U. S. Army Corps of Engineers Charleston District Regulatory Division Overview

Similar documents
Eric D. (Ric) Hines, PE February 2012 US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers

2008 Compensatory Mitigation Rule: Overview and Highlights. Jenny Thomas U.S. Environmental Protection Agency Wetlands Division July 2014


PUBLIC NOTICE Application for Permit

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L

United States Army Corps of Engineers, Civil Works

RE: Docket # COE ; ZRIN 0710 ZA05 Submitted via to NWP2012@usace.army.mil and Rulemaking Portal at

MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS, ATTN: CHIEFS, OPERATIONS DIVISIONS

Section 401 Water Quality Certification

QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL

New Waters of the United States Definition Released

Remaining Wetland Acreage 1,500, , ,040-39%

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Flood Risk Management

Flood Risk Management

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD

401 Water Quality Certification and Isolated Wetlands Permitting in Ohio. Tom Harcarik Division of Surface Water

DECISION DOCUMENT NATIONWIDE PERMIT 27

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

Environmental Health & Safety

Oklahoma Governor s Water Conference

Recognizing Wetlands. For additional information contact your local U.S. Army Corps of Engineers office. Pitcher plant.

1.7.0 Floodplain Modification Criteria

COMMUNITY CERTIFICATIONS

U.S. Army Corps of Engineers Tulsa District

Michigan Wetlands. Department of Environmental Quality

April 17, 2015 SUMMARY OF SUBJECT MATTER

CHAPTER 4 ALTERNATIVES COMPARISON

The answers to some of the following questions are separated into two major categories:

Public Law and Non-Structural Alternatives to Levee Repairs

Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists

Economic Analysis of Proposed Revised Definition of Waters of the United States

Restoring Ecosystems. Ecosystem Restoration Services

Wetlands in MN: Resource, Regulation, Restoration

National Marine Sanctuaries Act

3. The submittal shall include a proposed scope of work to confirm the provided project description;

The West Virginia Stream and Wetland Valuation Metric

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Implementing the Water Resources Development Act of 2007

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

REGULATORY GUIDANCE LETTER

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

ANNEX 3 ESF-3 - PUBLIC WORKS AND ENGINEERING. SC Budget and Control Board, Division of Procurement Services, Materials Management Office

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Department of the Interior. Departmental Manual

Applying HUD s Floodplain Management and Wetlands Protection Standards U.S. Department of Housing and Urban Development Office of Environment and

MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia

Post-Flood Assessment

Gold Ray Dam Interagency Technical Team Meeting

U.S. ARMY CORPS OF ENGINEERS JURISDICTIONAL DETERMINATION FORM INSTRUCTIONAL GUIDEBOOK

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

AN INITIATIVE TO IMPROVE

1. INTRODUCTION 5. THE PERMIT PROCESS

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

The History and Status of Wetland Mitigation Banking and Water Quality Trading

How To Amend A Stormwater Ordinance

Aligning Natural and Built Infrastructure for

Pipeline Regulatory and Environmental Permits

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

Appendix J Online Questionnaire

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS

Sec. 22a-1a page 1 (4-97)

Ecosystem Services, Wetlands and Houston s Growth. Jim Lester

Northern Middlesex Council of Governments

Gulf Coast Restoration & recovery 101 Basic policies, legal processes, and terms relevant to the Deepwater Horizon disaster

INDONESIA - LAW ON WATER RESOURCES,

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

STIPULATED SETTLEMENT AGREEMENT AND ORDER OF DISMISSAL - 1-

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

Transcription:

U. S. Army Corps of Engineers Charleston District Regulatory Division Overview Colt Bowles Charleston District Watershed Manager Northwest Regulatory Branch, Columbia, SC US Army Corps of Engineers

District Mission In order to support and serve the federal interests in our nation s resources Charleston District, US Army Corps of Engineers develops and facilitates innovative and effective solutions to meet the engineering, environmental and emergency management needs for the state of South Carolina, the US Army and the Nation.

