A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS BPM 7/1 (2014)



Similar documents
Environmental Protection Department March 2010

INDEX GENERAL

Iron and Steel Manufacturing

Hackney Biomass Boiler Information Request Form

Vogt Power Emission Control Solutions

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

A STUDY OF ENVIRONMENTAL BENEFITS OF INDUSTRIAL INTEGRATION

Texas Commission on Environmental Quality Page 1 Chapter Control of Air Pollution from Nitrogen Compounds

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY

State of the Art (SOTA) Manual for Boilers and Process Heaters

Site Identification No.: AAO Application No.:

Wolverine Clean Energy Venture

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.

Official Journal of the European Communities

MODERNIZATION OF STEAM GENERATORS

Module 5: Combustion Technology. Lecture 33: Combustion air calculation

Sludge Treatment Facility Stack Gas Monitoring Report February 2016

Continuous flow direct water heating for potable hot water

Application Note 12: TrendView Recorders Continuous Emissions Monitoring

Description of Thermal Oxidizers

INDUSTRIAL BOILER MACT FACTSHEET

Maryland Nuclear Power Plant s Contribution to the State Economy

Source: EIA Natural Gas Issues and Trends 1998

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF

Air quality and biomass installations. A briefing for local authorities

Federal Ministry for Environment, Nature Conservation and Nuclear Safety

This article provides a basic primer on an

Inventory of LCPs in Turkey LCP Database introductory presentation

What are the causes of air Pollution

Physical flow accounts: principles and general concepts

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

Natural Gas Conversions of Existing Coal-Fired Boilers

Oil and Gas Air Quality Regulations and Permitting

Michigan Nuclear Power Plants Contribution to the State Economy

ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS. Standards for emissions from furnaces, boilers and Power Plant

Air Quality Appraisal Damage Cost Methodology

Boiler Tune-up Guide

Energy Efficient Operations and Maintenance Strategies for Boilers

Waste to Energy in Düsseldorf. for a clean city.

Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems

University of Iowa Power Plant

WHY IS BREATHING SO IMPORTANT?

Examination syllabuses for Manual Stack emissions monitoring. Environment Agency Version 9 January 2015

CAT CG132. Series Gas Generator Sets

As of: September Waste Incineration A Potential Danger? Bidding Farewell to Dioxin Spouting

POINT SOURCES OF POLLUTION: LOCAL EFFECTS AND IT S CONTROL Vol. I - Air Pollution Caused by Industries - Jiming HAO and Guowen LI

Safe Operating Procedure

Guidance for developments requiring planning permission and environmental permits. October 2012 UNCLASSIFIED

GAS HEATING IN COMMERCIAL PREMISES

Combined Heat and Power: Local Authorities

FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS

Gas Turbine Emissions and Control

Air Quality PERMIT TO CONSTRUCT

COMBUSTION. In order to operate a heat engine we need a hot source together with a cold sink

BP Texas City Refinery

Technical Solutions for Emissions Reduction

An overview of Euro VI for trucks over 3.5t. Brought to you by Mercedes-Benz

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

2) Relevance for environmental policy ) Data sources and reporting ) References at the international level... 6

Marsa Thermal Treatment Facility Yearly Emissions Statement

Air Quality: Public Health Impacts and Local Actions

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

Guidance for monitoring enclosed landfill gas flares, LFTGN05

NITROGEN OXIDES FORMATION in combustion processes COMBUSTION AND FUELS

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

GO GREEN AND SAVE GREEN

Turbine Inlet Cooling

GO GREEN AND SAVE GREEN

SIX REASONS TO DRY BIOGAS To A LOW DEWPOINT BEFORE COMBUSTION IN A CHP ENGINE STEVEN SCOTT MARKET DEVELOPMENT MANAGER ALTERNATIVE ENERGIES

Monitoring of Total Suspended Particles & Toxic Gasses in Stationary Combustion Systems

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities

39th International Physics Olympiad - Hanoi - Vietnam Theoretical Problem No. 3

Nitrogenous Fertilizer Plants

Air Pollution Sampling and Analysis

Latest Low-NOx Combustion Technology for Pulverized-coal-fired Boilers

Factsheet & Process Description Regenerative Thermal Oxidizer (RTO) Vopak Terminal Amsterdam Westpoort

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

Nitrogenous Fertilizer Plants

The Finnish Classification of Indoor Environment and Material Emissions

DIN 2403 Identification of pipelines according to the fluid conveyed. Marking of pipes according to fluid transported

Emission report Honda accord/cu1

COMBUSTION. By: Michael Biarnes. In collaboration with: Bill Freed and Jason Esteves. E Instruments International LLC -

Coke Manufacturing. Industry Description and Practices. Waste Characteristics

Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers

AUTOMOTIVE GAS OIL. Robert Shisoka Hydrocarbon Management Consultancy

INTRODUCTION. Fact Sheet: Air Pollution Emission Control Devices for Stationary Sources

