Effect of Fiber Cut in Pakistan



Similar documents
Impacts of Recent Submarine Cable Cuts on Middle East Internet MENOG 10 Dubai, UAE 1 May 2012

IMPACT OF UNDERSEA CAPACITY IN EAST AFRICA

Cable Laying and Repair - Cable Ship Operations

Bridging the African Internet

Cable System Planning and Permitting: Business and Stakeholder Considerations

Communication Links for Offshore Platforms. A User s Guide to Troposcatter Communications

Submarine Cable Development. Africa, MENA, and South East Asia. 17 January Byron Clatterbuck CEO SEACOM Ltd

Visualizing the Impacts of Submarine Cable Breaks. Doug Madory, Senior Analyst

The Submarine Cable Industry at a Crossroads:

KPMG FLASH NEWS. Background. Facts of the case. 26 June KPMG in India

Mitigating your Financial Risks for your New Undersea Cable Projects

Improve Costs through Integrated processes. Supply Chain Excellence Series. Dr. Dermot Carey. Certified by MRM Ltd, Ireland

DE-CIX Premium Internet Exchange Services

Capacity and Traffic Trends

Very soon. Satellite Internet Broadband Service

Submarine Cable Route Maps

CSCAP MEMORANDUM NO. 24 Safety and Security of Vital Undersea Communications Infrastructure

Galaxy Office Automation Pvt. Ltd. Listening to Business, Applying Technology

REQUEST FOR PROPOSAL

Telecom Regulatory Authority of India

Global Network Mobility RIPE 48

Why an internet exchange point in Marseille spells good news for business in the Middle East

International connectivity submarine cables. Simon Smith Director Regulatory Affairs

Submarine Cables: Critical Infrastructure Supplier Perspective

Mapping The Digital Silk Road

International Wholesale: Increasingly regional, on the brink of change

Choosing the right Internet solution for your business.

Proposal Laying Fiber Optic for Cables along Railways Tracks in Sudan

SEACOM Closes Financing, Starts Full Construction of Undersea Fiber Optic Cable

DISASTER RECOVERY AND NETWORK REDUNDANCY WHITE PAPER

Telenor Global Services

Broadband costing and pricing - Approaches and best practices

International Submarine Cable Development: New Infrastructure, New Prices?

Colocation. Scalable Solutions for a Shared IT Infrastructure. Enterprise. Colocation

Opening up the bandwidth bottleneck in Africa. Martin Mutiiria, Director, Sales, Africa, WIOCC

RCOM s subsea cable business

NEPAD ICT BROADBAND INFRASTRUCTURE PROGRAMME Part of the Programme for Infrastructure Development in Africa (PIDA)

Colocation. Scalable Solutions for Shared IT Infrastructure. Enterprise. Colocation

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering % uptime

Corporate Profile. A TPG Telecom Company

Introduction Page 2. Understanding Bandwidth Units Page 3. Internet Bandwidth V/s Download Speed Page 4. Optimum Utilization of Bandwidth Page 8

Connect the Leading Global Financial Centres by Ultra Low Latency Network

Pacnet MPLS-Based IP VPN Keeping pace with your growth

Geopolitics of Internet Infrastructure. James Cowie, CTO

Section 1 - Executive Summary

Broadband Infrastructure in the ASEAN 9 9 Region

AMDOCS > CUSTOMER EXPERIENCE SYSTEMS INNOVATION

Traffic Characterization and Perceptual Quality Assessment for VoIP at Pakistan Internet Exchange-PIE. M. Amir Mehmood

Multihoming and Multi-path Routing. CS 7260 Nick Feamster January

Benchmarking Methodology Telecoms Price Benchmarking Study for Arab Countries

Japan 94% of parents think that their children s safety has improved since moving. China is home to the highest earning expats in the world

Michuki Mwangi! Regional Development Manager - Africa! ISOC! European Peering Forum (EPF) 7! Malta! Sept 2012!

General Tariff Information. Public Fixed Telecommunications Networks and Services Tariff Number B Tariff Effective Date

INTERNATIONAL CONFERENCE ON GOOD GOVERNANCE FOR NATIONAL DEVELOPMENT

An Analysis of Global Trade in Terephthalic Acid and its Salts

February: Additional 400Gbps (200G per segment) of Ciena upgrade is commissioned using 40Gbps technology.

Company presentation January 2013

Global IP Network Overview

Mail-SeCure Load Balancing

18 th EACO Congress, Kigali 23 rd May 2011 Barry Kingsland Fellow Institute of Directors Director - Energy & Sustainability

Reduce your downtime to the minimum with a multi-data centre concept

East African Cable Showcase: The Bandwidth Revolution in Eastern & Southern Africa. Ryan Sher COO, WIOCC

The Partnership between Dolphin & Telecom Italia Sparkle

MEASAT Satellite Systems Sdn. Bhd.

