Modernizing Your Automation System with I/O on Demand

Similar documents
Bailey to DeltaV Systems Connectivity

Electronic Marshalling Overview

DeltaV Virtual Studio

Professional Station Software Suite

M-series FOUNDATION Fieldbus I/O

Wired versus wireless trade-offs

S-series SQ Controller

DeltaV Virtual Studio

M-series MD Plus Controller

OPC Data Access Server Redundancy

The Personal Computer for DeltaV Wokstations

Wireless Field Data Backhaul

DeltaV SIS for Burner Management Systems

Wireless Remote Video Monitoring

S-series Mass Connection Solutions

S-series DC to DC Power Supply

Wireless Remote Video Monitoring

White Paper. Replacing Aging Process Automation Systems: Finding the best option. What s Inside:

DeltaV Virtualization High Availability and Disaster Recovery

Take a modern approach to increase safety integrity while improving process availability. DeltaV SIS Process Safety System

Maintenance Station Software Suite

S-series DeviceNet Interface Card

M-series Virtual I/O Module 2

Base Station. Base Station. Introduction. DeltaV Product Data Sheet. Adaptable work environment. Scalable to suit your needs. Dedicated functional use

The Evergreen DeltaV Process Automation System

DeltaV Workstation Operating System Licensing Implications with Backup and Recovery

Backup and Recovery FAQs

DeltaV Remote Client. DeltaV Remote Client. Introduction. DeltaV Product Data Sheet. Remote engineering and operator consoles

N.K. Srivastava GM-R&M-Engg.Services NTPC- CC/Noida

Operator Station Software Suite

DeltaV Event Chronicle

WDPF -to-ovation Migration Increasing Your Performance While Preserving Your Investment

Plantwide Event Historian

The Continuously Current Enterprise: Trends in lifecycle management of automation assets

DeltaV SISnet Repeater

ProfessionalPLUS Station Software Suite

DeltaV Web Server. DeltaV Web Server. Introduction. DeltaV Product Data Sheet. Gives you a secure view of your process from your desktop PC

Panduit Infrastructure Management Software for Data Centers and Enterprises

DeltaV Virtualization

Wireless I/O Card. Wireless I/O Card. Introduction. DeltaV Product Data Sheet

Wireless Mobile Workforce

How To Use The Deltav System With A Large Data File System

Data Center Network Infrastructure The Smart Choice For Your Data Center

Modernize your Monitor Pro software with less risk, less cost and less effort

Control System Migration: Protect Investments, Improve Business Results and Reduce Risks

Strategies for Upgrading your Paper Machine Automation System

OPC Mirror. OPC Mirror. Introduction. Product Data Sheet. Bi-directional data flow. Easy configuration. Fast data transfer. OPC Data Access compliant

Dealing with Thermal Issues in Data Center Universal Aisle Containment

DeltaV Operator Keyboard

OpEx Advantages + Asset Optimization

DeltaV Event Chronicle

Agile Project Execution

Process and Motor Controls in Central and Remote Buildings: PlantWeb Center, the Intelligent Remote Building

DeltaV System Cyber-Security

H.V.A.C. Design Plumbing Design

Operations Management and the Integrated Manufacturing Facility

Automated Patch Management Service

Application Station Software Suite

ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM

Batch Analytics. Predicts end-of-batch quality. Detects process faults and provides reason for deviation so operations can take action in real time

The integrated HMI-PLC

An Uninterruptible Power Supply Topology to Manage the Arrival of Big Data Kenny Green

Front End Engineering Design Capabilities

Table of Contents. Fiber Trunking 2. Copper Trunking 5. H-Series Enclosures 6. H-Series Mods/Adapter Panels 7. RSD Enclosures 8

Single or Multi-DC Network: Pros, Cons and Considerations

COST ESTIMATING METHODOLOGY

Plant Messenger Alert Reporting Service

GE Intelligent Platforms. PACSystems High Availability Solutions

Emerson Smart Firewall

Smart Card Two Factor Authentication

Selecting Sensors for Safety Instrumented Systems per IEC (ISA )

