Improving ERP Estimating



Similar documents
Headquarters U.S. Air Force. Building CERs & SERs for Enterprise Resource Planning (ERP)

GAO MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices

Enterprise Resource Planning Systems Schedule Delays and Reengineering Weaknesses Increase Risks to DoD's Auditability Goals

Status of Enterprise Resource Planning Systems Cost, Schedule, and Management Actions Taken to Address Prior Recommendations

Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010

Commercial Software Licensing

ort Office of the Inspector General Department of Defense YEAR 2000 COMPLIANCE OF THE STANDARD ARMY MAINTENANCE SYSTEM-REHOST Report Number

Army Supply Chain: Delivering the Future to the Warfighter

How To Get A Production Line Of A Cloud Based System To Work For A Military

How To Implement An Enterprise Resource Planning Program

Developing Work Breakdown Structures

How To Implement Itil V3

Joint Operational Medicine Information Systems Program

SPAWAR HQ ARCHITECTURE AND HUMAN SYSTEMS GROUP Human-Systems Integration/Systems Engineering Support Performance Work Statement

DEFENSE CONTRACT MANAGEMENT AGENCY PROCUREMENT, DEFENSE WIDE Fiscal Year (FY) 2002 Amended President's Budget

INFLUENCING AND OPTIMIZING BUDGETS AND SPENDING

SENTINEL AUDIT V: STATUS OF

How To Develop A Data Center Cost Model

Total Cost of Ownership

Information Technology

Project Management Planning

Executive Branch IT Reorganization Project Plan

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

FD-101. Electronic Commodity Ordering System (ECOS) & Web Based Supply Chain Management (WBSCM) Todd Griffith FDD Systems Branch May 2008

Using Parametric Software Estimates During Program Support Reviews

Report No. D January 14, Management of the General Fund Enterprise Business System

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

ODIG-AUD (ATTN: Audit Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA

Information Technology

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

PHASE 3: PLANNING PHASE

Introduction. Background. Army Enterprise Resource Planning (ERP) Services Request for Information

WORKFORCE COMPOSITION CPR. Verification and Validation Summit 2010

SECTION I PROJECT SUMMARY (TRW)

PHASE 3: PLANNING PHASE

Department of Defense MANUAL

MHS Health Information Technology Transformation March 1, 2016

GENERAL RECORDS SCHEDULE 3.1: General Technology Management Records

DoD Software Assurance (SwA) Overview

OmegaPS Users Conference A DND Perspective for Equipment Acquisition Projects By: Pierre Demers (pierre.demers@forces.gc.ca)

Department of Defense INSTRUCTION. SUBJECT: Information Assurance (IA) in the Defense Acquisition System

System/Data Requirements Definition Analysis and Design

raytek, Inc. Background Information and Capabilities

Space and Naval Warfare Systems Center Atlantic

UNCLASSIFIED. UNCLASSIFIED Defense Information Systems Agency Page 1 of 9 R-1 Line #131

WBS Development: Rules, Aberrations, and MIL-STD-881C Implementation Challenges

SAMPLE WORK BREAKDOWN STRUCTURES VARIOUS TYPES OF PROJECT

<name of project> Software Project Management Plan

Planning an ERP Implementation Small and Medium Enterprises

Enterprise Resource Planning (ERP) Program: Overview and Status Update

Company A Project Plan

4. Objective. To provide guidelines for IS requirements and LCM support under NMCI.

Best Practices for the Acquisition of COTS-Based Software Systems (CBSS): Experiences from the Space Systems Domain

Review of the Total Information Technology Operations Cost for the Pentagon Reservation and National Capital Region

FOCUS IT CORP. Company Profile & Service Offering

Selected Acquisition Report (SAR)

Software Cost Estimation Metrics Manual for Defense Systems

DEPARTMENT OF VETERANS AFFAIRS VA DIRECTIVE 6517 CLOUD COMPUTING SERVICES

Earned Value Management for Enterprise Resource Planning Implementations

Attachment 7 Requirements Traceability Matrix (RTM) ATMS RFP. New York State Department of Transportation Advanced Traffic Management System

Maximizing the Utility of Your Tool Set for Project Support

Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment

Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report

Appeals Case Management System Project. Scope Management Plan. November 20, 2014

VoteCal Statewide Voter Registration System Project. Master Project Management Plan. Version 1.2

Washington, DC Contract period: to North Star Group, LLC. 600 Maryland Ave SW, Suite 860E

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

System (of Systems) Acquisition Maturity Models and Management Tools

ERA System Development Statement of Objectives

Best Practices for Consolidation Projects

SECTION I PROJECT SUMMARY (TRW)

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

Information Technology (IT) Investment Management Insight Policy for Acquisition

Report of Audit OFFICE OF INSPECTOR GENERAL. Information Technology Infrastructure Project Management A Tammy Rapp Auditor-in-Charge

How To Manage A Help Desk Ticket In An Ipa.Org (Sdfie) Help Desk

Acquisition Decision Memorandum for the Defense Integrated Military Human Resources System

Information Resource Management Directive USAP Information Security Architecture

SERVICES WORK ORDER. Effective date of this Work Order: Work Order Number:

Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger

IBM Maximo for Aviation

UNITED STATES PATENT AND TRADEMARK OFFICE. AGENCY ADMINISTRATIVE ORDER Agency Administrative Order Series. Secure Baseline Attachment

Applying CMMI SM In Information Technology Organizations SEPG 2003

Project Management Planning

Forecast to Industry 2015 External Contracting Opportunities

PERFORMANCE WORK STATEMENT. for. United States Air Forces in Europe (USAFE)/ Air Forces Africa (AFAFRICA)

The Information Technology Program Manager s Dilemma

Information Technology Cost Containment / Reduction Plan

2.3. Performs inventories and ensures timely correction of discrepancies. Inspects and evaluates inventory management activities.

How To Improve The Defense Communications System

PM-LAV Product Data Management Technical Information Architecture. Robert Missig Portal Dynamics, Inc.

Transcription:

Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Improving ERP Estimating in the Department of Defense Dr. Wilson Rosa Max Hodal (Wyle) Brian Kolstad (MCR) Travis Packard Capt Charles Silvanic David Cashin (NCCA) Mike Tran (NCCA) Noel Bishop p( (DASA-CE) June 11, 2010 Approved for Public Release (2010-0371) 1

Overview Overview I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2

Overview: What is an ERP? Enterprise Resource Planning (ERP) software An enterprise software application that t Has a single, integrated database Integrates multiple business functions across an organization onto a single computer system that serves everyone s needs Eases the exchange of data and facilitates communication among departments Each module works separately performing specific data-processing Typically y enabled by Commercial-Off-The-Shelf (COTS) Software (SW) I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3

COTS vs. Custom Overview: ERP vs. Traditional SW Organizational design vs. System design Interconnected Systems vs. Standalone Systems Life ecyce Cycle Differences ee Concept Refinement Concept Decision A B C Technology Development System Development & Demonstration Initial Operational Capbility (IOC) Production & Deployment Full Operational Capbility (FOC) Operations & Support Pre-Systems Acquisition Systems Acquisition Sustainment Pre-Initiation A B C Software & Systems Integration Selection, Project Prep & Blueprinting Configuration & Report, Interface, Conversion, Extension (RICE) Development Transition & Cutover FDDR Go Live Ltd. Deplt /OT&E IOC FOC Sustainment & Roll Out Pre-Systems Acquisition iti Systems Acquisition iti Sustainment t FDDR I n t e g r i t y - S e r v i c e - E x c e l l e n c e 4

ERP Investment Cost Allocation Management 9% Interim Logistics Support 28% Development 38% Deployment 18% Procurement 7% MIL-STD-881 AIS WBS Reference: Management (Government Only)= Program Management (PM), Systems Engineering (SE), Change Management (CM) Development = Prime Mission i Product, Contractor t SE/PM/CM, DT&E, Training i Development, Data, Other Deployment = Site Activation, User Training, Data Migration, Management/Engineering Support Interim Logistics Support = system operations, help desk, system/database administration, deployment hardware software refresh I n t e g r i t y - S e r v i c e - E x c e l l e n c e 5

