Credits Overview. Slide 1



Similar documents
Operations Unit Custodial Services Staff and Managers/Supervisors who administer the policy.

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

TTU Green Standards. TTU Green Standards

How To Calculate Cost Of An Eco-Friendly Building

Going for LEED Gold: SUSTAINABLE DESIGN IN THE RICHARD IVEY BUILDING

Sika Sarnafil World Class Roofing and Waterproofing

34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory

DuPont Surfaces. Suitable for both horizontal and vertical applications, Corian solid surfaces and Zodiaq

How To Improve A Building

Haworth s Product to LEED Points. LEED - Commercial Interiors

University of Victoria Facilities Management Green Cleaning Policy. Green Cleaning Policy. Purpose:

the sustainability certification program for furniture

LEED GOLD CERTIFIED OFFICE DESIGN AND CONSTRUCTION

Green House, Hungary

Massport Sustainability Design Standards and Guidelines (SDG)

BOMA BESt AND LEED EBOM COMPARISON

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

What Makes A Building Green?

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

LEED for Homes Rating System

Radford University. Indoor Air Quality Management Plan

Operating Sustainable Facilities

The Economics of LEED for Existing Buildings. Michael Arny President, Leonardo Academy

Guide to the (Non-Residential) California Green Building Standards Code. Including changes effective July 1, 2012

LEED Canada EB:O&M existing building operations & maintenance

LEED Documentation Final Report

2010 LEED Application Guide for Multiple Buildings and On-Campus Building Projects (2010 AGMBC)

GREEN SCHOOL DESIGN (Revision no.1, Dated 07/14/2010)

SouthShore HILLSBOROUGH COMMUNITY COLLEGE

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008

City of Portland Green Building Policy. Status Report

LEED CANADA FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS 2009 LEED CANADA FOR CORE AND SHELL DEVELOPMENT 2009 RATING SYSTEM

Mission Statement: To enhance and sustain the spirit of the Vail Valley by providing leadership in educational, athletic and cultural endeavors.

Green Buildings Guidelines for Harvard

Corporate Office Energy Efficiency Initiatives

K12 Healthy Schools Program

Masters Series LEED. Masters Series Contributions to LEED

Introduction to Energy Codes & Green Building Programs

Masters Series Contributions to LEED

Sustainability in construction at Creighton

Green Cleaning Policies and Procedures

CITY OF FERNDALE EAGLE Checklist

Step 2: Define Project Objectives

Environmental Policy March 2012

BCA Green Mark for Restaurants

Robert D. Trimborn Airport Director Santa Monica Airport

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

YR&G. Corporate Sustainability. New York Denver Chicago

Aldrich Hall. LEED Facts. Silver 34* Case Study. Harvard Business School. Aldrich Hall Boston, MA

Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations

BOMA BESt Assessment Overview

CAMPUS LANDSCAPING. Tulane. Ecological Design. February 2000 Prepared by: The Office of Campus Planning Tulane Page 1

Environmental Management Plan

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD

Specification. Indoor Air Quality Management

Dukes of Hazard Activity Time:

Staron, a division of worldwide technology leader Samsung, offers a range of Staron

Managing Floor Drains and Flammable Traps

Sustainable Procurement: Green Purchasing Policies and Guidelines

SAFETY DATA SHEET. Section 1: Identification of the substance/mixture and of the company/undertaking. KaVo Everest ZS-Blanks und Ronden

LEED PRESENTATION OUTLINE

at SCA Tissue green is more than just a color

2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant.

GENERAL SERVICES POLICY STATEMENT

2006 Standard Application Processing Time. 10 months. 14 months

MSHDA Affordable Green Enterprise Green Communities USGBC LEED

Pest Management and Green Building Rating Systems

ASEAN GREEN HOTEL STANDARD

Engineering East Promoting Sustainability LEED Platinum Certified

THE UNIVERSITY OF TEXAS SYSTEM POLICY ON SUSTAINABILITY PRACTICES

GREEN EXISTING SCHOOLS PROJECT MANAGEMENT GUIDE

ASEAN GREEN HOTEL. Audit Checklist

UBC Building Operations Custodial Green Cleaning Program September Contents

Subject: LEED information concerning SpecSeal, EZ-Path and BlazeStop Products

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

The Raleigh Convention Center Raleigh, North Carolina Green Building Education A Self Guided Walking Tour

Transcription:

Slide 1 Innovation & Design Process Credits Overview Credit 1.1: Innovation in Design 1 Credit 1.2: Innovation in Design 1 Credit 1.3: Innovation in Design 1 Credit 1.4: Innovation in Design 1 Credit 2: LEED A.P.* 1 TOTAL 5 * A.P. = Accredited Professional The Innovation in Design credits provide points for projects that incorporate innovative and sustainable building features that go above and beyond the LEED Rating System requirements or categories. There are four points available where project teams can be awarded for exceptional performance in a category of their choice. The second credit specifically is awarded if a LEED AP is included in the project team.

Slide 2 Credits Overview INTENT: To provide design teams and projects the opportunity to be awarded points for exceptional performance above the requirements set by the LEED-NC Green Building Rating System and/or innovative performance in Green Building categories not specifically addressed by the LEED-NC Green Building Rating System. Exemplary Performance: Exceed credit requirements by the next increment Green building topic not covered in the LEED Rating System REQUIREMENTS - In writing, identify the following: intent of the proposed innovation credit proposed requirement for compliance proposed submittals to demonstrate compliance strategies that might be used to meet the requirements Under this credit there are two strategies to receive points. The first type of strategy is to exceed a credit s requirements; called exemplary performance. The second approach is to address a sustainability topic not covered in the LEED Rating System. Both strategies have the same intent and requirements needed for a complete submittal. The resources for possible credits are the CIR database and USGBC news briefs.

Slide 3 Credits Overview: Exemplary Performance Exceed credit requirements by next increment SSCredit 7.1: 100% underground parking WECredit 3.2: 40% water use reduction EACredit 6: 70% building s electricity from renewable sources in 2 year contract MRCredit 2: 95% construction waste recycled EQCredit 8.1: 95% daylighting of spaces Prerequisites are not eligible Not all credits have this capability The list above gives some examples where exemplary performance is allowed for an credit, with the proper percentage increase needed to earn a point. The general rule is that the requirements meet the next increment or double if incremental levels do not exist. An example of doubling the requirements is SS Credit 7.1 where the underground parking requirement is doubled from 50% to 100%. It is important to note that the rule is excused where it is not realistic for projects to meet a 100% threshold such as daylighting and construction waste recycling. In these cases a 95% threshold is sufficient.

Slide 4 Exemplary Alternative Transportation REQUIREMENTS for point: 1. Project must achieve 3 out of the 4 SS Credit 4 subcredits. 2. The extra commitment requirements are met. 3. All commitments are adequately and officially documented. SS Credit 4, Alternative Transportation: SS Credit 4.1, Public Transportation Access SS Credit 4.2, Bicycle Storage & Changing Rooms SS Credit 4.3, Alternative Fuel Vehicles SS Credit 4.4, Parking Capacity Over the course of the LEED-NC program, certain ideas have been used in many projects so that an intent and specific requirements have been created and approved by the USGBC. In essence, they have become fixed credits that have been adapted into other LEED Rating Systems. The alternative transportation plan above followed this process as well as the green building education and green housekeeping credits. The specifics of these credits will not be necessary for the LEED AP test, but showcase different ideas for credits. The first component to meeting the requirements is to achieve at least three out of the four alternative transportation credits in the Sustainable Sites category.

Slide 5 Exemplary Alternative Transportation Extra Commitment Requirements: Implement Guaranteed Ride Home program Install a carpool coordination kiosk or message board Orchestrate carpools with company vans Arrange discounts on Zip or Flex Cars Provide maps of preferred bike routes Subsidize bus and subway passes Encourage alternative work schedule (4 days/week) or tele-working options In addition to meeting three alternative transportation credits, the owner must do all of the above. Any programs that provide travel and subsidized travel passes must have a 5 year or more commitment.

Slide 6 Green Building Education Must do 2 of 3 options: 1) Comprehensive Signage Program: Build signage into the building's spaces to educate the occupants and visitors of the benefits of green buildings Include windows to view energy-saving mechanical equipment Call attention to water-conserving landscape features The education credit is another credit which is not in the LEED Rating System, but that has over time established its own requirements by the USGBC. The intent of the education credit is to provide interactive green building education to the public or interested building professionals.