THE WORLD'S FIRST WIRELESS GUIDED WAVE RADAR

DeltaV System Software Update Deployment

DeltaV Guardian Support

DeltaV OPC.NET Server

Health Care Solutions

Smart Data Center Solutions

Modular architecture for high power UPS systems. A White Paper from the experts in Business-Critical Continuity

Physical Infrastructure Management Solutions

AMS Suite: Intelligent Device Manager

Simplifying Data Center Network Architecture: Collapsing the Tiers

Data Center Colocation Build vs. Buy

How To Protect Your Deltav Controllers From Cyber Attacks

PROCESS AUTOMATION FLEXIBLE ASSET MANAGEMENT HART INTERFACE SOLUTIONS

How To Access Historical Data From The Deltav Oca History Server On A Pc Hda (Opc Hda) On A Microsoft Computer (Opca) Or Microsoft Microsoft Memory Card (Procedure) On An Ipc

ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery

Borregaard s Automation Migration: Strategic Tool for Business Improvement. Dag Skjeltorp, Chief Engineer, Borregaard, Ind. Ltd.

Fisher FIELDVUE Instrumentation Improving Safety Instrumented System Reliability

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center

Calculating ROI for Automation Projects

ProfessionalPLUS Station Software Suite

Wireless Plant Networks After Project

Cable management for rack-mounted systems

How To Create An Intelligent Infrastructure Solution

XLReporter for DeltaV Analyze

SummitStack in the Data Center

This document describes how engineered sounds for control system alarms improve Operator responsiveness.

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

High Availability for Non-Traditional Discrete and Process Applications Ensuring Continuous Operations With Increased Controller Reliability

SummitStack in the Data Center

Transcription:

January 2013 Page 1 Modernizing Your Automation System with I/O on Demand A brown field system modernization case study concludes that using DeltaV CHARMs I/O mounted in field junction boxes will reduce costs when compared to traditional homerun cabling to a central rack room. www.deltav.com

January 2013 Page 2 Table of Contents Table of Figures... 3 Introduction... 4 Modernization Case Study... 5 Case Study Assumptions... 5 Case A Actual Project Scope of Work... 5 Case A Subset Basis for Comparison with Case B... 6 Case B Electronic Marshalling Solution... 8 Summary of Findings... 11 Conclusion... 13 Appendix A. Considerations for Modernization... 14 Phased Migration or Rip and Replace... 14 When It Makes Sense to Migrate... 15 Appendix B. I/O on Demand... 16 Appendix C. Hot Cutover versus Cold Cutover... 17 Appendix D. Electronic Marshalling for Migration... 18

January 2013 Page 3 Table of Figures Figure 1 Value of Process Control Systems Increase as Technology Improves...4 Figure 2 Case A, actual project cross-marshalling with 83 new homerun cables...7 Figure 3 Case A, actual project E & I design and installation tasks...7 Figure 4 Electronic Marshalling Field Junction Box with 48 CHARMS...9 Figure 5 CHARMs base plate...9 Figure 6 Case B, electronic marshalling in Field Junction Boxes... 10 Figure 7 Electronic Marshalling in the field tasks are equal, reduced, eliminated or added... 11 Figure 8 Total Value Modernization Solutions... 15 Figure 9 Four distinct ways of bringing I/O into the control system... 16 Figure 10 Electronic Marshalling designed with migration projects in mind... 18 Figure 11 Replace old termination panels with horizontal CHARMS baseplates... 18 Figure 12 Terminate field wires directly,and eliminate cross-marshalling... 19

