Integrated Resource Planning with PLEXOS
|
|
|
- Rosemary Harris
- 10 years ago
- Views:
Transcription
1 Integrated Resource Planning with PLEXOS World Bank Thirsty Energy - A Technical Workshop in Morocco March 24 th & 25 th, 2014 Rabat, Morocco Dr. Randell M. Johnson, P.E. [email protected]
2 Integrated Planning with PLEXOS Multi-Sector Least Cost Planning Water Requirements for Power Plant Cooling Desalination Generation Capacity Planning Transmission Expansion Gas Pipeline Expansion Planning Renewables Integration Ancillary Services Commodity Storages Least Cost Optimizations Mixed Integer Programs Stochastic Optimizations Co-Optimizations 2
3 Water/Energy Tradeoffs or Opportunities Generate a power expansion plan considering aggregated water use limits When a desal can be the least cost options for both power supply and water production When to use one or the other type of cooling in power plant in response to environmental regulation or water constraints When to build a power plant in a different location given water constraints When to build a transmission line instead of a water pipe to locate the power plant where it makes sense to least cost expansion plan 4 April, 2014 Energy Exemplar 3
4 Country Electricity Demand (MW) Country Water Demand (MGD) Demand Duration Curves for Co-Optimized Expansion and Operation of Water and Electricity Sectors - Multi Sector CapEx and OpEx Least Cost Optimization - Primary and Secondary demand curve optimizations Percent Time Country Electricity Demand Country Water Demand 4 April, 2014 Energy Exemplar 4
5 Simplified Diagram of a Long Term Expansion Plan Optimization Problem Generator Type Expansion Decision Ctx Line 1 Load Ctx Line 2 Cooling Type Once Through Capital and O&M Costs - Build cost - Cooling Type - Efficiency - Substation - Others Ctx pp1 Ctx pp4 Ctx pp2 Ctx pp3 Recirculating Dry Thermal Plant Cpp1 Thermal Plant 1 Cpp4 Thermal Plant 4 Cpp2 Thermal Plant 2 Cpp3 Thermal Plant 3 Flow 1 Water Use C w1 Water Use Flow 4 C w4 Water Flow 2 Use Flow 3 C w2 Aqua Duct Vol 1 Vol 2 Vol 3 Cad 1 Flow ad 1 Water Use C w3 Coal Supply Capital Costs O&M Costs Fuel Costs Constraints OR Gas Supply Capital Costs O&M Costs Fuel Costs Constraints Fuel Supply Expansion Decision
6 Coal Plant Cooling Water Requirement water treatment production cost = water treatment penalty price x flow
7 Optimized Expansion Decisions Which power plant(s) to build and when considering water use costs and constraints? Which transmission interfaces to expand and when and how much? Should Aqua Duct be built, when, and what size? Should the Power Plant be build in a different water area? And build more power transmission? (co-optimize water pipe and power transmission as well) In the case above, could we consider as well the cost of building transport facilities for the fuels (the coal, gas) to the alternative power plant site? Include combined water-and-power production facilities, so that if one need to meet a water production target, the opportunity to co-generate water-and-power is exploited to minimize the power cost (INV and O&M) and meet the water targets (these water targets may for a separate and different type of water not necessarily the same or connected to the water in the 3 areas shown in the picture)
8 Expansion with Stochastic Electric and Water Demands Stochastic Electric Demand Paths Stochastic Decomposition Stochastic Water Demand Paths Hours over a Week Hours over a Week 4 April,
9 Multi Sector Least Cost Decision Making Chart shows the minimization of total cost of investments and of production cost Cost $ Objective: Minimize net present value of the sum of investment and production costs over time Investment cost/ Capital cost C(x) Total Cost = C(x) + P(x) As more investments made production cost trends down however investment cost trends up Minimize capital costs and production costs for electric, water, gas and other demands Minimum cost plan x Production Cost P(x) Investment x 9
10 Illustrative Least Cost Optimization Investment Cost Production Cost Y I T I Minimize BuildCost i Build i,y + ProdCost i Prod i,t + ShortCost Shortage t y=1 i=1 t=1 i=1 Individual Unit Build Cost Amount Built Individual Unit Individual Unit Production Cost Production VOLL Unserved Energy subject to Supply and Demand Balance: I i=1 Production Feasible: Prod i,t ProdMax i Expansion Feasible: Build i,y BuildMax i,y Integrality: Build i,y integer Reliability: LOLE(Build i,y ) LOLETarget Prod i,t + Shortage t = Demand t t i, t i, y 27 February, 2014 MA AGO y = for all y = year t = interval i = unit Y = Horizon This simplified illustration shows the essential elements of the mixed integer programming formulation. Build decisions cover generation, generation cooling types, water use costs, transmission, gas pipeline, coal transport, water pipe, as does supply and demand balance and shortage terms. The entire problem is solved simultaneously, yielding a true cooptimized solution. 10
11 PLEXOS Algorithms Chronological or load duration curves Large-scale mixed integer programming solution Deterministic, Monte Carlo; or State-of-the-art Stochastic Optimization (optimal decisions under uncertainty) Stochastic Variables Set of uncertain inputs ω can contain any property that can be made variable in PLEXOS: Load Fuel prices Electric prices Ancillary services prices Hydro inflows Wind energy, etc Discount rates Others Number of samples S limited only by computing memory First-stage variables depend on the simulation phase Remainder of the formulation is repeated S times Capacity Expansion Planning 11
