Inspection, Measuring and Test Equipment (IMTE) Calibration



Similar documents
COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history.

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

Self-Audit Checklist

EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc.

and Drug Administration/Office of Regulatory Affairs (FDA/ORA) laboratories.

NIST HANDBOOK CHECKLIST CONSTRUCTION MATERIALS TESTING

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

Procedure for Equipment Calibration and Maintenance

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

1 Quality Assurance and Quality Control Project Plan

USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of )

GLOBAL AEROSPACE PROCEDURE

BEST PRACTICES IN LEAK DETECTION AND REPAIR (LDAR) PROGRAMS. November 06, 2014 By: François Thibodeau, Eng.

Source Sampling Manual Volume II

Internal Audit Checklist

Checklist. Standard for Medical Laboratory

ISO/IEC QUALITY MANUAL

Laboratory Facility Cleaning and Maintenance Guidelines

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

Testing Facility Laboratory Manual

Surgi Manufacturing Quality Manual

State Water Resources Control Board Environmental Laboratory Accreditation Program

CORPORATE QUALITY MANUAL

ENVIRONMENTAL MANAGEMENT POLICY MANUAL

UNCONTROLLED COPY FOR REFERENCE ONLY

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

Underground Storage Tanks

NC SBI QUALITY ASSURANCE PROGRAM

Title:: Effective GMP AUDITS for APIs and Formulation Pharma Companies By G.Sundar-Director/Consultant PharmQA Compliance solutions

PROPOSED UPDATED TEXT FOR WHO GOOD MANUFACTURING PRACTICES FOR PHARMACEUTICAL PRODUCTS: MAIN PRINCIPLES (JANUARY 2013)

How To Ensure Quality Assurance

ALL UST SYSTEMS. MOTOR FUEL, USED OIL, BULK HEATING OIL STORAGE (Federal/State Regulated Systems)

WORKING IN CONFINED SPACES GUIDELINES

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

TEST REPORT for the ARID TECHNOLOGIES VAPOR RECOVERY UNIT installed in LANTANA, FL

XYZ Contract Company Industrial Hygiene Program

CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

Good Research Practice

PACKAGED FIRE TUBE BOILER

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Commonwealth of Kentucky. Wastewater Laboratory Certification Manual

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system

UNIVERSITY OF KENTUCKY CONFINED SPACE PROGRAM

Continuous Monitoring Manual

NATIONAL ORGANIC PROGRAM APPLICATION & ORGANIC SYSTEM PLAN - PROCESSING/HANDLING

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

Pharmaceutical Wholesaler Site Inspection Checklist

OVERVIEW SCOPE DEFINITIONS

Hydrostatic Testing of Aviation Components

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment

Texas Commission on Environmental Quality Page 1 Chapter Control of Air Pollution from Nitrogen Compounds

Software Verification and Validation

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level B

US Environmental Protection Agency Office of Pesticide Programs

Generator 101: Buying and Installing a Generator for Your Home or Office. bruniandcampisi.com

WHS LEGISLATIVE COMPLIANCE GUIDELINES

ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5

Audits must be conducted with due concern for employee safety and environmental protection.

Essentials Welding QA/QC Plan Sample

HOT WORK PERMIT PROGRAM TRAINING. John Braun

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Confined Spaces. Notes

EPA NATIONAL LEAD LABORATORY ACCREDITATION PROGRAM. LABORATORY QUALITY SYSTEM REQUIREMENTS (LQSR) REVISION 3.0 (November 05, 2007)

APPLICATION FOR DRY CLEANERS PROGRAM (THIS APPLICATION IS FOR A CLAIMS MADE POLICY)

Working Party on Control of Medicines and Inspections. Final Version of Annex 15 to the EU Guide to Good Manufacturing Practice

PPG SUPPLIER DEVELOPMENT ASSESSMENT

SCBA Frequently Asked Questions

STANDARD OPERATING GUIDELINES: EVIDENTIAL BREATH ALCOHOL INSTRUMENT CALIBRATION

Manual stack emission monitoring Performance standard for organisations. Environment Agency November 2011 Version 7.2

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Confined Space Entry Programs Use with the Confined Spaces book, Chapter WAC

BOSTON COLLEGE ENVIRONMENTAL HEALTH AND SAFETY LABORATORY GUIDE FOR RENOVATIONS, REMODELS, MOVES AND TERMINATIONS

CITY OF LOS ANGELES PERSONNEL DEPARTMENT CAREER OPPORTUNITIES FOR MECHANICAL HELPER

Confined Space Air Monitoring

Medical Cannabis Laboratory Approval Program

Quality Management System General

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

Installation and Operational Qualification Protocol (Reference: SOP )

SAFETY AND HEALTH PROGRAM

Generic CMMS Quality Assurance Plan

BC-5000 OPERATIONS MANUAL BATTERY CAPACITY TESTER COFKO LLC.