January 2013 Page 4 Introduction Market studies indicate that tens of billions of dollars worth of automation systems in operation today are reaching end of useful life economic and functional status. Plants with these legacy systems struggle to keep pace with best-in-class competitors. Upgrading to the latest technologies is essential for improved business results. 1 The contribution made by automation to a plant s bottom line has increased significantly since the early days of pneumatic instrumentation and panel board operation. Advances in electronic transmitters, final elements and distributed control helped to improve plant efficiency and product quality. A major paradigm shift came with digital plant architectures which enable tighter integration of field devices and business systems with the control network. Technologies were developed to turn vast amounts of diagnostic data into meaningful decision support information for operations, maintenance and plant business management. The latest advancements have been to reduce complexity, eliminate unnecessary work and embed essential knowledge into technology. These changes reflect Emerson s dedication to understanding work processes in order to determine and devise methods to improve the way people work. This area of study is called Human Centered Design (HCD), and its position on the continuum of automation system user experience is depicted in Figure 1. Figure 1 Value of Process Control Systems Increase as Technology Improves In the 1980 s, Emerson developed HART protocol, and later donated it for open use. Similarly, Emerson has broken new ground through HCD, incorporating it into all DeltaV version 11 products. One of the most innovative offerings is the highly flexible I/O on Demand 2, which includes DeltaV S-Series Traditional I/O, Electronic Marshalling, H1 Card with Integrated Power, Redundant Wireless I/O and more. 1 Considerations for Modernization are expanded in Appendix A 2 I/O on Demand is further defined in Appendix B

January 2013 Page 5 This paper presents DeltaV version 11 I/O on Demand in a case study involving a legacy or brown field system modernization to a DeltaV systemusing traditional wired I/O and field signal marshalling. This study shows actual costs and labor for the original project versus theoretical costs and labor using today s I/O on Demand where feasible, to reduce engineering and installation costs. Modernization Case Study In an effort to validate the magnitude of cost savings available with I/O on Demand solutions, Emerson engineers re-evaluated the brown field modernization project (Case A) that was completed at a North American chemical facility in 2006-2007,asking: How would the project have looked, had electronic marshalling been available? And, How would the total installed cost have been affected? The following case study (Case B) answers these questions and the results leave no doubt that electronic marshalling is truly a game-changing technology. Case Study Assumptions In the case study, some costs are held constant, at 2006 2007 levels, when the actual project (Case A) was executed. Here are the items that are unchanged for the new project estimate (Case B), which was developed in 2010. Construction staffing and project overhead costs for personnel at levels above general foreman Labor rates and materials pricing DCS configuration, display development, Factory Acceptance Test (FAT), Site Acceptance Test (SAT) and training costs DeltaV system hardware and software licensing costs Also, areas in the original project that required no new homerun cabling were kept as is for Case B, i.e., they were not reassigned to any new I/O type or electronic marshalling. Case A Actual Project Scope of Work The project replaced a late 1980 s distributed control systems (DCS) in process and utilities plant areas with a new DeltaV process automation system. Scope of work included 85,000 home office hours. Project tasks included: Front end engineering design (FEED) and detailed engineering to reassign ~ 5,500 hardwired I/O to the new DeltaV system Replace ~200 field instruments Design and install new plant-wide fiber optic network Design and install power distribution and grounding as needed Configure DCS controls and displays. Design interfaces to 3 rd party equipment including safety systems, machine vibration monitoring, process analyzers, plant historian and an advanced control package Conduct FAT and SAT Train operators Commission loops and support startup Plan and implement cutover. Hot cutover 3 was used for approximately 50% of the hardwired I/O during initial startup, with remaining I/O switched over during a turnaround. 3 Hot cutover is contrasted with cold cutover in Appendix C

