Feasibility studies and preliminary factory design



Similar documents
Title: Material Tracking in a Food Factory

Zoning requirements for Dairy Suppliers

Solutions for handling raw materials. Food Industry

Food Safety and Quality Management System

166. PROFILE ON SMALL RUMINANT MEAT PROCESSING

BRC Food Safety and Quality Management System. New Issue 7

164,491 SF Food Production Facility Situated on 10 Acres Available in

STANDARD OPERATING PROCEDURE S (SOP S) FOR HAZARDOUS ANALYSIS CRITICAL CONTROL POINT (HACCP) PLANS

A supermarket chain with a social conscience Far Eastern Economic Review, 2003

Agricultural Statistics ANNUAL REPORT OF MILK COLLECTION AND PRODUCTION OF DAIRY PRODUCTS

Swallow Street recycling facts and figures in partnership with Bywaters

südmo systems for the dairy & food industries

Kroger Manufacturing Trailer Seal Policy Revised 09/03/10

Impianti a Contaminazione Controllata Contamination control Systems

Free Examples of plant layout drawing

Logistics Warehouse. Janco Logistics (HK) Ltd. DSC Services

GCC STANDARDIZATION ORGANIZATION (GSO)

UTILITIES DEPARTMENT

How To Get Water In Los Angelesa

PLUMBING & CROSS-CONNECTION CONTROL

TURKISH FOOD CODEX COMMUNIQUÉ ON RAW MILK AND HEAT PROCESSED DRINKING MILK (Communiqué Number: 2000/6)

Name of Business. Record 1- Approved Food Suppliers List

Welcome to the Retail Module.

ATS Overhead Table Shelf System INSTRUCTION MANUAL

Flood Information for Food Businesses

Discharge of Water & Waste from Marine Vessels Standards & Regulations (MARPOL Convention)

ArcticStore. product guide environmentally friendly storage solutions

Artificial Insemination

Tetra Pak. Un pozzo di scienza I.T.I.S. F.Corni

Dry Ice Cleaning. New opportunities with FerroČrtalič d.o.o.

Making the best use of lifting and handling aids

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL

Lesson-13. Elements of Cost and Cost Sheet

CODEX STANDARD FOR MOZZARELLA

UNDERGROUND WASTE STORAGE FACILITY. sharing responsibility. for the future

Facility Self Evaluation Report

This project is financed by the EUROPEAN UNION. HACCP Case study Feta cheese

GUIDELINES FOR IMPLEMTING GMP IN FOOD PROCESSING

WASTE WATER TREATMENT for surface treatment applications

WIBObarrier OCS - Open Containment Systems WIBObarrier CCS - Closed Containment Systems

MILK. Amount Type Function PROTEIN 3.5% High Biological Value Growth of new cells & repair of old /damaged cells

for Dundee Your NEW recycling service What s new What you should recycle Your containers Find out more inside

Water Conservation in the Semiconductor Industry

Address of food business: Orford Place, Norwich, NR1 3QA Date of Inspection: 25 September 2014 Date of revisit: 8 th April 2015

China - Peoples Republic of. Dairy and Products Annual. Annual

Suma Café for better tasting coffee

The Challenge of Integrating Non-Continuous Processes Milk Powder Plant Case Study

MANURE COLLECTION AND TRANSFER SYSTEMS IN LIVESTOCK OPERATIONS WITH DIGESTERS. A. C. Lenkaitis GEA Farm Technologies Inc. (Houle USA), Naperville, IL

TEMPORARY FOOD ESTABLISHMENT EVENT APPLICATION

RFID in Food & Beverage Industry

Questionnaire: Physical-Ergonomic Workplace Evaluation The University of Aarhus 2008

Department: DOC#: 1 REV: Effective Date: Supersedes: New Subject: Raw Milk Cheddar

The Complete KASTO Program: Economic Sawing and Storing of Metal.

CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION

Queen's University Environmental Health and Safety

Preparing Food at Home advice and legal requirements


DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer

TARRANT COUNTY PUBLIC HEALTH DEPARTMENT fax FOOD ESTABLISHMENT REVIEW APPLICATION

Chapter 8 Water and Sewage Systems

&'( ,,( - 0&( .&( WMSD = Work Related Muscular Skeletal Disorder

FOOD HYGIENE & KITCHEN SAFETY

Contents 1.0 FROM THE CHIEF EXECUTIVE 2.0 QUALITY COMMITMENT

Food delivery & storage

FOOD TECHNOLOGY FOR EDUCATION AND TRAINING

Bringing good things ahead

Food Production Methods

THEME: DIRECT, INDIRECT AND INDUCED JOB CREATION

PROFESSIONAL CLEANING : A KEY CONTRIBUTOR TO PUBLIC HEALTH, HYGIENE AND WELLBEING

Ch. 57 MILK AND DAIRY PRODUCTS 7 CHAPTER 57. MILK AND DAIRY PRODUCTS GENERAL PROVISIONS

would your business stay afloat? A guide to preparing your business for flooding

02.11 Food and Nutrition Services

VENDOR APPLICATION FOR TEMPORARY FOOD EVENTS

WASTEWATER TREATMENT OBJECTIVES

Product Code: CP54PB HEAT TREATED GROUND BLACK PEPPER SPECIFICATION.

ACO Cleaning principles for drainage

FOREIGN MATTER MANAGEMENT 36 QUESTION ASSESSMENT

1 OF 6 3. SUBMISSION REQUIREMENTS FOR APPLICATION FOR APPROVAL TO OPERATE A PHARMACEUTICAL BUSINESS

Food Protection Program 2 North Meridian Street Indianapolis, IN

DOSSIER-00 OPTIMA /590

REQUIREMENTS FOR TRADE SHOWS

Replacing a toner cartridge. Removing a toner cartridge. Printing. Using color. Paper handling. Maintenance. Troubleshooting. Administration.

Large Personal Injury Claims by Accident Type (Number)

University of Toronto Office of Environmental Health and Safety Biosafety Containment Level 3

What Is An On-Lot Sewage Disposal System?

Drainage management for the Food Processing Industry

PRODUCTION CONCEPT. Production concept. Centre of purchases. MDI concept vs. traditional production. Turnkey factory. Financial forecasts

ADVANTAGES OF RFID FOR WARRANTY MANAGEMENT AND/OR MAINTENANCE

Contents. Before you begin. Introduction: Organise dispatch operations 1. Element 1: Planning and organising dispatch operations 3

Transcription:

Feasibility studies and preliminary factory design Feasibility NO Return of investment YES Design & Tenders Construction Budget To decide about an investment, the feasibility study is the first step that allows the estimation of the potential risks and the return of the investment in terms of time and income. Based on market research that considers the potential business growth, the competition, the distribution and sales possibilities as well the price levels, the capacity of the factory is estimated. From the capacity of the factory the land can be located and the factory preliminarily designed to obtain the budget cost for the building, and all the related mechanical and electrical plants. The running cost can also be estimated in relation to the production, the location and the services available nearby. Comparing the costs estimated in the previous steps plus the financial costs with the potential income from the sales, the return of the investment can be calculated and if satisfactory the project can start. The final project with tender documents is issued. Suppliers are going to be selected and the quotation checked to comply with the specifications. When the suppliers selection is done construction design can be provided and the works can start up to the testing and commissioning of the whole factory. 10/3/2011 Pertegato Ing. Giancarlo 1

Summarizing: The advising services are provided step by step with the benefit that a wrong investment can be recognized from the beginning minimizing the wasted costs. The cost for the go ahead on any project is the best investment because a project on wrong assumptions or data could be catastrophic Generally speaking the engineering and advising costs can vary between 1.5 and 7.5% of the total investment inversely to the amount (the higher the investment the lower the %) Input Feasibility study Preliminary project and lay-out Investment approval and final project with tender documents issuing Contract with suppliers, construction design and project start up 10/3/2011 Pertegato Ing. Giancarlo 2

Tendering Tendering Three working steps Checking Data Final Data Target Target Needs Checking Preliminary Final Feasibility Project Tenders Tenders Construction Interconnections Interconnections Impact Impact 10/3/2011 Pertegato Ing. Giancarlo 3

Advantages The design in several steps allows to modify the project according to the data acquisition and strategies with minimal impact when changes occur. Any change in the design phase has a costs incomparably lower than in construction phase. Invest in engineering means to minimize changes and modification during construction reducing the wasted costs generated by such changes Some projects are shown in the next slides 10/3/2011 Pertegato Ing. Giancarlo 4