U.S. Army Corps of Engineers History

General George Washington established the U.S. Army Corps of Engineers on June 16, 1775

Congress recognized the need for national engineering capability, and in 1802, established the US Military Academy at West Point where Corps officers lead the school

Corps Responsibilities 1899 1916 1928 1972

Charleston District- 1800s 1821: USACE works out of New York after Congress puts $4M for coastal fortifications 1826-1829: Forts Moultrie, Jackson and Sumter constructed 1871: First permanent USACE office in Charleston w/ COL Quincy A. Gillmore 1879-1895: Charleston Jetties constructed 7

Charleston District- 1900s 1912 Constructed Camps Jackson, Sevier and Wadsworth 1932 Authorized to dig AIWW 1940s/50s Constructed/Expanded 8 Airfields to include Charleston, Columbia, and Georgetown 1969 Environmental Policy Act greatly increases the scope and jurisdiction of the Regulatory Program 8

Corps Projects in South Carolina Ft. Sumter as it appeared c.1861 Old Railroad Station in Aiken, SC Charleston Harbor c.1835 Camp Jackson as it appeared c.1918

Charleston District Today Civil Works and MILCON District 200 workforce FY07 $54M program FY08 $60M program to include o $29M Myrtle Beach Renourishment o $20M Charleston/Georgetown Harbor/ Cooper River and Inland Waterway FY09 $245M program to include o $16M Charleston/Georgetown Harbor/ Cooper River and Inland Waterway o $85M BTC2 Project Ft. Jackson

U.S. Army Corps of Engineers Charleston District Projects

Charleston District Folly Beach Renourishment

Charleston District Morris Island Lighthouse

Charleston District Myrtle Beach Renourishment

Charleston District Study for Proposed Marine Terminal

Charleston District Lake Marion Regional Water System I-26 I-77 Columbia Sumter Co. I-95 Clarendon Co. Calhoun Co. Orangeburg Co. Dorchester Co. I-20 5-County Project Area in South Carolina I-95 I-26 Lake Marion

Charleston District Pocotaligo Swamp Restoration

US Army Corps of Engineers FY 08 Military Program $27 Billion/year 9 Divisions FY 08 Civil Works Program $9 Billion/year - 10,000 personnel - Military Construction - Contingency Ops - Installation Support - International/ Interagency Support 45 Districts - Homeland Security - Environmental - Real Estate Private Industry Partners - 22,000 personnel - Navigation - Hydropower - Flood Damage Reduction -Shore Protection -Water Supply -Regulatory -Recreation Engineer Research and Development Center Seven diverse research laboratories - $1 Billion

Private Sector Leverage 35,000 Federal Employees Construction Contractors Unlimited Capability Perform 100% of Civil Works/Military Construction ~ 300K daily Sponsors, Federal Agencies, Associations

Real Estate Civil Works US Army Corps of Engineers Global War on Terror Military construction Base operations Environmental restoration Geospatial Engineering Homeland Security Research & Development Military engineering Terrain & Geospatial Structures Environment Water Resources Critical Infrastructure Anti Terrorism Planner The Infrastructure Security Partnership Acquire, manage & dispose DOD Recruiting facilities Contingency operations DOD Federal State Local International Navigation, Hydropower Flood control, Shore Protection Water Supply, Regulatory Recreation, Disaster response BUILDING STRONG Environmental Restoration

US Army Corps of Engineers Global Engagement Engagement - 100+ Countries Physical Presence - 33 Countries ARCTIC ANTARCTIC

USACE Value to the Nation 627 Shallow Draft Harbors 400 miles Coastal Structures ¼ of Nation s Hydropower Production 4340 Recreation Areas 383 Major Lakes & Reservoirs 376 M Visitors/yr 11,000 miles Inland Waterways 8500 Miles of Levees 276 Locks 299 Deep Draft Harbors $500M Annual Dredging Costs Emergency Operations 11.7 Million Acres Public Lands Environmental Stewardship US Ports & Waterways convey > 2B Tons Commerce Foreign Trade alone Creates > $160B Tax Revenues Cumulative Flood Damage Prevention >$419B

Civil Works Program Missions Lock and Dam 15 ( Mississippi River ) Flood Wall ( Williamson, KY ) Navigation Hydropower Flood Risk Management Ecosystem Restoration Water Supply Regulatory (Wetlands / US Waters) Recreation Disaster Preparedness & Response Dredge ESSAYONS ( Coos Bay, OR ) Lake Seminole ( Mobile District ) Everglades Bonneville II Powerhouse ( Washington ) 23

Slide 16 at TAB B Military Program Missions Military Construction Global War on Terror Real Estate Formerly Used Defense Sites (FUDS) Base Realignment and Closure (BRAC) Interagency and International Services Installation Support

Disaster Preparedness & Response Support FEMA *Emergency Support Function (ESF) #3 Public Works & Engineering Support the Department of Defense Accomplish USACE missions 25