January 2013 Page 6 Case A Subset Basis for Comparison with Case B The case study comparison addresses only a subset of the actual project scope, as described here: Marshalling, homerunsfield junction boxes Analog and digital I/O from 76 existing field junction boxes (FJBs) were terminated at new marshalling panels in the DCS rack room where DeltaV controller cabinets were installed 75 homerun cables from 76 FJB s were replaced due to deterioration from age To minimize downtime, existing marshalling panels that housed terminations of homerun cables being replaced, were not reused. Designed and fabricated custom cabling between new marshaling panels and DeltaV I/O modules to expedite cutover during turnaround. Prior to the plant shutdown, new homerun cables were terminated at new marshalling panels Made terminations at existing field junction boxes during plant shut down Installed 8 new FJBs to accommodate new I/O to replace pneumatic controls. Pulled 8 homerun cables from these new FJBs to the DCS rack room. Thermocouples Rewired 473 thermocouple temperature signals from 22 existing FJBs to Rosemount 848T high density temperature transmitters using FOUNDATION fieldbus. 22 FOUNDATION fieldbus trunk cables were pulled back to the DCS rack room Summary A total of 75 + 8 = 83 new homerun cables were pulled from the field to the DCS rack room along with cable for 22 new FOUNDATION fiedlbus segments 1,300 feet of new cable trays, tee supports and multi cable transits were required, and existing cable trays were utilized where possible This project subset as originally installed is shown in the following figures. Figure 2 illustrates cross-marshalling to align field signals to assigned I/O modules.

January 2013 Page 7 Figure 2 Case A, actual project cross-marshalling with 83 new homerun cables Figure 3 shows engineering tasks around control, marshalling and junction box wiring. Figure 3 Case A, actual project E & I design and installation tasks

January 2013 Page 8 Case B Electronic Marshalling Solution In this scenario, CHARMs I/O 4 is mounted in the field and electronically marshaled to the DCS rack room. This eliminates the need to pull 83 homerun cables. Gone are cabinets, cross-marshalling and associated engineering and installation costs and labor. Note: To ensure that the case study scenario is realistic, actual project team members who know the site layout were consulted. Marshalling, homeruns, field junction boxes 1,100 I/O will utilize CHARMs installed in Emerson standard Factory Tested Field Enclosures. o o o o The engineering team evaluated retrofitting existing FJBs and mounting CHARMsS I/O inside. Due to size constraints, this was not practical. Rather, existing junction boxes will be refurbished and remain in place. The advantage of this approach is that conduit, wiring and terminations from field devices will not be disturbed. Short jumper cables are required in conduit from existing FJBs to new CHARMs enclosures. One CHARMs FJB can accommodate I/O from approximately three existing junction boxes. Therefore, only 30 new junction boxes are needed. o o o These will be mounted in central locations to minimize jumper cable length. Each of the 30 new CHARMsFJBs require redundant UPS power, grounding and fiber optic cable terminations. Although purging was not required by area classification, in consideration of the site s harsh environmental conditions, purging all new junction boxes was deemed customer best practice. Design and installation costs for FJB purge is included in the case study analysis New instrumentation to replace pneumatics is included in the I/O count. Wiring from the new devices will run directly to CHARMs enclosures. Thermocouples Converting 472 temperature signals to high density 848Ts with FOUNDATION fieldbus was deemed to be the best solution. The ability to mix and match in this way demonstrates the flexibility of I/O on Demand. Costs associated with running 22 FOUNDATION fieldbus segments are the same as in the original project. 4 CHARMs I/O is further explained in Appendix D

January 2013 Page 9 Standard Factory Tested Field Enclosures Emerson s standard factory tested field enclosures can have up to 48 CHARMs I/O. To allow for spares simply leave channels empty; and when needed, install a CHARM type appropriate to the new signal. Enclosures are shown in Figures 4 and 5. Figure 4 Electronic Marshalling Field Junction Box with 48 CHARMsS Figure 5 CHARMs base plate

January 2013 Page 10 Figure 6 shows the proposed CHARMs I/O solution used in Case B. Figure 6 Case B, electronic marshalling in ffield jjunction bboxes

