INNOVATIVE LOCALIZER ANTENNA BEATS THE ODDS Mel King Manager Flight Inspection Airways Corporation of New Zealand Ltd.



Similar documents
Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques

Avaya WLAN 9100 External Antennas for use with the WAO-9122 Access Point

Antenna Basic Concepts

Aircraft Noise Control at London Luton Airport. August 2015

TESTS OF 1 MHZ SIGNAL SOURCE FOR SPECTRUM ANALYZER CALIBRATION 7/8/08 Sam Wetterlin

TP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT. for

ILS Replacement. ACI World Safety Seminar November 2008 Kempinski Hotel Beijing Lufthansa Centre

Antenna Deployment Technical Brief

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

At the completion of this guide you should be comfortable with the following:

AVIATION TRAINING ACADEMY

Interference. Physics 102 Workshop #3. General Instructions

Applications in EMC testing. Outline. Antennas for EMC Testing. Terminology

Low Level Windshear Alert System (LLWAS) An integral part of the U.S. FAA Wind-shear safety program

Cable Analysis and Fault Detection using the Bode 100

Antenna Trainer EAN. Technical Teaching Equipment INTRODUCTION

Printed Dipole Array Fed with Parallel Stripline for Ku-band Applications

ELECTRON SPIN RESONANCE Last Revised: July 2007

Aviation Training Academy

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D' PART VI

ISS Minimalist Antenna

NZQA registered unit standard version 1 Page 1 of 8. Apply knowledge of aircraft radio systems to the certification of aeronautical maintenance

Hospital Heliport Inspection Basics

RESPONSE TIME INDEX OF SPRINKLERS

Cooking at the Speed of light!

Installation Instructions Hustler 6-BTV Trap Vertical

This presentation reports on the progress made during the first year of the Mapping the Underworld project. As multiple Universities and Departments

Pillbox Antenna for 5.6 GHz Band Dragoslav Dobričić, YU1AW

CABLES CABLES. Application note. Link Budget

ECE 435 INTRODUCTION TO THE MICROWAVE NETWORK ANALYZER

INTEGRITY AND CONTINUITY ANALYSIS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT FROM GPS. Integrity and Continuity Analysis 08/01/14 08/01/14 08/01/14

AIRCRAFT WARNING LIGHTS

TI GPS PPS Timing Application Note

SIGNAL GENERATORS and OSCILLOSCOPE CALIBRATION

Lab Exercise 1: Acoustic Waves

Ultrasonic Wave Propagation Review

13.0. Safety Management and Airspace Protection

Investment Projects - Health Safety & Environment Good Practice Guide

Policy document on the provision of waste & recycling collection and storage facilities. Includes both domestic and commercial premises

Efficient 2 meter Disguise Antenna Made From a TV Satellite Dish

Academy of Model Aeronautics. Requirements for the Operation of Remote Control (RC) Aircraft at Full Scale Airshows

Various Technics of Liquids and Solids Level Measurements. (Part 3)

WiMo Antennen und Elektronik GmbH Am Gäxwald 14, D Herxheim Tel. (07276) FAX

Phase II Design for a Multiband LMR Antenna System

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Rev E Page 1 of 10

Machine Foundation Design

You will need the following pieces of equipment to complete this experiment:

FXA UNIT G484 Module Simple Harmonic Oscillations 11. frequency of the applied = natural frequency of the

Minimum Safety Requirements for temporary Helicopter Landing Areas.

