BR Workshop on the efficient use of the spectrum/orbit resource (Geneva, 6 May 2009)



Similar documents
Inmarsat & Global Xpress

Separating Fact from Fiction: HTS Ka- and Ku- Band for Mission Critical SATCOM

Satellite Communication Systems. mgr inż. Krzysztof Włostowski Instytut Telekomunikacji PW

C1 SATELLITE PAYLOAD INFORMATION

Es hail-2 Satellite AMSAT Payload

GUIDELINES ON SATELLITE NETWORK FILING

STANDARDS TO ACCESS AND OPERATE SATELLITE SERVICES

RECOMMENDATION ITU-R S (Questions ITU-R 48/4 and ITU-R 70/4)

Evolution of Satellite Communication Systems

Frequencies for Mars Local High-Rate Links

Contact Information Iris Gateway Satellite Services Ltd Telecommunications Str, P.O.Box CY 1396 Nicosia, Cyprus Tel: ñ Fax: +357

Satellite technology

1 Introduction. 2 Demand for BSS services. Rep. ITU-R BO REPORT ITU-R BO BSS SYSTEMS FOR THE GHz BAND (Question ITU-R 220/11)

Rocket Science Made Simple

C1 Satellite. Payload Information

Not All Bands Are Created Equal

Strategic Review of Satellite and Space Science use of Spectrum. Satellite workshop 3 July 2015

Communication Satellite Systems Trends and Network Aspects

Optimized and Integrated Management of Communications Satellite Transponders

The Importance of the Global C-band Allocation for Satellite Communications Services

SPACE SERVICES WEBSITE SNL AND SNS ONLINE. Xavier Laurenson (BR/SSD/SPR)

REPORT ITU-R BO Broadcasting-satellite service earth station antenna pattern measurements and related analyses

COMMUNICATIONS AND MULTIMEDIA ACT 1998 NOTIFICATION OF ISSUANCE OF CLASS ASSIGNMENTS

Position Paper on Interference in C-band by Terrestrial Wireless Applications to Satellite Applications

THE USE OF THE FREQUENCY BANDS GHz AND GHz BY SATELLITE NETWORKS

Rec. ITU-R F RECOMMENDATION ITU-R F *

MITSUBISHI ELECTRIC ANNOUNCES THE SUCCESSFUL DEVELOPMENT OF AN AIRBORNE Ku-BAND ANTENNA SUBSYSTEM FOR SATELLITE COMMUNICATIONS

Notification of frequency. assignments for updating the. Master Register and Plans

Second International Symposium on Advanced Radio Technologies Boulder Co, September 8-10, 1999

SATELLITE ACCESS PROCEDURES


m Antenna Subnet Telecommunications Interfaces

SYSTEMS OPERATIONS GUIDE. ESOG Module 140 OPERATIONAL MANAGEMENT, CONTROL, MONITORING AND COORDINATION. Issue

DIRECT TO HOME TELEVISION (DTH)

MULTIBEAM EARTH STATION PRODUCT FAMILY MULTIBEAM EARTH STATION PRODUCT FAMILY

sources in our environment i.e. Natural and man-made. The sun, earth and ionosphere are the natural source.

Environmental Monitoring: Guide to Selecting Wireless Communication Solutions

LRS - Application Form PRESIDENT OF THE OFFICE OF ELECTRONIC COMMUNICATIONS

Application Note AN-00126

PROTECTION OF THE BROADCASTING SERVICE FROM BROADCASTING SATELLITE SERVICE TRANSMISSIONS IN THE BAND MHz

Satellite Basics. Benefits of Satellite

GSM frequency planning

BASIS for August 1996 REGULATION

Antennas & Propagation. CS 6710 Spring 2010 Rajmohan Rajaraman

COMMUNICATIONS AND MULTIMEDIA ACT 1998 CLASS ASSIGNMENTS NO. 1 OF 2015

Chapter 4 Solution to Problems

EE4367 Telecom. Switching & Transmission. Prof. Murat Torlak

C-S TEAM. Page 1 of 5

Boost Your Skills with On-Site Courses Tailored to Your Needs

RADIO STATION INSPECTION FRAMEWORK IN UGANDA

TWO-WAY INTERNET OVER ipstar USING ADVANCED ERROR CORRECTION AND DYNAMIC LINKS

GHANA NATIONAL FREQUENCY ALLOCATION TABLE 2013

Satellite Broadband Services

SHARING BETWEEN TERRESTRIAL FLIGHT TELEPHONE SYSTEM (TFTS) AND RADIO ASTRONOMY IN THE 1.6 GHz BAND. Paris, May 1992

INSTALLING A SATELLITE DISH USING TV EXPLORER

Below we provide general comments on the use of the C-band and, more specifically, on the UKE proposals.

