ENERGY AUDIT IN THE KACST BUILDING



Similar documents
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Code of Practice for Building Energy Audit

HEATING, VENTILATION & AIR CONDITIONING

SAVE ENERGY AT HOME INSULATE AND AIR SEAL

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Applying Schedules and Profiles in HAP

Energy Efficiency Tips for Businesses

CONCEPTUALIZATION OF UTILIZING WATER SOURCE HEAT PUMPS WITH COOL STORAGE ROOFS

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

Lesson 36 Selection Of Air Conditioning Systems

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)

HVAC Processes. Lecture 7

D5.3 Energy audit report

Creating Efficient HVAC Systems

Diego Ibarra Christoph Reinhart Harvard Graduate School of Design

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

Market Potential Study for Water Heater Demand Management

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

Carnegie Mellon University School of Architecture, Department of Mechanical Engineering Center for Building Performance and Diagnostics

Glossary of HVAC Terms

A Roof Integrated Solar Heating System Without Storage

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

ENERGY SAVING BY COOPERATIVE OPERATION BETWEEN DISTRICT HEATING AND COOLING PLANT AND BUILDING HVAC SYSTEM

TIPS ON ENERGY SAVING

HVAC Systems: Overview

CHAPTER 10: APPLIANCES AND LIGHTING

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

ICE THERMAL STORAGE IN AIR CONDITIONING APPLICATION FUNDAMENTALS

Residential HVAC Load Sizing Training October 14, David Kaiser Green Code Plan Reviewer

Selection Tips For Air-Conditioning Cooling Systems

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad

RESEARCH HIGHLIGHT. The Impact of Heat Pump Water Heaters on Whole-House Energy Consumption

SIMULATION OF RADIANT COOLING PERFORMANCE WITH

How To Save Money On Energy

Q Utility Rebate Report. Houston, TX

Section 2: Estimating Energy Savings and Incentives

Is an air source heat pump the right choice for my home? Important information and key things to consider before installing an air source heat pump

Energy'Saving,'Thermal'Comfort'and'Solar'Power'Information'Sheet'

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Xcel Business Customers: Program and Rebate Summary

How To Design A Building In New Delhi

THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT.

Heating, Ventilation & Air Conditioning Equipment

Example of audit of an air conditioning system

The Chilled Water and Hot Water Building Deferential Pressure Setpoint Calculation Chilled Water and Hot Water Pump Speed Control

COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN

RosevilleProject. LoE _ 2 Glass Products. You can reduce your cooling energy usage by 25% or more. Here is the proof.

Robert J. Hughes Manager Product Marketing Georgia Power Atlanta, GA, USA. (c) 2009 Georgia Power

Corporate Energy Conservation & Demand Management Plan (CECDMP)

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

Case Studies: Infrared Heating in Industrial Applications

Commercial/Office Space

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

Schedule OLM-AS OPTIONAL LOAD MANAGEMENT AND AUTOMATION SERVICES RIDER

Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

Study on Performance Evaluation of a Split Air Conditioning System Under the Actual Conditions

Comparing Energy Savings of Different VAV Systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

The sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications.

Energy Saving Tips. Adjust set point temperature up a few degrees... Window contact. Occupancy sensor. A Programmable Thermostat

The Sino-Italy Environment & Energy Building (SIEEB): A model for a new generation of sustainable buildings

CHAPTER 3. BUILDING THERMAL LOAD ESTIMATION

Green Building Handbook for South Africa Chapter: Heating, Ventilation and Cooling Luke Osburn CSIR Built Environment

A Cover HVAC ENERGY EFFICIENT

Yijun Gao, Wei Wu, Zongwei Han, Xianting Li *

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION.

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE

Center for Energy Education Laboratory

PARTNERING. in Energy. Solutions A PROGRAM TO PROMOTE BUSINESS ENERGY EFFICIENCY

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Comparison between Decentralised and Centralised Air Conditioning Systems

Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program. Seminar Outline & Sample BEST Exam Questions

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Acumen Enterprises, Inc.

HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget

Second Place: Industrial Facilities or Processes, New

Council s energy efficiency upgrades benefit community

The natural ombination

Tips on Saving Energy in Your Business

Air Conditioning Contractors of America

How to choose a heat pump and use it wisely

Building HVAC Load Profiling Using EnergyPlus

Mechanical, Plumbing, and Fire Protection Conditions

Typical Cooling Load Profile

imagine SOLAR AIR CONDITIONING MADE EASY

Heating, ventilation and air conditioning (HVAC) equipment. A guide to equipment eligible for Enhanced Capital Allowances

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Transcription:

ENERGY AUDIT IN THE KACST BUILDING S. M. Hasnain, S. H. Alawaji, A. M. Al-Ibrahim and S. M. Smiai Energy Research Institute (ERI) King Abdulaziz City for Science and Technology (KACST) P.O. Box 6086, Riyadh 11442, Saudi Arabia. Abstract A six storey office administration building of KACST was selected to conduct an energy audit. This new building is in use since 1996 and having well-insulated walls and roofs and different types of lighting lamps. Building air conditioning system is comprised of three air cooled reciprocating chillers, three pumps and four air handling units (AHUs). This paper presents measured values of actual electrical energy consumed by individual chillers, AHUs, different lighting systems, office equipment and other associated electric appliances used in the building. The results show that daily air conditioning load comprises 75% of the building load during peak summer period. Whereas the other major measured loads are 11.2% and 10% for interior lights and office equipment respectively. Nevertheless, the uses of programmable thermostat and ice thermal storage are suggested to be incorporated in the building for energy and power savings. 1. Introduction In the last two decades, electrical energy consumption in the Kingdom of Saudi Arabia has increased rapidly. This is mainly due to the rapid development and heavily subsidy of electricity costs (tariff ranges between 5 to 20 Halalas/kWh) [1]. This requires a huge investment either for building new power plants or upgrading the existing electric power systems. The electric utilities in the Kingdom face problems of peaking hours. The demand is very high during summer, mainly due to air conditioning consumption, lack of thermal insulation usage in most of the buildings as well as the implementing of the proper methods of energy conservation and the appropriate techniques for load management [2]. As a result, energy conservation became an important target for the Kingdom. Several efforts have been accomplished, however, they are not at the expectation and not more than 3-4 % at the country level has been achieved [3]. One of the essential goals of the Ministry of Industry and Electricity (MIE) is the reduction of peak load by 20% (at least) during summer as well as reducing energy consumption by 30% [3]. Therefore, the MIE started advising the customers to reduce their loads by supplying the energy conservation methods and techniques. At the same time electric utilities guide the customers and follow-up their efforts to achieve the established goals. First step towards achieving the MIE goals for energy conservation and peak load reduction, is to conduct an energy audit in a building and find out the areas for energy and power savings. To the best of the knowledge of the authors, measured experimental values of actual electrical energy consumption by individual equipment: chillers; air handling units; different lighting systems; office equipment and other associated electric appliances in an office building are not complete in the literature. This paper presents an energy audit in a newly constructed multi-storey Saudi office building and also identifies the areas for energy and power savings therein. 2. Building Design and Orientation The King Abdulaziz City for Science and Technology (KACST) based in Riyadh are having a number of multi-storey office buildings. A sixstorey office administration, building-26 of KACST, is being selected for conducting the energy audit and to propose energy conservation therein. The building represents a typical example of a Saudi office building. The building is rectangular in shape and longitudinally oriented in east-west axes, and all around exposed to solar radiation. The exterior of the building is composed of tented-double glazed windows (46% of the total area) and the remaining are of composite metallic walls. Total floor area of the building is equivalent to 7384 m 2. Normally, the building is occupied from 0730hrs to 1530hrs five days a week (Sat- Wed) and the number of occupants exceeds 150. Some personnel remain in the building up to 2200hrs. 3. Electrical Power Supply to the Building Electricity to the building is supplied through three transformers. Each transformer has an energy

meter. Out of these three, one transformer supplies power to all three chillers. The power and energy profiles of this transformer were monitored by an electric load analyser. The sequence of equipment operation and other details are given in the following sections. 3.1 Non Air Conditioning Equipment in the Building An inventory of office equipment, internal/external lights and other electrical appliances in the building has been made. It has been observed that the operating time of each equipment vary randomly. Total 2072 lighting fixtures of different individual rated power are used in the building. The total accumulated rated power is equivalent to 131.5 kw. 3.2 Air Conditioning Equipment in the Building The cooling load of the building is supplied by three 30GB-150 Flotronic II, Air Cooled Reciprocating Chillers. The capacity of each chiller is 527 kw (cooling). These chillers are situated 80 meters away from the main building. Two chilled water pumps are used to pump chilled water from chillers to the air handling units (AHUs), situated at the roof level (sixth floor) of the building. The chilled water is pumped from chiller plant to the HVAC plant rooms in the building through 350 meter pre-insulated steel piping. All the three chillers are used to supply the peak cooling demand during the peak hours of summer season. The HVAC system is a variable air volume system. There are four AHUs serving the building. Each AHU supplies air at a constant temperature and a variable volume to the Variable Air Volume (VAV) terminal units, located in the ceiling voids of the office areas. Each VAV unit (or units) is controlled by a wall mounted thermostat. While the AHUs are controlled by the Building Automation System (BAS) and the VAV/CAV(control air volume) units are controlled by room thermostat. Control of comfort conditions inside the building is achieved through the use of the on-off room thermostats, which can be set at a desired temperature by the user s. 4. Electrical Power Measurement As described earlier, three transformers supply electrical power to the building. Two transformer out of three, supply power to all the electrical load except chillers. The following section present methodology for measurement and results obtained from these measurements 4.1 Measurement Methodology, Results and Discussion The electrical equipment in the building, such as computers, air handling units, etc., have various rating power and different function as well as different operational time. It has been observed from monitoring the building that all equipment are being used for different period of time. For example, the daily average operating time of each personal computer is 12 hours. Operational time of other equipment have also been estimated. As described earlier, two transformers supplying electric power to all the equipment located in the building, and each transformer has an energy meter. Energy meter readings from these transformers have been recorded on hourly basis. The electric load of supply air fan (SAF), return air fan (RAF), and exterior lights were measured through load analysers. The remaining load, such as office equipment, lighting, miscellaneous load (for instance, electric cookers, hand dryers, electric water heaters), etc. of the building is estimated through two methods. The first method is an estimation on the basis of the equipment rated power and operational time duration. Table. 1 presents a list of all electrical equipment used in the building and their rated power. The table shows the total installed power equivalent to 680 kw. The second method is a determination procedure by calculating the difference obtained from the summation of the measured energy consumption of SAF, RAF, and exterior lights from the total energy meter reading. The illuminious measuremenin different area of the building was also conducted using LUX meter. Instantaneous measurements of power drawn by the motors of the compressors, the pumps and the fans were made using power transducers as well as electric load analyser. Different measurements of these supply and return chilled water temperature, power, ambient temperature and relative humidity were recorded periodically using a data logger. Data were sampled every 15 minutes. Those information were off-loaded to a personal computer for analysis. Table 1. List of electrical equipment used in the KACST s building Equipment Quantity Total Rated Power (kw)

Chillers 3 103.5 Condenser fans 36 55.8 Distributions pumps 3 20.94 Supply fans 4 58 Return fans 4 32 Office equipment 324 114 Interior lighting 2072 124 External Lights 150 7.5 Exhaust fans 2 0.7 Power for Communication 1 0.5 Humidifiers 4 9.9 Electric Cookers 12 24 Hand Dryers 12 25 Electric Water Heaters 12 66 Lifts 3 37 Table 2. shows the quantities and their rated power of all types of office equipment in the building. This table also reveals accumulated rated power of different equipment equivalent to 114 kw. It has been also found that the operational period of all equipment is dependent on the occupancy level. The total daily energy consumption by office equipment is found to be equivalent to 770 kwh. The daily average energy consumption by different non-air conditioning equipment is worked out according to the occupancy level as shown in Table. 3. This table shows that office equipment and interior lighting consume 40% and 45% respectively of the total non-air conditioning load. The table also shows that daily non-air conditioning energy consumption in the building is around 1263 kwh during 100% occupancy level. Similarly, the power profiles of chillers, SAF, RAF, pumps are obtained on regular interval. The results of those measurements are summarised in Table. 4, categorised according to the occupancy level. Table 2. Quantity and rated power of office equipment used in the KACST s building Equipment Total Quantity Rated Power (kw) Daily Energy Consumption (kwh) Personal Computer 108 20.7 248 Printers 61 21.6 151 Photocopy 29 41.3 248 Miscellaneous (a) 69 3.5 7 Miscellaneous (b) 20 8 8 Miscellaneous (c ) 14 5 10 Miscellaneous (d) 23 14 98 (a): Typewriter, calculator and paper cutter; (b): Fax machine; (c): TV, VCR, Overhead projector; (d): Water cooler, refrigerator, coffee machine, vacuum cleaner. Note: All similar equipment have different power rating