SPECIFICATIONS. Recommended Battery sizes (Maintenance) AUTOMOTIVE CCA CCA MARINE MCA MCA DEEP CYCLE 17 55Ah 17 80Ah

Planning requirements for heliports and helicopter landing sites

THE COMPOSITE DISC - A NEW JOINT FOR HIGH POWER DRIVESHAFTS

Recognition of overseas flight crew licences and ratings

JAMAICA CIVIL AVIATION AUTHORITY JOB SPECIFICATION & DESCRIPTION

Gas Meter Clearances and Service Installation Requirements

Troubleshooting Problems Affecting Radio Frequency Communication

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

A comparison of radio direction-finding technologies. Paul Denisowski, Applications Engineer Rohde & Schwarz

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Experiment 7: Familiarization with the Network Analyzer

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Selecting Receiving Antennas for Radio Tracking

AVIATION INVESTIGATION REPORT A02P0004 OPERATING IRREGULARITY

VE3MLB Phased Double V Antenna for 75/80 Meter Band

Networks. The two main network types are: Peer networks

EH-20 20m antenna. By VE3RGW

Understanding Range for RF Devices

Vectors. Objectives. Assessment. Assessment. Equations. Physics terms 5/15/14. State the definition and give examples of vector and scalar variables.

Storm Drain Inlet Protection - IP

Appendix E FAA ALP Sheet Checklist

Engineering Sciences 151. Electromagnetic Communication Laboratory Assignment 3 Fall Term

Preparing for the NBN. Fixed Wireless Connections

Pigeon Spike Stainless Economy Bird Spikes Includes specifications for: Pigeon Spike Stainless models, hardware and surface cleaning.

In-situ Load Testing to Evaluate New Repair Techniques

Breakaway Walls

Paper presented at ISASI 2014 Seminar, October 2014, Adelaide, Australia. Safety Management; Reversing the False Glide Slope Myth

APPLICATION NOTES POWER DIVIDERS. Things to consider

EDUCATIONAL OVERSIGHT INSPECTION OF PRIVATE FURTHER EDUCATION AND ENGLISH LANGUAGE COLLEGES MONITORING VISIT CAE OXFORD AVIATION ACADEMY

Approval of this procedure is provided by signatory indicated in the approval block at the footer of Page #1, for and on behalf of Jabiru Pty. Ltd.

Understanding Power Splitters

Rain Penetration Tests on Manthorpe Mini Castellated Vent Tile with 15" x 9" Format Roof Tiles. Prepared for: Ben Hales

INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

S a f e G u i d a n c e. Single Lamp Control and Monitoring

RGB for ZX Spectrum 128, +2, +2A, +3

Franz Hirtenfelder and Stephen Murray, CST Computer Simulation Technology and W. L. Gore and Associates (Gore) March 5, 2015

Weekend Antennas No. 1 A Bobtail Curtain for 2m

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

Air Support services are centred on four core practice areas, as indicated below and briefly described later on.

Variety of Control Options Control is possible via wall switches, remote control systems or integration into building management systems.

Omni Antenna vs. Directional Antenna

ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES

Engineering Air Traffic

2m and 70cm Portable Beam for ARES

Sheet Metal Stamping Dies & Processes

Just a Dipole. Gary Wescom N0GW July 16, 2007

Transcription:

INNOVATIVE LOCALIZER ANTENNA BEATS THE ODDS Mel King Manager Flight Inspection Airways Corporation of New Zealand Ltd. Wellington International Airport runway is built on a narrow neck of land. The south end of the runway finishes adjacent to the open sea of Cooks Strait whilst the Northern end finishes adjacent to Wellington harbour. The photograph below illustrates this layout Inline ILS systems serving both approaches were first installed some 30 years ago. The localizers associated with those ILS s had their 8 element antenna systems mounted down the bank at each end of the runway strip so as to avoid penetrating Obstruction Clearance Surfaces. This arrangement also provided protection for the antenna system from direct jet blast. The next photo shows the previous antenna in this configuration