12 Constraints Driving Decisions Investment Constraints Renewable Energy Laws year horizon Minimum zonal reserve margins (% or MW) Reliability criteria (LOLP Target) Inter-zonal transmission expansion (bulk network) Resource addition and retirement candidates (i.e. maximum units built / retired ) Water Pipe Gas Pipeline Coal Transport Build / retirement costs Age and lifetime of units Technology / fuel mix rules Operational Constraints Energy balance Ancillary Service requirements Optimal power flow and limits Resource limits: energy limits, fuel limits, emission limits, water use, etc. Emission constraints User-defined Constraints: Practically any linear constraint can be added to the optimization problem Capacity Expansion Planning 12
13 AverageHeatRate (btu/kwh) IncrementalHeatRates (btu/kwh) Gas and Coal Gen Efficiency System expansion for obtaining higher capacity factors leads to better over all efficiency and lower carbon intensity MinCap 50% 65% 85% MaxCap Capacity (MWh) AverageHeatRate(btu/kWh) IncrementalHeatRate(btu/kWh) Full Load HeatRate(btu/kWh) 4 April, 2014 Energy Exemplar 13
14 PLEXOS Example: Desalination Electricity Seawater Heat Desalination Freshwater 14
15 DESAL Electricity Consumption Example of Desal Expansion Desal Expansion Decision Option for power plant expansion simultaneous with a desal expansion Existing Desal Capacity Expanded Desal 4 April, 2014 Energy Exemplar 15
16 Water Production Water Production Merit Order Unit A Unit B Hours over Week 4 April, 2014 Energy Exemplar 16
17 Example Desalination Plant Example of Gold Coast Desalination Plant: Maximum Production = 133 ML/day Energy Consumption = 3.2 kwh/1000l Expression of Demand ML/hour (rate) ML (quantity) Use units consistently: 133/24 = ML/hour 3.2kWh 1000 = 3.2 MWh/ML PLEXOS treats water demand as a load on the electrical system Generation and load are balanced with following equation: j Generation j + USE i,t Dump i,t NetInjection i,t = Load i,t i, t Where USE i,t is unserved energy, Dump i,t is over-generation and NetInjection i,t is the net export from the transmission node 4 April 2014 Generic Decision Variables 17
18 Objects Class Name Cat- Description Decision Variable Heat - The amount of heat provided to the desalination process in period t Decision Variable Heat Input - Heat input to storage in period t Decision Variable Heat Loss - Heat lost from storage in period t Decision Variable Heat Stored - Amount of heat in stored in period t Decision Variable Heat Stored Lag - Amount of heat stored in period t-1 Decision Variable Water - Freshwater Constraint Heat Definition - Definition constraint for "Heat" Constraint Heat Input Definition - Definition of "Heat Input' as sum of waste heat and ancillary boiler heat. Constraint Heat Load - Defines the heat load associated with desalination. Constraint Heat Loss Definition - Defines "Heat Loss" as a proportion of "Heat Stored" Constraint Heat Stored Definition - Defines "Heat Stored" as a function of previous period "Heat Stored" and "Heat Input" and "Heat Loss" Constraint Heat Stored Lag Definition - Defines "Heat Stored Lag" as "Heat Stored" in the previous period 4 April 2014 Generic Decision Variables 18
19 Production Cost with Desal Demand with Desal (MW) Demand before Desal (MW) 4 April 2014 Generic Decision Variables 19
20 Economic Generation Dispatch to meet Electrical Demand and Water Demand 4 April, 2014 Energy Exemplar 20
21 PLEXOS Example: Co-Optimization of Generation and Transmission Expansion 21
22 Security Constrained Unit Commit /Economic Dispatch SCUC / ED consists of two applications: UC/ED and Network Applications (NA) SCUC / ED is used in many power markets in the world include CAISO, MISO, PJM, etc. Unit Commitment / Economic Dispatch (UC/ED) Energy-AS Co-optimization using Mixed Integer Programming (MIP) enforces resource chronological constraints, transmission constraints passed from NA, and others. Solutions include resource on-line status, loading levels, AS provisions, etc. Resource Schedules in 24 hours for DA simulations, or in sub-hourly for RT simulations Violated Transmission Constraints Network Applications (NA) DC-Optimal Power Flow (DC-OPF) solves network power flow for given resource schedules passed from UC/ED enforces transmission line limits enforces interface limits enforces nomograms
23 Simple Example: G&T Co-Optimization Intermediate/advanced exercises: 1. Create a locational model by defining new GT (operating on Oil) candidate close to the load. 2. Solve the trade-off expansion problem of building Oil-fired GT or reinforcing the transmission system (building a second circuit L1-3 at 10 Million $$). WACC = 12% and Economic Life Year = 30, not earlier than 1/1/2015 Enable following Line expansion properties: Coal_Gen Gas_Gen (2x) New CCGT New_GT x2 Line 1-Coal_Mine Max Flow (MW) L L L River & Market L1-2 L2-3 L1-3 L1-3_new 3-Load_Center GT-oil Load 23
24 Generation and Transmission Expansion Results Generation Expansion Transmission Expansion 24
25 Australian ISO Use of PLEXOS of Co-Optimization of Generation and Transmission in planning Least-cost expansion modelling delivers a co-optimized set of new generation developments, inter-regional transmission network augmentations, and generation retirements across the NEM over a given period. This provides an indication of the optimal combination of technology, location, timing, and capacity of future generation and inter-regional transmission developments. The least-cost expansion algorithm invests in and retires generation to minimize combined capital and operating-cost expenses across the NEM system. This optimization is subject to satisfying: The energy balance constraint, ensuring supply matches demand for electricity at any time, The capacity constraint, ensuring sufficient generation is built to meet peak demand with the largest generating unit out of service, and The Large-Scale Renewable Energy Target (LRET) constraint, which mandates an annual level of generation to be sourced from renewable resources. 25
26 PLEXOS Example: Co-Optimization of Ancillary Services for Energy Storage to Balance Renewables 26
27 Co-Optimization of Ancillary Services Requirements for Renewables Integration of the intermittency of renewables requires study of Co- Optimization of Ancillary Services and true co-optimization of Ancillary services is done on a sub-hourly basis More and more the last decade, it has been recognised that AS and Energy are closely coupled as the same resource and same capacity have to be used to provide multiple products when justified by economics. The capacity coupling for the provision of Energy and AS, calls for joint optimisation of Energy and AS. 27
28 Ancillary Services Reliable and Secure System Operation requires the following product and Services (not exhaustive): 1. Energy 2. Regulation & Load Following Services AGC/Real time maintenance of system s phase angle and balancing of supply/demand variations. 3. Synchronised Reserve 10 min Spinning up and down 4. Non-Synchronised Reserve 10 min up and down 5. Operating Reserve 30 min response time 6. Voltage Support Location Specific 7. Black Start (Service Contracts) 28
29 Energy Storage Providing Ancillary Services and Time Shift of Energy 4 April, 2014 Energy Exemplar 29
30 PLEXOS Example: Sub-Hourly Energy and Ancillary Services Co-Optimization 30
31 PLEXOS Base Model Generation Result Peaking plant in orange operating at morning peak Some displacement of hydro to allow for ramping Variable wind in green 31
32 Spinning Reserve Requirement CCGT now runs all day to cover reserves and energy Coal plant 2 also online longer Oil unit not required Less displacement of hydro generation for ramping 32
33 PLEXOS higher resolution dispatch 5 Minute Sub-Hourly Simulation Oil unit required at peak for increased variability Increased displacement of base load to cover for ramping constraints 33
34 Energy/AS Stochastic Co-optimisation!!! So far the model example has had perfect information on future wind and load requirements. Uncertainty in our model inputs should affect our decisions Stochastic optimisation (SO) The goal of SO then is to find some policy that is feasible for all (or almost all) the possible data instances and maximise the expectation of some function of the decisions and the random variables What decision should I make now given the uncertainty in the inputs? 34
35 Energy/AS Stochastic Co-optimisation Even though load lower (wind unchanged) more units must be committed to cover the possibility of high load and low wind These units must then operate at or above Minimum Stable Level 35
36 References for Ancillary Co-Optimization Applications of PLEXOS WECC Balancing Authority Cooperation Concepts to Reduce Variable Generation Integration Costs in the Western Interconnection: Intra-Hour Scheduling (using PLEXOS), DOE Award DE-EE , 02:10 12:12 Integration of Wind and Solar Energy in the California Power System: Results from Simulations of a 20% Renewable Portfolio Standard (using PLEXOS) Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection (using PLEXOS), Prepared under Task Nos. DP , SM sponsored DOE 36
37 PLEXOS Example: Consideration of Adequacy of Supply for System Expansion Planning 37
38 Summer 2017 Peak Load Forecast Distribution (MW) Calculated 1-in-10 LOLE for ISO-NE Control Area Forecast Probability 2017 Peak Load Forecast 10/90 28,325 20/90 28,590 30/70 28,940 40/60 29,340 50/50 29,790 60/40 30,265 70/30 30,750 80/20 31,445 90/10 32,210 95/5 32, PLEXOS Simulations of High Level ISO-NE Control Area Model Results: NICR = 33,855 MW LOLE ~ March, Installed Capacity (MW) - Simulated load risk in calculating Loss of Load Expectation (LOLE) - Simulated multiple capacity levels MA AGO 38
39 95% 96% 97% 98% 99% 100% 101% 102% 103% 104% 105% 106% 107% 108% 109% 110% Cost of Lost Load ($) LOLE (days) $4,000,000,000 Cost of Lost Load 0.6 $3,500,000,000 $3,000,000,000 $2,500,000,000 $2,000,000,000 PLEXOS calculation of average load weighted cost of lost load $1,500,000, $1,000,000,000 System LOLE degrades rapidly below Net Installed Capacity Requirement (NICR) $500,000,000 $0 PLEXOS calculation of average load weighted LOLE Value of Lost Load % NICR LOLE Assumption: VOLL = $20,000/MWh March, 2014 MA AGO 39
40 Applications of Integrated Planning Tools Planning Objectives PLEXOS Capability Environmental Policies Optimization of Annual, Mid-Term, and Short Term constraints Water usage, Environmental Constraints, others Generation Capacity Planning Least cost capacity expansion planning, cooling types (once through, recirculating, dry), Capacity Expansion Type, Minimization of Production Costs including water treatment costs Renewables Integration and System Flexibility Requirement Assessments Least Cost Resource Change within and Across Regions Minimizing production costs and consumer costs Sizing Natural Gas Network Components and Natural Gas Storage Sub-Hourly Co-Optimization of Ancillary Services with Energy and Transmission Power Flows Stochastic Optimization and Stochastic Renewables Models PHEV, EE, DR, SG, Energy Storage Models Co-Optimization of Generation and Transmission Expansion Generation Retirements and Environmental Retrofit Models Reliability Evaluation, Interregional Planning Co-Optimization of Production cost of Water, Electrical, and Natural Gas Sectors Electrical Network Contingencies and Natural Gas Network Contingencies Co-Optimization of Natural Gas Network Expansion along with Electricity Sector Expansion Electrical Network Contingencies and Natural Gas Network Contingencies Integrated Reliability Evaluation Integrated Reliability Evaluation to Ensure LOLE and other Metrics Maintained with Co- Optimization of Electric and or Gas Sector Expansion or True Monte Carlo 40
