Lecture 10. Procurement and Outsourcing Strategies (Chapter 9)

Similar documents
Outsourcing, Purchasing Management and Partnership Sourcing

TU-C2020 OPERATIONS MANAGEMENT (5 cr) Strategic supply management

Scope of Supply Chain Management (SCM)

SCM. Logistics, Service, and Operations Management

THIRD PARTY. T i m L i e t z R e g i o n a l P r a c t i c e L e a d e r R i s k A d v i s o r y S e r v i c e s

Copyright , Pricedex Software Inc. All Rights Reserved

Learning Objectives. Supply Chains & SCM Defined. Learning Objectives con t. Components of a Supply Chain for a Manufacturer

Managing a tender process for Applicant Tracking Systems

Competitor or Partner?

To learn more about Trinity Logistics and our solutions:

MRO Optimization for high performance. Accenture Product Lifecycle Optimization

Strategic Sourcing. Increasing competitiveness and profitability with effective purchasing

Autodesk. Connect people, information and processes.

Next-Generation Supply Management

Leveraging the Cloud for Smarter Development On Oilfields; What Does that Entail? Kevin Wagner, Director - Energy

Product Design. Chapter 5. Product and Service Design. Service Design. An Effective Design Process. Stages In The Design Process

Fleet/Asset Management Systems

Data Center Business Overview:

AGILE RANDOMIZATION AND TRIAL SUPPLY MANAGEMENT SOLUTIONS: A RECIPE FOR SPEED, SIMPLICITY AND SERVICE

Management. Information. Systems. Education. Available Software and Guidelines for Selection (EMIS):

Supply Chain Design and the effects on shipping

Cost-effective supply chains: Optimizing product development through integrated design and sourcing

What makes SAP SRM 7.01 impressive? Rakesh Singh, GyanSys Inc. Naveen Rajan, GyanSys Inc.

PLM Enabler: BOM Management Across the Enterprise

White paper. The long and short of managing tail spend. Deepa M.K. Abstract

Automated Invoice/P2P Processing

10 reasons to embrace a hybrid solution.

Automated Invoice/P2P Processing

Supply Chain Strategy Mind Mapping

Case Study: Tilcon The Integration of Information Rutgers Summit---Strategies for Improving Working Capital & Reducing Inventory Presenter: Keith

HEDCO Total Management Solution

A Sample Organization Chart

Supply Chain Management

EXPERTISE AN INNOVATIVE PROGRAMME ENABLING YOU TO LEVERAGE BT S CISCO RELATIONSHIP AND TO STIMULATE REVENUE

Non-Stop Manufacturing Excellence. Automotive. Answers for industry.

PinkLINK July Pink Elephant. All rights reserved. Page 1 of 5 Learn more about ITIL by visiting:

CORPORATE TURNAROUNDS

maximum 2 lines Ultimate flexibility and control for enterprise cloud users plus infrastructure savings of up to 40%

Retail s Complexity: The Information Technology Solution

A Case For Insourcing ITSM Governance & Tools While Managing Multiple Vendors. White Paper

Supplier Management for Complex Outsourced Services: A Strategic Framework

Increase Business Velocity with Connected, Insightful, Cloud-Based Software

LHRIC Network Support - Additional Service Features

consulting group Increase Competitiveness Reduce Costs

Acquiring and Using a Fleet Management Information System to Manage Your Fleet

How To Outsource Mro Supply

What is project management?

aurora Complex billing made simple billing software solutions

WHITE PAPER December TMS Transportation Management Systems & Supply Chain Sustainability

Staying a Step Ahead by Comprehensive Industrial MRO Outsourcing

Part of the Deloitte working capital series. Make your working capital work for you. Strategies for optimizing your accounts payable

Are you diluting the value of your outsourced recruitment process?