Iris Gateway Satellite Services Ltd. Bridging the World

REPORT ITU-R M Rep. ITU-R M (2007)

RECOMMENDATION ITU-R M (Question ITU-R 88/8)

CONSTRUCTING A CONSTELLATION OF 6U SOLAR POWER CUBE SATELLITES

Envistacom White Paper

How To Write A National Radio Plan

Antenna Deployment Technical Brief

CONTENTS. Satellite Fleet. Türksat 2A. Türksat 3A. Türksat 4A. Türksat 4B. Türksat VSAT

Analysis of the US Government and Military Commercial Satellite Market Turbulent Government Contracts Impact Growth

Mobile Communications: Satellite Systems

International Monitoring

Communications COMMUNICATIONS (TELEPORT FACILITY LICENCE) REGULATIONS 2006

TECHNICAL ARRANGEMENT. ON BORDER COORDINATION OF BROADBAND SYSTEMS (UMTS, LTE AND WiMAX) IN THE 900 MHZ BAND

DIGITAL SATELLITE TELEVISION - SPECTRUM MANAGEMENT (PAPER D)

'' EGGBEATER '' ANTENNA VHF/UHF ~ PART 2

SATELLITE COMMUNICATIONS REGULATIONS WORKSHOP

FREQUENCY ASSIGNMENT REQUIREMENTS FOR THE LAND MOBILE SERVICE

Characteristics of terrestrial IMT-Advanced systems for frequency sharing/ interference analyses

ECC/DEC/(04)08 ELECTRONIC COMMUNICATIONS COMMITTEE

Robot Perception Continued

Ka and Ku Operational Considerations for Military SATCOM Applications

A comparison of radio direction-finding technologies. Paul Denisowski, Applications Engineer Rohde & Schwarz

Introduction to RF Engineering. Andrew CLEGG

SATELLITE COMMUNICATION

Satellite Network Designer s Guide

Intelsat General s Broadband Solution for Government Airborne Applications

General GPS Antenna Information APPLICATION NOTE

Radio. Navigation. Satellite. Service. ITU Progress Report BR,, Space Department. Attila MATAS, ITU-BR. (After the 7 th RES-609 meeting)

REPORT ITU-R SM.2092 *

ANALOG SATELLITE COMMUNICATION : Introduction, Base band analog (Voice) signal,

Pre-4th Mission Idea Contest, 3 rd UNISEC Global Meeting 4 July 2015, Takeda Hall, Asano Campus University of Tokyo, Japan

3-5 Ka-band High Power Multi-port Amplifier (MPA)

THE EUTELSAT QUANTUM CLASS SATELLITE

Western Washington Amateur Relay Association

Migration for Fixed Satellite Station in C-Band from Measat 1 to Measat 3

OPTIMIZING A GLOBAL SATELLITE CONSTELLATION FOR AIS AND MARITIME DOMAIN AWARENESS ABSTRACT BACKGROUND

Model Rules for License-Exempt White Space Devices

Introduction to Inmarsat and the Global Xpress Ka Band System

Transcription:

BR Workshop on the efficient use of the spectrum/orbit resource (Geneva, 6 May 2009) Spectrum inefficiencies resulting from the claimed use of steerable beams, multiple beams or large coverage area beams for the Notification of 14/13/12/11GHz-band FSS satellite networks Author: Dr. Richard J. Barnett Telecomm Strategies Inc. 1 Introduction This document provides data and associated analysis to demonstrate the gross inefficiencies in the use of scarce 14/13/12/11GHz-band (referred to hereafter as Ku-band ) spectrum that results when FSS satellite networks are Notified (under Article 11) as having beams whose coverage area far exceeds the actual service area capability of the satellite. When such networks are entered into the ITU s Master International Frequency Register in this way they become a permanent obstacle to other satellite networks, at nearby orbital positions, that may wish to provide service to an area that is geographically far removed from the actual service area of the previously Notified satellite. This can result in vast areas of the Earth being deprived of satellite coverage from nearby orbital locations when in fact there would be no unacceptable interference in practice. 2 Actual satellite coverage is limited by technology and economics In reality the actual service area from a typical Ku-band FSS satellite is limited by technical and economic factors. Although, in principle, a satellite could be built with the capability to provide service simultaneously over the entire visible Earth, this is rarely done in practice. A large antenna beam coverage in and of itself is not a problem, but the power needed to transmit into such a large coverage antenna would be excessively high if normal Ku-band e.i.r.p. levels are to be provided. So a satellite designer normally optimizes the beam coverage such that the satellite transmits its available power only over the geographic area that it intends to serve. Typically, this results in the actual satellite beam coverage being a small fraction of the actual visible Earth. a. Typical e.i.r.p. service levels for Ku-band FSS satellites Over the years the typical e.i.r.p. performance levels required from Ku-band FSS satellites has increased in keeping with the trend of reducing earth station sizes. Early Ku-band satellites achieved edge-of-coverage e.i.r.p. levels in the mid 30 s to low 40 s depending on the size of the beam coverage, and used travelling wave tube amplifiers ( TWTAs ) in the range of 20 Watts. These days TWTAs in the 100 to 150 Watt range are the norm and this gives an increase of 7 to 9 db compared to the use of 20 Watts, resulting in a corresponding increase in e.i.r.p. levels, assuming the same beam coverage area, with edge-of-coverage e.i.r.p. levels in the high 40 s to low 50 s. These e.i.r.p. levels are high enough to provide good service to relatively small earth station antennas (upwards of 50cm), and are

- 2 - regularly used for one-way DTH (Direct-To-Home) services as well as two-way VSAT type services. Most Ku-band FSS satellite operators today provide edge-of-coverage e.i.r.p. levels of at least 50 dbw as demonstrated further below. b. Trends in TWTA power levels There has been a significant trend over the past 20 years of increasing TWTA power levels for communications satellites. This was partly spurred on by the need to implement effective Ku-band direct broadcast satellites, which required ideally several hundred Watts per TWTA to provide the necessary e.i.r.p. levels. In the 1980 s it appeared that Ku-band TWTAs in the 240 Watt, or even 450 Watt range would be feasible, but the developments of even the 240 Watt TWTAs ran into problems in terms of TWTA reliability. For this reason the current maximum TWTA power level regularly used in Ku-band satellites is on the order 150 Watts. When higher transponder e.i.r.p. levels are required, as is the case for direct broadcast satellites, two or three such TWTAs are phase combined to produce up to 450 Watts per transponder. This technique is expensive and additional losses are introduced by the power combining elements. For this reason most FSS Ku-band satellites do not implement such combining and are therefore limited to around 150 Watts, or in some cases less, per transponder. c. Typical beam coverage for Ku-band FSS satellites In order to achieve the edge-of-coverage e.i.r.p. levels mentioned in the sections above (typically low 50 s), while limited to the available TWTA power level of 150 Watts, the antenna must provide a certain minimum gain. A typical e.i.r.p. budget is given in Table 1 below. This shows that the minimum edge-of-coverage antenna gain needs to be greater than 30 dbi to achieve the required e.i.r.p. performance. TABLE 1 Typical Ku-band FSS e.i.r.p. budget Parameter Value Units TWTA saturated output power 150 Watts TWTA saturated output power 21.8 dbw Post-TWTA losses 2 db Available output power to antenna 19.8 dbw Antenna peak gain 33.2 dbi Antenna edge-of-coverage gain 30.2 dbi e.i.r.p. at beam peak 53 dbw e.i.r.p. at edge-of-coverage 50 dbw

- 3 - An antenna beam with this gain performance will inevitably only be able to cover a relatively small portion of the visible Earth. To put this in perspective, from the geostationary orbit, a beam that provides full Earth coverage has a peak gain of less than 19 dbi and an edge-of-coverage gain of typically 17 dbi. This is almost a 15 db shortfall compared to the required 30+ dbi edge-of-coverage gain necessary. This means that a beam with 30 db edge-of-coverage gain will only be able to cover approximately one twentieth of the visible Earth s surface. The effect described above is illustrated in Figure 1 below where a shaped beam over Europe achieves a peak gain of approximately 33 dbi and an edge-of-coverage gain of 30 dbi. Note the vast geographic areas that are unserved by this beam, and which could be served by a nearby, or even collocated, satellite, without creating a mutual interference situation between the two satellite networks. A similar situation exists in the Americas where a CONUS beam has similar edge-of-coverage gain as the European beam shown in Figure 1. Figure 1 Example Beam Achieving 30 dbi Edge-Of-Coverage Gain -20 FT -6-2 -4-10 -20 5.00-2 -10-4 -6-20 Theta*sin(phi) in Degrees 0.00-5.00-5.00 0.00 5.00 Theta*cos(phi) in Degrees

- 4 - d. Use of Actually Steerable Antenna Beams It is of course possible to implement satellite antennas that can genuinely steer the beam over the entire visible Earth s surface, or a part of it, but such antennas require relatively complex techniques and result in performance impairments compared to a simple fixed antenna beam. The simplest antenna steering technique is a mechanically steered antenna, where either the antenna reflector or the antenna feed/subreflector, or both, are physically rotated using an antenna pointing mechanism ( APM ). The APM increases the cost and the weight (mass) of the satellite and reduces the reliability of the communications payload. Use of an APM with a large (e.g., greater than 1.5 meter) antenna reflector increases even further the cost/mass burden because of the physical requirements on the APM. Such techniques also degrade the antenna performance if only the reflector is rotated because they effectively move the feed away from the geometric focal point of the reflector. For these reasons, the APM approach is often not implemented and instead a fixed pointed antenna is used. A more advanced antenna steering technique has been used in a limited number of satellites in recent years. This involves using a phased array satellite antenna that can electronically steer the beam over the visible Earth s surface. The drawbacks of phased array antennas are well known and will not be expanded upon here. To date these techniques have not been used in any commercial Ku-band FSS satellites. The antenna beam of a satellite can also be effectively steered if the spacecraft pointing can be biased away from its nominal Earth pointing direction. However, the attitude control systems on geostationary satellites do not permit any significant adjustment of the beam in the north-south direction (i.e., roll bias usually limited to ±0.5 ) even if they can permit more east-west movement (pitch bias adjustment of ±3 ). The above reasons explain why many commercial Ku-band FSS satellites are not implemented with any, or very limited, capability to actually steer their antenna beams. 3 Review of actual vs Notified beam coverage for a sample 18 degree wide arc We have taken a random 18-degree wide segment of the geostationary orbit and assessed the actual beam coverage of the satellites that are currently in use in Ku-band in that orbit arc. This 18-degree arc constitutes one twentieth of the entire global arc. The results of this assessment are given in Table 1 below, where the inconsistencies between actual and Notified beam coverage are highlighted. Note that out of the total of 12 operational satellites in this orbit arc, seven are claiming steerability in their Notification (in some or the entire used spectrum) when in fact such steerability does not exist. In all of these cases the actual fixed beam coverage capability of the satellite is vastly less than the visible Earth, and the estimated percentage is given in Table 1. The land areas (as well as the sea areas) not covered are therefore being denied service by any other satellite networks at or close to these orbital locations because of the inaccurate claims made in the Notification of the satellites in question. Based on this example assessment alone it is estimated that an average of approximately 50% of the world s land mass is being denied satellite service in the Ku-band, averaged across all orbit locations where frequency re-use should be readily achievable (i.e., co-frequency satellites every 3 degrees in the GSO orbit).

- 5 - Table 1 Notified vs Actual Beam Coverage Flexibility for Actual Operational Ku-Band FSS Satellites in a Sample 18 Arc Satellite # Notified Beam Coverage Actual Beam Coverage Capability Estimated % of Visible Land Area Served by Fixed Beam 1 Fixed & Steerable Fixed in 75% of used spectrum Steerable in 25% of used spectrum <5% 2 Fixed & Steerable Fixed <5% 3 Fixed & Steerable Fixed in??% of used spectrum Steerable in??% of used spectrum <10% 4 Fixed & Steerable Fixed <5% 5 Fixed & Steerable Fixed <5% 6 Fixed Fixed 7 Fixed & Steerable Fixed <5% 8 Fixed & Steerable Fixed & Steerable in 100% of used spectrum 9 Fixed Fixed 10 Fixed Fixed 11 Fixed & Steerable Fixed <10% 12 Fixed & Steerable Steerable in 100% of used spectrum 4 Need for regulatory procedures that permit more efficient use of spectrum Before 1997 the Radio Regulations permitted Notified assignments in the MIFR to be made for all the frequency assignments in all frequency bands of a network based on the fact that only one of those assignments was actually brought into use. This situation was changed by WRC97 by the addition of RR 11.44 which now means that only the actual frequency assignments that are brought into use within the permitted time period can become protected assignments in the MIFR. 1 This important change to the Radio Regulations was made to improve the actual usage of the scarce orbit/spectrum resources. The situation regarding the Notification of beam coverage areas is directly analogous to the RR 11.44 situation referenced in the preceding paragraph. RR 11.44 relates to spectrum usage whereas the ideas presented here relate to beam coverage. Both directly impact the efficient use of spectrum. Orbit/spectrum efficiency can only be optimized when the resource is not warehoused by the Notification of satellite characteristics that go beyond what the satellite is actually capable of providing. Therefore, radio regulations and/or rules of procedure need to be developed that require administrations to Notify only the beam coverage that the satellite is physically capable of providing, although not 1 Other changes were made relating to Resolution 49 that effectively made this new rule apply restrospectively to existing Notified assignments in the MIFR.

- 6 - necessarily simultaneously, at the time it is brought into use. A provision similar to RR 11.44, but relating to beam coverage, would help to achieve this.