Cost Body of Knowledge Main Challenges with ERP Estimating Unfamiliar with Cost and Schedule Drivers Limited ERP Cost Research Few white papers found on cost drivers but none provide supporting data Policy and Guidance Limited data to support Program Decision reviews and Weapon Systems Reform Act of 2009 I n t e g r i t y - S e r v i c e - E x c e l l e n c e 6

Cost Improvement Initiative I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7

Recent Developments First-Ever MIL-STD-881 Work Breakdown Structure, Data Dictionary, and Software Resource Data Report for ERP Adopted in recent Cost and Schedule Data Report Plans (CDSR) -- GFEBS, GCSS-Army, ECSS, DEAMS, GCSS-MC, and NAVY ERP ERP Cost Database AFCAA in conjunction with NCCA and DASA-CE have collected empirical cost, schedule, and technical data on 18 ERP programs ERP Cost Toolkit (Sep 10) Empirically-based cost estimating metrics and benchmarks ERP Cost Handbook (Nov 10) Standards, guidelines and rules of thumb for estimating ERP ERP Cost Risk and Uncertainty Metrics (Aug 10) I n t e g r i t y - S e r v i c e - E x c e l l e n c e 8

Acronym AIS Automated Information System BY09 Base Year 2009 CM Change Management COOP Continuity of Operations COTS Commercial Off The Shelf DASA CE Deputy Assistant Secretary of the Army (Cost and Economics) DEAMS Defense Enterprise Accounting Management System DISA Defense Information Systems Agency DT&E Development Test and Evaluation ECSS Expeditionary Combat Support System ERP Enterprise Resource Planning FDDR Full Deployment Decision Review FFRDC Fd Federally Funded dresearch and Development tcenter FOC Full Operational Capability GCSS Army Global Combat Support System Army GCSS MC Global Combat Support System Marine Corps Go Live Also referred as FOC HW Hardware IOC Initial Operational Capability MAIS Major Automated Information System MS Milestone PMP Prime Mission Product LRE Latest Revised Estimate NCCA Naval Center for Cost Analysis OEM OT&E PM PMO RICE SE SE/PM SRDR SW T&E WBS Original Equipment Manufacturer Operational Test & Evaluation Program Management Program Management Office (Government) Report, Interface, Conversion, Extension Systems Engineering Systems Engineering / Program Management Software Resources Data Report Software Test and Evaluation Work Breakdown Structure I n t e g r i t y - S e r v i c e - E x c e l l e n c e 9

Performance Tracker Performance Tracker I n t e g r i t y - S e r v i c e - E x c e l l e n c e 10

Performance Tracker Schedule Growth Actual schedule ranges between 110% and 240% of initial (Milestone B) schedule duration Extends standing army costs (a significant cost) 5 ERP programs I n t e g r i t y - S e r v i c e - E x c e l l e n c e 11

Based on data from 7 ERP Programs Performance Tracker Requirements Growth Growth is measured as percent difference between predicted and actual number of RICE Objects Projects Mean Median Low High Growth in RICE Object Count 7 75.4% 20.0% -13.7% 361.4% I n t e g r i t y - S e r v i c e - E x c e l l e n c e 12

Performance Tracker Historic ERP Cost Growth Actual/LRE vs. Baseline, 2000-2010 2010 Cost Growth Projects Sample Size (Number of Programs) Low Bound Mean High Bound Completed 3 8.4% 96.2% 187.8% Ongoing* 4* 117.6% 229.5% 411.3% Combined 7 8.4% 172.4% 411.3% 1 Investment Phase: Program Insertion through Go-Live *Historical schedule/cost growth beyond 5 year point I n t e g r i t y - S e r v i c e - E x c e l l e n c e 13

Contribution to Cost Growth *Contribution to Cost Growth by Variance Category Misc. 0% Quantity 10% Engineering 9% Schedule 25% Estimating 56% *Investment Phase Only: Program Insertion through Go-Live I n t e g r i t y - S e r v i c e - E x c e l l e n c e 15

Reasons for Cost Growth 1. Estimation: A lack of understanding of the new technology and business environment led to the use of obsolete cost models (1980-1990s) and dubious estimating methods 2. Schedule: limited budgets have forced decision makers to extend the period of performance of Level of Effort related tasks Civilian, Contractor, and Military FTEs 3. Engineering: i Inexperience with Oracle/SAP Customization ti has led to underestimation of requirements. Difficulty changing business processes to match ERP processes 4. Quantity: war-fighter need has led some program offices to reassess user and implementation requirements I n t e g r i t y - S e r v i c e - E x c e l l e n c e 15