Table 3. Average daily non-air conditioning energy consumption (kwh) in KACST s building Time period (hours) 00:00 to 07:00 07:00 to 15:30 15:30 to 00:00 Occupancy Level (%) Office Equipment Interior Light External Light (a) Exhaust Fans Telcommunica tion Miscellan -eous (b) Total (kwh) 0 169.5 31.7 45 4.9 3.5 1.92 256.5 100 416.5 739.5 0 5.95 4.25 97.26 1263.5 15 184 118 45 5.95 4.25 73.99 431.2 Total Energy (kwh) % age Contribution 770 39.58 883 45.33 90 4.62 16.8 0.86 12 0.61 173.17 8.90 (a) Operational Time from 18:00 to 06:00 (b) Miscellaneous : Electric cookers, Hand dryers, Electric water heaters and lifts 1944.9 100 AHUs AI-Us 17 % Pumps 4 % Interior Lights 11.2 % Chillers 54 % External Lights 1.1 % Office Equipment 10 % Exhaust Fans & Telecommunication 0.5 % Miscellaneous Items 2.2 % Figure 1. Total daily electrical energy consumption (kwh) in the KACST s building Table. 4. Daily Energy Consumption (kwh) for facilitating Air Conditioning in KACST s building Time Period (hrs) Chillers & Fans Pumps Supply Air Fan Return Air Fan 00:00-07:00 137 92 12 6 07:00-15:30 2431 112 494 272 15:30-00:00 1657 112 357 197 Total 4225 316 863 475

It has been found that total daily energy consumption in the building-is equivalent to 5879 kwh and 1946 kwh by air conditioning and non air conditioning equipment respectively. Figure. 1 shows that 75% of energy is consumed by the air conditioning equipment and the rest is used by the interior lights, office equipment, etc. Within the air conditioning system 72% consumed by chillers, 22.5% by AHUs and 5.5% consumed by pumps. Summation of all electrical energy measurements consumed by different equipment in the building revealed that the total monthly energy consumption is equivalent to 228,459 kwh. An area-wise survey of LUX level was conducted at ten different locations on each floor. Table. 5. shows average LUX level in different areas of the building. It has been found that 11.2% of total daily energy is consumed just for energising interior lights. This can be reduced by using timers and occupancy sensors especially in offices. Table. 5. Average Illuminance levels in different areas of the KACST s building Area Measured LUX Level Recommended LUX values * Offices (north side) 658 500 Offices (south side) 620 500 Partitioned Offices 448 Corridors / passages 145 100/150 Mosque 400 Lift lobby 62 100/150 * Manual of LUX meter from RS Components Limited 5. Suggestions for Energy and Power Savings Salient climatic feature of Saudi Arabia is the long summer period of 7 months with an average daytime ambient temperature ranging from 42 C to 48 C. Cooling of buildings is therefore essential, requiring large demand of electrical power/energy (see Fig. 1). Following are the some of the proposals to be considered for energy and power saving in an office building. 5.1 Use of Programmable Thermostat Most of the office buildings in the Kingdom are occupied for part of the day. The A/C system in these buildings, however, continue to operate at the set conditions throughout the day, for all days of the week. It has been observed in the buildingunder investigation, that chillers and AHUs were running even after occupied time schedule on working days as well as on non-working days. The operation of A/C system was continued till the outside air temperature reduces to 38 C. These preliminary results reveal, that the existing operation of HVAC in the building consuming enormous amount of electrical energy for running chillers as well as AHUs after office hours on working days even on non-working days. One of the way to conserve electrical energy in the building, is to change the sequence of operation of AHUs as per actual cooling requirement of each zone after office hours on working and nonworking days. Programmable thermostats, have the facility to set desired room temperatures for different periods of the day and for different days of the week. They are the excellent device to save energy in the building with part-of-day occupancy. However, it has an adverse effect on the peak cooling demand as a result of the thermal energy stored in the thermal mass of the building. The increase in peak cooling demand results in an increase in the air conditioning system capacity and the demand on power supply. The problem is more critical on the first day (Saturday) after the weekend. Pre-cooling the building few hours prior to its occupancy schedule can minimise this negative impact. A comprehensive study is required to find out the precooling period of the building with different temperature offset in order to save energy and reduce the day-time cooling demand. 5.2 Use of Single Water Pump At present, two chilled water pumps were always in operation irrespective of the number of chillers in use. During the non-occupancy period of the building in summer time and during the months of