Slide 7 Green Building Education 2) A Manual, Guidelines, or Case Study: Develop a tool to inform the design of other buildings based on the successes of this project This manual will be made available to the USGBC for sharing with other projects The Green Building Toolkit is an example of a guide to help building professionals go through the process of creating a high performance building. There is information about the economic benefits of green building, how to manage a project in the LEED program, and provides technical resources. Please visit the this resource at www.southface.org.

Slide 8 Green Building Education 3) Educational Outreach Program or Guided Tour: focus on sustainable living, using the project as an example The third option is to create a guided tour, self guided tour, or educational outreach program to the public. A tour synergizes well with signage describing the green building features. Writing a self guided tour that explains all of the building s information is an easy way for walk-ins to learn about the building if a formal tour will not occur that day.

Slide 9 Green Housekeeping INTENT: Reduce exposure of building occupants and maintenance personnel to potentially hazardous chemical contaminants that adversely impact air quality, occupant well-being, and the environment REQUIREMENTS: have in place over the performance period a low-impact environmental cleaning policy addressing: Sustainable building systems Use of chemical cleaning products Use of chemical concentrates and appropriate dilution systems Proper training of maintenance personnel in the hazards, use, maintenance, and disposal of cleaning chemicals, dispensing equipment packaging Use of hand soaps that do not contain antimicrobial agents except where required by health codes and other regulations Use of cleaning equipment that reduced impacts on IAQ Purchase cleaning products that meet the Green Seal GS-37 Standard Green housekeeping practices are an important aspect to a green building. Cleaning products can to harm environmental and human health. Cleaning products have the potential to off-gas volatile organic compounds (VOCs) into the air and contaminating the indoor air quality for occupants. In addition to the problems associated with IAQ, these chemicals harm water systems as they are poured down drains. These toxic substances in our waterways harm wildlife and drinking water quality. The solution to this problem is not to clean our buildings less, but to replace toxic cleaning products with less toxic substances. This change to a low impact environmental cleaning program is a cost-neutral exchange from the conventional cleaning program because green cleaning products are becoming more prevalent in the market. * Purchase products that satisfy the Green Seal GS-37 Standard and create a training program that helps janitorial staff learn the effective use of the new products and procedures implemented in the policy.

Slide 10 Cradle to Cradle Products C2C Product Certification Means: Environmentally safe and healthy materials Design for material reutilization, such as recycling or composting Energy efficiency and the use of renewable energy Efficient use of water, and maximum water quality associated with production Instituting strategies for social responsibility (Life Cycle Assessment) LEED Requirements: Use Cradle to Cradle Certified building materials and products for 2.5% of the total value of all building materials C2C Certification provides manufacturers with a means to measure achievement in environmentally intelligent design and helps customers purchase and specify products that are pursuing a broader definition of quality. Through C2C, product manufacturers implement the sustainable alternatives above and create products that are made with healthier materials and processes and can be turned into another useful product at the end of its life. The authors of Cradle to Cradle suggest changing manufacturing processes to separate biological materials and technical/synthetic materials, because when separated, the waste can be disposed of properly: biological wastes are composted without contaminating the environment and technical/synthetic wastes are designed to be recycled and reused again by industry rather than in a landfill. If a candidate product achieves the necessary criteria, it is certified as a Silver, Gold or Platinum product or as a Technical/Biological Nutrient (available for homogeneous materials or less complex products), and can be labeled as Cradle to Cradle. * For more information about this program it is explained at www.mbdc.com/certified.

Slide 11 Innovation & Design: Credit 2 LEED Accredited Professional INTENT: To Support and encourage the design integration required by a LEED-NC green building project and to streamline the application and certification process. REQUIREMENTS: At least one principal participant of the project team shall be a LEED Accredited Professional (AP). Capabilities of a LEED AP: Manage the integration process Explain credit intents Know reference standards Identify credit synergies Verify that documentation meets LEED requirements Manage credit templates Explain life cycle cost benefits of a LEED project Serve as point person to USGBC A LEED Accredited Professional is a critical player in the project team if the project hopes for LEED Certification. The project will more likely reach the certification goal because the LEED AP is trained and has passed a test in the LEED Rating System. When someone with training, experience, and guidance in the LEED Rating System is on the team it saves time, money and stress in the certification process. LEED accreditation is applicable to architects, contractors, engineers, and any building professionals interested in green building. Prove you are the LEED AP on a project: 1. Provide name and company of LEED AP. 2. Provide brief description of AP s role in project. 3. Provide copy of LEED AP s certificate from the USGBC.