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

Assessing the Changes Required by the Industrial Boiler MACT Regulations

Air Quality in San Diego 2013 Annual Report

FIRE EXTINGUISHER TRAINING

The laboratory fulfils the requirements for periodic emission measurement according to ČSN P CEN/TS 15675:2009

Transcription:

A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS (COAL-FIRED PLANT, GAS-FIRED GAS TURBINE, AND OIL-FIRED GAS TURBINE (PEAK LOPPING PLANT)) BPM 7/1 (2014) Environmental Protection Department Air Policy Group 20 January 2014

1. Introduction This note lists the minimum requirements for meeting the best practicable means for Electricity Works (coal-fired plant, gas-fired gas turbine and oil-fired gas turbine (peak lopping plant)). It should be noted that in granting a licence under the Air Pollution Control Ordinance, the Authority, i.e. the Director of Environmental Protection, will also consider all other relevant aspects and may impose more stringent and/or additional control requirements. The requirements in this note are applicable to all generation units constructed after 1 January 1991 with the following overall installed generation capacity: (a) Coal-fired Power Plants : Equal to or more than 200 MW (electrical output; aggregate generating capacity) Gas-fired Gas Turbines : Equal to or more than 15 MW (electrical output) (c) Oil-fired Gas Turbines (Peak Lopping Plant) : Equal to or more than 15 MW (electrical output) Upgrading of control on the older generation units to meet the requirements should, however, be made whenever they can be achieved technically and economically. Discussion would be arranged by the Authority to agree on the details and time schedule of implementation when the need arises. 2. Design of Chimney (a) Chimney height To be determined by mathematical or physical dispersion modelling techniques acceptable to the Authority. The aims are to ensure:- (i) (ii) (iii) the relevant Air Quality Objectives (AQO) will not be threatened; the emission of non-aqo pollutants, in particular, heavy metals and carcinogenic organic compounds, will not cause any adverse effect to human health or environment; and no undue constraint will be incurred to existing and future development or land use. The final chimney height should be agreed with the Authority but as a general guideline, the chimney height in a flat terrain situation, should not be less than the sum of the Building Height and 1.5 times of the lesser of the Building Width or the Building Height. Suitable adjustment should be made to take into account local meteorological data, local topography and background air pollutant concentrations. For non-combustion processes, the same guideline should be observed as far as 1

practicable and in any case, the chimney height should not be less than 3 metres plus the building height. Efflux velocity Not less than 15 m/s (at full load condition). (c) Exit temperature Not less than 80 o C (at full load condition). (d) Mode of discharge Releases to air from chimneys should be directed vertically upwards and not restricted or deflected by the use of, for example, plates, caps or cowls. The weather protection device of a chimney, if used, should be properly designed so as not to restrict the upward movement of the gas flow. In order to obtain maximum advantage from thermal buoyancy, hot emissions should take place from the minimum practicable number of chimneys, i.e. a multi-flue chimney design should be used as far as practicable. Chimneys for release of hot emissions should, wherever necessary, be insulated with materials which should be free of asbestos. 3. Emission Limits The emission limits stipulated below shall be applicable to all emissions during normal operations including soot blowing and load change. For smoke emission, the emission limits shall also be applicable to the start-up and shut-down periods. (a) Coal-fired Power Plants (for existing coal-fired generation unit only [1] ) (All figures, other than smoke emission or those specified below, are based on an hourly averaging period and expressed as at 6% O 2 (or 12% CO 2 as the case may be), 0 o C, 101.325 kilopascals and dry conditions) Combustion process : Particulates Sulphur dioxide : 50 mg/m 3 (2-hourly average) : 90% removal of the potential emission from burning of coal with a maximum allowable sulphur content of 1% by weight (air dry basis) (Approximate equivalent concentration: 200 mg/m 3 ) [1] As coal-fired generation unit emits more pollutants than gas-fired generation unit, the Authority, since 1997, prohibits the installation of new coal-fired generation unit to control the emissions from power generation sector. 2

Nitrogen oxides (as NO 2 ) Smoke : 670 mg/m 3 : (i) Less than Shade 2 on the Ringelmann Chart for start-up from cold; and Non-combustion process : (ii) Less than Shade 1 on the Ringelmann Chart for other period (The following figure is expressed as at 0 o C, 101.325 kilopascals and undiluted conditions) Particulates : 50 mg/m 3 Gas-fired Gas Turbines (Other Than Peak Lopping Plant) (All figures, other than smoke emission or those specified below, are based on an hourly averaging period and expressed as at 15% O 2, 0 o C, 101.325 kilopascals and dry conditions) Combustion process : Particulates Sulphur dioxide Nitrogen oxides (as NO 2 ) : 5 mg/m 3 (2-hourly average) : 15 mg/m 3 : (i) for plant installed on or before 19 January 2014: 90 mg/m 3 ; and (ii) for plant installed on or after 20 January 2014 (including the modification or change of gas-fired peak lopping gas turbines to baseload operation): 5 mg/m 3 at 70% loading and above Ammonia Smoke 8 mg/m 3 for plant installed on or after 20 January 2014 and with the use of ammonia for NOx control : (i) Less than Shade 2 on the Ringelmann Chart for start-up from cold; and (ii) Less than Shade 1 on the Ringelmann Chart for other period (c) Oil-fired Gas Turbines (Peak Lopping Plant) (All figures, other than smoke emission or those specified below, are based on an hourly averaging period and expressed as at 15% O 2, 0 o C, 101.325 kilopascals and dry conditions) 3

