AC Tech Project Survey



Similar documents
Moisture Mitigation for Concrete Slabs

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

CA-48 TECHNICAL SPECIFICATION

Wecryl Waterproofing System under surfacing supplied by others

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

MOISTURE CONTROL SYSTEMS

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

Division 9. SignaFlor Pad and Pour Flooring System

BRIDGE REHABILITATION. Maintaining and Repairing Existing Structures

SECTION Formatted Specification for the ULTRAFLOR DIAMATIC Topical Polished Concrete System DRAFT

Moisture Testing of Concrete Slabs

Moisture and Resilient Floor Covering

STERI-SOFT HIGH FOOT TRAFFIC, ULTRAVIOLET RESISTANT, URETHANE RESILIENT FLOORING SYSTEM, 1/8 GREEN BUILDING FEATURES TYPICAL APPLICATIONS

BENTLEY ELEMENTS COLLECTION LVT

Vinyl Composition Tile Installation System

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

Concrete Repair. Applications and Procedures

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

SECTION POLISHED CONCRETE FINISHING

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

Metropolitan Builders Association Masonry & Concrete Standard

T R A N S F E R A B L E F U L LY

CHAPTER 3 MOISTURE TESTING

12 POLYURETHANE ADHESIVE (PU 105)

Sample Specification Guideline for Installing a Polished Overlay Using Rapid Set TRU Self-Leveling SECTION POLISHED CONCRETE TOPPING

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

Section Polished Concrete Finishing. Vexcon

SECTION POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

Example Specification for Concrete using Current Building Code Requirements

Epoxy Crack Injection (the basics)

Document Library TS Data Sheet

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

Colorado State University. Durrell Center Roof Repair

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

Carpet Tile Installation Guidelines

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

TECHNICAL REQUIREMENTS AND SPECIFICATIONS

SECTION PLAYGROUND SURFACING TILES

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Installation System. Existing Resilient Sheet Floors

WATERPROOFING OF WET ROOMS

Amendment 1 Preliminary Engineering Report for the City of Salida

Secondary Containment Comparison ATI Ultra COAT vs HDPE

ARDEX GUIDE SPECIFICATION ARDEX PC-T POLISHED CONCRETE TOPPING Part of the ARDEX Polished Concrete System (APCS)

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

Resurfacing Concrete. Page 1 of 5

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

Construction. Pre-Bagged Structural Waterproofing System. Product Description. Product Data. Tests. Form

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

Carl Christ Director of Onsite Services Diamon-Fusion International, Inc. March 19, 2015

Ron Miedema Cement Contractor 1865 Pine Ridge ~ Jenison, MI 49428

SECTION RESURFACING CAST IN PLACE CONCRETE

Advancements in Permeable Pavements

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

SECTION 1 GENERAL REQUIREMENTS

GigaCrete Specification PlasterMax

RECOATING AND RENEWING SPF ROOFING SYSTEMS

Common Perils of Ceramic Floor Tile Systems. Parkway, Suite 220, Plano, Texas 75093; PH (469) ;

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

UBC Plant Operations Asbestos Work Procedures April 2004

UI Procedures for Asbestos Management

PHOENIX Product Data Sheet (Updated on 14-Jan-2012)

Guide Specifications for Maple Flooring Systems

SECTION FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

Daimer s All-About Guide to Carpet Cleaners

Installation PowerPoint for Grasscrete Formers

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Minor Cracks in Horizontal Surfaces

CRACK and JOINT REPAIRS on INDUSTRIAL CONCRETE FLOORS, PAVEMENTS and SECONDARY CONTAINMENT AREAS

PC-Concrete Injectable Concrete Anchoring and Repair System

C. Section TESTING LABORATORY SERVICE.

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

Commercial/Residential Linoleum Sheet Installation System

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Epoxy Floor Coating Problem Solving Guide

SC2000 CEMENT BONDING PROCEDURES

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

International Greenhouse Company

This will also provide you with the knowledge to insure long life for your Investment

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

Suffolk County Department of Health Services. Division of Environmental Quality

Section BUILT UP ROOF (BUR) SPECIFICATION. 3 Coat Protocol. Material Only_10 yr Warranty

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

LATICRETE 290 Premium Floor and Wall Thin-set Adhesive PRODUCT DESCRIPTION

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

RESILIENT TILE FLOORING INCLUDING SOLID VINYL AND LINOLEUM FLOOR TILE

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Transcription:

AC Tech Project Survey PROJECT NAME: DATE: PROJECT SIZE: EST. START DATE: I. Overview Successful projects depend on accurate and detailed information. The AC Tech Approved Applicator must obtain and record as much information about an up-coming, on-going or completed project as possible. This Project Survey will help ensure that all project information is gathered in one document for technical review by AC Tech and all other trades and stakeholders associated with this project. While this is not a legal document, this Project Survey provides information that can help clarify material or procedural issues that may arise before, during or after project completion. This is a living document and project information should be obtained on an on-going basis, from project initiation to project completion. The Approved Applicator should enter information into this document as it becomes available (rather than at project completion), in order to ensure accuracy and solve potential technical issues before they arise. The Pre-Project section (Pages 2 6) must be completed and returned to AC Tech technical staff prior to product application. AC Tech materials applied prior to review and approval by technical staff will not qualify for a warranty. The Post-Project section (Pages 7 & 8) should be completed by an Approved Applicator who was on-site and personally observed installation. A completed Project Survey must be submitted immediately upon completion of product application and prior to submitting a Warranty Request Form. Warranties will not be issued until a completed Project Survey is submitted to AC Tech. This document must be completed in its entirety (use unknown or n/a for fields that are to be left empty) and returned to AC Tech Administrative Staff upon job completion in order to obtain a full material and labor warranty from AC Tech.