Lanitis Bros. Ltd. TANKER 1 TANKER 2 TANKER 3 TANKER 4 10/3/2011 Pertegato Ing. Giancarlo 5

LIFT RAW MATERIAL BUFFER CANTEEN CANTEEN CANTEEN DRY (UHT) - DRIVE IN DRESSING ROOMS AND TOILETS RAW MATERIAL COLD DRESSING ROOMS AND TOILETS RE-ADJUSTMENT SUGGESTED TO AVOID CROSS CONTAMINATION RAW MATERIAL COLD RAW MATERIAL COLD Raw Material Store for: 1. Straws for TBA 3 and TBA - 19 Prisma 2. Carton Boxes for TBA 3 250/1000 & TBA 19 Prisma (for all different kinds) 3. Schrink for TBA 19 line & TBA 3 line 4. Glue for the carton Boxes and Straws 5. Paper reels for the 3 machines, strip and aluminum strips for the pull tab 6. Chemical liquids for the macines (Peroxide, external Cleaning, Acid, LFT) 7. Trolley for lifting and turning the reels 8. Raw materials needed for Mac Donalds 9. Ready product storage DISPATCHING LIFT 21-FRESH MILK GRAVITY COLD 4 5b ANARI cold store 22-COLD FOR READY PALLETIZED GOODS FOR LOCAL MARKET 4 9-PACKING ROOM 7-COLD h=3.7m h=3.7m BLAST COOLER 4-FOLDING & SALTING U.H.T. FILLING 1-HALLOUMI PRODUCTION h=4.9m MILK FILLING/PAKING 22 10-PACKING IN BOXES h=4.9m h=4.9m 6-BRINING U.H.T. Operator side Vacuum p acked por t i ons ( 3 x 3) D r iv en belt Turning Unit Ex ist i ng bel t co nveyor with C onver ger Q u eui ng conveyor Wei gh -p rice l abe l i ng machine conve yor metal detec tor m ount ed D r i ven con veyor with reject arm Outle tfor di ve rted products Stan dar d out l et D i ver t in g poi nt (option) Mul tivac exit con veyor Separating wal 3-ANARI PRODUCTION 3-HALLOUMI COOKING POWER GENERATOR HV TRANSFORMERS CRATES h=3.7m CRATES WASHING 17-FETTA MATURING 18 16-FETTA PRODUCTION 22 11-KEFALOTIRY 12-KEFALOTIRY 13-KEFALOTIRY PRODUCTION PRESSING 10 BRINING 10 h=4.5m MILK PASTEURIZATION h=3.5m (lowered for technical space) 18-FETTA STORAGE 4 19-HALLOUMI STORAGE 4 15-KEFALOTIRY STORAGE 4 CHEESE PRODUCTION BUFFER TANKS LABORATORY C.I.P. MILK MIXING ROOM 20-DRIVE IN EXPORT CHEESE -18 PROCESSED CHEESE 23-DRIVE IN COLD 4 24-DRIVE IN YOGURT COLD 4 COW 100T COW 100T SHIP 40T GOAT 40T -25 C Store -45 C Freezer YOGURT RIPENING YOGURT BLAST COOLER -1 TANKER 1 TANKER 2 TANKER 3 TANKER 4 LIFT MILK RECEPTION 28-FUTURE PACKED CHEESE DRIVE IN COLD 4 26-24TRADING AND DISPATCHING COLD S 1ST FLOOR (FUTURE PROVISION) 25-FUTURE FRESH MILK GRAVITY COLD 4 WORKSHOP SEWAGE TANKER LIFT 29-DISPATCHING GRAVITY COLD 4 PACKAGING 30-BUFFER COLD 4 UNPACK ROOM 15 RE-PACKING ROOM 15 (CLEAN ROOM) DISPTACHING 15 SLICING TRADING AND DISPATCHING COLD S GROUND FLOOR (FUTURE PROVISION) RECEIVING/DISPATCHING OFFICES AND FACILITIES Christis Dairies Ltd. Limassol Cyprus 2-MOULD WASHING/STORAGE 8-ACCESS FROM BASEMENT 14-KEFALOTIRY MATURING 18 ROW MATERIAL MAIN ELECTRIC BOARD 10/3/2011 Pertegato Ing. Giancarlo 6

Kasih Food Production Co. 10/3/2011 Pertegato Ing. Giancarlo 7