Hydro Cascade & Storage Optimisation utilising PLEXOS

Similar documents
USBR PLEXOS Demo November 8, 2012

Integrated Resource Planning with PLEXOS

Managing Risks and Optimising an Energy Portfolio with PLEXOS

An Introduction to Variable-Energy-Resource Integration Analysis Energy Exemplar October 2011

Different types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example

System Optimizer Solution for resource planning, capacity expansion, and emissions compliance for portfolio optimization

Power Generation Industry Economic Dispatch Optimization (EDO)

Renewable Energy Management System (REMS): Using optimisation to plan renewable energy infrastructure investment in the Pacific

Forecasting power and gas prices on various

joint Resource Optimization and Scheduler

Methodology for Merit Order Dispatch. Version 1.0

Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration

Value of storage in providing balancing services for electricity generation systems with high wind penetration

Demand Response Management System ABB Smart Grid solution for demand response programs, distributed energy management and commercial operations

UNIT COMMITMENT AND ECONOMIC DISPATCH SOFTWARE TO OPTIMISE THE SHORT-TERM SCHEDULING OF ELECTRICAL POWER GENERATION

Carbon Price Transfer in Norway

Techno-Economics of Distributed Generation and Storage of Solar Hydrogen

Modelling of Smart Low-Carbon Energy Systems. Imperial College London

Generation Expansion Planning under Wide-Scale RES Energy Penetration

Impacts of large-scale solar and wind power production on the balance of the Swedish power system

CHAPTER 3 SECURITY CONSTRAINED OPTIMAL SHORT-TERM HYDROTHERMAL SCHEDULING

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT?

Summary of specified general model for CHP system

Prescriptive Analytics. A business guide

Offshore Wind: some of the Engineering Challenges Ahead

ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104

CAPACITY MECHANISMS IN EU POWER MARKETS

Operating Hydroelectric and Pumped Storage Units In A Competitive Environment

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources

DOES WIND KILL THE ENERGY ONLY MARKET?

Integrating 300 GW wind power in European power systems: challenges and recommendations. Frans Van Hulle Technical Advisor

Addressing the challenge of modelling energy storage in a whole energy system Sheila Samsatli, Nouri Samsatli, Nilay Shah

Chapter 11 Monte Carlo Simulation

The Norwegian Power System

Resource Planning Opportunities

CO 2 Price Impacts on Nuclear Power Plant Competitiveness in Croatia

Refinery Planning & Scheduling - Plan the Act. Act the Plan.

Computing the Electricity Market Equilibrium: Uses of market equilibrium models

Future Energy Storage/Balancing Demand

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)

Energy Storage Systems and Role for the US Grid

Energy Forecasting Methods

A joint control framework for supply chain planning

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

Risk-limiting dispatch for the smart grid: some research problems

Concepts and Experiences with Capacity Mechanisms

DG Transmission Impact Analysis for Rate Determination GTMax Software Demonstration

UNCERTAINTY IN THE ELECTRIC POWER INDUSTRY Methods and Models for Decision Support

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

Analysing the Demand Supply Dynamics of the Australian South Eastern Gas Market Using PLEXOS

STOCHASTIC ANALYTICS: increasing confidence in business decisions

Assessment of the economic viability of balancing from Norwegian hydro from the perspective of a single power producer

Energy storage in the UK and Korea: Innovation, Investment and Co-operation Appendix 4.1: Stakeholder interviews from Korea

Energy Storage for Renewable Integration

Modeling and Simulation of Advanced Pumped-Storage Hydropower Technologies and their Contributions to the Power System

Fiscal Year 2011 Resource Plan

Storage Battery System Using Lithium ion Batteries

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations

Modeling the Financial and System Benefits of Energy Storage Applications in Distribution Systems

Analysis of the EU Renewable Directive by a TIMES-Norway

IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014

The Brazilian Electricity Model: An Overview of the Current Structure and Market Design

Advanced Electricity Storage Technologies Program. Smart Energy Storage (Trading as Ecoult) Final Public Report

Valuation of Natural Gas Contracts and Storages

R&D in Vattenfall Johan Söderbom

Wind Power and District Heating

Section 4: Scheduling Philosophy & Tools

System-friendly wind power

A vision of sustainable energy future: A multi-energy concept of smart energy systems Central European Student and Young Professionals Congress

Ancillary Services and Flexible Generation

Modelling framework for power systems. Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo

The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution.