TANKER - SHORE SAFETY CHECK-LIST

Minnesota Pollution Control Agency. Quality Assurance Project Plan Guidance

AS9100 Quality Manual

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

Sample Written Program. For. Confined Space OSHCON

Elements Elements describe the essential outcomes.

UST Site Inspection Guidance Document

ngenieros Ingenieros Asociados De Control S.L.

Safe Work in Confined Spaces

Environmental Management Plan

Equipment Qualification

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE

Environment-Laboratory Ambient Conditions

Labour and Workforce Development. Confined Space Entry

Inspection and Testing of Water-Based Systems

3.3 Recording of Requests for Inspection and Inspection Certificates

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

Transcription:

Inspection, Measuring and Test Equipment (IMTE) Calibration Purpose and Scope 2 Responsibilities 2 About IMTE 3 Master IMTE Log 4 Identification of IMTE Calibration Status 5 Handling and Storage of IMTE 6 Calibration of IMTE 6 Establishing Calibration Frequency 6 Pre-Calibration 6 Calibration 7 Post-Calibration 7 Recordkeeping 8 Forms and Attachments 8 Attachment(s): Master IMTE Log Author: Greg Johnson Quality Reviewer: Manager of Standards, Approver: Director of SHEQ Training and Systems 1.4 November 2006 IMS-11-03-GAM Inspection, Measuring and Test Equipment (IMTE) Calibration Page 1 of 8

Purpose and Scope Purpose This chapter provides guidelines for: identifying Inspection, Measuring and Test Equipment (IMTE) identifying IMTE calibration status handling and storing IMTE maintaining IMTE. Scope This chapter applies across BOC North America to IMTE used for one or more of the following applications: used to measure in-process and final product quality/quantity characteristics used to measure key characteristics that can have a significant environmental impact such as, wastewater or air discharges and underground storage tank monitoring devices used for occupational safety and health measurements such as personal atmospheric air monitors, noise measurement devices, combustible, oxygen and toxic monitoring devices used to calibrate or maintain IMTE that is used for any of the above applications. Responsibilities Location Manager or designee The Location Manager or designee is responsible for: controlling the identification, calibration and marking of inspection, measuring and test maintaining a register of measuring and testing maintaining records of calibration for a minimum of 6 years from the calibration expiration date. 1.4 November 2006 IMS-11-03-GAM Inspection, Measuring and Test Equipment (IMTE) Calibration Page 2 of 8

About IMTE Recording IMTE data All must be recorded on a maintenance planning system such as SAP or MAXIMO, which details: serial number location in the plant calibration frequency calibration method date and record of previous calibration date placed in service. Note: Where possible this information may be used to generate the Master IMTE Log. Calibration standards Calibration must be performed using Metrology Equipment or internationally recognized standards, such as those of the National Institute of Standards and Technology (NIST). If no internationally recognized standard exists, a standard based on scientific rationale must be developed, validated and used. Any standard of this nature must be reviewed and approved by relevant approval/design authorities. Calibration should be carried out against the following: test gases or solution of known composition covered by approved certification dead weight testers with approved certification manufacturer s test data (for example, electrical impulse). Calibration certificate requirements A calibration certificate is required and must be maintained on file which: was issued by a BOC-approved, nationally accredited test laboratory, or certifies that the calibrations performed are traceable to national or international standards, and cross-references the serial number of the calibration standard(s) used, and identifies both the As Found and As Left conditions, highlighting any As Found results that are found to be outside acceptance limits and documents the extent of the deviation. Note: Where calibration is performed internally, the Calibration Record fulfills this requirement. Instruments in continuous use Some panel-mounted instruments, due to continuous processing demands, may not be removed for calibration. In this case calibration frequencies should be established to coincide with plant shut downs. When shut down is not possible, the instrumentation loops must be based on design and past performance data. 1.4 November 2006 IMS-11-03-GAM Inspection, Measuring and Test Equipment (IMTE) Calibration Page 3 of 8

Calibration checks All calibration checks and adjustments must be carried out against approved procedures or by approved subcontractors under suitable environmental conditions. In the event of failing to achieve calibration, it must be both removed and replaced, or identified with a BOC official label or tag stating: DO NOT USE. When a calibration Non-Conformance is detected: raise a corrective action report, and re-certify previous inspections/tests. Note: Previously accepted product must be re-certified prior to dispatch and, where necessary, recalled. Master IMTE Log Instruments All Primary Instruments / Measuring Devices used to measure product acceptance criteria, metrology used for primary instrument/ calibration, and Safety, Health and Environmental instrumentation must be recorded on the Master IMTE Log (see attachment) by: Functional description Range (optional) Manufacturer (optional) Type (master or work) Identifier/Tag number Serial number Model number Location Calibration frequency Date placed in service Date removed from service When validated electronic maintenance scheduling and tracking systems are used, and include all the information that is required above, a paper Master IMTE Log is not required. Sample list of primary instruments/ Residual and Final Product Analyzers Fill or process measurement working gauges and/or transducers Scales Thermometers Analytical flow meters Timers 1.4 November 2006 IMS-11-03-GAM Inspection, Measuring and Test Equipment (IMTE) Calibration Page 4 of 8