Combustion process : Particulates Sulphur dioxide : 10 mg/m 3 (2-hourly average) : Potential emission from burning of fuel oil with sulphur content of not more than 0.005% by weight Nitrogen oxides : 150 mg/m 3 (as NO 2 ) Smoke : (i) Less than Shade 2 on the Ringelmann Chart for start-up from cold; and (ii) Less than Shade 1 on the Ringelmann Chart for other period (d) Gas-fired Gas Turbines (Peak Lopping Plant) (All figures, other than smoke emission or those specified below, are based on an hourly averaging period and expressed as at 15% O 2, 0 o C, 101.325 kilopascals and dry conditions) Combustion process : Particulates : 5 mg/m 3 (2-hourly average) Sulphur dioxide : 15 mg/m 3 Nitrogen oxides (as NO 2 ) Smoke : 30 mg/m 3 at 70% loading and above : (i) Less than Shade 2 on the Ringelmann Chart for start-up from cold; and (ii) Less than Shade 1 on the Ringelmann Chart for other period 4. Fugitive Emission Control (a) Boundary Ambient Standards Respirable suspended particulates [2] Fine suspended particulates [2] : 100 μg/m 3 (24 hour average) 50 μg/m 3 (annual average) : 75 μg/m 3 (24 hour average) [ 2 ] Added or revised with reference to the new air quality objectives effective from 1 January 2014 as promulgated under the Air Pollution Control (Amendment) Ordinance 2013 gazetted on 19 July 2013. 4

35 μg/m 3 (annual average) Odour : 2 odour units [3] Engineering Design/Technical Requirements To be agreed with the Authority. As a general guideline, the loading, unloading, handling and storage of fuel, raw materials, wastes or by-products should be carried out so as to prevent the release of:- (i) (ii) (iii) visible dust emissions; and/or emissions of organic vapours; and/or other noxious or offensive emissions and to render these emissions harmless and inoffensive when released. 5. Material / Fuel Restriction (a) Solid Fuel Sulphur content : Not more than 1% by weight Liquid Fuel Sulphur content : Not more than 0.005% by weight Viscosity : Not more than 6 centistokes at 40 o C 6. Monitoring Requirements Parameters and sampling frequency will be determined by the Authority. However, the following parameters should be monitored continuously. The in-stack monitoring data should also be transmitted to the Authority instantaneously by telemetry. (a) Coal-fired Power Plant In-stack monitoring Oxygen, carbon monoxide, particulates (opacity), sulphur dioxide, nitrogen oxides, stack temperature. [ 3 ] An odour unit is the measuring unit of odour level and is analogous to pollution concentration. It shall be determined by dynamic olfactometry in accordance with BS EN 13725 or other similar methods acceptable to the Authority In this context, the odour level is defined as the ratio of the volume which the sample would occupy when diluted with air to the odour threshold, to the volume of the sample. In other words, one odour unit is the concentration of odorant which just induces an odour sensation. 5

Process monitoring Generation output, essential operating parameter(s) which may significantly affect the emission of air pollutants of air pollution control equipment. Ambient monitoring At site boundary : Respirable suspended particulates (24-hour sample on daily basis) At location(s) acceptable : to the Authority Sulphur dioxide, nitrogen dioxide and nitric oxide Gas-fired Gas Turbines (Other Than Peak Lopping Plant) In-stack monitoring Nitrogen oxides, sulphur dioxide, ammonia (for plant installed on or after 20 January 2014 and with the use of ammonia for NOx control), oxygen, carbon monoxide, stack temperature. Process monitoring Generation output, water-to-fuel injection ratio, and/or essential operating parameter(s) which may significantly affect the emission of air pollutants of air pollution control equipment. Ambient monitoring At location(s) acceptable : to the Authority Nitrogen dioxide (c) Oil-fired Gas Turbines / Gas-fired Gas Turbines (Peak Lopping Plant) Process monitoring Generation output, water-to-fuel injection ratio, and/or essential operating parameter(s) which may significantly affect the emission of air pollutants of air pollution control equipment. 7. Commissioning Commissioning trials (to be witnessed by the Authority whenever appropriate) should be conducted to demonstrate performance capability of the air pollution control measures and a report of commissioning trial should be submitted to the Authority within 1 month after completion of the trial. 6

8. Operation and Maintenance Requirements include not only the provision of the appliances, but the proper operation and maintenance of equipment, its supervision when in use and the training and supervision of properly qualified staff. Specific operation and maintenance requirements may be specified for individual equipment. Malfunctioning and breakdown of the process or air pollution control equipment which would cause exceedance of the emission limits or breaches of other air pollution control requirements should be reported to the Authority within three working days. 7