Delivering Subsea Capacity at 100G

Myanmar, a republic in South-East Asia, bounded on the north by Tibet

GNSS Scenario. By Dr Ashok Kaushal. GNSS scenario in India in India. 05/08/2007 Slide No.: 1

South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering % guaranteed uptime

DEAL LIST: FOCUS ON TECHNOLOGY, MEDIA AND TELECOMMUNICATIONS

Member of the Tata Group

UNIT I OVERVIEW OF E- COMMERCE

RESEARCH Recruiting Online

A Link Load Balancing Solution for Multi-Homed Networks

Country Report of Myanmar

Redundancy for Corporate Broadband

UAEnic at a Glance. Abdulla A. Hashim UAEnic Manager hashim@nic.ae. inet MEA Regional Conference. Cairo, Egypt, 8 May 2005

Konti Skan Replacement of Cable 1

KENET NETWORK INFRASTUCTURE. KENNEDY ASEDA

AMENDED GUIDELINE ON CALL CENTER LICENSING

EBSA Power Distribution Application Paper

Introduction Insurance Industry Overview and Major Trends

Intelligent Routing Platform White Paper

Transcription:

Effect of Fiber Cut in Pakistan Muhammad Idrees Afzal Manager Network Operations (IT Division) Telenor Pakistan (Pvt) Ltd Idrees.afzal@telenor.com.pk

Facts Sea-Me-We 3 (South East Asia-Middle East-Western Europe) is 39,000 kilometers long in total This cable has 39 landing points in 33 countries in Europe, Asia Pacific and Australia. Other countries on the affected segment of the cable are India, the United Arab Emirates (UAE), Oman and Djibouti Internet services to those countries were not affected, according to reports due to availability of proper back ups Submarine cable installation, maintenance and repair company E-marine (Marine Services FZE), has a contract with the SEA-ME- WE-3 consortium for annual storage, repair and maintenance of the cable across the region

SEA-ME-WE 3 Map

The Incident June 27, 2005 at 2055hrs all Internet and Telecom connectivity of whole country was discontinued All international STM-1 links via SEA-ME-WE-3 optical fiber network went down The cable was cut 35 nautical miles (69-km) south-west of Hawksbay, Karachi in deep sea. Traffic was shifted to 3 E3 satellite links but it made no difference On July 1, 2005 satellite backups were arranged, and things started working to much extent. The cable was recovered on 1224hrs July 8, 2005

SEA-ME-WE 3 Cut

Commercial Impact ISPs Over 10 million Internet surfers suffer from this Over PKR15 million loss to ISPs per day as per ISPAK GPRS GPRS services remained down along with Internet Call Centers Estimated loss of US$ 1million to call centre industry The cable fault raised questions about the future of the country's fledgling call centre industry Medical Subscription Stock Exchanges Online trading system of stock exchanges

Commercial Impact E-Commerce No business on web Online banking On line transactions were not possible LDI Operators LDI operators were unable to continue their services ISD Calls Unable to make calls to and from Pakistan for 2 days Airlines Online Reservation system of Airlines was badly effected

Interim Measurements Shifting to satellite links Re-advertisement of IP blocks on new links and traffic re-engineering Prioritizing the traffic for business applications and providing backups to these on priority basis Continuous feed back from ISPs and other organizations regarding new situation and reconfigurations / traffic re-engineering Provisioning of point to point satellite links for critical business applications depending on customer requirement

Effects of interim measures After 1 day PSTN ISD calls were recovered After 2 days, a slow internet was provisioned, rather than a dead Internet After 4 days Internet was recovered with some reasonable speed After 5 days point to point IPLC s and LDI operators links were recovered with less capacity as per customer requirements After 12 days cable was recovered

Technical Insight When SEA-ME-WE 3 cable was cut, All IP prefixes advertised to other ASN s, were no longer on Internet. During shifting to new satellite links, route flapping occurred which resulted in route dampening of different advertised pools. This was resulted because new links were added prefix advertisements were made and changed to new satellite links in order to load balance the things This was done on Interim basis keeping in view business priorities

Route flap dampening Route flapping when occurs rapidly and on a large scale. It can get out of control and affect network performance. During the shifting to multiple satellite links in new emergency situation, resulted in route flapping because different IP prefixes were advertised on different links These advertisements were changed frequently as per traffic requirement Result was flapping routes of some prefixes The Internet is protected from route flapping using the phenomena of route dampening. The new situation also resulted in dampened routes for some prefixes, leading to a new more complex situation

Food for thought Can we afford to loose business and cut off from world for days? The answer is NO Can a country depend on Single Cable or single communication channel? The Answer is obviously NO Alternate links must be obtained so that a redundancy can be obtained Fault detection and correction time must be minimized (MTTR)

What is being done? SEA-ME-WE 4 cable An agreement for SEA-ME-WE-4 cable at a cost of $40 million had already been finalized with consortium and it is expected that it would commence functioning in October-November this year. Fiber Optic Connectivity with India memorandum of understanding with the Indian company Reliance had been inked after removing all security concerns in March under which laying of fiber optic till Wagah border, Lahore would be completed by the end of September Trans world Associates Ltd (TWA), a joint venture between Orascom Telecom of Egypt and Saif Group of Companies, is in the process of planning of setting up, at a cost of $36 million, undersea fiber optic cable from Karachi to Fujaria All this will result in four (at least 3) parallel fiber optic connectivity paths for the country till the end of this year

Thank You