Major Costs Major Costs I n t e g r i t y - S e r v i c e - E x c e l l e n c e 16

Major Costs: Background The primary purpose p of any metrics provided is to give the estimator insight into reasonable bounds and benchmarks for program size and cost. The benchmarks in this presentation should not be used for a primary estimating methodology!!! I n t e g r i t y - S e r v i c e - E x c e l l e n c e 17

Major Costs: ERP Work Breakdown Structure WBS ID Level 1 Level 2 Level 3 Level 4 Level 5 1.0 Automated Information System (AIS) 1.1 Automated Information System Prime Mission Product Release/Increment X 1.1.1 Custom Application Software 1..n 112 1.1.2 Enterprise Service Element t1..n 1.1.3 Enterprise Information System 1..n 1.1.4 External System Interface Development 1..n 1.1.5 System Level Integration 1.2 System Engineering 1.3 Program Management 14 1.4 Acquisition Logistics 1.5 System Test and Evaluation 1.5.1 Development Test and Evaluation 1.5.2 Operational Test and Evaluation 1.6-1.7 Training/Data 1.10 Operational/Site Activation 1.10.X Site Type 1 N 1.10.X.1 Deployment Software and Hardware 1.10.X.2 Site Activation 1.10.X.3 User Training 1.10.X.4 Data Migration 1.10.X.5 Management/Engineering Support 1.10.X.6 Interim Logistics Support 110X61 1.10.X.6.1 Systems Engineering/Program Management 1.10.X.6.2 System Operations / Sustaining Engineering 1.10.X.6.3 Help Desk 1.10.X.6.4 System Database Administration 1.10.X.6.5 Deployment Hardware/Software Refresh 1.10.X.6.6 Software Maintenance, 1.10.X.6.7 Follow on Training 1.10.X.6.8-9 Accreditation / Independent Verification and Validation Unpublished MIL-STD-881 References (Final Review Stage): [1] Appendix TBD: Automated Information System Work Breakdown Structure and Definition [2] APPENDIX I: COMMON ELEMENTS WORK BREAKDOWN STRUCTURE AND DEFINITIONS I n t e g r i t y - S e r v i c e - E x c e l l e n c e 18

Practical Cost Metrics: Mapped to ERP WBS Practical Cost Metrics Development Productivity ($/RICE) Size (RICE Objects) Size (External System Interfaces) Size (Business Processes) Program Office Staff (FTE/yr or $/yr) Duration (Years) Procurement / Deployment User Count Migrated Legacy Systems Servers (UNIX and Windows Servers) Operating Locations Training/Test Events Interim Logistics Support / Operations and Sustainment PMO Staff (% Ramp-Down after FOC) Contractor Staff (% Ramp-Down after FOC) Help Desk (Users/FTE) Software License Fees ($/User) System/Database Administration Staff (FTE/Servers) Follow on Training Factor (% of User Training Cost) ERP WBS Reference Development WBS 1.1.3, 1.2-1.4 (contractor only), 1.5.1,1.6-1.7 WBS 1.1.3, 1.2-1.4 (contractor only), 1.5.1, 1.6-1.7 WBS 1.1.4 WBS 1.1 1 WBS 1.2-1.4 (government only) WBS 1.2-1.4 (government only) Procurement / Deployment WBS 1.10.X.1.1 (deployment Software) WBS 1.10.X.4 WBS 1.10.X.1.2 (deployment hardware) WBS 1.10.X.5 WBS 1.10.X.3 Operations and Sustainment WBS 1.10.X.6.1 (WBS 2.1 after FOC) WBS 1.10.X.6.6 (WBS 2.6 after FOC) WBS 1.10.X.6.3 (WBS 2.3 after FOC) WBS 1.10.X.6.5 (WBS 2.5 after FOC) WBS 1.10.X.6.4 (WBS 2.4 after FOC) WBS 1.10.X.6.7 (WBS 2.7 after FOC) Note: Interim Logistics Support (WBS 1.10.X.6) is renamed to Operations and Support (WBS 2.X) after FOC I n t e g r i t y - S e r v i c e - E x c e l l e n c e 19