Sample list of metrology Master gauges (used to calibrate working gauges) Master thermometers Master flowmeters (used to calibrate working thermometers) Master timers Sample list of safety, health and environmental Portable and fixed atmospheric analyzers (inert, flammable, toxic, oxygen) Noise monitoring Air monitoring Voltage detectors Refrigerant leak detectors Wastewater monitoring devices Air pollution monitoring devices Underground storage tank interstitial monitors Fuel pump meters Identification of IMTE Calibration Status Calibration status label All instruments recorded on the Master IMTE Log should have their calibration status indicated with a label or tag, which includes: date on which calibration was performed date on which calibration is due initials of the person performing such calibration identification of device used for calibration. Note: Labeling of should be done where practical. Equipment requiring daily or weekly calibration does not require labeling. Laboratory Numerous laboratory items are too small for, or normal use prevents, the use of a status label. For example: mercury-in-glass thermometers, volumetric glassware or thermocouples. In these instances, an alternative method of identifying the calibration status must be developed, by labeling the device storage container, for example. A list of metrology used at the site must be maintained to identify laboratory and to record calibration status. See Master IMTE Log (see attachment). General exemptions Some pressure gauges used in critical applications, such as Quality Control (QC) panels, are not designed to be calibrated after manufacture. Provision for regular replacement must be made and the device identified with a replace by (date) label. Note: Read only gauges do not require calibration. 1.4 November 2006 IMS-11-03-GAM Inspection, Measuring and Test Equipment (IMTE) Calibration Page 5 of 8

Handling and Storage of IMTE Guidelines Adequate handling and storage facilities must be provided to ensure that all instruments are: in a current state of calibration clean undamaged adequately maintained. Calibration of IMTE Establishing Calibration Frequency Calibration frequency Calibration frequencies are to be established by relevant approval/design authorities, and must be determined by considering the following: Manufacturer s recommended frequencies Plant operational conditions Product assurance standards Regulatory requirements. Note: Frequencies may be modified when statistical evidence demonstrates that it is justifiable to do so, to reflect plant operational conditions, and in consideration of experience gained with similar and BOC standards. Calibration Checks For calibration checks, frequency and scheduling specifications must be detailed on a Calibration Schedule or included in a planned maintenance system. Pre-Calibration Pre-calibration requirements Before commencing work on IMTE, ensure that: a safe system of work has been established the plant operating personnel have been informed of the work to be done, and the possible effect on the control system any process control that may be affected has been set up correctly, for example: controllers are set to manual analyzer trip or calibration overrides switched ON the following are available: manufacturer s maintenance manual relevant test /reference standards calibration record sheets. 1.4 November 2006 IMS-11-03-GAM Inspection, Measuring and Test Equipment (IMTE) Calibration Page 6 of 8

Calibration Generic IMTE process The generic process for the calibration of all IMTE must be as follows: Step Responsibility Action 1 Person performing Calibrate test and record results. calibration 2 Person performing calibration 3 Supervisor/ Manager 4 Supervisor/ Manager Has the instrument been found to be outside calibration or does it show evidence of physical damage? If no, calibration has been satisfactorily completed If yes, log information on the Corrective Action Report, and advise the supervisor or equivalent, so that the potential impact on previously inspected products, or processes can be assessed. If the potential impact on previously inspected products, or processes is considered significant, notify management in order to implement appropriate corrective action, which may include: customer notification re-testing recall replacement Decide if the instrument should be replaced or the time period between calibrations reduced. Post-Calibration Post-calibration requirements On completion of calibration, ensure that: the appropriate supervisor and plant operating personnel are informed that calibration has been appropriately completed any process control, which has been adjusted during calibration, is restored to its normal running position. Note: Notify plant-operating personnel if restoration is not possible. 1.4 November 2006 IMS-11-03-GAM Inspection, Measuring and Test Equipment (IMTE) Calibration Page 7 of 8

Calibration records Calibration Records are maintained and must include: Identification of the device being calibrated Date of calibration Name and signature of person performing the calibration Identification of the standard (calibrated gas, master gauges, etc.) used to verify the suitability of the device "As Found" and "As Left" results Signature of quality reviewer as required by business process, such as medical or beverage. All required calibration information (record on a label and attach to the instrument as required). Recordkeeping Retention The Master IMTE Log must be maintained current for the life of the plant. Forms and Attachments Forms The following forms are used in this chapter: Master IMTE Log (see attachment) 1.4 November 2006 IMS-11-03-GAM Inspection, Measuring and Test Equipment (IMTE) Calibration Page 8 of 8