Guidelines on Prior Approval (PA) Application to recruit Foreign Workers (Construction)



Similar documents
C-2 Construction, Inc. - NAICS Codes

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

Construction Industry Scheme

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor.

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

CHECKLIST FOR SUBMISSION Construction Productivity Awards - Projects 2015

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Qatar National Construction Standards 2010 Contents

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Tennessee 07/01/14. Contracting Class Codes with Descriptions (8)

American Safety Insurance Company

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

MORE JOB AND TRAINING OPPORTUNITIES FOR LOCALS IN CONSTRUCTION SECTOR

CHARLOTTE COUNTY Community Development Department

CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning

Application Form - Contracting Firm

ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; NMAC Rn & A, 13 NMAC 17.6.

Substantially incomplete submissions will be declined

CONTRACTORS SUPPLEMENTAL INSURANCE APPLICATION

TECHNICAL SCHOOL. Construction. Construction. Build your future the INTEC way

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

Building Condition Assessment Report

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Building Condition Assessment Report

CONSTRUCTION SKILLS REGISTER HANDBOOK

C I T Y O F P E A R S A L L

Long Service Leave. Your obligations as an employer of construction industry workers

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

How To Install An Overhead Sewer

Construction Trades 2015 PROGRAMMEs

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

MAKE CHECK PAYABLE TO MIAMI-DADE COUNTY

Information for Construction Contractors. Terry O Neill Taxpayer Service Specialist

LICENSING OF BUILDERS - Simplified Guide

College of the Siskiyous Insurance Requirements

2. What building projects are exempted? (permit not required)

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES

Construction Technologies Career Field Pathways and Course Structure

Outlook for the construction industry. Part One: BETA monitoring report Joinery ITO August 2013

TD AMERITRADE Park Omaha

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

Capital Expenditure. The common definition of capital expenditure is

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

SEWER BACKUP PREVENTION PROGRAM

Number 34 of 2013 CONSTRUCTION CONTRACTS ACT 2013 ARRANGEMENT OF SECTIONS. 6. Right to refer payment disputes to adjudication.

City of Fort Smith Building Permit Process Frequently Asked Questions

FREQUENTLY ASKED QUESTIONS General Licensing Issues

CHAPTER 2 QUANTITY TAKE-OFF

KIEWIT CM/GC Enabling/Utilities

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List

Botetourt County, Virginia. Frequently Asked Questions

INCIDENCE AND LEVY OF TAX ON WORKS CONTRACTORS, BUILDERS & COLLABORATORS

GENERAL LIABILITY PROGRAM FOR ARTISAN CONTRACTORS

5. Financial requirements The relevant financial requirements in the board s policies.

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Notice to Property Owners

INSTRUCTIONS FOR COMPLETING THE CITY OF GILLETTE CONTRACTOR LICENSE APPLICATION (RENEWAL)

Water Leak 1: Intrusion Policy

Facility Support Services

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Scope of EN Clarification Document

NOTICE TO CONTRACTORS

Home Improvement Contractors New Application. State of Arkansas CONTRACTORS LICENSING BOARD

Construction Contractors

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS

Chapter Four Taxable Services and Contractors

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

In Partnership with. TDIndustries Diplomat Drive Dallas, Texas Phone: Fax: Website: TDIndustries.

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

NAHB PRODUCT DEFINITION

Geotechnical Building Works (GBW) Submission Requirements

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

FORTHE ADMINISTRATION OF CERTAIN HUD-FUNDED ACTIVITIES IN THE UNIFIED GOVERNMENT OF KANSAS CITY, KANSAS AND WYANDOTTE COUNTY

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed

General Contractors/Developers General Liability Application

OWNER/TENANT LETTER OF AUTHORIZATION & INDEMNITY (This form is available online via

GUIDELINE FOR NATIONAL CONTRACTOR REGISTRATION (NCR)

Estimating Database Checklist

Crump Insurance Services

State of Florida Statewide Financial Statements Capital Asset Policy. Introduction

Transcription:

