Parking Infrastructure Development. in Santariskes Medical Campus (SMC), VILNIUS, LITHUANIA



Similar documents
Financing PPPs: Project Finance June 2006

Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit

Law of Mongolia on Concessions

Invitation for Expression of Interest

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note April 2000

Developing by Public Private Partnership (PPP): Meeting infrastructure needs successfully.

B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y

arrangements typified by joint working between the public and private sectors covering all types of collaboration across the private-public sector

Investment incentives in Bulgaria

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Developing a Public-Private Partnership Framework: Policies and PPP Units

PRAGUE AIRPORT KLADNO RAILWAY LINK

UNECE PPP Healthcare Standard

HOW TO HIRE AN ARCHITECT

Public Sector Comparator for Highway PPP Projects. Henry Kerali Lead Transport Specialist

REPORT FEHMARNBELT FIXED LINK. Financial Analysis - February Main Results. March Prepared by Sund & Bælt / Femer Bælt

''The construction of the Public Urban Centre in Sikorskiego St. and Legionów Ave. in Łomża

Estevan Student and Market Rental Housing Project. Assessment Report

Certificate in Construction Project Management

Implementation of qualified electronic signatures in the process of creating project and technical documentation. Austria. January 28 th 2016

PPP Practioner s Notes

Ministry of Information and Communication Technology EXPRESSION OF INTEREST

Vivek Aggarwal Managing Director, MP Road Dev. Corporation Bhopal (M.P.), INDIA

RECOMMENDATIONS ON BUSINESS PLAN PREPARATION

Release: 1. CPCCBS6010 Conduct and report on building surveying audits of residential buildings up to three storeys

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

Law No. 67 for the year 2010

SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES

Gebze Izmir Motorway & Izmit Bay Crossing Project

Information about Changes of JSC Citadele banka Services Pricelist from January 1, 2015

Buying and selling an unincorporated business

Minerals production in Hungary (Mtons) - source: Hungarian Office for Mining and Geology

Asset Management Policy for Major PFI Projects

CLIENT S GUIDE 1. WHERE TO START WHAT TO CONSIDER 3. ANSWER THE WHYS 4. NEEDS & OPTIONS REVIEW HOW TO HIRE AN ARCHITECT

REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT

Concessions and PPPs. Brief 18. Public Procurement. August 2011

Comparative Study of Frameworks to protect the Long Term Interests of Pension Funds Investing in Public-Private Partnerships

The following services are being offered and can be sub-categorised as follows:

Railway Crossing Information System

COWI s Role in the Copenhagen Metro Project

Public-Private Partnerships

PUBLIC-PRIVATE PARTNERSHIP IN INFRASTRUCTURE

PREQUALIFICATION DOCUMENT FOR PROVISION OF WEBSITE HOSTING AND MAINTENANCE SERVICES - TENDER NO KENAS NO/19/2013/2015

The Inkosi Albert Luthuli Hospital. Cairo, May 25 26, 2008

LAW OF MONGOLIA ON CONCESSIONS CHAPTER ONE. GENERAL PROVISIONS

Introduction Building project management

PUBLIC PROCUREMENT SYSTEM AND REFORM IN AFGHANISTAN Anwar M. Raufi

Norwegian road tolling: scope, limits and perspectives for the future

ASSAM POWER GENERATION CORPORATION LIMITED

Rechtsanwälte, Lawyers, Abogados, Advocaten

PUBLIC PROCUREMENT CONTRACTS

Business Area Distribution

List of fees charged by the Bucharest Stock Exchange. A. Fees and commissions applicable to Participants

Public Sector ICT Procurement

Telecommunications Regulation. NORWAY Advokatfirmaet Thommessen AS

Mongolia: Fifth Health Sector Development Project

City of Vantaa New Plans and Projects

Designing Health and Safety into Procurement and Contract Management

Preliminary Value for Money Analysis

PPP Seminar : Health Royal Liverpool Hospital Case study

BMT Tax Depreciation Estimate

Introduction to Public-Private Partnerships (P3s)

Annex A: Pre-Qualification Questionnaire Core Questions

consultants chartered accountants registered auditors

Bicycle and Public Transport Dream Team or Rivals? The Berlin Experience

Wind farm project development in Poland experience report from a market participant