USACE Divisions and Districts San Francisco Portland Seattle Sacramento Walla Walla South Pacific Division Northwestern Division Omaha St. Paul Kansas City Rock Island St. Louis Great Lakes & Ohio River Division Detroit Buffalo Chicago Pittsburgh Cincinnati Huntington Louisville North Atlantic Division New York Philadelphia Baltimore Norfolk New England Alaska Los Angeles Honolulu Pacific Ocean Division 2 Engineer Commands 9 Divisions 45 Districts 2 Centers ERDC Albuquerque Tulsa Southwestern Division Dallas Ft. Worth Little Rock Galveston Vicksburg Memphis Nashville Mobile New Orleans Mississippi Valley Division Atlanta Charleston Savannah Jacksonville Wilmington South Atlantic Division 26

Charleston District Offices and Boundaries Fort Jackson Construction Resident Office Columbia St. Stephen s Conway Regulatory Permitting Office Aiken CASA Surveying Office Dam/Power Plant Charleston District HQ Savannah District Administers all Civil Works Projects in the Savannah River Watershed 27

U.S. Army Corps of Engineers Regulatory Program

Regulatory Mission The mission of the Corps Regulatory Program is to protect the Nation's aquatic resources, while allowing reasonable development through fair, flexible and balanced permit decisions. The Corps evaluates permit applications for essentially all construction activities that occur in the Nation's waters, including wetlands.

Corps Regulatory Program One of the most visible and controversial Corps programs Charged with balancing environmental protection with sustainable development

Corps Regulatory Program

Corps Regulatory Program Watershed Approach 6 5 4 3 Salkahatchie-Lower Savannah Santee-Cooper Waccamaw Pee Dee Broad-Catawba Saluda-Upper Savannah 1 2

Corps Regulatory Program Regulatory Authorities The Corps issues permits pursuant to: Section 10 of the Rivers and Harbors Act of 1899 Section 404 of the Clean Water Act Section 103 of the Marine Protection Research and Sanctuaries Act of 1972

Section 10 of the Rivers & Harbors Act of 1899 Regulates structures, or work in or affecting, navigable waters of the United States

Section 10 of the Rivers & Harbors Act of 1899 Prohibits the unauthorized obstruction or alteration of any navigable water of the United States unless you have a permit from the Corps of Engineers Examples of obstructions or alterations are: construction of any structure in or over any navigable water of the United States, the excavating from or depositing of material or the accomplishment of any other work affecting the course, location, condition, or capacity of such waters

Section 10 Definition Navigable Waters of the United States Navigable waters of the United States are those waters that are subject to the ebb and flow of the tide and/or are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce. BUILDING STRONG 36

Section 10 Waters in South Carolina

Section 10 Atlantic Ocean

Section 10 Charleston Harbor BUILDING STRONG 39

Section 10 Tidal Creek

Section 10 Atlantic Intracoastal Waterway

Section 10 Congaree River

Section 10 Lake Murray (Court Determined)

Section 10 of the Rivers and Harbors Act Regulated Activities

Section 10 Dredging

Section 10 Beach Nourishment

Section 10 Wando Terminal

Section 10 Structures

Section 10 Overhead Powerlines

Section 10 Docks

Section 10 Marinas

Section 404 of the Clean Water Act of 1972 Regulates discharges of dredged or fill material into wetlands and other waters of the United States

Clean Water Action Section 404 authorizes the Secretary of the Army, acting through the Chief of Engineers, to issue permits, after notice and opportunity for public hearing, for the discharge of dredged or fill material into the waters of the United States at specified disposal sites. (See 33 CFR Part 323.)

Waters of the United States All Navigable Waters of the U.S.; All interstate waters including interstate wetlands; All other waters such as intrastate lakes, rivers, streams (including intermittent streams), mudflats, sandflats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, or natural ponds, the use, degradation or destruction of which could affect interstate or foreign commerce including any such waters: Which are or could be used by interstate or foreign travelers for recreational or other purposes; or from which fish or shellfish are or could be taken and sold in interstate or foreign commerce; or, Which are used or could be used for industrial purpose by industries in interstate commerce.

Section 404 Bottomland Hardwoods

Section 404 Trout Stream

Section 404 Riffle Pool Complex

Section 404 Stream and Adjacent Flood Plain

Section 404 Stream

Section 404 Seasonal Streams

Section 404 Wetlands Defined (33 CFR Part 328.3 (b) Those areas inundated or saturated by surface or groundwater at a frequency sufficient to support, and under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions

Section 404 Wetlands Delineation 1987 US Army Corps of Engineers Wetland Delineation Manual Use by Corps is required

Section 404 Wetlands Delineation All 3 Must be Present Hydrophytic vegetation Hydric soil Hydrology (2 primary indicators)