41 Appendix
42 PLEXOS Optimization Methods Linear Relaxation - The integer restriction on unit commitment is relaxed so unit commitment can occur in non-integer increments. Unit start up variables are still included in the formulation but can take non-integer values in the optimal solution. This option is the fastest to solve but can distort the pricing outcome as well as the dispatch because semi-fixed costs (start cost and unit no-load cost) can be marginal and involved in price setting Rounded Relaxation - The RR algorithm integerizes the unit commitment decisions in a multi-pass optimization. The result is an integer solution. The RR can be faster than a full integer optimal solution because it uses a finite number of passes of linear programming rather than integer programming. Integer Optimal - The unit commitment problem is solved as a mixed-integer program (MIP). MIP solvers are based on the Branch and Bound algorithm, complemented by heuristics designed to reduce the search space without comprising solution quality. Branch and Bound does not have predicable run time like linear programming. It is difficult in all but trivial cases to prove optimality and guarantee that the integer-optimal solution is found. Instead the algorithm relies on a number of stopping criteria that can be user defined in determining unit on and off states. Dynamic Programming - Dynamic programming (DP) is a technique that is well suited to the unit commitment problem because it directly resolves the min up time and min down time constraints, and over long horizons. Its weakness is in the way unit commit is decomposed so that units are dispatched individually. Thus if all units in the system were dispatched using dynamic programming it would be difficult to converge on a solution where system-wide demand was met exactly, and where any other system-wide or group constraint such as fuel or emission limits were obeyed. For certain classes of generator though DP can be fast and highly effective. The DP is most suited to units with a high capacity factor, and if applied to all units in the system is likely to produce significant under/over generation. Thus you must carefully select units for which the DP is applied e.g. high capacity factor plant with long min up time or min down time values are most suitable. Stochastic Programing - The goal of SO is to find some policy that is feasible for all (or almost all) of the possible data instances and maximize the expectation of some function of the decisions and the random variables Multiple Optimization Methods Offer Advantages to Solving Planning Problems 42
43 Solving Unit Commitment and Economic Dispatch using MIP Unit Commitment and Economical Dispatch can be formulated as a linear problem (after linearization) with integer variables of generator on-line status Minimize Cost = generator fuel and VOM cost + generator start cost + contract purchase cost contract sale saving + transmission wheeling + energy / AS / fuel / capacity market purchase cost energy / AS / fuel / capacity market sale revenue Subject to Energy balance constraints Operation reserve constraints Generator and contract chronological constraints: ramp, min up/down, min capacity, etc. Generator and contract energy limits: hourly / daily / weekly / Transmission limits Fuel limits: pipeline, daily / weekly/ Emission limits: daily / weekly / Others 43
44 Illustrative DC-OPF LP Formation minimize subject to f f k j bg g min j k min i k f PTDF j k bgf k, j max j i, j ( g and other constraints k l j bg i k c f k g k j f r j j k f 2 j l k bg ) systemenergy balance; g max i power flow in line flow limits in line j j; r, l flow limit for branch group i k j k generation and load at bus k line resistance of line j; Where bgk i,j = branch-group factor for line j in group i PLEXOS Detailed Nodal Transmission Load Flows integrated with Optimization Algorithms 44
45 Illustrative Formulation of Energy/AS Co-optimization Min subject to k k as g g t k as t,min m,k t,min k t m,k o o t k t k c g as as g Generator Ramp Rate Constraints Generator Min Up/Down Time Constraints Generator Energy Constraints Transmission Constraints Fuel Constraints k l t k t k t sc (o t,min m t m,k loss as m as o g Emission and Other Constraints j t j t,m (AS constraint for AS m) t m,k o t,max t m,k k ) t t t t 1 k k k k k t k m t (System Energy Balance) t,k,m (Generation AS Capacity Limits) t,max k o t k ac t m,k as t m,k t,k (Generation and AS Capacity Limits) 45
46 Objective: Illustrative Formulation of Co-Optimization of Natural gas and Electricity Markets Co-Optimization of Natural Gas Electricity Markets Minimize: Electric Production Cost + Gas Production Cost + Electric Demand Shortage Cost + Natural Gas Demand Shortage Cost Subject to: [Electric Production] + [Electric Shortage] = [Electric Demand] + [Electric Losses] [Transmission Constraints] [Electric Production] and [Ancillary Services Provision] feasible [Gas Production] + [Gas Demand Shortage] = [Gas Demand] + [Gas Generator Demand] [Gas Production] feasible [Pipeline Constraints] others 46
47 Stochastic Optimization (SO) Fix perfect foresight issue Monte Carlo simulation can tell us what the optimal decision is for each of a number of possible outcomes assuming perfect foresight for each scenario independently; It cannot answer the question: what decision should I make now given the uncertainty in the inputs? Stochastic Programming The goal of SO is to find some policy that is feasible for all (or almost all) of the possible data instances and maximize the expectation of some function of the decisions and the random variables Scenario-wise decomposition The set of all outcomes is represented as scenarios, the set of scenarios can be reduced by grouping like scenarios together. The reduced sample size can be run more efficiently 47
