INSTALLATION OF INSITUFORM LINER



Similar documents
REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

02780 LINER FOR SEWER REHABILITATION

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Line Rehabilitation

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

CLEANING, INSPECTION, AND TESTING OF SEWERS

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

EVENT ATTACHMENT C

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

Section 2320 Cured-In-Place Pipe Lining

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION STORM DRAIN SYSTEM

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

LS 2540 SEWER LATERALS AND INSPECTION TEES

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

SECTION CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

Section 2100-Trenching and Tunneling

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

FY08 SEWER POINT REPAIRS BID TABULATION

SECTION 18 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE (CIPP) METHOD MOBILE AREA WATER AND SEWER SYSEM

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation

CHAPTER 6 - SANITARY SEWER

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

FY15 Gravity Sewer and Manhole Rehabilitation

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

SPECIFICATION FOR CURED-IN-PLACE PIPE RENOVATION OF PRESSURE PIPELINES. (As submitted by Insituform Technologies, Inc.)

SANITARY SEWER SPECIFICATIONS

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Section 402. STORM SEWERS

EI- MH TO MH LINER

SECTION PRECAST CONCRETE UTILITY STRUCTURES

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

2015 SANITARY SEWER REHABILITATION SPECIFICATIONS SECTION 1.00 SCOPE... 1 SECTION 2.00 SEWER LINE CLEANING... 2 SECTION 3.00 SEWER FLOW CONTROL...

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

Introduction to Pressure Pipe Rehabilitation with CIPP

SECTION GRAVITY SANITARY SEWERS

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

SECTION 807 PUMP STATION REHABILITATION

Beacon Hill Sewer District Standard Specifications

Let Us Give Utilities the Respect that they Deserve.

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SANITARY SEWER REHABILITATION SPECIFICATIONS

SECTION 802 GRAVITY SEWER PIPE

Defense Technical Information Center Compilation Part Notice

Special Specification 7021 Water Main and Sewer Line Replacements

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

STANDARD SPECIFICATIONS SECTION SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.

Water Main Lining A Sustainable Alternative to Open Cut Replacement

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

Section 2651 Television Inspection

SECTION STORM DRAINAGE SYSTEM

SECTION SANITARY SEWER PIPE

OVERVIEW. 1 Intent: Applicability: Referenced Standards Invert Repair Mortar... 3

SECTION 810 SEWER LINE CLEANING

Proposed Sanitary Sewer No. 5787A, CIP TRENCHLESS TECHNOLOGY (REHABILITATION OF EXISTING SANITARY AND COMBINED SEWERS BY LINING PROCESS)

STANDARD SPECIFICATIONS SECTION CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

Sewer Rehabilitation Design Requirements

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

SECTION ABANDONMENT OF SEWER MAINS

C. Section TESTING LABORATORY SERVICE.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

SPR PE Steel Reinforced Liner

by Leonard Friesenhahn, P.E.

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION POLYVINYL CHLORIDE (PVC) PIPE

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

Transcription:

PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation purpose. B. When complete, the cured liner should extend from end to end in a continuous, tight fitting, watertight pipe-with-in-a-pipe. All service laterals shall be restored to leak-free condition at their connections to the liner, and be leak-free over their lengths to respective property lines. C. The Contractor shall furnish, prior to use of the lining materials, satisfactory written guarantee of his compliance with the Specifications for all materials used in the Insituform process furnished by others than Insituform of North America, Inc. D. Should the Contractor choose to submit a deviation that does not meet all the requirements of the Owner's specifications, he shall include a description of the deviation with data showing the engineering aspects of the deviation. Acceptance of such deviations shall be subject to the approval of the Engineer. PART 2 PRODUCTS 2.1 INSITUFORM LINER: A. The lining material shall be polyester fiber felt tubing lined on one side with an impermeable 3- ml minimum thickness membrane, such as polyurethane or polyvinyl chloride (PVC). It shall be fully impregnated with the liquid thermosetting resin required. B. The tubing shall be properly sized to the diameter and length to be lined. The finished lining material thickness shall be as shown on the Plans. The cured lining material shall conform to the minimum structural standards listed below: TABLE B-1 LINER MATERIAL TEST STANDARD RESULT Tensile Strength ASTM D 638 3,000 psi Flexure Strength ASTM D 790 3,000 psi Modulus of Elasticity ASTM D 790 300,000 psi Revision 5 January 2008 Page 1 of 5