1/ 11 TED19_TFL 24/03/2016- ID: Standard form 2 - EN Rapid Charge Point Concession Framework

How To Manage Two Web Portals In South Africa

Investors day. Investors Day. Marketing and economics Vice President Benoit CARON. January 8 th, January 8th, 2004 Page 29

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA INTERIM REVIEW OF ROYAL ALBERT DOCK PROCUREMENT

Guide to Subdivision and Land Development

Business Succession Planning With ESOPs

PPP POLICY AND REGULATION IN INDONESIA

The South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees

GIMPA EXECUTIVE CONFERENCE CENTRE

Presentation for investors

INDIVIDUAL CONSULTANCY

Position Description

The National Council of the Slovak Republic has adopted the following Act: Article I. 1 Scope of the act

Transcription:

Parking Infrastructure Development in Santariskes Medical Campus (SMC), VILNIUS, LITHUANIA

Santariskes Medical Campus (SMC) main medical campus in lithuania 64 ha 6 public / 2 private medical institutions 5 000 employees 2 000 HOSPITAL BEDS PATIENTS & 1 M visitors ANNUALY HEALTH CARE / HOSPITAL PUBLIC RESEARCH INSTITUTION OTHER 2

The current situation in SMC's Parking infrastructure Fails to ensure full accessibility for health services Insufficient, incoherent and inefficient Non-compliant with regulatory requirements Overloaded and not safe for users Encourages illegal parking 3

EXISTING PARKING SPACE AND FEES 2 279 PARKING SPACES 2 039 IN PARKING LOTS 42 % 12 % 11 % 24 % Employees with permits VISItORS VISITORS Employees with permits paid 40 LTL/montH FREE Tolled 2LTL/HOUR FREE 240 ON STREET 11 % ON STREET tolled 2 LTL/hour Most of this car parking space has to be removed due to regulatory requirements or for SMC development reasons. SMC is designated as a yellow parking toll zone by Vilnius city municipality (2Lt/h). This is the only tolled parking area outside Vilnius city centre (1Lt/h to 6Lt/h). There are 40 parking spaces in 2 private parking lots which are not included in the project. 4

Future of the SMC Expected development of THE SMC Today In 1 to 5 years In 5 to 25 years medical institutions Number of employees Number of patients & visitors annualy 5 000 1 M 8 10 15 6 800 1.4 M 8 600 1.75 M Estimated DEMAND FOR parking SPACES 2 249 3 210 4 130 5

Project goals Implementing an efficient, integrated system for SMC parking management Designing and building new parking infrastructure Implementing an electronic parking management system Reconstructing existing parking lots Improvement of the parking service quality Operation and maintenance of all parking infrastructure for 25 years 6

Project HighlighTs Project goal Project owner Development of new parking infrastructure in SMC Ministry of Health of Lithuania Partnership Type Concession Contract Type Design, Build, Finance, Operate, Transfer Project Duration 25 years Investment estimated 16.7 M EUR (VAT excl.) NUMBER OF PARKING spaces CONSTRUCTED Obligatory: min 937 new spaces reconstruction of the existing spaces Optional: up to 2 250 new spaces Number of Parking spaces Operated from 937 to 2 250 new spaces up to 1 347 existing spaces 7

SMC Parking infrastructure DEVELOPMENT SCHEME 2 250 maximum NEW PARKING SPACES 937 MIN to replace removed or reallocated parking space for employees and visitors 1 413 MIN to replace removed existing parking space plus additional spaces if needed TODAY 1st DEVELOPMENT STAGE (Short Run) 2ND DEVELOPMENT STAGE (Long Run) Existing PARKING SPACES 2 279 2 039 in parking lots 240 on street 1 236 for employees 1 043 for visitors 1 342 max on demand: at least 446 spaces to be removed to allow SMC developement at least 30 allocated to disabled or special purpose vehicle parking or dropoff zones 866 max in 1-2 years: at least 537 in parking lots and 240 on street to be removed at least 160 allocated to disabled or special purpose vehicle parking or dropoff zones 8