Major Costs Major Cost Drivers: Development I n t e g r i t y - S e r v i c e - E x c e l l e n c e 20

Major Costs: Development Training Development 7% Development Test and Evaluation 26% Prime Mission Product 41% Contractor PM/SE/CM 26% Average Low High Stdev Prime Mission Product 41% 25% 60% 11% Contractor PM/SE/CM 26% 9% 51% 15% Development Test and Evaluation 26% 9% 43% 11% Training Development 7% 3% 16% 4% I n t e g r i t y - S e r v i c e - E x c e l l e n c e 21

Major Costs: Development Number of RICE Objects Includes Reports, Interfaces, Conversions, Extensions, Workflows, Bolt-On, and Patches Standard ERP Sizing metric Number of Business Processes and Sub-Processes Available early in the acquisition process Metric for complexity and size or as a crosscheck Number of Requirements Metric to determine size or as a crosscheck Number of External Interfaces Metric to determine complexity and size Drives complexity of ERP Development Training Includes Training Development Initial Training costs accounted for in Deployment I n t e g r i t y - S e r v i c e - E x c e l l e n c e 22

Major Costs: Development Mean Median Low High StDev $ per RICE Object (PMP Only) $143K $120K $9K $690K $170K $ per RICE Object (Development*) $400K $255K $20K $1,318K $377K *Development = Prime Mission Product, Contractor SE/PM/CM, DT&E, Training Development, Data, Other I n t e g r i t y - S e r v i c e - E x c e l l e n c e 23

Major Costs: Development Mean Median Low High StDev $ per RICE Object (PMP Only) $143K $120K $9K $690K $170K I n t e g r i t y - S e r v i c e - E x c e l l e n c e 24

Major Costs: Development Mean Median Low High StDev Hours per RICE Object (PMP Only) 700 550 50 3,250 800 Hours per RICE Object (Development*) 2,350 2,300 125 7,250 1,950 *Development = Prime Mission Product, Contractor SE/PM/CM, DT&E, Training Development, Data, Other I n t e g r i t y - S e r v i c e - E x c e l l e n c e 25

Major Costs: Development Government SE/PM (a.k.a PMO) Combination of civilian, military, and support contractors: PM, Systems Engineering, Change Management, and Support Does not include Prime Contractor SE/PM I n t e g r i t y - S e r v i c e - E x c e l l e n c e 26

SIZE METRICS Major Costs: Development Small ERP Programs Medium ERP Programs Large ERP Programs Sample Defined Defined Range Average Sample Range Average Sample Defined Average Range Number of RICE Objects 4 0 200 114 7 201 600 325 3 601+ 1050 Number of Business 3 0 30 18 4 31 60 49 3 61+ 155 Processes Number of Business Sub 3 0 200 129 3 201 400 341 2 401+ 580 Processes Number of Requirements Number of External Interfaces 2 0 750 385 6 751 3,000 1,288 4 3,001+ 6,800 4 0 10 6 3 11 25 18 3 26+ 39 Number of Migrated Legacy 2 0 30 9 1 31 100 65 2 101+ 190 Systems I n t e g r i t y - S e r v i c e - E x c e l l e n c e 27

Major Costs Major Costs: Procurement and Deployment I n t e g r i t y - S e r v i c e - E x c e l l e n c e 28

Major Costs: Procurement/Deployment Operational Test & Evaluation 7% Data Migration 13% Deployment Software and Hardware 43% user Training 24% Site Activation 13% Average Low High Stdev Deployment Software and Hardware 43% 9% 64% 30% Site Activation 13% 9% 16% 4% User Training 25% 15% 41% 15% Data Migration 13% 3% 31% 16% Operational Test & Evaluation 7% 3% 11% 4% I n t e g r i t y - S e r v i c e - E x c e l l e n c e 29