Simulation of parabolic trough concentrating solar power plants in North Africa

A new electricity market for Northern Ireland and Ireland from Integrated Single Electricity Market (I-SEM)

Dealing with the rise of Renewables Investing in smart renewables. Felice Egidi Head of Regulatory&Antitrust Affairs Paris, July 2 nd 2014

Power market integration. Geir-Arne Mo Team Lead Nordic Spot Trading Bergen Energi AS

VESI JA ENERGIA VIENTITUOTTEENA. Fortum Miko Olkkonen Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy

Overseas Investment in Oil Industry and the Risk Management System

How to build a wind company INSIDE: >> CABLES FOR WIND WORK. >> GENERATOR DIAMETER SPANS 12m >> SIEMENS SWT 6.0 PAGE 50 PAGE 8 PAGE 42

STOCHASTIC MODELLING OF WATER DEMAND USING A SHORT-TERM PATTERN-BASED FORECASTING APPROACH

Perspectives for ESS in Germany and Europe legal situation and applications StoREgio energy storage system association

From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations

STORAGE ELECTRICITY. Improving the world through engineering

ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential

Wind and Energy Markets: A Case Study of Texas.

Optimal Allocation of renewable Energy Parks: A Two Stage Optimization Model. Mohammad Atef, Carmen Gervet German University in Cairo, EGYPT

PIER FINAL PROJECT REPORT RESEARCH EVALUATION OF WIND GENERATION, SOLAR GENERATION, AND STORAGE IMPACT ON THE CALIFORNIA GRID

ESC Project: INMES Integrated model of the energy system

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers

Generator Optional. Timeline including the next steps. A practical example. Potential benefits of OFA? Key implications. How might OFA work?

2016 ERCOT System Planning Long-Term Hourly Peak Demand and Energy Forecast December 31, 2015

Recommended Practice for Software Acquisition

Power System review W I L L I A M V. T O R R E A P R I L 1 0,

Energy and Consumer Impacts of EPA s Clean Power Plan. Prepared for the American Coalition for Clean Coal Electricity

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector

The Impact of Climate Change on the Renewable Energy Production in Norway

NV Energy ISO Energy Imbalance Market Economic Assessment

HydroPeak - WP3. Assessing capacity mechanisms in the European power system. Stefan Jaehnert, PhD HydroPeak User group meeting, Trondheim,

Transcription:

Hydro Cascade & Storage Optimisation utilising PLEXOS 2 nd Annual Electricity Price Modelling and Forecasting Forum Tom Forrest Senior Power Market Consultant Energy Exemplar - Europe

Contents Overview of Energy Exemplar & PLEXOS Current renewable situation in Europe Challenges in modelling hydro assets compared to conventional generation Hydro Modelling with PLEXOS Exploring different approach's for short vs Long term forecasting? Coping with uncertainty in modelling 2

OVERVIEW OF ENERGY EXEMPLAR & PLEXOS 3

Energy Exemplar Commercial company since 1999 Focused on development of PLEXOS Integrated Energy Model Continuously enhanced and developed to meet challenges of a changing energy markets and clients modelling requirements Over 50 employees serving our global base from five locations: Adelaide, Australia (Head Office) London, UK California, USA (West) Hartford, USA (East) Johannesburg, South Africa High growth rate of new Customers and Installations at over 30% p.a. 25% staff with Ph.D. level qualifications spanning Operations Research, Electrical Engineering, Economics, Mathematics and Statistics 4

PLEXOS users around the world European Region Commercial Client Breakdown Consultants Utilities Manufactuers (Gen, storages etc) Energy Regulators/Comissions Research Institutes Transmission System/Market Operators 6% 6% 19% 7% 9% As of February 2015, worldwide installations of PLEXOS exceeded 1,030 at over 170 sites worldwide in 36 countries 53% 5

