guide Session Slips, Trips and Falls

2-3 SAS/SATA II HDD Canister USER S MANUAL XC-23D1-SA10-0-R. Document number: MAN A

ESD/EOS ESD Electrostatic Discharge (ESD) Why Should I Care About Electrostatic Discharge?

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

GaN IC Die Handling, Assembly and Testing Techniques

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY METRIC SPECIFICATIONS FOR RS232 LEASED LINE MODEMS (LOW SPEED MODEL 400)

SAFETY AND HEALTH PROGRAM

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

Electrical Wiring Methods, Components and Equipment for General Use. Approved for Public Release; Further Dissemination Unlimited

SLC 500 Analog Input Module

Service Guide. Gateway M275

DUAL%CHANNEL BROADBAND%LINEAR%AMPLIFIER Model&A800D

Specification Approval Sheet

PERFORMANCE EXCELLENCE Procurement Standards

PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics

CSA Z32 TESTING GUIDELINE AND PROCEDURES

METHODS FOR THE CALIBRATION OF ELECTROSTATIC MEASURING INSTRUMENTS

APPLICATION NOTES for THROUGH-HOLE LEDs

Transcription:

PROFESSIONAL STATIC CONTROL SERVICES Example ESD Control Program Document Based on ANSI/ESD S20.20-2007 The following document demonstrates the structure for an ESD control program that is compliant to ANSI/ESD S20.20-2007. The basis of this program is as follows: 1. Personnel are grounded by either a wrist strap or footwear-flooring system. 2. Handling operations are performed at a grounded work surface. 3. ESD sensitive devices are moved from operation to operation inside a metallized shielding bag. The company name for the purposes of this example is ACME Electronics Factory Ltd. 1.0 Purpose The purpose of this procedure is to document the key administrative and technical requirements of the ESD Control Program used by ACME Electronics Factory Ltd. This program has been developed to comply with the ESD Control Program requirements of ANSI/ESD S20.20-2007. 2.0 Scope This procedure applies to all manufacturing areas and the associated manufacturing operations where unprotected ESD sensitive products are handled. 3.0 Responsibilities ACME Electronics Factory Limited has assigned an ESD Coordinator who is the owner of this document and shall be responsible for ensuring compliance with this procedure. 4.0 References (example) ANSI/ESD S20.20-2007 ANSI/ESD S541-2003 ESD ADV1.0-1994 Glossary of Terms 5.0 Definitions (example) ESD Protected Area (EPA) A designated environment provided with materials and equipment to limit electrostatic potentials. 1072 Tower Lane, Bensenville, IL 60106 USA 630-238-8883 FAX: 630-238-9717 www.halperinassoc.com

6.0 ESD Control Program Plan This procedure meets the requirements of ANSI/ESD S20.20-2007. The controls referenced in this document have been selected to ensure that ESD sensitive devices (ESDS) that are susceptible to Human Body Model discharges of 100 volts or greater will not be damaged. For the purposes of this ESD program, it is assumed that all ESDS have a Human Body Model ESD sensitivity of greater than or equal to 100 volts. ESDS devices that are more sensitive may require additional control measures. The basic guidelines that comprise the local ESD control Program are as follows: 1. All semi-conductor electronic devices are considered to be ESD sensitive. 2. All employees that handle unprotected ESD-sensitive products shall have successfully completed the company initial ESD training class and must attend re-certification training every 24. 3. All employees shall be grounded when handling unprotected ESD sensitive devices. 4. ESD sensitive products shall be moved between grounded workstations in metallized shielding bags. ESD Sensitive products are only to be handled in an ESD protected area by grounded employees. 5. All ESD control elements must be periodically verified per the compliance verification plan. 6. Non-essential insulators must be removed from the ESD Protected Area (EPA). 7.0 Training Plan 7.1 Initial Training: All ACME Electronics Factory Ltd. employees who handle ESD sensitive products (whether on a continual or intermittent basis) must attend initial ESD orientation training before handling ESD sensitive products. The initial training classes are provided by the ACME Electronics Factory Ltd. training department personnel. The initial ESD class covers ESD basics as well as a description of the ACME Electronics Factory Ltd. ESD controls. At the conclusion of the ESD training class each employee shall write an ESD comprehension test. The ACME Training department will mark the test and in order to pass the employee must obtain a score of 80%. If an employee passes the test a training record will be set up in the training database that is controlled by the Training Department. If the employee fails to obtain a score of 80% the employee will have to attend a supplemental class held by the Training Department. The employee will be required to write a second test and obtain a score of 80% in order to pass. If the employee passes the second test a record will be set up in the training database. If the employee fails to obtain a score of 80% on the second test the Human Resources manager will need to make a determination on whether or not the employee will continue their employment with ACME. Page 2 of 8

