PHYSICAL PLANT OPERATING POLICY AND PROCEDURE. DATE: May 7, 2009 PURPOSE



Similar documents
b. Supervisor: An employee s immediate supervisor, section supervisor, foreman, or general supervisor.

The following terms should be understood prior to review of the Services Policy:

Procedure for Conducting Audits and Management Reviews

OVERSIGHT CONCEPT DIVISION FINANCIAL AUDIT

Oklahoma State University Policy and Procedures

Administrative Procedure

Facilities Division Integrated Safety Management Plan March 16, 2006

2. Be sure to fill out all applicable pages of this application completely. Use additional pages, if necessary.

Process Safety Management Program

PROSPECTUS ALTERATION DENVER FEDERAL CENTER BUILDING 53 LAKEWOOD, CO

Issues & Logs. Used to track and report all accident incidents on a project. Serves as the Accident Investigation Report

Internal Audit Hearing Sheet

The Project Inspector Construction Phase Richard Conrad FAIA, Division of the State Architect

ALABAMA STATE DEPARTMENT OF EDUCATION

Title: Construction, Renovation and Demolition

EMS Example Example EMS Audit Procedure

best interest of the Alliance to approve the Asset Capitalization Policy as proposed; now, therefore

Chapter 4: Contractor Quality Control

Audit Report. The National Nuclear Security Administration's Weapons Dismantlement and Disposition Program

Installation and Operational Qualification Protocol (Reference: SOP )

Overview. Responsibility

CHAPTER THREE ADMINISTRATION AND FINANCE

View condition history for assets.

IAS ACCREDITED INSPECTION AGENCIES: GUIDELINES FOR CONDUCTING INTERNAL AUDITS AND MANAGEMENT REVIEWS. Revised January, 2016

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Worship Facility Matching Grant Program 2010 Program Manual

SUPPLIER QUALITY SYSTEM AUDIT

DEVLOPMENT APPLICATION PROCEDURES

Guidelines for Disposal of Goods & Equipment

CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR PUBLIC SCHOOLS, CHARTER SCHOOLS AND JUNIOR COLLEGES

Regulation of Air Traffic Service SMS and. Air Traffic Service Units/Facilities SMS

Suggested Procedures for School Boards

OH&S Management Systems Audit Checklist (NAT, E3)

Module 6: QUALITY MANAGEMENT FOR CONSTRUCTION PROJECTS. Submodule 1: Introduction. Objectives: After completing this submodule, you will be able to:

Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020

South Coast Air Quality Management District

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs.

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements

POLICY AND PROCEDURE FOR THE DISPOSAL OF AN ASSET

MACHINE SAFETY SOFTWARE THAT IS REVOLUTIONIZING INDUSTRY THE

Asset Management Policy

Title:: Effective GMP AUDITS for APIs and Formulation Pharma Companies By G.Sundar-Director/Consultant PharmQA Compliance solutions

SECTION 807 PUMP STATION REHABILITATION

GUIDANCE NOTE ON OUTSOURCING

The Commonwealth of Massachusetts

Air Traffic Service Training Providers Entry Control Procedures Manual 3. Sample Documents

Asset Management Update - Concessioner Funded Project

Procurement practices of school districts and charter schools; definitions

FM Project Files Management Procedures

State of Alaska Department of Corrections Policies and Procedures Distribution: Due for Rev:

Module 17: EMS Audits

FACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION

Post Occupancy Evaluation (POE) Technical Instructions

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

NEIAF June 18, IS Auditing 101

Construction Notification and Start-Up

NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS

PURPOSE REVIEW POLICY/PROCEDURE. 1. Definitions. a. CCG Texas Council on Competitive Government.

Guide Document for Development of WHS Management Plans

Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only

Home Repair Program. December 2007 Housing and Community. Development. Home Repair Program

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

Revised Work Scope Dated April 23 rd, 2015

Title V Compliance Verification Process

General Equipment Preventive Maintenance Guidelines Preventive Maintenance services at 201 Granby Street for NRHA.