What is PLEXOS? Proven power market simulation tool & Integrated Energy Model Primarily a modelling tool based around the Fundamentals of the energy market however technicals and stochastics can be integrated also Uses cutting-edge linear and Mixed Integer (MIP) programming, optimisation and stochastic techniques Uses the same techniques that are used in scheduling, pricing and dispatch models Flexible object-oriented design allowing modelling of, Capacity expansion & investment planning Market Analysis or Design Price forecasting and risk analysis Portfolio Optimisation and valuation Transmission and Ancillary Services Analysis Renewable Integration analysis & optimisation Integrated Electric and Gas System Market Modelling Co-optimisation of other commodities (Water, Heat etc.) 6

Simulation and Analysis tools in PLEXOS Seamless Integration LT Plan Optimal investment PASA Optimal reserve share MT Resource Allocation ST Chronological Unit Commitment LT Schedule PASA MT Schedule ST Schedule Phase Primary Function & Analysis Main Output Horizon Generation/Transmission Expansion, Resource Planning, Project viability, Investment analysis, renewable integration System Outage Scheduling, (Convergent or classical) Monte-Carlo random outages, Regional capacity share Hydro-thermal coordination, Long-term Take-or-Pay contracts, Competition analysis & behavior modelling (LRMC recovery, Nash Cournot, RSI, Bertrand), Risk Management Day/Week/Hour market simulation, optimal bidding, CCGT analysis, ST risk management, Energy & Ancillary Service optimisation, OPF Builds and Retirements Maintenance Schedule & reliability indices Operating policies Detailed Chronological Operation 10-50 years 1-10 years 1 year Detailed by-period results 1 day 1 week RT Schedule Intra-hour market dispatch, Real Time (RT) & Day Ahead (RA) coupling RT economic Dispatch Intra day (down to 1 minute) 7

How does PLEXOS work? Input Data Series Fuel Prices Renewable Forecasts Results Hourly Price forecasts Energy Demand Generation Availability Generation Dispatch Heat Demand Fuel Contracts Technical Characteristics PLEXOS Fundamental Model PLEXOS Engine Select Solver Solution from the optimisation task Dispatch Costs Revenue & P/L Generator technical properties (heat rate, ramp rates, MSL, start profiles etc.) Fuel Constraints Emission Limits Interconnector NTCs System constraints Ancillary Services requirements Market mechanisms Water Usage 18

Output & Reporting Options with PLEXOS 9

CURRENT RENEWABLE SITUATION IN EUROPE 10

Renewable growth in Europe & unintended consequences German Annually new installed generation capacity in MW for the EU Region 35GW of new generation installations in 2013 Wind Power 32% (11.2GW) Solar 31% (11.1GW) 11

Increased Focus: Flexible Generation & Energy Storage solutions A German study undertaken by Statkraft on how Germany could procure all of its electricity from renewable resources by 2050 identifies Norwegian dams as a realistic way to store large volumes of energy. Limitations identified to be overcome: Regulations around reservoir ramp rates (1cm per hour vs 5cm per hour required) Size of storages need to be increased to 30GW Transmission Line capacity upgrades required into Germany CR Olsen. (2013, Jan- Can Norway be Europe's "green battery"? [Online]. http://www.cedren.no/news/article/tabid/3599/articleid/1079/cannorway-be-europe-s-green-battery.aspx Typical Nordic Region Merit Order Approximately 50% of all European hydro reservoir capacity is situated in Norway The share of hydro power in Norway was 97% in 2012 12

Increased Focus: Flexible Generation & Energy Storage solutions Other storage options have also been explored: Compressed Air Energy Storage (CAES) Air is pumped into underground salt caverns and the compressed air is then released through a generator to generate when required. High build cost however at 1,000 /kw Becoming closer to commercialisation Battery Storage numerous technologies flow, liquid metal, Ni-Cd & Lithium-ion Many technologies still lack commercial viability Limited life span of batteries Potential safety hazard Power to Gas, Electric Vehicles (EV), hydrogen. 13