7.2 Refresher Training All ACME Electronics Factory Ltd. employees who handle ESD Sensitive products must receive refresher training once every 24. On a monthly basis, the Training department shall prepare a list of employees who require re-training in the next two. The employees on the list as well as their immediate supervisor will be notified that retraining is required and the affected employee will be invited to attend a re-training session held by the training department. At the conclusion of the re-training session the employee must pass a written test and obtain a score of at least 80%. The training department will update the records for the employees who pass the test. If the employee fails to obtain a score of 80% the procedure outlined in the initial training session will be followed. If an employee fails to attend a re-training session before their certification period expires, the employee will not be allowed to have access to the manufacturing areas until the retraining session has been successfully completed. 8.0 Compliance Verification Plan The ESD control program verification requirements established by ACME Electronics Factory Ltd. to control ESD can be found in Table 1. The ESD Coordinator is responsible for ensuring that all of the ESD control items used in the facility (see Table 1) have been qualified per the requirements of tables 2 and 3 in ANSI/ESD S20.20-2007. Product qualification data, to the required test methods and standards, is compiled and maintained by the ESD Coordinator. The ESD Coordinator is responsible for defining the ESD control items that require periodic verification. The ESD Coordinator is also responsible for the development of the audit procedures as well as the training of any person performing ESD audits. The ESD Coordinator will ensure that all non-conformances found during the audits have been closed prior to publishing the quarterly audit report to management. Note: The audit test methods not covered by the ESD Association Technical Report (TR) 53 can be found in Annex 1 of this document. Page 3 of 8

Table 1 Compliance Verification Requirements Technical Control Item Limits Test Procedure Test Frequency Checked By Wrist strap (system test) Rs < 1.0x10 7 Ω ESD Association publication TR53: Daily (before use) Operator Footwear Rs < 1.0x10 7 Ω Ohms Wrist strap section ESD Association publication TR53: Footwear Section Flooring Rg <1.0x10 6 Ω ESD Association publication TR53: Flooring Section Work surface Rg < 1x10 9 Ω ESD Association publication TR53 Wrist strap Rg < 1 Ω Annex A.1 of this connection procedure point Daily (before use) Operator Site Facilities maintenance ESD Coordinator Quality Department Static Generators < 2,000 Volts/inch Annex A.2 of this procedure Quality Department Shielding bags Visual indications of damage Random visual inspection Quality Department Rs refers to system resistance including person, the wrist band and the grounding cord or ESD footwear Rg refers to resistance to ground 9.0 ESD Protected Area Requirements ESD sensitive products will only be handled in an ESD Protected Area. For the purposes of the ESD control program at ACME Electronics Factory Ltd. the ESD Protected Area (EPA) is defined by yellow floor tape that outlines the borders of the EPA. The ESD protected work stations within the EPA are identified with a sign indicating that the workstation is ESD protected. Unprotected ESD sensitive devices shall only be handled at an ESD protective workstation by grounded, ESD certified employees. Visitors to the EPA as well as untrained employees shall be escorted by ESD certified employees. In no instance shall untrained visitors or employees handle unprotected ESD sensitive devices. Non-essential insulators (insulative items not required in the manufacturing process), including packaging materials, shall be removed from all ESD protected workstations. Process required insulators are permitted at an ESD protective workstation as long as the measured electrostatic field does not exceed 2,000 V/inch (see the measurement procedure in annex 1). If the measured field exceeds 2,000 V/inch the process required insulator must be moved a minimum of 12 inches from the ESD sensitive device. 9.1 Grounding Plan Equipment (AC) ground shall be used as the ground reference for all ESD control items used by ACME Electronics Factory Ltd. All wrist strap connection points, and work surfaces shall be connected to ground via a common point ground as defined in Page 4 of 8