Section 404 Wetlands Delineation

Section 404 Wetlands Delineation Water Marks

Section 404 Wetlands Delineation

Section 404 Wetlands Delineation

Section 404 Wetlands Delineation

Section 404 Wetlands Delineation

Section 404 Wetlands Delineation

Section 404 Wetland Example

Section 404 Wetland Example

Section 404 Wetland Example

Section 404 Wetland Example

Section 404 Wetland Example

Waters of the United States Not Regulated by Corps Isolated Wetlands Non-tidal drainage ditches excavated in upland Artificial lakes/ponds excavated in upland Active sand/gravel pits excavated in upland Water filled depressions on upland construction sites

Waters of the United States Not Regulated by Corps Isolated Wetlands As stipulated in the January 9, 2001, United States Supreme Court decision on Solid Waste Agency of Northern Cook County v. United States Army Corps of Engineers, the US Army Corps of Engineers cannot assert Clean Water Act jurisdiction over isolated, non-navigable, intrastate waters based solely on their use as habitat for migratory birds. Not connected to waters of the United States Not adjacent to waters of the United States

Corps Regulatory Authority Rapanos/Caravalle Supreme Court Decisions Decisions affirmed jurisdiction Guidance issued June 5, 2007

Corps Regulatory Authority Terms and Acronyms TRADITIONAL NAVIGABLE WATERS (TNW) all waters which are currently used, or were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters which are subject to the ebb and flow of the tide. A traditional navigable water includes all of the navigable waters of the United States, defined in 33 C.F.R. 329, and by numerous decisions of the Federal courts, plus all other waters that are navigable-in-fact.

Corps Regulatory Authority Terms and Acronyms SIGNIFICANT NEXUS DETERMINATION (SND) A significant nexus analysis will assess the flow characteristics and functions of the relevant reach of the tributary, in combination with functions collectively performed by all wetlands adjacent to the tributary, to determine if they have more than an insubstantial or speculative effect on the chemical, physical, or biological integrity of TNWs. 1987 Manual - Is it a wetland? Significant Nexus- Will impacts to a particular wetland impact waters downstream? Next - Regional Indicators

Corps Regulatory Authority Exemptions 33CFR Part 323.4(A)(1) Farming Forestry Ranching Certain plowing, seeding, cultivating, minor drainage, harvesting and related activities do not require a Section 404 permit from the Corps

Corps Regulatory Authority Non- Regulated Activities Excavation in a wetland or Non Section 10 Water (Tulloch) Excavated and deposited directly to high ground. No side-casting, double handling, or temp. storage in a wetland.

Corps Regulatory Program Department of Army Permits General Permits Individual Permits

Corps Regulatory Program General Permits Nationwide Permits Issued by Chief of Engineers for certain activities that are determined to have minimal impacts. Regional Permits Issued by District Commander for certain repetitive minor activities within a specific area.

Corps Regulatory Program Nationwide Permits 50 Nationwide permits (38 used in SC) Wetland fills of less than ½ acre and/or stream impacts of less than 300 Regionally conditions (Corps and SCDHEC) 12 Utility lines 13 Bank stabilization 14 Linear transportation crossing 27 Stream/Wetland Restoration 29 Residential or Private residence 39 Commercial or Industrial Activity

Corps Regulatory Program NWP 29 Residential Developments Authorizes both single unit residences and multiple unit residential developments Requires PCN for all activities ½ acre non tidal, 300 LF stream bed loss limits (Cumulative Loss) Does not authorize discharges adjacent to tidal BUILDING STRONG 86

Corps Regulatory Program Individual Permits Processing Steps 6. Permit decision 5. Evaluation 4. Agency coordination (SHPO, USFW, SCDNR) 3. 30-day comment period 2. Public Notice issued 1. Application submitted (Corps & DHEC)

Corps Regulatory Program Related Laws Coastal Zone Management Act Section 401 of the Clean Water Act National Historic Preservation Act of 1966 Endangered Species Act of 1973 Fish & Wildlife Act of 1956 Migratory Marine Game-Fish Act Fish & Wildlife Coordination Act Clean Air Act Resource Conservation & Recovery Act of 1976 Comprehensive Environmental Response Compensation and Liability Act of 1980 Essential Fish Habitat

Corps Regulatory Program Other Factors Public Interest Review Factors 404 (b)(1) Guidelines National Environmental Policy Act Environmental Assessments Environmental Impact Statements BUILDING STRONG 89

Corps Regulatory Program Public Interest Review Factors conservation economics aesthetics general environmental concerns wetlands historic properties fish and wildlife values flood hazards floodplain values land use navigation shore erosion and accretion recreation water supply & conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership in general, the needs and welfare of the people BUILDING STRONG 90