In order to provide for a runway end safety area at the Southern end of the runway the runway strip needed to be extended over an existing roadway and up to the edge of an existing wave trap. There was no possibility of locating a Localizer antenna down the bank into the wave trap and so there began consideration of locating a reduced height antenna on the surface of and at the end of the RESA adjacent to the wave trap. Issues faced in accomplishing this were threefold Antenna height - Obstruction Clearance Surface requirements limited the total available height for the new Localizer antenna to no greater than one metre. This restriction could impact adversely upon both the Localizer antenna element matching as well as the achieved Localizer coverage. Salt Spray protection - During Southerly Storm weather conditions a significant quantity of sea spray is dumped over and beyond the wave trap at the southern end of the runway. Sea spray had already been a cause of shutdown with the previous 8 Element Localizer antenna. With the new Localizer antenna located closer to the sea the problem of spray dump is much greater. Jet Blast Protection - The new Localizer antenna would be only 53 metres from the runway starter extension. At this distance the antenna could be subjected to jet blast wind speeds greater than its design limit.

Antenna Height Issue To check the effect upon the antenna element matching a single antenna element was mounted on a variable height support and the Input feed VSWR measured at various heights. The following plot shows that matching was not going to be a problem and was best at around 600mm height Thales{Wilcox} Localizer LPD Input SWR versus height 1.14 1.13 1.12 Input SWR 1.11 1.1 1.09 1.08 1.07 500 550 600 650 700 750 800 850 900 950 Graph 1 -Height above ground surface - mm Localizer coverage issue-the difference in signal strength in the user airspace between a down the bank mounted 8 element antenna and a normal height [1.8m] surface mounted 8 element antenna is approximately 10dB. A graph of the relative signal level versus height for a surface mounted array is displayed in the next plot. This shows the 10dB reduction occurs around 0.55m height. This suggested a suitable minimum height to mount the antenna array. Graph 2 -Signal level relative to 1.8m [Normal] antenna height 2.00 0.00-2.00 Gain relative to 1.8m height -4.00-6.00-8.00-10.00-12.00 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Height above ground - metres

Whilst a low mounted antenna system appeared to potentially match the coverage of the previous down the bank system it was decided to add some margin by using a 14 element array together with placing the equipment room underground immediately below the antenna array in order to minimize cable loss. Thus we were confident that we would achieve a coverage not less than that previously obtained with the down the bank antenna. Protection from Sea Spray Dump

To investigate protection measures we firstly undertook tests upon a single antenna element to determine what parts were most sensitive to the presence of salt water. The test setup is illustrated below. Signal Generator Directional Coupler Antenna under test Far field sampling Antenna A B Vector Voltmeter Phase Amplitude Oscilloscope Adaptor Laptop PC

Test equipment Location

Sea Spray Watering Set up

Sea Spray Simulation Sea Spray Dump Test Results No Protection Salt Spray test- No Protection 1000 Phase Amplitude 20 per. Mov. Avg. (Phase) 20 per. Mov. Avg. (Amplitude) 800 600 1.9dB Normal level 400 Am plitude - m V 200 0-200 19Degrees -400-600 Spray duration -800 0 10 20 30 40 50 60 Elapsed time - seconds

Sea Spray Test results Grating plus Radome plus Dipole covers Salt Spray Test - Open Grating+Radome+D/covers 1000 Phase Amplitude 20 per. Mov. Avg. (Phase) 800 2.4dB 600 400 Amplitude - mv 200 0-200 21 Degrees -400-600 -800 Spray duration -1000 0 10 20 30 40 50 60 Elapsed time - seconds Sea Spray Test Results Radome plus Dipole covers Salt Spray test- No Grating+Radome+D/covers Phase Amplitude 500 1.75dB 400 300 Change-mV 200 100 0 10 Degrees -100-200 Spray duration -300 0 2 4 6 8 10 12 Elapsed time - Seconds

Sea Spray Test results Radome plus Dipole Lips Salt Spray Test- Radome+D/Lips 1000 Phase Amplitude 20 per. Mov. Avg. (Phase) 20 per. Mov. Avg. (Amplitude) 800 600 0.5dB 400 Amplitude - mv 200 0-200 11 Degrees -400-600 -800 Spray duration -1000 0 10 20 30 40 50 60 Elapsed time -Seconds Final Protection Configuration