ANSI/ESD S6.1-2005. All newly installed work surfaces and wrist strap connection points shall be tested before use to ensure that they are connected to ground. The ESD floor shall be connected directly to AC ground. 9.2 Personnel Grounding Plan Personnel shall be connected to ground with either a wrist strap system or, for standing operations, through the ESD floor when wearing approved ESD footwear. Wrist strap system: The wrist band must be worn such that there is 360 degrees of contact with the employee s skin. The wrist cord must be plugged into the wrist strap receptacle that is located at every ESD protected work station. Footwear System: Employees working at standup operations while handling ESDS must wear ESD footwear that has been qualified by the ESD coordinator per the requirements in ANSI/ESD STM 9.1 and ANSI/ESD STM 97.1. Note: Product qualification data has shown that the total system resistance of the employee, ESD footwear and flooring is less than 3.5x10 7 ohms when tested per the requirements of ANSI/ESD STM 97.2. This allows the footwear/flooring system used in this facility to follow the Method 1 qualification and compliance verification requirements as listed in Table 2 of ANSI/ESD S20.20-2007. Testing: Employees shall test their wrist strap and footwear at least once per day (before use) using the testers located at the entrance to the manufacturing area. If the tester gives a pass indication the employee shall initial the log sheet located next to the tester. If the tester gives a fail indication the employee shall contact their supervisor or the ESD coordinator. The ESD coordinator or the supervisor will help to determine the cause of the failure. Employees must not handle ESDS until both the wrist strap and footwear have passed the daily test. Employees who only visit the manufacturing lines periodically must test their wrist strap and footwear on the days when they handle ESD sensitive devices. The testing must be done before ESD sensitive devices are handled. The test log sheet must be initialed (if pass indication is achieved) before the employee handles ESD sensitive devices. Tailoring Statement: ACME Electronics Factory Ltd. has one process step where the Personnel grounding rules do not apply. The operation involves personnel who work at the repair operation and work with exposed, powered products. Since there is a risk that the operators might come into contact with dangerous voltages management has decided any person working on this operation must not wear their wrist strap. In addition, an insulative floor mat is installed at this process step to isolate the operators from the ESD floor while Page 5 of 8

wearing their ESD footwear. The final product is to be handled by the edges and contact with ESDS is to be avoided where possible. As an additional protective measure, an air ionizer has been installed at this location in order to reduce charge levels. The following sign is posted above the workstation to inform personnel of the special handling conditions. ATTENTION HIGH VOLTAGE Operation WRIST STRAP USAGE NOT REQUIRED WHEN HANDLING ESD SENSITIVE DEVICES 9.3 Work surfaces All work surfaces within the EPA on which ESDS may be placed shall have a grounded surface that is compliant with Table 1. Any surfaces that do not comply shall be marked to indicate that they are not suitable for holding unprotected ESDS. 9.4 Packaging Only new metallized shielding bags (qualified per ANSI/ESD S541) shall be used to transport ESD sensitive products from one ESD protected workstation to another. ESD sensitive products must be completely enclosed by the shielding bag. ESD sensitive products are to be removed from the packaging only at an ESD protected work surface by grounded employees. Once the ESD sensitive product has been tested it will be returned to the shielding bag and sealed. The sealed shielding bag will then be placed in a protective container for shipment to the customer. In the case where specific ESD protective packaging is specified by the customer, by either contract or purchase order, these materials shall be used. 9.5 Marking ACME Electronics Factory Ltd. has not received any specific marking requirements from its customers. However, in order to ensure that the customer is aware that the product is Page 6 of 8

ESD sensitive the following label will be used to seal the metallized shielding bag that is used to ship all products to the customer. ATTENTION CONTENTS STATIC SENSITIVE OBSERVE PRECAUTIONS FOR HANDLING ELECTROSTATIC DISCHARGE SENSITIVE DEVICES Page 7 of 8

ANNEX 1 Audit Procedures Annex A.1 Testing of wrist strap connection point Equipment: Calibrated multi-meter 1. Connect one lead of the multi-meter to ground. 2. Connect the second lead to the wrist strap connection point. 3. Turn on the multi-meter and read the resistance. 4. If less than 2 Ohms then the reading is acceptable. 5. If greater than 2 Ohms have the wiring connection checked and fixed if necessary. Annex A.2 Checking for Static Generators Equipment: Calibrated electrostatic field meter 1. Turn on, ground and zero the electrostatic field meter. 2. Measure all the items the work area (where the ESD sensitive devices are handled) with the field meter. If the reading exceeds 2,000 V/inch then the non-compliant material must be either: a. Moved 12 inches away from area where ESD sensitive products are handled. or b. Removed from the area completely 3. If the readings are less than 2,000 V/inch then no further action is required. Page 8 of 8