PART 3 EXECUTION 3.1 GENERAL: A. The Contractor shall designate a location where the uncured resin in original containers and the unimpregnated liner will be vacuum impregnated prior to installation. The Contractor shall provide for the Engineer's inspection of the materials and "wet-out" procedure. A resin and catalyst system compatible with the requirement of this method shall be used. The quantities of the liquid thermosetting materials shall be sufficient to provide saturation of the lining thickness shown on the Plans. B. Preparatory to lining any sewer reach, the users of the sewer shall be notified of the work; the pipe shall be cleaned per SECTION 6200 "Sanitary Sewer Pipe Installation" paragraph 3.5. The structural repairs and/or other work designated on the Plans shall be completed; and the flow shall be diverted in such a way that overflow of the upstream sewer is avoided, while eliminating all flow in the reach to be lined. C. All preparations shall be completed to the Owner's satisfaction prior to beginning to insert the liner into the sewer. Once the insertion phase is begun, the work shall be carried through to completion without delay or interruption until all service reconnections are completed. D. As part of his preparatory responsibilities, the Contractor shall ensure that no other work is simultaneously in progress upstream or downstream of his operations which may adversely affect the successful completion of his work. 3.2 SCHEDULING: A. The work shall be so scheduled and conducted such that the liner insertion water service interruption begins between the hours of 7 p.m. and 9 p.m. or 8 a.m. and 10 a.m. B. Users of the sewer reach to be lined shall be notified in writing 48 hours in advance of service interruption. The notice shall include the following items: 1. Day and date of service interruption. 2. Estimated time, in hours, water service will be shut off. 3. Estimated time, in hours, sewer service will be turned off. 4. Approximate time service interruption will begin. C. A written record of these notifications shall be maintained by the Contractor and turned over to the Engineer. D. The water service interruption shall not exceed eight hours and the sewer service interruption shall not exceed an additional one-half-hour per connection. E. The water service shall be turned off only by the Owner and shall be phased with the liner insertion such that its discontinuance time for each user is minimized. The Contractor shall restore the water service as soon as the liner is cured. Revision 5 January 2008 Page 2 of 5

F. Each user shall be notified verbally when water and sewer service is restored again. 3.3 SEWER CLEANING AND CLEARING: A. The sewer shall be cleared of all obstructions such as solids, dropped joints, protruding service connections, or collapsed pipe that will prevent insertion of the liner or prevent it from obtaining a circular cross section when completed. B. Obstructions that cannot be removed by conventional cleaning equipment shall be removed by excavating a repair pit. Prior to commencing the work, the Contractor shall obtain the Engineer's written approval for any work not shown on the Plans by necessary to achieving a quality product. C. Television reports and tapes are available for review by the Contractor. Structural failures requiring repair prior to lining installation are noted on the Project Plans. 3.4 SEWER REPAIRS: A. Where shown on the Plans or approved by the Engineer, excavate a repair trench, remove the defective mainline sewer pipe, and construct new sewer per SECTION 6200. The inverts of the new and existing pipe shall match at each end of the repair. B. The Owner, at no cost to the Contractor, will inspect the new sewer by videotape. Any misalignments and/or grade deficiencies will be repaired at the expense of the Contractor. 3.5 FLOW CONTROL: A. The Contractor shall at all times provide for the flow of sewage around the reach, or reaches, of pipe to be lined. The by-pass shall be made by plugging the line at an existing upstream manhole and pumping the flow into a downstream manhole or adjacent capacity and size handle the flow. B. In rare situations it may be permissible to plug the upstream manhole without pumping the flow around the reach to be lined. Such a condition will be shown on the Plans or approved in witting by the Engineer prior to the work. 3.6 INSTALLATION: A. The wet-out liner material shall be inserted through and existing manhole and fully extended to the next designated manhole. The inversion head shall be adjusted to sufficient height to extend the liner from manhole to manhole, to hold the liner snug to pipe wall, and to produce dimples at side connections and flared ends at the manholes. Care shall be taken not to over stress the felt fiber at the elevated curing temperatures that may cause damage or failure of the liner prior to cure. Revision 5 January 2008 Page 3 of 5