AC Tech Pre-Project Survey II. General Project Information (Check all that apply) Private Public Federal Industrial Commercial Residential One Building Multiple Buildings ew Construction Renovation Other: Project Name: Project Address: City: State: Zip: Facility Contact: Title: Phone: Mobile: Fax: Email: Owner: Contact: Title: Address: City: State: Zip: Phone: Mobile: Fax: Email: General Contractor: Project Manager: Title: Address: City: State: Zip: Phone: Mobile: Fax: Email:

Flooring Contractor: Address: City: State: Zip: Contact: Title: Phone: Mobile: Fax: Email: AC TECH-Approved? Y Trained By: Concrete: ew Old Size of Floor (square feet): Building History / Previous Usage: (If known) III. Concrete Information (If more space is needed, please use additional sheet) Age of Concrete: Thickness: Condition of Concrete: Good Fair Poor Other: Type: Slab on Grade Elevated Lt-Wt Other: Existing Cracks: Y Approx. Linear Ft: Cracks: Moving on-moving Control Cuts Expansion Spider Previous Flooring? one Resilient Epoxy Other: Flooring Manufacturer: Flooring Type: Blisters: Y Size: Wet Dry Approx No:

Other Manifestations: Joints Lifted Tiles Brown-Staining Other Notes: IV. Concrete Curing Method (Please make note of any Tilt-Up construction) Concrete Moisture Cured? Y Membrane Cured? Y Type: Silicate Based Curing Compound? Y Type: Chemical Floor Hardener Applied? Y Type: Discussed Core Testing? Y N Recommended Core Testing? Y N Notes: V. Concrete Testing & Test Results (Include all test results & floor of test areas) Moisture Testing (ASTM F1869) Moisture Vapor Emissions Rate (MVER) Testing: Number of test kits applied: High reading: Average: (ASTM F2170) Relative Humidity Testing: Number of probes installed:

High Reading: Average: Core Testing Was Core testing explained & offered to all concerned parties? Y If Not, Why? Core Testing Protocols: Take 2 deep X 3 in diameter short core samples. The first 3 test protocols make up usual battery of testing required to obtain a data set for proper analysis. Petrographic Analysis is not usually performed unless ASR is suspected. 1. Ion Chromatography (IC): Quantify any water soluble salts 2. Infra Red Spectroscopy (IR): Identify possible organic load 3. Energy Dispersive X Ray Analysis (EDXA): Concrete makeup 4. Petrographic Analysis (Thin-Slice): Identifying/confirming ASR (Alkali-Silica- Reactivity) Number of Cores Taken: Bagged and Marked? Y Lab Cores Sent to: Lab Contact: Phone: Lab Job No: Tests Performed: 1 2 3 4 Other: Please instruct lab to send copies of all testing and test results to the AC Tech Technical Staff for data review and analysis prior to the start of any coatings application. Fax: (757) 855-5108 Email: bharrill@actamerican.net

VI. Concrete Slab Parameters (ACI 201: ACI 201.2R-01 Guide to Durable Concrete) Compressive Strength Measured? Y Elcometer Reading: psi (Record Lowest reading) Surface Contaminates or Deficiencies Visible or Observed? Y Stains, Chips, Large Cracks, Gouges, Holes, Not Level, etc. Please Describe: This concludes the pre-project section. All information provided above is accurate and true to the best of the signer s knowledge. Any changes, deviations or errors in the above information or requested information must be listed on a separate sheet and accompany this document. Any information discovered to be falsified or purposely misrepresented at any time may result in the cancellation of any warranty provided or promised for this project or voiding of any warranties supplied by AC Tech for any of its products involved in this project. I acknowledge that the provided information is accurate and true to the best of my knowledge: Date: Signature of Approved Applicator

AC Tech Post - Project Survey VII. Concrete Surface Preparation Shotblast? (With edge grinding) Y ICRI CSP Value Recommended (min. of 3) 3 4 5 Other: CSP Value Achieved: 2 3 4 5 Other: Grinding: AC Tech Approval: Y Machine Type: Other Mechanical Means: Will Concrete Need Additional Repairs? Y Repairs Needed: Concrete Surface Cleaned Properly? Y Excess Shot Removed? Y Swept With Broom? Y Vacuumed? Y VIII. Product Application AC TECH Product Recommended/Used: 2170 2170-FC Zero Oil Buster Combimix SLP CrystalFlex PUR Injection Liquid Floor Other: Spread Rate: Gallons Used on Job: Mixing Instructions Reviewed? Y

Mixer Type: Mix Time: Squeegee / Backroll: Y Notched Mil Squeegee Size: Proper Nap/Type Roller Cover: ⅛" ½" ¾" Other: Dew Point Checked: Y Dew Point (if known): F Slab Temp @ Application: F Air Temp @ Application: F Time Measured: (Slab temperatures must be steady or falling, NOT rising.) Humidity Checked: Y Ambient Humidity: % This concludes the post-project section. All information provided above is accurate and true to the best of the signer s knowledge. Any changes, deviations or errors in the above information or requested information must be listed on a separate sheet and accompany this document. Any information discovered to be falsified or purposely misrepresented at any time may result in the cancellation of any warranty provided or promised for this project or voiding of any warranties supplied by AC Tech for any of its products involved in this project. I acknowledge that the provided information is accurate and true to the best of my knowledge: Signature of Approved Applicator Date: