OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs

Similar documents
How To Improve Safety At A Nuclear Power Plant

Proposal to Consolidate Post-Fukushima Rulemaking Activities

June 27, Scott C. Flanders, Director Division of Site Safety and Environmental Analysis Office of New Reactors

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013

Executive Director for Operations AUDIT OF NRC S CYBER SECURITY INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS (OIG-14-A-15)

abstract NRC Headquarters United States Nuclear Regulatory Commission

Options for Cyber Security. Reactors. April 9, 2015

A Regulatory Approach to Cyber Security

How To Determine An Operating Safety Certificate

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

NUCLEAR REGULATORY COMMISSION

Overview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate

Security Requirements for Spent Fuel Storage Systems 9264

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions

DRAFT REGULATORY GUIDE

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION

EMERGENCY PREPAREDNESS FREQUENTLY ASKED QUESTION (EPFAQ) NEI REVISIONS 4 THROUGH 6; NUMARC/NESP 007

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C June 1, 2005

PUBLIC MEETING. details&code APPLICATIONS FOR NUCLEAR POWER PLANTS Regulatory Guide [Revision]

POLICY ISSUE (INFORMATION)

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

U.S. Nuclear Regulation after Three Mile Island

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C July 7, 2015

Audit of NRC s Network Security Operations Center

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE (Draft was issued as DG-1226, dated August 2009)

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C November 13, 2012

How To License A Nuclear Plant

Sara Brock Counsel for NRC Staff

Second License Renewal Roadmap. May 2015 Prepared by the Nuclear Energy Institute

IAEA Safety Standards for Regulatory Activities

Nuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3

Special Permits Program Desk Guide

NEI 06-13A [Revision 2] Template for an Industry Training Program Description

Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2

IFRAM Handbook on Reactor Aging Management

Aboriginal Affairs and Northern Development Canada. Internal Audit Report. Prepared by: Audit and Assurance Services Branch.

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, 2014

NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission

Independent Evaluation of NRC s Implementation of the Federal Information Security Modernization Act of 2014 for Fiscal Year 2015

PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006

Licensing Process for New Nuclear Power Plants in Canada. INFO-0756 (Revision 1)

Introductions: Dr. Stephen P. Schultz

Backgrounder Office of Public Affairs Telephone: 301/

Report. November 2013

RENCEE SAFETY MARIES

Office Of Nuclear Energy Light Water Reactor Sustainability Program Annual Review Meeting

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC June 16, 2011

AP1000 European 18. Human Factors Engineering Design Control Document

This occurrence is considered to be of no significance with respect to the health and safety of the public.

Watts Bar Nuclear Plant Unit 2 Completion Project. Quarterly Update to the Estimate to Complete August October 2012

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C March 3, 2011

Evaluation Report. Weaknesses Identified During the FY 2013 Federal Information Security Management Act Review. April 30, 2014 Report Number 14-12

Old Phase Description New Phase Description

Belgian Stress tests specifications Applicable to all nuclear plants, excluding power reactors 22 June 2011

US-APWR Human Performance Monitoring Implementation Plan

The Role of COG in CANDU Fuel Channel Life Management

Safety Analysis for Nuclear Power Plants

March 6, Executive Director for Operations

Part 1 General and Administrative Information. Part 3 Applicant s Environmental Report Combined License Stage

MATERIALS LICENSE. Docket or Reference Number Maximum Amount that Licensee May Possess at Any One Time Under This License: Source

Owner-User Pressure Equipment Integrity Management Requirements

Integrated Regulatory Review Service Mission to the United States

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C February 1, 2006

REGULATORY GUIDE (Draft was issued as DG-1207, dated August 2012)

May 30, Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff

Federal Bureau of Investigation s Integrity and Compliance Program

Government Degree on the Safety of Nuclear Power Plants 717/2013

Safety Analysis Probabilistic Safety Assessment (PSA) for Nuclear Power Plants REGDOC-2.4.2

Guidance for the Quality Assurance of Fire Protection Systems

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls

U.S. NUCLEAR REGULATORY COMMISSION January 2010 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 5.71 (New Regulatory Guide)

IAEA-TECDOC Effective corrective actions to enhance operational safety of nuclear installations

Quality Management System-A Revision 7 (NRC-approved Version)

NRC INSPECTION MANUAL

NRC Cyber Security Policy &

IAEA Action Plan on Nuclear Safety 1

Transcription:

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs

Program Overview Bill Dean Director Office of Nuclear Reactor Regulation 2

About Half of the NRC Staff Works on Operating Reactors FY2016 FTE 3

About a Quarter of the NRC s Expenditures Support Operating Reactors FY2016 Contract Support and Travel 4

NRC Conducts Thorough and Responsive Oversight Conducted ~ 260,000 inspection hours Completed 564 LAs and 547 OLTs Conducted 5 SITs Completed 8 supplemental inspections Opened 231 and closed 243 allegation cases 5

Activities that Enhance Safety and Extend Plant Life Compliance with Fukushima Orders all 62 audits completed Mitigating Strategies 68 units SFP Instrumentation 89 units TI-191 Inspections 6 sites Renewed Licenses Byron 1&2 Davis Besse Braidwood 1&2 6

Rule and Guidance Updates Focusing on Safety Issues 15 Rulemaking Activities 2 Proposed Rules published 1 Advance Notice of Proposed Rulemaking published Generic Correspondence 9 Information Notices issued 13 Regulatory Information Summaries issued 1 Generic Letter issued 5 Regulatory Guides published 7

The Staff Is Engaging the Commission on Policy Issues Fukushima Tier 2 and 3 Papers (SECY-15-0137, 16-0041, and 16-0074) Open Phase (SECY-16-0068) Digital I&C (SECY-16-0070) NRR/NRO Merger (SECY-16-0075) 8

Major Licensing Accomplishments Licensing and safe startup of Watts Bar 2 Issuing the SHINE construction permit Renewing licenses for 5 units Workload management 9

Other Significant Accomplishments Completing draft of CNS National Report Improving the operator licensing program Enhancing the Reactor Oversight Process Closing generic issue on boiling water reactor emergency core cooling system suction (GI-193) 10

Several Technical Challenges Face the Business Line Using risk insights in making decisions Enhancing safety focus of technical reviews Implementing Digital I&C Action Plan Completing remaining Fukushima activities Preparing for subsequent license renewal 11

Additional Focus on Organizational Challenges Managing workload changes Restructuring NRR Potentially merging NRR and NRO Implementing enhancements to the Reactor Oversight Process 12

Licensing Topics Anne Boland, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 13

Significant Reactor Licensing Accomplishments Seamless transfer of Vermont Yankee, Crystal River, and SONGS to Decommissioning and Low Level Waste Business Line Completion of complex licensing actions (e.g., NFPA-805) Reduction of licensing actions > 12 months old 14

100% Substantial Progress in Licensing Timeliness and Completions 1800 95% 90% 85% 1732 95% 1543 94% 1613 93% 1314 90% 1444 96% 95% 1197 1372 87% 1269 88% 1760 95% 1600 1400 1200 1000 800 80% 600 400 75% 2008 2009 2010 2011 2012 2013 2014 2015 2016 Completed LAs and OLTs LA 1 Year Timeliness LA 2 Year Timeliness OLT 1 Year Timeliness OLT 2 Year Timeliness 200 15

Strengthened Workload Management Applied additional resources Greater management oversight on workflow process Periodic status meetings Lessons learned on specific licensing actions Review of licensing and acceptance review processes 16

Updating Data Management and Tools Replacement Reactor Program System (RRPS) Procedure revision Workload forecasting - RIS 2015-16 17

Revised Expectations to Staff Re-emphasized process adherence and incorporated lessons learned Clarified process for requests for additional information Draft SE prior to RAI issuance Consideration of alternatives Enhanced management involvement Review of responses for scope changes 18

Rebaselining Efficiency Efforts in Progress Eliminated commitment audits and UFSAR Reviews 2.206 process enhancements Implementing electronic correspondence and concurrence Streamlined briefing packages 19

Changing Environment Creates New Opportunities Aligning the organization for future work Continuing to identify licensing process efficiencies in order to sustain performance Harmonizing processes and procedures between operating and new reactors Integrating greater use of risk insights into processes and procedures Maintaining focus on safety, security, and preparedness 20

A Risk-Informed Approach for Addressing Low Risk Compliance Issues Rob Elliott Division of Safety Systems Office of Nuclear Reactor Regulation 21

Continued Progress Integrating Risk-Informed Decision-making Current risk-informed programs: Reactor Oversight Program Risk-informed completion time and surveillance frequency control programs Notices of enforcement discretion Some licensing basis design issues are not immediate safety concerns TS-driven urgency to resolve these issues may not result in best solution or use of staff and licensee resources 22

Applying Risk-Informed Solutions Tornado Missile Protection: Generic problem identified Low probability event Significantly lower probability of loss of safety function Timely compliance concerns drove plant and NRC response actions Solution: Enforcement Guidance Memorandum (EGM) 2015-002 Risk informed to allow appropriate time to take corrective actions 23

A New Risk-Informed Regulatory Tool is Under Consideration Applying TS completion times to low risk, low safety-significant design issues can lead to unnecessary regulatory burden Working group with staff from NRR, OGC, OE, and the Regions Considering a new plant-specific process: Evaluation of risk, defense-in-depth, safety margins, compensatory measures and risk management actions Potential for enforcement discretion Stakeholder involvement during process development 24