November to March, the building cooling demand can be comfortable met by a single chiller. Under such operating conditions, the water flow rate of 600gpm was higher than the design value, resulting in a temperature drop of less than 3 C across the chiller. Use of single water pump with higher chilled water temperature setting to 7 C was found satisfactory after conducting an experiment. Operation of the system with one chilled water pump can reduced the motor power around 7 kw. There are other additional advantages such as reduction in pumping heat and improved chiller performance due to the increased temperature of leaving chilled water. 5.3 Ice Thermal Storage It has been observed that if cooling is generated and stored during low demand night-time (off-peak period) for later dayt(on-peak period) use, more peak capacity would be available for other uses, and night-time capacity of the power plant would be more fully used. By this way the on-peak energy consumption will be shifted to off-peak periods. Hasnain [4] explained that installation of off-peak ice based air conditioning system in new Saudi office buildings will reduced peak electric load by 20% and peak cooling load by 30%. As peak electrical load of a building is reduced by 20% with storage, therefore there will be savings on: new power connection charges; costs of reduced size of transformer & switchgear. 6. Concluding Remarks This paper presents measured values of actual electrical energy, consumed by individual chillers, air handling units, different lighting systems, office equipment and other associated electric appliances used in the multi-storey KACST s administration building-26. The building represents a typical Saudi office building. It has been found that 75% of energy is consumed by the air conditioning equipment, 11.2% by the interior lights, 10% by office equipment, etc. in this building. Within the air conditioning system 72% consumed by chillers, 22.5% by AHUs and 5.5% consumed by pumps. This paper also identified areas for energy and power savings in an office building in order to achieve the MIE goals for energy conservation and peak load reduction. Methodology for use of programmable thermostats and use of single water pump in an existing building can be adopted for energy conservation. Whereas, incorporation of ice thermal storage system with the conventional central air conditioning system is found to be, one of the power saving tools, particularly in new installations. Acknowledgements The authors wish to acknowledged the support and help of Engr. Mohammed I. Al-Hussani (Director General, General Support Services, KACST) and his colleagues for arranging different modifications in the existing set ups, as required from time to time for experimental measurements. References 1. Ministry of Industry and Electricity (MIE), Electricity Growth and Development in the Kingdom of Saudi Arabia up to the year 1417H (1996/1997G), 1998. 2. Smiai, S., Alawaji, S., and Elani, U. Energy Management and its Conservation Equipment Proc. of the 4 th Saudi Engineering Conference, Jeddah, Saudi Arabbia, Nov. 5-9, 1995. 3. Al-Tuwaijri, A., The Impact of Energy Conservation Programs on the Long-Term Plan of Electricity in the Kingdom of Saudi Arabia, Proc. of the 17 th Congress of the World Energy Council, Houston, Texas, USA, Sept. 13-18, 1998, Vol. 2, pp. 515-524. 1998. 4. Hasnain, S. M., Alawaji S. H., Al-Ibrahim A. M. and Smiai, S. M., Applications of Thermal Energy Storage in Saudi Arabia, International Journal of Energy Research, 1999 [in press].