Corps Regulatory Program 404 (b) (1) Guidelines Determine water dependency Consider off-site alternatives Avoid unnecessary impacts Minimize unavoidable impact Compensatory mitigation

230.10(b) No discharge of dredged or fill material shall be permitted if it: 1. Causes or contributes to violations of any applicable State water quality standard; 2. Violates any applicable toxic effluent standard or prohibition under section 307 of the Act; 3. Jeopardizes the continued existence of species listed as endangered or threatened under the Endangered Species Act of 1973, as amended, or results in likelihood of the destruction or adverse modification of critical habitat; 4. Violates any requirement imposed by the Secretary of Commerce to protect any marine sanctuary.

Corps Regulatory Program Permit Decisions District Commander s Permit Decision Options: 1. Deny permit if project is contrary to public interest or fails to comply with Section 404(b)(1) Guidelines 2. Issue Permit (with conditions) 3. Require preparation of EIS if project is determined to be a major Federal action that would significantly affect the quality of the human environment

Corps Regulatory Program Mitigation The Corps will strive to avoid adverse impacts and offset unavoidable adverse impacts to existing aquatic resources, and for wetlands, will strive to achieve a goal of no overall net loss of functions and values. (1990 EPA/Army MOA)

Mitigation Sequencing Avoiding Impacts Minimizing Impacts Rectifying Impacts Repairing, Rehabilitating, or Restoring Reducing Impacts over time-preservation and Maintenance Compensation for Impacts by Replacing or Providing a Substitute Resource

Compensatory Mitigation Actions taken to offset impacts to wetlands, streams, and other aquatic resources authorized by 404 and other Department of Army permits Goal of no overall net loss of functions and values.

Methods/Mechanisms Methods Restoration Enhancement Establishment Preservation Mechanisms Mitigation Banks In Lieu Fee (ILFs) Permittee Responsible Mitigation (PRM)

Mechanisms Mitigation Bank Public or private sponsors Mitigation initiated in advance of credit sales In Lieu Fee Government or nonprofit entity Credit sales prior to implementing mitigation

Mitigation vs. Impacts 2005 Permitted Impacts 20,754 Acres Required Mitigation 56,693 Acres 2001-2005 Averages Permitted Impact 23,000 Acres Required Mitigation 50,000 Acres

History Compensating for Wetland Losses Under the Clean Water Act (2001 National Research Council) Conclusion 1: The goal of no net loss of wetlands is not being met for wetland functions by the mitigation program, despite progress in the last 20 years. Conclusion 2: A watershed approach would improve permit decision making. Conclusion 3: Performance expectations in Section 404 permits have often been unclear, and compliance has often not been assured nor attained. Conclusion 4: Support for regulatory decision making is inadequate. Conclusion 5: Third-party compensation approaches (mitigation banks, in-lieu fee programs) offer some advantages over permitteeresponsible mitigation.

The New Mitigation Rule Significant Elements Does not alter existing regulations Sequence: Avoid, Minimize, Mitigate Promote greater consistency, predictability and ecological success of mitigation projects under the Clean Water Act Requires similar standards for all types of Mitigation New Standards for ILFs Mitigation statement required for all Individual Permits Focus on Where and How Mitigation is Implemented

New Mitigation Hierarchy Mitigation Banks In Lieu Fee Programs Permittee Responsible under a Watershed Approach On-site and/or In Kind PRM Mitigation Off-site and/or Out of Kind PRM Mitigation Soft Preference/Document Decision

Existing Watershed Plans Mitigation Watershed Approach No plan-use available information site conditions and needs Consider landscape position and sustainability Provide for a suite of functions Level of information required and analysis commensurate with impacts

Mitigation Components of a Mitigation Plan Objectives Site Protection Instrument Baseline Information Maintenance Plan Performance Standards Monitoring Requirements Financial Assurances Site Selection Factors Credit Determination Long-term Management Plan Adaptive Management Plan

Mitigation Banks and ILFs Standardizes the Banking Process Prospectus Draft Mitigation Banking Instrument Mitigation Banking Instrument

Mitigation Banks Groove Creek BUILDING STRONG 106

Mitigation Banks Groove Creek BUILDING STRONG 107

Mitigation Banks Groove Creek 108

Regulatory Program Enforcement Unpermitted activity Penalties up to $ 32,500/day Site restoration/after the Fact Permit Referral to EPA or US Justice Department Discretionary

Thank you for your interest in the Corps Regulatory Program

Colt Bowles 803-253-3400 colton.b.bowles@usace.army.m il