Potential Benefits Implement timely corrective action commensurate with safety significance Ensure continued safe operation Focus resources on safety significant issues Complementary to existing regulatory processes Consistent with existing Enforcement Policy 25

Next Steps Continue consideration of a new riskinformed process that: addresses low risk/low safety significance design issues affecting operability potentially utilizes enforcement discretion ensures safe operation while the licensee implements corrective action Continued stakeholder engagement Keep Commission informed 26

Regional Perspective Len Wert, Deputy Regional Administrator for Operations Region II 27

Regional Focus on Safety Maintaining Vigilance Identifying Issues 28

ROP Provides Framework for Assuring Safety Effective Oversight Program Refinement Reliability/ Consistency 29

Regional Sites with Special Focus Units in Column 4 Watts Bar 2 30

Regional Implementation of Specialized Inspections Fukushima 14 TI 191 inspections planned or completed Cyber Inspections Milestone 8 inspections 2017 31

Our Employees: Vital to Success Maintaining Capacity and Expertise Resource Sharing Enhancing Flexibility 32

Effectively Managing Change Changes: Activities Staffing and Organization Employee Engagement 33

Ensuring Safety Through Research David L. Rudland, Branch Chief Division of Engineering Office of Nuclear Regulatory Research 34

Research Confirms Safety High Energy Arc Faults Thermal Hydraulic Analyses Integrity Analysis Tools Flooding Severe Accident Analyses Digital I&C 35

Implementing Re-Baselining Shed Impact Path Forward Alloy 52M Weld Overlay Weld Mitigation Technical Basis Reduced analyses for evaluating new techniques Evaluate using existing expertise and experience Forgo plans to update Appendix G Continue to Implement existing requirements Part 50 Appendix G Technical Basis 36

Ensuring Piping Integrity PFM analyses not standardized Computer codes written for case specific application 10 CFR 50, App A, GDC 4 No active material degradation Leak-before-break (LBB) No quantitative probabilistic solution available 37

Developing Robust Analysis Tools Aligned with DOE efforts Large Cooperative effort with EPRI Nucleargrade Quality Assurance Rigorous Verification and Validation xlpr Probabilistic Pressure Boundary Integrity Software Technically vetted Modular for flexibility 38

Using xlpr to Ensure Safety Significance Determination Process Prioritize Research Activities xlpr Seismic loading on integrity Future use Near term use Leakbeforebreak Integritybased relief requests Risk informed ISI 39

Rolling Out xlpr Soon Production version (2.0) to be released in Aug 2016 Currently undergoing verification and validation xlpr maintenance program under development Establishing a Users Group Future Plans LBB Sensitivity studies in 2017 Regulatory guidance in 2018 40

Security and Incident Response Activities in Support of the Business Line James Andersen, Director Cyber Security Directorate Office of Nuclear Security and Incident Response 41

Cyber Security Regulatory Structure Has Been Enhanced Staff has endorsed Nuclear Energy Institute (NEI) guidance document, NEI 13-10, Revision 4 Industry has implemented Milestones 1-7 of their cyber security plans Addressing generic inspection issues 42

Additional Cyber Security Enhancements Will Be Implemented Preparing for Milestone 8, full implementation of the cyber requirements Engaging stakeholders to improve consistency of implementation Issued cyber security notification rule and guidance 43

Improving Emergency Preparedness Licensing Effectiveness Working with NRR and the industry Maintaining licensing action submittal plan as a living document Identifying problem areas and the need for additional guidance 44

Summary Executing a business line with has large breadth and scope Responding to challenging environment with creativity and dedication Ensuring safety and security for the future 45

List of Acronyms CFR Code of Federal Regulations CNS Convention on Nuclear Safety DOE Department of Energy EPRI Electric Power Research Institute 46

List of Acronyms (cont d) FTE Full Time Equivalent FY Fiscal Year GDC General Design Criteria I&C - Instrumentation and Control ISI In-service Inspection 47

List of Acronyms (cont d) LA Licensing Action LBB Leak Before Break LOCA Loss of Coolant Accident MBDBE Mitigation of Beyond Design Basis Event NFPA National Fire Protection Association 48

List of Acronyms (cont d) NRO Office of New Reactors NRR Office of Nuclear Reactor Regulation OE Office of Enforcement OGC Office of General Counsel OLT Other Licensing Task 49

List of Acronyms (cont d) PFM Probabilistic Fracture Mechanics PWSCC Primary Water Stress Corrosion Cracking RAI Request for Additional Information RIS Regulatory Issue Summary 50

List of Acronyms (cont d) ROP Reactor Oversight Process SE Safety Evaluation SFP Spent Fuel Pool SIT Special Inspection Team SONGS San Onofre Nuclear Generating Station 51

List of Acronyms (cont d) TI Temporary Instruction TS Technical Specifications UFSAR Updated Final Safety Analysis Report xlpr Extremely Low Probability of Rupture 52