U.S. Bank Corporate Travel Card. OR ST Overview

Case Study BOEING 787: GLOBAL SUPPLY CHAIN MANAGEMENT TAKES FLIGHT. Leveraging Global Partners to Maximize Customer Value

Insourcing vs. Outsourcing. Bart Leung Senior Associate, Ehvert Mission Critical

A Case Study in Global Supply Chain Risk Management: How AGCO Implemented an SCRM Solution to Save Millions

Service Supply Chain Forum. Jon Guyett Americas Service Parts Logistics Director

GET CLOUD EMPOWERED. SEE HOW THE CLOUD CAN TRANSFORM YOUR BUSINESS.

Streamline your Purchase to Pay (P2P) functions within your business

Lessons for the NHS from the literature on procurement and supply chain management

DevOps: Roll out new software and functionality quicker with high velocity DevOps

TOOLING DEFINITIONS, COST AND AUDIT GUIDELINES

Operations Management Coursework ECCO Shoes Global Value Chain

Value chains, value networks and supply chain management

Understanding ITIL Service Portfolio Management and the Service Catalog. An approach for implementing effective service lifecycle management

PRUSAGE. Procurement BPO Services. Prudent and Sage. Advisory ˡ ˡ Automation ˡ ˡ Outsourcing

REGULATIONS FOR THE DEGREE OF MASTER OF SCIENCE IN CONSTRUCTION PROJECT MANAGEMENT (MSc[ConstProjectMan])

Supply Chain Finance Overview. January 2013

MDM Challenges and Solutions from the Real World

Supply Chain Management Think Global, Go Global. Hau L. Lee Stanford University

W204 - LMS Consolidation, Underlying Design More Important Than Platform

SAP Solution Brief SAP Technology SAP IT Infrastructure Management. Unify Infrastructure and Application Lifecycle Management

White Paper Cisco Unified Communications: New Deployment Models for Communications and Collaboration

Bid/No-Bid Decision-Making Tools and Techniques

IT Outsourcing. Third Time Lucky? Winter 2014/15 INSIGHTS

Management. SAVE$1 Million. WITH BETTERFleet. Financing/Leasing HERE ARE SOME TIPS ON HOW TO DO IT. B Y S COTT P ATTULLO

INDUSTRY PERSPECTIVE

Data Center Consolidation in the Federal Government Looking beyond the technology

Value-Driven Business Process Management Berlin, Germany/Orlando, FL USA

REGULATIONS FOR THE DEGREE OF MASTER OF SCIENCE IN CONSTRUCTION PROJECT MANAGEMENT (MSc[ConstProjectMan])

Transcription:

Lecture 10 Procurement and Outsourcing Strategies (Chapter 9)

What is outsourcing? 9.1 Introduction Outsourcing has been increased progressively over the years Companies outsourced everything Fashion Industry (Nike) (all manufacturing outsourced) Electronics Industry Cisco, Apple (over 70% of components outsourced) Not Just Manufacturing but Product Design, Too

Outsourcing Case Where is the Boeing 787 Dreamliner Made? American companies make the front and back of the plane. The rest come from all over the world.

Comparison of Boeing's strategy for its 737 and 787 programs

9.2 Outsourcing Benefits and Risks Benefits Economies of scale Risk pooling Reduce capital investment. Focus on core competency Increased flexibility Outsourcing Risks 1) Loss of Competitive Knowledge 2) Conflicting Objectives open up opportunities for competitors lose their ability to introduce new designs preventing innovations that require crossfunctional teamwork

Is outsourcing to blame for Boeing s 787 Dreamliner woes? Boeing contracted with a top tier of about 50 suppliers in all, handing them complete control of the design of their piece of the plane, including the electrical system. Boeing can shorten the development time Reduce the development cost. As Boeing outsourced more, communication and coordination between Boeing and its suppliers became critical for managing the progress of the 787 development program.

Frequent accidents - Delay delivery time -A fire in electrical system, failure in brake equipment, fuel leakage - Boeing 787 Dreamliner battery problems

SC structure for airplane mfg. Boeing's strategy for its 787 programs

Is outsourcing to blame for Boeing s 787 Dreamliner woes? Very different on the 787 is the structure of the outsourcing. - A top tier of about 50 suppliers, who control the design of their piece of the plane. - Those major partners had to make the upfront investment, share the risk and own their design. Each was responsible for managing its own subcontractors. You only know what s going on with your tier 1 supplier. You have no visibility, no coordination, no real understanding of how all the pieces fit together. Can the management team trace all the way down the tree to every single supplier and unit? That s really difficult.