CHALLENGES IN HYDRO MODELLING VS CONVENTIONAL GENERATION 14

What Hydro generators can we model? There are generally three types of hydro plants we want to model: Regulated or Storage hydroelectricity, based on reservoirs that function as batteries Storing water inflow from rain and melting snow in large dams, giving the decision maker some extent of freedom regarding the timing of generation Run-of-river hydroelectricity, which offers little or no storage possibilities. Such power plants are often used in coherence with reservoirs upstream Pumped storage, which can be used for load balancing and shifting. Water is pumped from lower elevation reservoirs to higher elevation reservoirs during low priced hours, and can thus be used for generation and sold during high priced hours 15

The Hydro-Thermal Modelling Problem Mathematical formulation of a hydro & thermal problem is more complex than a pure thermal system: Hydro power plants have the option of storing water if there is a storage attached to them so there is hydraulic temporal coupling Natural inflows are uncertain and can be hard to forecast accurately over a long horizon Cascade or Run-of-River systems can be complex to optimise due to the decisions taken along the chain There may be some specific water usage policies and constraints. Operation co-ordination is more complex due to high variety of constraints. Minimum flow constraints Storage ramp constraints Minimum Operating Levels While water is cost-free but its opportunity cost is fundamental 16

If water is free how can we decide when to use it optimally? A typical conventional generators SRMC can be broken down into: SRMC = (Fuel Price x Marginal Heat Rate) + VOM Charge + Emission Cost+ UoS Charge But with water being free how can we value it? We need to determine the value of water (or more commonly called Water Value) which will vary depending on the expected value of the water in storage Therefore our objective is to plan the operation of the storage so as to maximise the expected value of production over time Should we, 1. Use the water for generation and sell the power to a known price today? 2. Keep it in the reservoir and store it for generation and sale at a later stage? Option 1 Option 2 17

The Importance of Storage Management & Optimisation The Water Value can be seen as the fictitious marginal generation cost, and is linked to the asset owner s evaluation of the future revenue opportunity Large storages give asset owners flexibility as to when to generate vs when to store Short term releases however need to be managed by looking over a longer period of many months or even years for optimal storage management. Usually have monthly or yearly targets then these are then decomposed back into a daily running schedule. Large imbalances generally occur between the occurrence of peak demand and peak inflow In PLEXOS this process is done via a 2 step process called decomposition utilising 2 phases of PLEXOS in sequence Norway: Typical water inflows vs Demand in a year 18

HYDRO MODELLING APPROACHES WITH PLEXOS 19

Hydro-Thermal Co-ordination Problem The hydro-thermal coordination problem aims to minimise the expected value of thermal generation over a forecast horizon (T) subject to constraints on availability of hydro generation and storage. 20

Hydro Modelling in PLEXOS Modeller can choose between 3 hydro model settings depending on data available: Energy (Storages volume in GWh, releases and inflows represented in MWs) Level (Storage volume in 1000m3, releases and inflows represented in cumecs) Volume (Storage volume in CMD, releases and inflows represented in cumecs) Environmental constraints such as minimum releases or storage ramp constraints can be modelled Manual storage targets (optional) Generator efficiency curves and storage head effects Natural Inflow forecast 1 cumec = 3,600 cubic meter per hour 1 Cumec Day (CMD) = 24 Cumecs or 86,400 cubic meters 21

An example Hydro System setup incorporated into PLEXOS 22

1 Week Simulation Horizon Hourly Intervals Daily Chronology Total System Cost - $3.1m 4 March, 2015 23

1 Week Simulation Horizon Hourly Intervals Weekly Chronology Total System Cost - $2.8m 4 March, 2015 24

Simulation and Analysis tools in PLEXOS Seamless Integration LT Plan Optimal investment PASA Optimal reserve share MT Resource Allocation ST Chronological Unit Commitment LT Schedule PASA MT Schedule ST Schedule Phase Primary Function & Analysis Main Output Horizon Generation/Transmission Expansion, Resource Planning, Project viability, Investment analysis, renewable integration System Outage Scheduling, (Convergent or classical) Monte-Carlo random outages, Regional capacity share Hydro-thermal coordination, Long-term Take-or-Pay contracts, Competition analysis & behavior modelling (LRMC recovery, Nash Cournot, RSI, Bertrand), Risk Management Day/Week/Hour market simulation, optimal bidding, CCGT analysis, ST risk management, Energy & Ancillary Service optimisation, OPF Builds and Retirements Maintenance Schedule & reliability indices Operating policies Detailed Chronological Operation 10-50 years 1-10 years 1 year Detailed by-period results 1 day 1 week RT Schedule Intra-hour market dispatch, Real Time (RT) & Day Ahead (RA) coupling RT economic Dispatch Intra day (down to 1 minute) 25