48 Day-ahead Unit Commitment, Continued Stochastic Optimisation: Two stage scenario-wise decomposition Stage 1: Commit 1 or 2 or none of the generators Reveal the many possible outcomes Take the optimal decision 2 Stage 2: There are hundreds of possible wind speeds. For each wind profile, decide the optimal commitment of the other units and dispatch of all units Take Decision 1 Is there a better Decision 1? Expected cost of decisions 1+2 RESULT: Optimal unit commitment for generators 48
USBR PLEXOS Demo November 8, 2012
PLEXOS for Power Systems Electricity Market Simulation USBR PLEXOS Demo November 8, 2012 Who We Are PLEXOS Solutions is founded in 2005 Acquired by Energy Exemplar in 2011 Goal People To solve the challenge
Hydro Cascade & Storage Optimisation utilising PLEXOS
Hydro Cascade & Storage Optimisation utilising PLEXOS 2 nd Annual Electricity Price Modelling and Forecasting Forum Tom Forrest Senior Power Market Consultant Energy Exemplar - Europe Contents Overview
ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104
PROMAX SHORT-TERM ENERGY & TRANSMISSION MARKET SIMULATION SOFTWARE PACKAGE ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104 ECCO International, Inc. Copyright 2009 EXECUTIVE
An Introduction to Variable-Energy-Resource Integration Analysis Energy Exemplar October 2011
An Introduction to Variable-Energy-Resource Integration Analysis Energy Exemplar October 2011 1. Introduction Increased Renewable Portfolio Standards (RPS) are being enacted at the state, provincial, and
Price Responsive Demand for Operating Reserves in Co-Optimized Electricity Markets with Wind Power
Price Responsive Demand for Operating Reserves in Co-Optimized Electricity Markets with Wind Power Zhi Zhou, Audun Botterud Decision and Information Sciences Division Argonne National Laboratory [email protected],
NV Energy ISO Energy Imbalance Market Economic Assessment
March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,
From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations
From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations Presented at the Energy Central Webinar May 12, 2015 Copyright 2015 Newton Energy Group LLC Welcome and Introduction
Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources
Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources FERC Technical Conference Increasing RT & DA Market Efficiency Through Improved Software June 24 26, 2013 Nivad
Value of storage in providing balancing services for electricity generation systems with high wind penetration
Journal of Power Sources 162 (2006) 949 953 Short communication Value of storage in providing balancing services for electricity generation systems with high wind penetration Mary Black, Goran Strbac 1
Emissions from Traditional & Flywheel Plants for Regulation Services
Emissions from Traditional & Flywheel Plants for Regulation Services Rick Fioravanti, Johan Enslin & Gerard Thijssen KEMA, Inc. EESAT 2007, San Francisco, Sep. 24, 2007 Funded in part by the Energy Storage
Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant
Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Beacon Power Corporation KEMA Project: BPCC.0003.001 May 18, 2007 Final Report with Updated Data Emissions Comparison for
Power Generation Industry Economic Dispatch Optimization (EDO)
An Industry White Paper Executive Summary The power industry faces an unprecedented challenge. At a time of unstable fuel costs, historic environmental challenges, and industry structural changes, the
Managing Risks and Optimising an Energy Portfolio with PLEXOS
Managing Risks and Optimising an Energy Portfolio with PLEXOS Tom Forrest, B.Com. (Hons) Senior Power Market Consultant - Europe 1 Introduction Energy markets inherently exhibit far greater risk compared
joint Resource Optimization and Scheduler
www.siemens.com/spectrum-power joint Resource Optimization and Scheduler All forecasting and planning applications in one component. Answers for infrastructure and cities. joint Resource Optimization and
Flexible Capacity Planning for Renewable Integration CEF Topical White Paper Jeremy Hargreaves, Elaine Hart, Ryan Jones, Arne Olson E3
July 15, 2013 Flexible Capacity Planning for Renewable Integration CEF Topical White Paper Jeremy Hargreaves, Elaine Hart, Ryan Jones, Arne Olson E3 Problem Statement For California, meeting an economy-
Improving Market Clearing Software Performance to Meet Existing and Future Challenges MISO s Perspective
Improving Market Clearing Software Performance to Meet Existing and Future Challenges MISO s Perspective FERC Technical Conference on Increasing Real-Time and Day-Ahead Market Efficiency through Improved
ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS
ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS January 2008 Executive Summary The All Island Grid Study is the first comprehensive assessment of the ability of the electrical power
Energy and Consumer Impacts of EPA s Clean Power Plan. Prepared for the American Coalition for Clean Coal Electricity
Energy and Consumer Impacts of EPA s Clean Power Plan Prepared for the American Coalition for Clean Coal Electricity Contents Executive Summary Overview of the Clean Power Plan NERA Methodology Baseline
Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations
Grid of the Future Integration of Renewables Energy Storage Smart Grid Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Current Power System Gen. Trans. Dist.Cust.