Work Pass Division 18 Havelock Road Singapore 059764 Tel: 6438 5122 http://www.mom.gov.sg mom_wpd@mom.gov.sg Guidelines on Prior Approval (PA) Application to recruit Foreign Workers (Construction) Please read the Guidelines on Prior Approval Application. 1. Prior Approval Application Forms (Page 2 to 5) and the supporting documents should be sent by post to: Construction Permit Section, Work Pass Division, Ministry of Manpower, 18 Havelock Road, Singapore 059764 Please note that incomplete application form and insufficient supporting documents will be rejected. 2. The applicant company must submit the following duly completed forms in its Prior Approval (PA) application: Form 1A & 1B: to be completed by the applicant company Form 1C: to be completed by the main contractor if applicant company is a sub-contractor. The processing time for the PA application is 14 working days after we received it with all the documents in order. The outcome of the application will be mailed to the applicant company. The Work Pass Division (WPD) will not accept new PA application after the completion of the projects. Kindly note that once a PA has been utilised, it will not be returned to the applicant company. 3. In addition to the duly completed application forms, the applicant company must submit: (a) (b) A photocopy of the firm s / partnership s / company s latest Accounting and Corporate Regulatory Authority (ACRA) Instant Information Profile Printout (printed within the last 3 months from the date of application). Construction activity must be reflected as one of the company s principal activities in the printout. A photocopy of the valid Registration certificate issued by the Building & Construction Authority (BCA) or the valid SLOTS (Singapore List of Trade Subcontractors) Certificate issued by the Singapore Contractors Association Limited (SCAL) when applying for PA for NTS workers. Kindly note that under the BCA s Contractor Registration System, the Supply workheads (SY) are not acceptable for PA application. 4. Please note that Form 1B and 1C must be signed only by the director / partner / sole proprietor of the company / Business as registered with ACRA. If a managerial employee is authorised by the director to endorse and sign on Form 1B or Form 1C, the said director must submit an original authorisation letter with a specimen of the authorised person s signature to confirm the arrangement. 5. The applicant s company must be ready to produce the following for this Division s verification when required: (a) (b) (c) (d) A photocopy of the valid Man-Year Entitlement (MYE) Certificate A photocopy of the last 3 monthly CPF Contribution Statements i.e. Form 90 (e.g. A PA application submitted in December 2011 must be accompanied by CPF Contribution Statements for the months of August, September, October 2011) A photocopy of the applicant s company s declarant NRIC or a photocopy of his/her Passport and Embarkation / Disembarkation card if the declarant is a non-singapore Citizen A photocopy of its direct contract or its preceding sub-contractors contracts/ documents for this Department s verification when required. 6. Please note that the applicant company must have a valid CPF account solely for Construction Work Permit application. 7. Should the supporting contract awarded to the applicant s company be terminated at any point in time during the validity period of the Prior Approval, the main contractor must notify the WPD, in writing, to withdraw the Prior Approval immediately.

Work Pass Division 18 Havelock Road Singapore 059764 Tel: 6438 5122 http://www.mom.gov.sg mom_wpd@mom.gov.sg Prior Approval (PA) Application to recruit Foreign Workers (Construction) This form may take you 15 minutes to fill in. You will need the following information to fill in the form: The company s CPF Submission No. and Registration No. (ACRA) The MYE certificate number The expiry date for SLOTS and BCA certificate The details of the project / contract Note: Please refer to the guide on page 1 before completing Form 1A, 1B and 1C. Form 1A Part 1 Applicant Company s Particulars (applicant company must complete Form 1A and 1B) Company s CPF Submission Number: Company s Registration Number (ACRA): Company s name: Company s address: SLOTS registered contractor: Yes No Expiry Date: BCA registered contractor: Yes, please indicate highest Grade No: No BCA Builder Licence Yes No Date of BCA contractor s Registration Certificate expiry: Telephone: Fax: Part 2 Sub-contract Details (Only to be completed if the applicant is a Sub-contractor of the project) Name of the company awarding contract to applicant company: *Project Duration: From *Project Value S$: to *to follow the duration and value stated in the sub-contract Part 3 Type of Prior Approval Applying For Please submit separate PA applications for Non-Traditional Source (NTS) and People s Republic of China (PRC) workers respectively. Man-Year Certificate number: Source of Workers (please tick): NTS (Bangladesh, India, Thailand, The Republic of the Union of Myanmar, Philippines or Sri Lanka) PRC 2

Form 1A Prior Approval (PA) Application to recruit Foreign Workers (Construction) Please the appropriate box. One-Year Work Permit Number of New workers: (a) [Number of Man-Years (g) Number of Renewal workers: (b) Number of Transfer workers: (c) for one-year Work Permit] (g) = (a + b + c) x 1 year Two-Year Work Permit Number of New workers: (d) [Number of Man-Years (h) Number of Renewal workers: (e) Number of Transfer workers: (f) for two-year Work Permit] (h) = (d + e + f) x 2 years Total number of Man-Years to be deducted from the Main Contractor = (g + h) For Official Use:- 3