Modelling months, years or a multi-year horizon The Medium Term (MT) Phase of PLEXOS addresses the key limitation of modelling large horizons in a single chronological step Long time horizons are a challenge because they imply that the simulator must optimise decisions spanning weeks, months and years and simultaneously optimise decisions in the short-term (at an hour or minutely resolution) Consider the simulation of a single year, one might think that we 'simply' make a mathematical program that includes all 8760 (or 8784) hours of the year and solve it in one giant step, but unfortunately this is usually computationally impossible. So we need a way of optimizing medium and long-term constraints and commercial decisions while still simulating in relatively small time steps Multi-Phase 2 stage run 1 st Phase => MT --Results--> 2 nd Phase => ST 26

MT ST Decomposition MT Phase runs first using a reduced chronology (e.g. Using Load Duration Curves) The red line in the chart right shows the Storage End Volume results from MT Schedule as one-value-per-month. The continuous upper envelope of the area in the chart shows the synthesized chronology based on the LDC block-by-block release/inflow results mapped back to hours. This chronology map can provide a reasonable trajectory for ST Schedule to follow down even to an hourly resolution (though in this case a daily ST Schedule step is as finer resolution as seem sensible). 27

MT to ST Decomposition ST Schedule daily levels now roughly match MT schedules monthly storage trajectory The end volume from each LDC block out of MT Schedule has been used to set target end storage volumes* for each ST Schedule step *Water Values derived from the MT Phase can also be Decomposed down to the ST as an alternative to storage targets 28

COPING WITH UNCERTAINTY IN MODELLING 29

Coping with Uncertainty PLEXOS offers three distinct approaches to coping with uncertainty: Scenario analysis Monte Carlo simulation Stochastic optimisation In PLEXOS any parameter can easily have uncertainty applied to it. Common parameters to undertake analysis of include: Load growth and load shapes Fuel and emission prices Hydro inflows and wind generation or speeds Technology cost trends These parameters (Variables) can also be correlated A high wind generation/speed might be associated with a high demand sample 4 March, 2015 Energy Exemplar 30

Stochastic Optimisation (SO) Fix perfect foresight issue Monte Carlo simulation can tell us what the optimal decision is for each of a number of possible outcomes assuming perfect foresight for each scenario independently; It cannot answer the question: What decision should I make now given the uncertainty in all the possible inputs? Stochastic Programming The goal of SO is to find a decision that is feasible for all (or almost all) the possible data instances and maximise the expectation of some function of the decisions and the random variables PLEXOS uses scenario-wise decomposition and can be configured to run in either a two-stage or multi-stage stochastic optimisation 4 March, 2015 Energy Exemplar 31

Hydro-thermal Coordination: Today s decisions have impact on the future In a Hydrothermal system water release is relevant to determine the dispatch operations Present Period High Inflow Future period Future period consequences - Low thermal generation - Low cost of future supply High releases of water Low Inflow High Inflow - Low dam levels - High cost for future supply of energy - Probably unserved energy - Spill of water - Low future cost - Present cost could be lower Low releases of water Low Inflow - Water available in future periods to face dry season - Unserved energy is avoided 32

Monthly Scenario- 10 Possible Inflow Forecasts Min, Max & Mean of adjacent - 10 Inflow Samples 10 Inflow Forecast Samples 4 March, 2015 Energy Exemplar 33

10 Inflow Samples - Monte Carlo (MT Schedule) Lake Adelaide End Volume Lake Brisbane End Volume Q. What is our optimal storage trajectory for the next 1 week? 34

10 Inflow Samples Stochastic Optimisation (MT Schedule) Lake Adelaide End Volume Lake Brisbane End Volume Gives the generation scheduler a single trajectory to target for each storage Allows us to reassess our decisions again after a week - possibly with new forecasts Allows Managers and planners can defend their storage operating decisions with conviction 35