January 2013 Page 11 Figure 7 summarizes tasks required in the theoretical case, work added and work eliminated through the use of electronic marshalling solutions. Figure 7 Electronic marshalling in the field tasks are equal, reduced, eliminated or added Summary of Findings The case study found that using electronic marshalling for this project would reduce design, construction and installation costs significantly. Net design labor savings is almost 1900 hours or 47 man-weeks. The biggest time savings is the elimination of work required for loop drawings. Table 1 details design work savings. E&I Task Table 1 Electrical and Instrumentation Design Man Hour Savings Required E & I Design Man Hours Case A Case B Case B - Case A Engineering Quality Checks 628 496 (132) Design Quality Checks 1154 890 (264) Marshalling Panel Layout and Wiring Design 280 120 (160) DCS Loop Diagrams 3264 2089 (1175) Power and Grounding Plans 95 175 80 Cable Tray Plans and Details 280 80 (200) Fiber Optic Plans and Details 70 110 40 Cable Ppenetration Details 80 20 (60) TOTAL Design Man Hours Savings with Electronic Marshalling (Case B) (1871)

January 2013 Page 12 Electronic Marshalling eliminates engineering, labor and materials required for traditional cross-marshalling of signals. With no terminations in the DCS cabinets, fewer cabinets are needed and amount of work to create, check, edit and recheck drawings is dramatically reduced.. This reduces costs and rack room footprint. In this case, the number of I/O cabinets was reduced by more than half. With CHARMS I/O mounted in Field Junction Boxes, the savings in cable, trays, conduit and structural work is significant. Table 2 summarizes construction and installation tasks and man-hours savings achievable with electronic marshalling, specifically DeltaV CHARMs. Construction & Installation Task Field Construction: Labor and Material Table 2 Construction and Installation Savings Hrs Required Case B - Case A $63,000 Description Incremental cost to add 38 CHARM FJBs, 6 power distribution cabinets, fiber optic patch panels and air purging vs. homerun cables to existing FJBs Scaffolding Rental ($240,000) Large savings due to redundant fiber runs vs. homerun cables Civil / Structural ($150,000) Fewer cable trays and supports Purchased, Engineered Materials ($127,000) Marshalling panels and homerun cables eliminated vs. adding FJBs NET Savings ($454,000) Construction and Installation Savings with Electronic Marshalling The incremental costs to install new CHARMS Field Junction Boxes are offset by substantial savings in materials and construction. Omitting $240,000 in scaffolding rental also has a significant safety benefit, lowering risks associated with contractors working high above the ground. For the actual project, engineers designed and fabricated custom cabling between the marshalling panels and DeltaV I/O cards to expedite the cutover. When modernizing a control system, the ability to complete the transition as quickly as possible is critical. Using CHARMs I/O in field junction boxes eliminated the need for custom cabling, because much of the work could be completed while the plant is still running. Final analysis indicates that using electronic marshalling for part of this modernization project would result in ~ 9% overall savings. Table 3 summarizes categories of project work and savings for each, when using electronic marshalling. Table 3 Overall Project Savings Electronic Marshalling Savings Summary Cost, $K E & I design engineering savings $141 Construction and installation savings $454 Total savings $595 Electronic Marshalling vs Actual Project Cost, $K Actual project contract cost $6,687 Net case study project cost $6,092 Percentage Savings 8.9%

January 2013 Page 13 Conclusion The flexibility with electronic marshalling and all of the I/O on Demand solutions gives users a unique set of options to design the best solution to move to digital plant architecture. The case study comparison shows 8.9% savings in total installed cost when using CHARMsS I/O in field junction boxes versus traditional wired I/O in a central rack room. Distance between field I/O terminations and controller is directly proportional to cost savings for design and installation, i.e., longer distance, greater savings. Electronic marshalling dramatically reduces numbers of cables, conduit runs, wiring terminations and associated drawings.