Form 1B - to be completed by Applicant Company Part 4 Declaration by Applicant Company 1) I,, in my capacity as (Name of Person making Declaration) (Designation in Company) of, hereby declare that my project as a (Name of Applicant Company) main contractor / sub-contractor with sub-contract details stated in Part 2 of Form 1A is on-going and has not been terminated by the owner / developer or any third party concerned. 2) I declare that the above Prior Approval application (in Form 1A) made by my company is meant for the recruitment of Foreign Workers for the purpose of the mentioned project / sub-contract. My company is engaged in the construction works, and we will comply with all the Conditions and Regulatory Conditions of Work Permit and the provisions of the Employment Act. I also hereby undertake to comply with the requirements under the SEC Scheme for new NTS/PRC workers. I understand that failure to comply with the conditions, provisions and requirements will affect my company s present and future Work Permit applications. The Controller of Work Passes also reserves the right to revoke Work Permits issued if the Work Permit conditions are not complied with or the documents submitted in supporting the applications are not valid. 3) I further declare that my company is engaged in one or more of the construction activities listed in Annex A of this document and all the NTS/PRC construction workers employed by us shall be engaged solely in these construction activities and at our construction sites. Name of declarant: NRIC/Foreign Identification Number (FIN) of declarant: Signature of declarant: Date of endorsement: Applicant s company s stamp: This document is to be signed by the Director / Partner / Sole Proprietor of the Company / Business as registered with the Accounting and Corporate Regulatory Authority (ACRA). The date of all signatures in the application form must not be more than one month from the time of submission. Application without the date of endorsement will be rejected. 4

Form 1C to be completed by the Main Contractor Part 5 For Applicant Company which is not the Main Contractor Declaration is to be given by the main contractor providing the Man-Year Entitlement. Name of main contractor: Address of main contractor: CPF Submission Number: Telephone: Fax: Confirmation of Support and Declaration by Main Contractor 1) I,, in my capacity as (Name of Person making Declaration) (Designation in Company) of hereby declare that my (Name of Main Contractor) company is the main contractor of this project and supports the application for the Prior Approval submitted by, whom has been awarded a (Name of Sub-contractor/ Applicant s Company) contract by to work on the project (Name of Company awarding contract to Sub-contractor/ Applicant s Company) stated in Part 2 of Form 1A, and the latter is a bona fide Sub-contractor for the project. My company understands that with this support, the sub-contractor / the applicant company will be given number ( a + b + c ) of Foreign Workers on one-year Work Permit, number ( d + e + f ) of Foreign Workers on two-year Work Permit, AND number ( g + h ) of Man-Years will be deducted from my company s Man-Year Entitlement Certificate number if the application is successful. 2) The sub-contractor / applicant company is truly engaged in the construction works of this project. My company undertakes to be jointly responsible with the sub-contractor for the Foreign Workers employed by the sub-contractor under this Prior Approval, should they be abandoned by the sub-contractor as a result of the subcontractor defaulting on levy payments leading to the cancellation of the workers Work Permit. Under such circumstances, my company will undertake to accommodate the abandoned workers and find alternative employment for the workers as soon as possible. I understand that if my company fails to do so without valid ground or reasonable cause, my company could be debarred from employing Foreign Workers for 2 years, or such period as may be decided by the Controller of Work Passes. Name of declarant: NRIC/Foreign Identification Number (FIN) of declarant: Signature of declarant: Date of endorsement: Main contractor s company s stamp: This document is to be signed by Director / Partner / Sole Proprietor of the Company/ Business as registered with ACRA. The date of all signatures in the application form must not be more than one month from the time of submission. Application without the date of endorsement will be rejected. The form is updated on 09 Nov 2012. 5