B. CURING OF THE LINER: 1. After insertion is completed, the Contractor shall uniformly raise the water temperature in the entire liner above the temperature required to effect a cure of the resin as determined by the resin\catalyst system employed. The liner shall be held under positive head pressure until the resin has cured and attained the physical strengths specified in the materials section. 2. Water temperature in the line during the cure period shall not be less than 150 0 F or more than 200 0 F as measured at the far end of the lower quadrant (invert). 3. The cure period shall be of a duration recommended by the resin manufacturer during which time the recirculation of the water to maintain the temperature in the liner within the temperature range will be continued. C. COOL DOWN OF THE LINER: 1. The Contractor shall cool the hardened liner to a temperature below 100 0 F before relieving the static head. Care shall be taken in the release of the static head such that a vacuum will not be developed that could damage the newly installed liner. 2. While the liner is cooling, water services shall be restored to the users, and they shall be instructed to limit its use until the sewer service is reconnected. 3.7 SEALING LINER IN MANHOLES: A. If due to broken or misaligned pipe at the manhole wall, lining fails to make a tight seal, the Contractor shall apply a seal at that point. The seal shall be of a resin mixture compatible with the liner. 3.8 SERVICE RECONNECTION: A. After the liner has been cured, the Contractor shall restore the existing service connections. The services shall have a smooth invert and capacity shall be restored to a minimum of 90 percent of the original. B. Service laterals shall be lined to the property line. 3.9 MEASUREMENT AND PAYMENT: A. LINER - Payment will be made at the contracted price bid per linear foot of specified Insituform Liner supplied to and installed at the project site, including all royalties, fees and taxes chargeable to the Contractor for the work. B. BY-PASS - Payment will be made at the contracted lump sum price for flow control, including mobilization, notifications to sewer users, by-pass pumping, testing, and cleanup and any ancillary items of work essential to proper and effective performance of the work. Revision 5 January 2008 Page 4 of 5

C. SERVICE RECONNECTION - Payment for service reconnection to the cured liner shall be at the unit price bid for each reconnection authorized regardless of the method used and shall cover all labor, equipment, and materials employed to accomplish the work, complete. D. SEWER POINT REPAIRS - Payment for repairs to the existing sewer pipe where called for on the Plans shall be made at the contracted prices for the various applicable items of work listed in the Proposal. Said items may include any or all of the following: common trench excavation and common or granular backfill, pavement removal and replacement, sanitary sewer pipe/bedding, tee and wye fittings, shoring sheeting, and bracing, etc. Incidental to and included in these costs shall be all work necessary to provide the Owner with a videotape of all repair work. E. TV INSPECTION: Payment for TV inspection and digital deliverables will be paid by LS as indicated in the Bid Proposal. PART 4 TESTING 4.1 INSPECTION: A. The finished lining shall be continuous over the entire length of an insertion run between two manholes and be as free as commercially practicable from visual defects such as foreign inclusions, dry spots, pinholes, and delamination. The lining shall be impervious and free of any leakage from the pipe to the surrounding ground or from the ground to inside of the lined pipe. B. Any defects visible during the warranty period which will affect the integrity or strength of the lining shall be repaired at the Contractor's expense, in a manner mutually agreed by the Owner and the Contractor. 4.2 HYDROSTATIC TESTING AND TELEVISION INSPECTION: A. The water tightness of the liner shall be tested in accordance with SECTION 6200 "Sewer Pipe Installation", Hydrostatic Testing, as the liner is cured. The Contractor will conduct a TV inspection of the work after the liner is installed and tested and the services have been restored at no expense to the Contractor. B. Contractor shall provide a digital TV inspection of the finished product in the current format of the City Maintenance Division requirements. END OF SECTION Revision 5 January 2008 Page 5 of 5