This final protection configuration reduced the signal amplitude disturbance to an insignificant amount. The signal phase disturbance remained essentially the same as with the full dipole covers. Overall this final protection scheme provided around a 2:1 improvement for signal phase disturbance over having no protection. These single antenna results were then inserted into a computer model of the 14 LPD antenna array proposed for the new Runway 16 localizer. For this simulation a spray fan 7.5m wide [i.e. covering three antennas at a time] sweeping across the array from West to East was used as this was considered to best replicate what happened in reality. The diagram following shows the resulting prediction of the Localizer Course disturbance with and without the protection measures applied. This shows that the protection measures applied would likely overcome Localizer outage during Southerly storm conditions. Effect of sea spray sweeping across Localizer Antenna Array Note Spray fan 7.5metre wide 0.025 Unprotected Antenna Array ICAO Course deviation limit Protected Antenna Array 0.020 Course deviation- DDM 0.015 0.010 0.005 0.000-8 -6-4 -2 0 2 4 6 8 Relative position of spray fan [0=centre of Array]

With the supplementary protective radome in place there remained the possibility of salt contamination building up over time on the antenna radome. To address this possibility a fresh water spray cleaning system was installed. The configuration of this cleaning system is illustrated below. Fresh water plastic feed pipes Supplementary Radome cover Spray Nozzle Antenna Dipole Element Antenna Radome

Each antenna is equipped with fourteen spray nozzles [seven along each side] to clear away any salt accumulation. The fresh water supply to each antenna is controlled by a solenoid operated valve, and the fourteen antennas are washed in pairs symmetrically displaced about the Localizer array centreline. To determine the minimum quantity of water needed for the wash a test rig was setup. This consisted of a short length of transmission line placed on one side of a fibre glass sheet [to simulate the antenna feed arrangement] with a spray nozzle above. The impedance of the transmission line was monitored using an RF Bridge. The sheet was encrusted with a dry salt layer and then sprayed at various water rates and patterns noting the time taken for impedance change to stabilize back to normal. This test resulted in adopting a fine mist fan spray with a flow rate of 0.6 litres/minute which equated to 16.8 litres per minute for each of the seven antenna pairs. At this rate a heavy salt accumulation was cleared in approximately 12 seconds. The setup for this test is shown below.

Jet Blast protection. The largest aircraft using the airport is the Boeing 767. A plot of the Jet blast velocity versus distance is shown below. It will be seen that at 53m distance behind the aircraft the exhaust air velocity is greater than 100mph.

Clearly it was possible that the wind speed design limit for the Localizer antenna array could be exceeded. Therefore a jet blast deflector needed to be placed directly in front of the array. Electrically the deflector design should introduce minimum attenuation to the localizer signal from the Array. A design was conceived employing a comb like structure having only vertical aligned metal strips. Furthermore the dimensions were tailored such that the top of comb presented high impedance between adjacent strips. The configuration of this prototype is shown below. Prototype Jest Blast Deflector With this prototype jet blast deflector placed immediately in front of the Test antenna at a minimum possible distance, no change in either the amplitude or phase of the far field received signal was detected. Following this test the prototype design was modeled and tested in a wind tunnel to determine whether the reduction in wind speed would be adequate. The following picture shows the wind tunnel model.

Prototype Jet Blast Deflector Wind Tunnel Model

Having completed the design concepts it was then the task of the Structural engineers to replicate the basic form of the prototype deflector into a practical piece of hardware complete with the necessary shear pins to provide for a frangible structure. The following pictures show the final design as installed on site.

It was a requirement that there be no interruption to the ILS service during the period of this RESA construction. To achieve this much of the Civil Work was carried out late at night. The new Localizer had to be installed and commissioned into service before the previous Localizer was removed. As part of this process a reinforcing mesh screen was laid along the edge of the roadway underpass to ensure that this edge was electrically parallel to the New Localizer antenna array until the gulley remaining between the underpass and the old localizer had been backfilled.