PARKING SPACE AND DEVELOPMENT SCHEME EXISTING PARKING SPACE AND AVAILABLE LAND PLOTS SUGGESTED FOR CONSTRUCTION PARKING SPACE TO BE REMOVED OR REALLOCATED DURING 1 ST DEVELOPMENT STAGE (Short Run) PARKING SPACE TO BE REMOVED OR REALLOCATED DURING 2 ND DEVELOPMENT STAGE (Long Run) BUILDINGS 9

investor's responsibilities and pricing model Investor's responsibilities Develop the business plan Raise financing Create new infrastructure Set pricing and receive income PRICING MODEL Investor submits the pricing model during the tender procedures Different pricing models should be developed for employees and visitors The priority is low prices for SMC employees, and then for visitors 10

Project TIMELINE Feasibility study Selection of the project consultants Market consultation Contract award 2012 2013 1Q 2013 2Q 2013 3Q 2013 4Q 2014 1Q 2014 2Q 2014 3Q 2014 4Q 2015 1Q Project aproved by Ministry of Finance PPP commission Government Tender documentation preparation Public procurement procedures Start of the project implementation 11

PREQualification CRITERIA CRITERIA Economic and Financial THE CANDIDATE SHALL MEET Average turnover of construction and installation works (3 yrs) Average turnover of non-residential real estate management services (3 yrs) Critical liquidity ratio Ability to raise the project funding Minimum value 4.65M EUR 0.29M EUR 0,5 4.65M EUR Technical and Professional License to carry out design and construct buildings At least 1 construction contract of a similar size (5 yrs) At least 1 construction contract implemented for new parking facilities (5 yrs) 3 yrs of experience in parking management experience in multistorey parking management experience in large-scale parking management experience in paid parking management Competent experts: project manager, building construction managers, parking service specialist, traffic management specialist Specialised or sufficient 4.65M EUR 500 spaces 1 000 spaces 1 multistorey parking 500 spaces in 1 lot 1 paid parking lot 12

Most Economically Advantageous Tender PRICE 60 % 20% Monthly permit price for employees 40% Hourly price for visitors 40% Income sharing threshold Income is shared by giving 75% of income over the threshold to the authority QUALITY 40 % 30% 20% Newly built spaces Reconstructed existing spaces 40% 10% Technical aspects Traffic management solutions Functionality Parking payment system Environment solutions Project implementation schedule 13

INDICATIVE SCHEDULE OF THE Selection process Concession competition notice PQQ PQQ Assessment 2 months 1 month Preliminary Solution Preparation 2-3 months Contract award Preliminary Solution Assessment BINDING Solution Preparation BINDING solution Assessment Negotiation Final Arrangements and Financial Close 1 month 1-2 months 1 month 1 month 3-4 months 14

PARTNERSHIP SCHEME USER S OF THE INFRASTRUCTURE Makes payments for the contract management PROJECT OWNER Ministry of Health Assigns parking infrastructure BIDDER INVESTOR CONCESSION CONTRACT RECEIVES INCOME PROJECT IMPLEMENTATION SPECIAL PURPOSE VEHICLE Ltd. CONCESSIONAIRE PROVIDES SERVICES PROJECT FUNDING PRIVATE INVESTORS/ SHAREHOLDERS COMMERCIAL BANKS IFIs MaNAGES CONTRACT INVESTMENT FUNDS Assigns contract management rights AND Makes payments for the contract management PROJECT ADMINISTRATOR 15

Expectations Infrastructure for users Functional and comfortable to use, and providing easy access, parking management systems, quick parking solutions and drop-off zones for patients. Low parking prices Low parking prices for employees and visitors is a priority. Free parking is required for the disabled, for ambulances and other special purpose vehicles, and for short-stay use (15 minutes or less). Lower operating cost Environmentally friendly technology and operational efficiency. Tomorrow's solutions Proposition of innovative solutions where possible. Investment vs. total cost of ownership Possibility for bigger capital investment if operating and maintenance costs can be reduced. The city s identity vs. design Optimal technical solution incorporated in Vilnius City's architectural and visual identity. Effective partnership Establishment of relationships, communication routes and systems, active support and enhancement of these throughout the life of the project so that a sustainable partnership of trust and respect is maintained. 16

CONTACTS JUSTINAS IVAŠKA Project ManageR +370 5 236 50 10 justinas.ivaska@santa.lt Irmantas Butkauskas INVeSTORS RELATIONS +370 5 264 90 78 irmantas.butkauskas@investlithuania.com Additional information on procurement: www.cvpp.lt