January 2013 Page 14 Appendix A. Considerations for Modernization Phased Migration or Rip and Replace Phased migration is preferable in many situations to rip and replace of a system, whether staying with the incumbent or switching to a new supplier. In horizontal phased migration, typically one replaces the human machine interface (HMI) with new console hardware and the latest operating system. This is a popular first step because - Legacy consoles become obsolete long before controllers and I/O do - Console replacements are low risk and relatively easy transitions for operators. The downside is that little business value is realized while legacy controllers and I/O remain in service. By the time controller replacement business drivers are evident, another console upgrade may be due. Vertical modernization involves much beyond the control system. The entire automation infrastructure comes into play. To support the new state-of-the-art DCS, new networks, switches, cabling and instrumentation may be required. Additional capabilities may be desired, such as asset optimization to improve operational effectiveness. A vertical strategy involves upgrading controllers, which is often perceived by plant management and engineering personnel as higher risk than HMI upgrade. Implementation planning and execution must enable the plant to resume full production safely, quickly and seamlessly with the new automation system. Control functionality must be equal to that of its predecessor, but the expectation is of improved performance. Emerson advocates not doing replace-in-kind applications because - Simply upgrading hardware without implementing new software applications would place unnecessary constraints on system capabilities and process improvements. - It is analogous to running 20-year-old MSDOS programs in a shell on Windows 7. Emerson has developed tools and services to lower risks when modernizing applications. Analysis routines identify base level functions for automatic conversion, as well as functions for which advanced control applications may be applicable. These applications include model predictive control, neural networks, closed loop adaptive control or embedded control performance monitoring. One step rip and replace modernizations require plant shutdown, severing connections to the legacy system and start up of new hardware and software. Risks can be minimized with - Detailed installation planning, - Rigorous testing using simulation, and - Operator training Costs are concentrated heavily in the project front-end, as opposed to being distributed over time. Downtime costs present the biggest obstacle to justifying one step replacements. Some plants simply cannot allow sufficient downtime to complete this type of switchover, even though overall costs can be less than multi-year, phased migrations. To minimize process downtime, wiring solutions are available that allow field terminations to remain undisturbed, while connect ing to the new system using prefabricated cables or interface panels.

January 2013 Page 15 When It Makes Sense to Migrate ARC wrote in the white paper titled Emerson s Flexible Approach to Control System Migration. When does it Make Sense to Migrate? The question was answered as follows: Impending threat of unscheduled downtime/incident No longer cost-effective to support old system, system dead-ended or phased out, no spare parts availability Old system cannot support new information technology that provides economic advantage New or emerging business opportunity impossible without new system Old system is inflexible and cannot react to rapid shifts in customer demand Old system lacks visibility that could prevent abnormal situations, equipment breakdown, disruptions in supply chain etc Old system does not have the capacity or is not cost-effective to expand Even when some or all of these conditions exist, before embarking on a modernization effort, decision-makers must be convinced that the risks will be manageable, costs minimal, and results will be profitable. Emerson has a great deal of experience helping customers achieve business results through modernization of automation equipment. Figure 8 depicts the types of services, solutions and expertise applicable for modernizations Figure 8 Total value modernization solutions With an extensive portfolio of system migration solutions, domain expertise in all major platforms, a wealth of experience executing modernization projects and a clear leadership position in technology, Emerson is the ideal choice for an automation partner.

January 2013 Page 16 Appendix B. I/O on Demand DeltaV S-series with I/O on Demand provides maximum choice and flexibility for both green field and brown field modernization projects. I/O on Demand allows users to decide what type of I/O they want, when they want it, wherever they want it. Bringing I/O into the control system can be accomplished using any combination of these four distinct ways: Traditional Wiring Electronic Marshalling Digital Busses WirelessHART These I/O solutions are depicted in Figure 9. Figure 9 Four distinct ways of bringing I/O into the control system Engineers make selections for the best, most cost effective approach for each situation. (For details and information on I/O on Demand and electronic marshalling, please see whitepapers, Electronic Marshalling Overview, Electronic Marshalling Robustness and Performance and the S-series Electronic Marshalling product data sheet.)