Finale To date sea spray dump has not caused shutdown of the new Localizer. Flight Inspection recorded the coverage to be slightly better than for the previous Localizer installation and comfortably meets the ICAO 18/10nm alternative criteria. The testing to prove the concept was conducted during 2004 and 2005. The civil works began in 2006 and the new Localizer was commissioned in 2007. Work has commenced to install a similarly configured Localizer but without the sea spray protection, on the opposite approach [Runway 34] Mel King is a Navigation Aids Engineer heading the New Zealand Airways Corporation Flight Inspection Unit. He has also been a serving member of the International Committee for Airspace Standards and Calibration since 1996.

C U R R I C U L U M V I T A E NAME: NATIONALITY: Mel King New Zealand BORN: 12 th May 1932 APPOINTMENT: FIRM: Manager Flight Inspection and Systems Engineer Airways Corporation of New Zealand Ltd BACKGROUND Mel King is a professional engineer with an electrical and electronics engineering background spanning some 50 years and focusing on radio-navigation systems and flight inspection. He has been widely involved in a number of major projects during this period featuring all aspects of planning and implementation. His expertise and experience includes financial management, maintenance activities and responsibility for those sections providing air navigation services. Mr King has held high office in government civil aviation administration and management, including appointments as Assistant Director of Civil Aviation and Chief Engineer. He has been an adviser with the International Civil Aviation Organisation (ICAO) on behalf of the United Nations Development Program (UNDP) and currently is a serving member on the International Committee for Airspace Standards and Calibration. KEY EXPERIENCES Assistant Director Technical Development with the then Civil Aviation Department of the New Zealand Ministry of Transport, responsible for technical and engineering standards and compliance with ICAO requirements for an air traffic services system. Chief Engineer Navigation Aids with the New Zealand Civil Aviation Department, responsible for planning, procurement and installation of navigation facilities in New Zealand and the Pacific Islands through the New Zealand overseas aid development programme. Development of life cycle cost management standards for technical equipment. Negotiating flight inspection contracts for navigation aid checking. Experiences at all aspects of project management and its related definition, evaluation, costbenefit, schedule, negotiating, financial and analytical skills. Vice-Chairman of the International Committee for Airspace Standards and Calibration. 1

Development and implementation of Global Navigation Satellite System flight inspection capability. PROFESSIONAL MEMBERSHIPS Member, Institution of Professional Engineers of New Zealand (MIPENZ) Member, Institution of Electrical Technology IET(United Kingdom). EXPERIENCE 1991-Present 1991-Present Airways Corporation of New Zealand Ltd Systems Engineer Flight Inspection and Manager Flight Inspection Responsible for: managing flight inspection services defining and maintaining flight inspection standards and procedures analysing and maintaining flight inspection records researching flight inspection methods and system undertaking flight inspection engineering duties throughout New Zealand and Indo-Asia-Pacific regions. 1990-91 Self employed Consulting engineer in the aviation industry specialising in radio navigation aids and flight inspection 1986-89 International Civil Aviation Organization Expert Appointment with ICAO as Flight Calibration (Inspection) Adviser, under the United Nations Development Programme, to provide technical assistance in Tanzania, East Africa. The purpose of this position was to establish a Flight Inspection Unit for the Eastern-Southern African States. 1945-1986 New Zealand Ministry of Transport, Civil Aviation Department 1986 Assistant Director Technical Development Responsible for the overall management for communications, navigation and surveillance systems and airfield electrical systems for New Zealand. 1983-1985 Chief Engineer Navigation Aids Responsible for planning, procurement and implementation of radio navigation facilities in New Zealand, and in Pacific islands states through the New Zealand overseas aid development programme. 2

1945-1983 Aeronautical Systems Engineering Positions (various) Employed in a variety of positions with the New Zealand Ministry of Transport, specialising in aeronautical electrical and electronic systems. 3