Anticipating Compliance Strategies and Forecasts for Satisfying Clean Power Plan Requirements
Anticipating Compliance Strategies and Forecasts for Satisfying Clean Power Plan Requirements By Maggie Shober, Matthew Tanner, and Matt Drews CONTENTS Executive Summary 2 The Clean Power Plan 4 Litigation
Forecasting power and gas prices on various
Forecasting power and gas prices on various time frames and resolutions with PLEXOS Dr Christos Papadopoulos Regional Director Europe Energy Exemplar (Europe) Ltd 5 th Annual Electricity Price Modelling
UNIT COMMITMENT AND ECONOMIC DISPATCH SOFTWARE TO OPTIMISE THE SHORT-TERM SCHEDULING OF ELECTRICAL POWER GENERATION
UNIT COMMITMENT AND ECONOMIC DISPATCH SOFTWARE TO OPTIMISE THE SHORT-TERM SCHEDULING OF ELECTRICAL POWER GENERATION INTRODUCTION Electricity generating companies and power systems have the problem of deciding
Generator Interconnection and Deliverability Study Methodology Technical Paper
Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:
Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
Stochastic Security-Constrained Unit Commitment Lei Wu, Mohammad Shahidehpour, Fellow, IEEE, and Tao Li, Member, IEEE
800 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 2, MAY 2007 Stochastic Security-Constrained Unit Commitment Lei Wu, Mohammad Shahidehpour, Fellow, IEEE, and Tao Li, Member, IEEE Abstract This paper
Operating Hydroelectric and Pumped Storage Units In A Competitive Environment
Operating electric and Pumped Storage Units In A Competitive Environment By Rajat Deb, PhD 1 LCG Consulting In recent years as restructuring has gained momentum, both new generation investment and efficient
Wind and Energy Markets: A Case Study of Texas.
Wind and Energy Markets: A Case Study of Texas. Ross Baldick Department of Electrical and Computer Engineering [email protected] The University of Texas at Austin May 21, 2010 1 Abstract Many jurisdictions
DR Resources for Energy and Ancillary Services
DR Resources for Energy and Ancillary Services Marissa Hummon, PhD CMU Energy Seminar Carnegie Mellon University, Pittsburgh, Pennsylvania April 9, 2014 NREL/PR-6A20-61814 NREL is a national laboratory
Planning Reserve Margin (PRM)
Planning Reserve Margin (PRM) Nguyen Pham Planning Specialist, Power Supply & Planning Overview A more detailed version of the PRM presentation given in July 2015 Q & A on the PRM report based on 2012
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
Techno-Economics of Distributed Generation and Storage of Solar Hydrogen
Techno-Economics of Distributed Generation and Storage of Solar Hydrogen Philipp Grünewald, Tim Cockerill, Marcello Contestabile, Imperial College London, UK Abstract For hydrogen to become a truly sustainable
Strategic Assessment of the Role and Value of Energy Storage Systems in the UK Low Carbon Energy Future
Strategic Assessment of the Role and Value of Energy Storage Systems in the UK Low Carbon Energy Future Report for June 2012 Goran Strbac, Marko Aunedi, Danny Pudjianto, Predrag Djapic, Fei Teng, Alexander
Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems
Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems Sandra Scalari Enel Ingegneria e Ricerca SpA Copenhagen, May 27-28 th 2014 Enel Presentation Generation Shift & Market in Europe Enel
CHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Power systems form the largest man made complex system. It basically consists of generating sources, transmission network and distribution centers. Secure and economic operation
System Optimizer Solution for resource planning, capacity expansion, and emissions compliance for portfolio optimization
System Optimizer Solution for resource planning, capacity expansion, and emissions compliance for portfolio optimization System Optimizer is the portfolio management solution to prepare resource plans,
Comparison of CO 2 Abatement Costs in the United States for Various Low and No Carbon Resources. Total System Levelized Cost Based on EIA LCOE
Comparison of CO 2 Abatement Costs in the United States for Various Low and No Carbon Resources Every year the Energy Information Administration (EIA) publishes its Annual Energy Outlook (AEO). In the
2013 Ventyx, an ABB company
Co-optimization of Congestion Revenue Rights in ERCOT Day-Ahead Market Chien-Ning Yu, Vladimir Brandwajn, Show Chang ABB/Ventyx Sainath M. Moorty ERCOT FERC Conference on increasing real-time and day-ahead
ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update
ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental
Electricity Costs White Paper
Electricity Costs White Paper ISO New England Inc. June 1, 2006 Table of Contents Executive Summary...1 Highlights of the Analysis...1 Components of Electricity Rates...2 Action Plan for Managing Electricity
Energy Storage for Renewable Integration
ESMAP-SAR-EAP Renewable Energy Training Program 2014 Energy Storage for Renewable Integration 24 th Apr 2014 Jerry Randall DNV GL Renewables Advisory, Bangkok 1 DNV GL 2013 SAFER, SMARTER, GREENER DNV
Concepts and Experiences with Capacity Mechanisms
Concepts and Experiences with Capacity Mechanisms Manuel Baritaud, International Energy Agency Conference Capacity Mechanisms: Experiences in Various European Countries Bundesministerium fur Wirtschaft
Different types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example