January 2013 Page 17 Appendix C. Hot Cutover versus Cold Cutover Horizontal migrations can be performed easily with the plant running. Old and new systems can run in parallel until operators are comfortable with the new user environment. Conversely, one step replacements require a process shutdown for cutover. Partial vertical migrations (by process unit or area) are often accomplished by a hot cutover of non-critical loops and brief shutdowns for moving select equipment controls to the new system. This presents greater complexity for operators, temporarily, as they use HMI s from both systems until cutover is complete. Some other factors to consider when planning a cutover strategy are: General Cold Cutover Hot Cutover Real estate and space constraints Type of process (batch or continuous), Industry (example: offshore platform), Corporate best practice and Current economic conditions Reduces process safety hazards during rewiring and commissioning Reduces operational safety for construction personnel Reduces potential for plant upsets, spills, and fires, due to human error Reduces risk of environmental violations Allows for thorough loop checkout before putting system into service Potential downside may be unable to switch back to original system Significant operator training is required prior to process startup on new system Minimizes process downtime and is therefore economically more attractive for some processes Requires keen attention to details during design and implementation to ensure smooth cutover New system acceptance by operations is incremental with each area cut over vs. a one-tep change with cold cutover Start-up risks, including time to full on-spec production are lower

January 2013 Page 18 Appendix D. Electronic Marshalling for Migration An innovative example of electronic marshalling for legacy I/O migration is given in the pproduct data sheet, S- series Electronic Marshalling for Migrations. The CHARM I/O card (CIOC) supports up to 96 individually configurable channels. CHARM I/O base plates, when mounted horizontally, allow for direct replacement of legacy hardware within existing cabinets. A migration to DeltaV S-series hardware can be done without having to add cabinets, custom cables, or extra marshalling. All communications are completely redundant from the channel (CHARM) to the DeltaV S-series controller. Figure 10 shows an electronic marshalling configuration suitable for migrations. Figure 10 Electronic marshalling designed with migration projects in mind Install the CHARMs migration panel above, below, or even in front of the legacy termination panel and move wires a matter of inches to complete the installation. Since the CHARMsmigration panel is a standard CHARMs baseplate, it talks to the CIOC the same as the standard vertical installation via the cable interface. This allows the migration panel to be mounted in the best location to facilitate a clean system cutover with no concerns about how to stretch I/O cables to a new termination. CHARMs baseplates can be mounted in any orientation as best fits the layout and needs. Figure 11 shows how s/o Cards (CIOCs) can be installed in an existing cabinet. Figure 11 Replace old termination panels with horizontal CHARMs baseplates

January 2013 Page 19 Horizontally mounted CHARMs baseplates replace legacy termination panels in the same footprint and the wires for each channel can simply be moved a few inches and re-terminated. The signal types do not matter as a matching CHARM is all that is needed. Another option shown in Figure 12 is to eliminate marshalling altogether and re-terminate field wires directly to CHARMsI/O. Figure 12 Terminate field wires directly,and eliminate cross-marshalling The case study in main body text uses CHARMs I/O mounted in field junction boxes.

January 2013 Page 20 This page intentionally left blank. To locate a sales office near you, visit our website at: www.emersonprocess.com/deltav Or call us at: Asia Pacific: 65.6777.8211 Europe, Middle East: 41.41.768.6111 North America, Latin America: +1 800.833.8314 or +1 512.832.3774 For large power, water, and wastewater applications contact Power and Water Solutions at: www.emersonprocess-powerwater.com Or call us at: Asia Pacific: 65.6777.8211 Europe, Middle East, Africa: 48.22.630.2443 North America, Latin America: +1 412.963.4000 Emerson Process Management 2013. All rights reserved. For Emerson Process Management trademarks and service marks, go to: http://www.emersonprocess.com/home/news/resources/marks.pdf. The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed as warrantees or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our terms and conditions, which are available on request. We reserve the right to modify or improve the design or specification of such products at any time without notice. www.deltav.com