Questions/Issues with Outsourcing Why do many technology companies outsource manufacturing, and even innovation, to Asian manufacturers? What are the risks involved? Should outsourcing strategies depend on product characteristics, such as product clockspeed, and if so how?

9.3 Framework for Make/Buy Decisions How can the firm decide on which component to manufacture and which to outsource (purchase)? Focus on core competencies How can the firm identify what is in the core? What is outside the core?

Two Main Reasons for Outsourcing Dependency on capacity Firm has the knowledge and the skills required to produce the component,but For various reasons decides to outsource Dependency on knowledge Firm does not have the people, skills, and knowledge required to produce the component Outsources in order to have access to these capabilities.

Outsourcing Decisions examp. at Toyota About 30% of components in-sourced Engines: Company has knowledge and capacity 100% of engines are produced internally Transmissions Company has the knowledge of design and mfg. all the components 70 % of the components outsourced, depending on its suppliers capacities. Vehicle electronic systems Designed and produced by Toyota s suppliers. Depends on both capacity and knowledge outsourcing depends on the strategic role of the components

Modular product Product Architectures Made by combining different components Components are independent of each other Components are interchangeable Standard interfaces are used Customer preference determines the product configuration. Integral product Made up from components whose functionalities are tightly related. Not made from off-the-shelf components. Designed as a system by taking a top-down design approach. Evaluated on system performance, not on component performance Components perform multiple functions.

A Framework for Make/Buy Decisions Product Dependency on knowledge and capacity Independent for knowledge, dependent for capacity Independent for knowledge and capacity Modular Outsourcing is risky Outsourcing is an opportunity Opportunity to reduce cost through outsourcing Integral Outsourcing is very risky Outsourcing is an option Keep production internal

Hierarchical Model to Decide a specific component should be outsourced or Not The component s importance to the Customer Component Clock-speed Competitive Position Capable Suppliers: Architecture: Modular? Integral?

Examples of Decisions Criteria Example 1 Example 2 Example 3 Example 4 Customer Importance Important Not important Important Important Clockspeed High Slow High Slow Competitive Position Competitive Advantage No advantage No advantage No advantage Capable Suppliers X X Key variable to decide strategy Architecture X X Key variable to decide strategy DECISION In-house Outsource Inhouse, Acquire supplier, Partnership Outsource with modular; Inhouse or joint development with integral.

9.4 Procurement Strategies Impact of procurement on business performance - PC firms: >70% of cost The smaller the profit margins, the more important it is to focus on reducing procurement costs.

Kraljic s Supply Matrix Firm s supply strategy should depend on: 1) profit impact Volume purchased/ percentage of total purchased cost/ impact on product quality or business growth 2) supply risk Availability/number of suppliers/competitive demand/ make-or-buy opportunities/ storage risks/ substitution opportunities

Kraljic s Supply Matrix : Importance to customer experience Price is a large portion a single supplier long-term partnerships with suppliers quadrant high impact on profit Many suppliers cost savings competition between suppliers

quadrant: Bottleneck components Suppliers have power position Ensure continuous supply, even possibly at a premium cost long-term contracts or by carrying stock (or both) quadrant: Non-critical items Simplify and automate the procurement process as much as possible Use a decentralized procurement policy with no formal requisition and approval process

SUMMARY Outsourcing has both benefits and risks Buy/make decisions should depend on: a particular component is modular or integral? Whether or not a firm has the expertise and capacity to manufacture a particular component or product. Variety of criteria including customer importance, technology clockspeed, competitive position, number of suppliers, and product architecture. Procurement strategies vary with components: Four categories of components, strategic, leverage, bottleneck and non-critical items

Questions in Chapter 9 What are outsourcing benefits and risks? Page 274: Q5. Q7