Concluding Remarks and Summary Flexible generation & battery like storage is becoming increasingly important as countries increase non-flexible renewable capacity (wind & solar) due to investment and production subsidies Understanding the physical characteristics of each technology and how it will operate in the chosen energy market will help guide initial investment and optimal operation & dispatch Fundamental modelling software can assist in forecasting the optimal operation of a hydro storage over numerous time horizons in a competitive market environment Uncertainty in inflow forecasts (or any other forecasted input) can be taken into consideration in results by using Monte Carlo approach's or Stochastic Optimisation 4 March, 2015 Energy Exemplar 36

Thank you for your time and the opportunity Tom Forrest Senior Power Market Consultant tom.forrest@energyexemplar.com www.energyexemplar.com 4 March, 2015 37

APPENDIX 38

PLEXOS Optimisation Methods Linear Relaxation - The integer restriction on unit commitment is relaxed so unit commitment can occur in non-integer increments. Unit start up variables are still included in the formulation but can take non-integer values in the optimal solution. This option is the fastest to solve but can distort the pricing outcome as well as the dispatch because semi-fixed costs (start cost and unit no-load cost) can be marginal and involved in price setting Rounded Relaxation - The RR algorithm integerizes the unit commitment decisions in a multi-pass optimization. The result is an integer solution. The RR can be faster than a full integer optimal solution because it uses a finite number of passes of linear programming rather than integer programming. Integer Optimal - The unit commitment problem is solved as a mixed-integer program (MIP). MIP solvers are based on the Branch and Bound algorithm, complemented by heuristics designed to reduce the search space without comprising solution quality. Branch and Bound does not have predicable run time like linear programming. It is difficult in all but trivial cases to prove optimality and guarantee that the integer-optimal solution is found. Instead the algorithm relies on a number of stopping criteria that can be user defined in determining unit on and off states. Dynamic Programming - Dynamic programming (DP) is a technique that is well suited to the unit commitment problem because it directly resolves the min up time and min down time constraints, and over long horizons. Its weakness is in the way unit commit is decomposed so that units are dispatched individually. Thus if all units in the system were dispatched using dynamic programming it would be difficult to converge on a solution where system-wide demand was met exactly, and where any other system-wide or group constraint such as fuel or emission limits were obeyed. For certain classes of generator though DP can be fast and highly effective. The DP is most suited to units with a high capacity factor, and if applied to all units in the system is likely to produce significant under/over generation. Thus you must carefully select units for which the DP is applied e.g. high capacity factor plant with long min up time or min down time values are most suitable. Stochastic Programing - The goal of SO is to find some policy that is feasible for all (or almost all) of the possible data instances and maximize the expectation of some function of the decisions and the random variables 39

Stochastic Optimisation Theory The most widely applied and studied stochastic programming models are two-stage linear programs Here the decision maker takes some action in the first stage, after which a random event occurs affecting the outcome of the first-stage decision A recourse or new decision can then be made in the second stage that compensates for any bad effects that might have been experienced as a result of the first-stage decision The optimal policy from such a model is a single first-stage policy and a collection of recourse decisions (a decision rule) defining which second-stage action should be taken in response to each random outcome 40

Stochastic Optimisation Theory This decision framework is conveniently visualized though a scenario tree. The nodes represent states of the problem at a particular instant: where the decisions are made. In the first node, called The Root, the first stage decisions are made. The nodes connected to the root node are the second stage nodes and represents the points where the second stages decisions are made. The number of nodes in the last stage equals the number of scenarios. The branches are different realizations of the random variables. Stage 0 Stage 1 Stage 2 41

Multi-Stage Stochastic Optimisation A stage means that new information is revealed and a new decision can be made based on the current state of the stage. In this case two branches per node means that the random variable can take two different values from the state defined in node. At 3 rd stage there are eight possible outcomes from root to 3 rd stage. No information is revealed in this node Node two leaves means that the random variable can take two different outcomes, so for the period between root and 1 st stage there are two different realizations of the random variable. Node Four different nodes in one stage means that four different decisions can be taken between this stage and the next one. Root 1 st stage 2 nd stage 3 rd stage Time 42