Annex A List of Construction Activities for Employment of NTS/PRC Construction Workers General Building Construction and Civil Engineering Works 1. General Building Works for the construction of structures, including multi-storey car parks, buildings for parks and playgrounds and other recreational works, industrial plants and utility plants. Scope of work includes addition and alteration of works on buildings involving structural changes and installation of roofs, as well as interior and exterior renovation works (see Appendix 1 for list of trades). 2. Civil Engineering Works involving concrete, masonry and steel in bridges, sewers, culverts, reservoirs, retaining walls, canals, drainage systems, underground structures, cutting and fitting of embankments, river banks, excavation of deep trenches, scraping of sub-soil, surface drainage works, flexible pavements, rigid pavements or laterite roads, bus bays, open car parks, bridges, tunnels, viaducts, elevated highways and related works such as kerbs and footways. 3. Waterproofing of basement, roofs and walls. 4. Erection of perimeter fences and gates. 5. Concrete repairs which encompass the reinforcement of structures and joints through the use of cement-sand-mortar mix, the injection of slurry into the joints and cracks in concrete structures and the application of spraying of cementsand-mortar onto surfaces of reinforced concrete works. 6. Repainting and minor non-structural repair of buildings and existing structures. Roadworks 7. Marking and painting of roads. 8. Laying asphalt. 9. Laying underground pipes and the subsequent reinstatement of roads and other surfaces. 10. Installation of underground cables and subsequent reinstatement of roads and other surfaces. Specialised Installation Activities 11. Installation of integrated signposting systems for complexes, airports and shopping centres. 12. Installation of cold rooms and ventilation systems. 13. Installation of microprocessor or computer based control systems, such as Integrated environmental control, fire and security computer control systems and industrial process control systems. 14. Installation of communications system, such as Intercom and wireless radio and security systems, such as CCTV, security alarms, car park security control and card access system. 15. Installation of Central Antenna Television (CATV) systems. 16. Installation of electrical based systems such as switch gears, transformers and large generators, including. electrical installations in buildings. 17. Installation of fire alarms, fire prevention and fire protection systems. 18. Installation of low-tension and and high-tension overhead wires and poles for overhead cable and street lighting. 19. Installation and commissioning of lifts, escalators and travelators. 20. Installation of mechanical plant, machinery, power generators and turbines systems. 21. Installation of aluminium, steel, steel alloy and timber structural components, metal scaffolds and curtain wall. 22. Installation of water and gas pipes, sanitary works and plumbing fixtures. 6

Annex A List of Construction Activities for Employment of NTS/PRC Construction Workers 23. Installation of traffic light systems, and setting-up of signs along roads. 24. Installation of all heavy sheet piles, driven precast reinforced and prestressed concrete piles, bored cast-insitu piles and timber piles. Telecommunication Works 25. Laying of underground telecommunication cables. 26. Laying of underground pipes for the purposes of telecommunications. 27. Wiring work within a building for telecommunication purposes. Earthworks & Soil Sampling cum Classification 28. Excavation and earthmoving works. 29. Collection of or removing earth samples for the purpose of investigation and testing services to determine soil classification, strength and composition and soil stabilisation works such as micro piling, ground anchoring, sand drains and ground grouting. Landscaping Works 30. Provision of landscaping works excluding grass cutting and nursery work. The landscaping works must form an integral part of an on-going Building / Civil Engineering project. Demolition Works 31. General demolition works. Marine Construction Works 32. Works involving marine piling and the construction of marine structures such as jetties, wharves, sea and river walls. Dredging and Land Reclamation Works 33. Works involving the dredging of canals, rivers and offshore waters for the purpose of deepening. Reclamation works are also included. Corrosion Protection Works 34. Corrosion protection work on metal surfaces and structures, including processes such as cathodic, anodic and electrolytic protection. Driving 35. Driving vehicles within construction sites, and shall not include driving vehicles in the course of work on public roads. Fabrication Works 36. Fabrication of structural precast concrete products like slab panels, wall panels, column and beams. 37. Fabrication of prefabricated steel reinforcement products like beam cages and pile cap cages. Caveat: Please note the above items, with exception of Fabrication Works (items 36 and 37), are confined only to work carried out on project sites for the construction of building structures, upgrading and civil engineering works as defined in the section on General Building and Civil Engineering Construction Works. It should however be noted that Non-Traditional Source (NTS) construction workers are not allowed for routine maintenance works. 7

Appendix 1 - List of Construction Activities for Employment of NTS/PRC Construction Workers Construction Trades under Items 1 and 2 are: Brick and block laying and masonry Building electrical installation Bulldozer operation Cable TV wiring installation Ceiling works Concrete floor finishing Concreting Curtain wall installation / cladding Drainlaying Drywall installation Installation work for air-conditioning & ventilation and related ducting Excavator operation Formwork (timber, metalform, system form) Fire sprinkler installation Installation of awning and window shades Installation of solar control films Joinery, carpentry and other woodworks Marble laying Metal scaffolding (erection and dismantling) Painting works Pavement slab & kerb construction Piling operation Plumbing & pipefitting Plastering Precast concrete component erection Precast decorative motif installation Prestressing works Roofing works Railing installation Raised floor installation Gritblasting work on construction sites Steel reinforcement work Structural repair works Structural steelwork/steel fitting Shovel operation Telescopic handler operation Thermal insulation Tiling Waterproofing Welding works Window, door, frame and grill installation The information is updated on 09 Nov 2012. 8