Operating Policy and Procedure. Installation of Cabling in Buildings and Tunnels. DATE: April 19, 2016

Monitoring requirements and global quality assurance

NATIONAL ARCHIVES AND RECORDS ADMINISTRATION. Records Schedules; Availability and Request for Comments

CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS

WHS Contractor Management Procedure

NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS

DECISION No EX 03-1 OF THE PRESIDENT OF THE OFFICE. of 20 January 2003

1 RCNY CHAPTER 100

March 13, Internal Audit Report Maximo Work Order System Facility Maintenance Maintenance and Operations

fmxpert facilities management software

ILLINOIS DEPARTMENT OF CENTRAL MANAGEMENT SERVICES CLASS SPECIFICATION CLASS TITLE POSITION CODE EFFECTIVE

AUTOMOTIVE BUSINESS REGULATION

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS

Internal Audit Checklist

DENVER URBAN RENEWAL AUTHORITY HOUSING PROGRAMS SINGLE FAMILY REHABILITATION PROGRAM

ANR facilities are typically occupied by relatively small staffs of between 10 and 20 employees and researchers and therefore, environmental

STATE OF OHIO DEPARTMENT OF COMMERCE DIVISION OF FINANCIAL INSTITUTIONS "An Equal Opportunity Employer and Service Provider"

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

PREVENTIVE MAINTENANCE AND FACILITY MANAGEMENT

Sewer Scope Inspection Report

23. The quality management system

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

Helping You With Your Home Purchase

Vehicle Management Plan revision

NOTICE ON OUTSOURCING

CHAPTER VI ELECTRICAL LICENSING

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

THE UNIVERSAL SECURITY AUDIT PROGRAMME (USAP)

September 2014 Report No

Foreign Exchange Inspection Manual

Room Function Definitions

FIRE RISK ASSESSMENT SW13 0HA

Salini Costruttori S.p.A. Report of the Board of Statutory Auditors on the Financial Statements as at

DIABLO VALLEY COLLEGE CATALOG

1 OF 7. there will be few "surprises" as the work progresses.

Transcription:

PHYSICAL PLANT OPERATING POLICY AND PROCEDURE : Facilities Audit Program DATE: May 7, 2009 PURPOSE The purpose of this Physical Plant Operating Policy and Procedure (PP/OP) is to establish the policy and procedures for the administration of the Facilities Audit Program. This program systematically and routinely identifies facility deficiencies and functional performance of campus facilities through a physical inspection and observation reports. The audit program is a facilities management tool that enables Physical Plant administrators and the administration of the university to take action(s) necessary to support a program of major repair and/or capital renewal, deferred maintenance, functional improvements, replacements, and disposal of facilities. Also the purpose of this program is to establish maintenance priorities through a continuous process that will extend the useful life of campus facilities and infrastructure, reduce disruptions in the usage of space and equipment, and improve relations between facilities management and the users of the facility. REVIEW This PP/OP will be reviewed in April of each odd numbered year (ONY) by the Associate Managing Director of the Physical Plant (AMDPP) with recommendation for change forwarded to the Managing Director of the Physical Plant (MDPP). POLICY/PROCEDURE 1. General a. The Facility Audit Program will be the responsibility of the AMDPP. The Physical Plant Facilities Coordinator will coordinate all audits and ensure they are performed as scheduled or required with all documentation reflecting an accurate condition of the facilities and campus infrastructure. b. Facilities, infrastructure, and component systems that are the maintenance responsibility of the Physical Plant and funded and supported by Education and General Funds will be audited as a matter of priority. Facilities, infrastructure, and component systems funded and supported by auxiliary or other sources of funding will be audited as requested.