Different types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example Peny Panagiotakopoulou, Senior Power Systems Consultant, Energy Exemplar Europe Overview
Section 4: Scheduling Philosophy & Tools
Welcome to the Scheduling Philosophy & Tools section of the PJM Manual for Scheduling Operations. In this section you will find the following information: A description of the PJM OI s scheduling philosophy
PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013
PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity
Optimal Power Flow Analysis of Energy Storage for Congestion Relief, Emissions Reduction, and Cost Savings
1 Optimal Power Flow Analysis of Energy Storage for Congestion Relief, Emissions Reduction, and Cost Savings Zhouxing Hu, Student Member, IEEE, and Ward T. Jewell, Fellow, IEEE Abstract AC optimal power
E N G I N E E R I N G
Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement
The UK Electricity Market Reform and the Capacity Market
The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have
Electric Power Resource Planning: EGEAS Software Overview
Electric Power Resource Planning: EGEAS Software Overview Mr. Wah Sing Ng NG Planning LLC EPRI Program 178b Webcast April 16, 2015 2015 Electric Power Research Institute, Inc. All rights reserved. Today
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
GENERATION TECHNOLOGY ASSESSMENT
SPO PLANNING ANALYSIS GENERATION TECHNOLOGY ASSESSMENT Technology Cost & Performance Milestone 2 Public Technical Conference OCTOBER 30, 2014 NOTE: ALL IRP MATERIALS ARE PRELIMINARY & SUBJECT TO CHANGE
DOES WIND KILL THE ENERGY ONLY MARKET?
DOES WIND KILL THE ENERGY ONLY MARKET? Oliver Brown, Stephen Poletti, David Young University of Auckland Economic Paradox Low-carbon power system High cap cost low and very low variable costs eg. Wind,
CHAPTER 3 SECURITY CONSTRAINED OPTIMAL SHORT-TERM HYDROTHERMAL SCHEDULING
60 CHAPTER 3 SECURITY CONSTRAINED OPTIMAL SHORT-TERM HYDROTHERMAL SCHEDULING 3.1 INTRODUCTION Optimal short-term hydrothermal scheduling of power systems aims at determining optimal hydro and thermal generations
Operator Initiated Commitments in RTO and ISO Markets
Price Formation in Organized Wholesale Electricity Markets Docket No. AD14-14-000 Staff Analysis of Operator Initiated Commitments in RTO and ISO Markets December 2014 For further information, please contact:
Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure
No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time
A vision of sustainable energy future: A multi-energy concept of smart energy systems Central European Student and Young Professionals Congress
A vision of sustainable energy future: A multi-energy concept of smart energy systems Central European Student and Young Professionals Congress Tomislav Capuder, PhD Faculty of Electrical Engineering and
Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015
June 2015 Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015 This paper presents average values of levelized costs for generating technologies that
CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market
CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive
process is usually performed with an additional SCUC and has been the natural fit for the use of wind power forecasts. Currently, however, since this
Impact of Variable Renewable Energy on US Electricity Markets By J.C. Smith, Stephen Beuning, Henry Durrwachter, Erik Ela, David Hawkins, Brendan Kirby, Warren Lasher, Jonathan Lowell, Kevin Porter, Ken
An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009
An Overview of the Midwest ISO Market Design Michael Robinson 31 March 2009 The Role of RTOs Monitor flow of power over the grid Schedule transmission service Perform transmission security analysis for
Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers
Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Presented to ISO/RTO Council by Edward G. Cazalet, PhD The Cazalet Group [email protected] www.cazalet.com 650-949-0560
Convergence Bidding Tutorial & Panel Discussion
Convergence Bidding Tutorial & Panel Discussion CAISO June 13, 2006 Joe Bowring PJM Market Monitor www.pjm.com Convergence Basics Day-Ahead Market basics Day-Ahead and Real-Time Market interactions Increment
Modelling framework for power systems. Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo
S VISIONS SCIENCE TECHNOLOGY RESEARCH HIGHLIGHT 196 Modelling framework for power systems Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo VTT TECHNOLOGY 196 Modelling framework for power systems
The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012
Introduction. The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012 The increased reliance on natural gas as the primary fuel
PJM Renewable Integration Study
GE Energy Consulting PJM Renewable Integration Study Executive Summary Report Revision 03 Prepared for: PJM Interconnection, LLC. Prepared by: General Electric International, Inc. February 28, 2014 Legal
Modelling of Smart Low-Carbon Energy Systems. Imperial College London
Modelling of Smart Low-Carbon Energy Systems Imperial College London Goran Strbac, Marko Aunedi, Dimitrios Papadaskalopoulos, Meysam Qadrdan, Rodrigo Moreno, Danny Pudjianto, Predrag Djapic, Ioannis Konstantelos,
Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration
Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration H. Holttinen, P. Meibom, A. Orths, F. Van Hulle, C. Ensslin, L. Hofmann, J. McCann, J. Pierik,
ELECTRIC ENERGY EFFICIENCY POTENTIAL FOR PENNSYLVANIA
GDS Associates, Inc. Engineers and Consultants ELECTRIC ENERGY EFFICIENCY POTENTIAL FOR PENNSYLVANIA Final Report Prepared for: PENNSYLVANIA PUBLIC UTILITY COMMISSION May 10, 2012 Prepared by GDS Associates
Levelised Unit Electricity Cost Comparison of Alternate Technologies for Baseload Generation in Ontario
Canadian Energy Research Institute Levelised Unit Electricity Cost Comparison of Alternate Technologies for Baseload Generation in Ontario Matt Ayres Senior Director, Research Electricity Morgan MacRae
Demand Response Management System ABB Smart Grid solution for demand response programs, distributed energy management and commercial operations
Demand Response Management System ABB Smart Grid solution for demand response programs, distributed energy management and commercial operations Utility Smart Grid programs seek to increase operational
Modeling Demand Response for Integration Studies
Modeling Demand Response for Integration Studies Marissa Hummon, Doug Arent NREL Team: Paul Denholm, Jennie Jorgenson, Elaine Hale, David Palchak, Greg Brinkman, Dan Macumber, Ian Doebber, Matt O Connell,
Sodium Sulfur Battery. ENERGY STORAGE SYSTEM for Reducing CO2 Emissions
Sodium Sulfur Battery ENERGY STORAGE SYSTEM for Reducing CO2 Emissions Sodium Sulfur Battery For the Future of Our Planet NGK s NAS system is now generating momentum for saving energy and renewable energy
Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets. Jared Moore and Jay Apt.
Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets Jared Moore and Jay Apt Supporting Data Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured
Renewable Energy Credit (REC) Price Forecast (Preliminary Results)
Renewable Energy Credit (REC) Price Forecast (Preliminary Results) OVERVIEW What is a REC price forecast and why is it needed? Interest in renewable energy has increased worldwide in response to concerns
Fiscal Year 2011 Resource Plan
Salt River Project Fiscal Year 2011 Resource Plan Page 1 Last summer SRP hosted three resource planning workshops for a diverse group of stakeholders and customers to explain the planning process, discuss
Carbon Price Transfer in Norway
Public ISDN nr. 978-82-93150-03-9 THEMA Report 2011-1 Carbon Price Transfer in Norway The Effect of the EU-ETS on Norwegian Power Prices Commissioned by Energy Norway, Federation of Norwegian Industries
Computing the Electricity Market Equilibrium: Uses of market equilibrium models
Computing the Electricity Market Equilibrium: Uses of market equilibrium models Ross Baldick Department of Electrical and Computer Engineering The University of Texas at Austin April 2007 Abstract We discuss
Texas transformed. Achieving significant savings through a new electricity market management system
Texas transformed Achieving significant savings through a new electricity market management system KHOSROW MOSLEHI The state of Texas has long been the center of energy activities in the United States,
Natural Gas and Electricity Coordination Experiences and Challenges
1 Natural Gas and Electricity Coordination Experiences and Challenges Challenges Facing the New England Power System Gordon van Welie, President and CEO, ISO New England 2015 IEEE Power & Energy Society
California s Electricity Market. Overview
California s Electricity Market Law Seminar s International Tribal Energy and the California Market June 23, 2008 Denny Brown California Energy Commission Overview Role of the Energy Commission Electricity
PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations
PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region
Agent-Based Micro-Storage Management for the Smart Grid
Agent-Based Micro-Storage Management for the Smart Grid Perukrishnen Vytelingum, Thomas D. Voice, Sarvapali D. Ramchurn, Alex Rogers and Nicholas R. Jennings University of Southampton Outline Energy Domain
Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards
FACT SHEET Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards In June 2014, the U.S. Environmental Protection Agency (EPA) used its authority under Section 111(d) of
Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
Analysis of the EU Renewable Directive by a TIMES-Norway
Analysis of the EU Renewable Directive by a TIMES-Norway NorRen Summer School Arne Lind Institute for Energy Technology 07.08.2012 Outline The EU Renewable Directive (RES) Definition Targets Implications
Energy Storage Activities at New York Power Authority
Energy Storage Activities at New York Power Authority Li Kou, Ph.D. PE Sr. R&TD Engineer New York Power Authority APPA National Conference, Seattle, WA June 19, 2012 1 New York Power Authority Highlights
High Penetration of Distributed Solar PV Generation
High Penetration of Distributed Solar PV Generation Lessons Learned from Hawaii September 30, 2014 Discussion Overview Solar PV penetrations trends in Hawaii Lessons learned from Hawaii s high penetration
Energy capacity planning and modeling
Andras Herczeg: Energy capacity planning and modeling - with Open Source Energy Modeling System (OSeMOSYS) (Final Report) Rensselaer Polytechnic Institute MANE-6960H01 Mathematical Modeling of Energy and