Major Costs: Procurement/Deployment Procurement/Deployment includes: HW purchases, HW upgrades, COTS SW, User Licenses, Rollout, Initial Training, i OT&E and applicable change management Includes Data Migration / Cleansing if migration is done on-site Should not include Hardware Refresh (but frequently does) User License Data http://www.oracle.com/corporate/pricing/technology-price-list.pdf com/corporate/pricing/technology price list pdf http://www.oracle.com/corporate/pricing/sig.pdf http://www.sap.com/solutions/licensingmodel/index.epx Discounts from the OEM (from Supply Management Office or other resources) are frequently available and may be applicable to license refresh rates in O&S I n t e g r i t y - S e r v i c e - E x c e l l e n c e 30

User Count Major Costs: Procurement/Deployment Includes Users and SW Maintainers Useful to calculate COTS licenses, servers, storage space, and size Migrated Legacy Systems provide insight into complexity and scope of the ERP, and is especially helpful in estimating data conversion, data cleansing, and data migration Servers Useful to calculate storage space and amount of data transfers anticipated i t I n t e g r i t y - S e r v i c e - E x c e l l e n c e 31

Major Costs: Procurement/Deployment Operating Locations are a cost driver for ERPs, specifically for Deployment labor, Deployment schedule, training, site activation costs, and travel costs. Note: Due to lack of consistent reporting and varying definitions of Locations, they were not included in this set of metrics Could mean central server locations (including COOP) Could mean bases (or other equivalent) where the ERP is used (Preferred) Site Activation Varies by program and number of operating locations Typically does not require much HW, but is labor-intensive OT&E Data is incomplete or not broken out to specify OT&E I n t e g r i t y - S e r v i c e - E x c e l l e n c e 32

Major Costs: Procurement/Deployment SIZE METRICS Small ERP Programs Medium ERP Programs Large ERP Programs Sample Defined Average Sample Defined Defined Average Sample Range Range Range Average Number of RICE Objects 4 0 200 114 7 201 600 325 3 601+ 1,050 Number of Et External 4 0 10 6 3 11 25 18 3 26+ 39 Interfaces User Count 6 0 5,000 1,890 4 Number of Servers 5,001 15,000 10,800 2 15,001+ 62,000 3 0 50 16 1 51 300 150 2 301+ 486 I n t e g r i t y - S e r v i c e - E x c e l l e n c e 33

Major Costs Major Costs: Operations and Sustainment I n t e g r i t y - S e r v i c e - E x c e l l e n c e 34

Major Costs: O&S Hardware/Software Refresh 5% Follow on Training 2% Software Maintenance 8% Accreditation and IV&V 1% System Database Administration 18% Systems Engineering & Program Management 32% Help Desk 9% System Operations 25% * I n t e g r i t y - S e r v i c e - E x c e l l e n c e 35

Government SE/PM Staffing Ramp-Down (Post-FOC) Average of 4 programs is around 50% Major Costs: O&S The two programs that kept a higher percentage of staff post- FOC had higher RICE Object counts I n t e g r i t y - S e r v i c e - E x c e l l e n c e 36

Major Costs: O&S Recurring COTS License Fees Typically represented as an annual cost based on a percentage (around 20% 30% annually) of the initial purchase cost Initial Purchase Cost price lists http://www.oracle.com/corporate/pricing/technology-price- list.pdf http://www.oracle.com/corporate/pricing/sig.pdf http://www.sap.com/solutions/licensingmodel/index.epx Discounts on Initial Purchase of COTS may be applicable to license refresh rates in O&S I n t e g r i t y - S e r v i c e - E x c e l l e n c e 37

Summary Summary I n t e g r i t y - S e r v i c e - E x c e l l e n c e 38

Schedule growth drives a large portion of cost growth Summary Some of the largest costs in the program are PMO/FMO and System Integrator staffing ( Standing Army costs) Schedule growth has relatively small effect on PMP cost, but the standing army must be kept, greatly increasing the below-the-line costs RICE is a reasonable estimator, if uncertainty is included Very wide variations around the mean The bulk of the costs are in Development and Deployment; Procurement plays a small role DISA / Mega-Center / Database Maintenance costs figure primarily in O&S, and make up a substantial portion of O&S costs O&S Metrics are evolving as ERPs enter that t life cycle phase and generate data I n t e g r i t y - S e r v i c e - E x c e l l e n c e 39

Questions? I n t e g r i t y - S e r v i c e - E x c e l l e n c e 40