May 7, 2009 Page 2 2. Policy a. An audit will be performed every five (5) years for all Education & General buildings, facilities, and infrastructures. b. The audit program is structured as outlined in the publication, The Facilities Audit, A Process For Improving Facilities Conditions, authored by Harvey H. Kaiser. c. The individual facility component (subsystem) checklist(s) and evaluation form(s) are designed to provide a means by which each component can be assigned a numerical rating. 3. Audit Personnel The appropriate personnel from the various departments of the Physical Plant will perform audits as a team. Other university personnel will be included in the inspection process when deemed necessary. At a minimum, the audit team will consist of the following Physical Plant personnel: Physical Plant Facilities Coordinator Team Leader (Architect/Engineer as assigned by Physical Plant Engineering Services) Architect Electrical Engineer Mechanical Engineer Shop Superintendents Elevator Inspector To ensure a coordinated effort, the Physical Plant Facilities Coordinator will have supervisory authority over Physical Plant personnel performing the audit as well as during the evaluation and presentation of findings. 4. Information Forms Five attachments describe the facility audit process. The attachments are: a. Attachment A Facility Audit System Evaluation Guidelines. This form is used to provide evaluation guidelines for the overall rating of the building and its systems. b. Attachment B Facility Audit Inspection Forms Files. A listing of assigned building systems to be inspected (includes the file location in the audit report.)

May 7, 2009 Page 3 c. Attachment C System Audit Inspection Report Summary (Example). A building roof system audit form is attached as an example of form layout. This form is used to evaluate the roof system of a building being audited (see Attachment B for a list of building systems.) d. Attachment D Facility Audit Report (Example). The team leader will complete this report after receiving notification from the Physical Plant Facilities Coordinator that all inspection forms are complete. e. Attachment E Overall Facility Profile Summary. This form is used to document the overall condition of the building. The Physical Plant Facilities Coordinator will complete this form for each building after the inspection report is complete. The overall building condition rating will be the average of all the building systems rated. 5. Scheduling and Processing Facility Audits No later than the 1st workday of the audit month the Physical Plant Facilities Coordinator will notify the appropriate personnel and provide them with a list of facilities scheduled for inspection. Notification will be via e-mail or written memorandum. 6. Facility Auditor Responsibilities a. The facility auditor will: (1) Review all information on the facility being inspected and make adequate preparations for the inspection. The Physical Plant Facilities Coordinator will be contacted immediately if information is missing/incorrect or if additional information is needed. (2) Conduct the audit with the audit team and complete all required inspection documentation. Take pictures of deficiencies as applicable. (3) Review inspection information with appropriate Physical Plant personnel and consult with them regarding preparation and input of work orders, projects, and/or Capital Improvement Projects. (4) Prepare new Capital Improvement Projects forms if necessary and forward to the Physical Plant Facilities Coordinator. (5) Review the System Audit Inspection Report Summary (Attachment C) for each facility component. Notify Physical Plant Facilities Coordinator when inspection form is complete. Inspection forms and photos should be saved in the building specific folder in the following file location: P:\COMMON\Facility Audit Program.

May 7, 2009 Page 4 b. Facilities Audit Team Leader Responsibilities (1) Acquire master key for building access. (2) Upon notification from Physical Plant Facilities Coordinator that audit inspection forms are complete, prepare the Facility Audit Report (see Attachment D). Report to be completed within one month and prior to next audit. (3) Notify Physical Plant Facilities Coordinator when the report is complete. c. Physical Plant Facilities Coordinator Responsibilities (1) Maintain schedule for facility audits. (2) Make notifications of scheduled audit. Notifications should include audit team members, Director for Engineering Services, Director for BMC, and AMDPP. (3) Furnish the facility inspector(s) with a list of the current Capital Improvement Projects for the facility being inspected. (4) Monitor the progress of the scheduled inspections and ensure satisfactory progress is being made. (5) Review and consolidate inspection information. (6) Notify Team Leader that inspection forms are complete. (7) Complete the Overall Facility Profile Summary (Attachment D). (8) Enter the audit information into the Capital Improvement Projects database and update the next audit date for that particular facility.

May 7, 2009 Page 5 RESPONSIBILITIES POSITION SECTION MONTH Associate Managing Director for Physical Plant Review April (ONY) Approved: Reviewer Approved: Managing Director for Physical Plant