INTERNSHIP TRAINING SCHEME



Similar documents
DIRECTORATE OF ESTATES & FACILITIES

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

PROFESSIONAL PRACTICE

Check. They re Chartered. Chartered Project Managers

POSTGRADUATE CERTIFICATE IN PROFESSIONAL PRACTICE IN ARCHITECTURE

UCD ARCHITECTURE- PROFESSIONAL DIPLOMA (ARCHITECTURE) COURSE INFORMATION 2011/12

APPLICATIONS. UCD School of Architecture Professional Diploma (Architecture) PROGRAMME INFORMATION


Project manager services

SAQA LOGO: QUALIFICATION TITLE Bachelors Degree in Quantity Surveying (NQF level 7) based on Unit Standards. LEVEL: NQF level 7 CREDITS: 360 FIELD:

CONTRACTUAL LIABILITY INSURANCE ENGINEERING CONTRACTORS PROPOSAL FORM

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

A guide to appointing an architect

HANDBOOK FOR THE PART III PROFESSIONAL EXAMINATION

CLIENT / PROJECT MANAGER AGREEMENT

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN

Nottingham Trent University Course Specification

Appendix 18 NEC3 Options

REGULATIONS FOR THE DEGREE OF MASTER OF SCIENCE IN CONSTRUCTION PROJECT MANAGEMENT (MSc[ConstProjectMan])

CONTRACT MANAGEMENT POLICY

To verify the quality of completed Ministry of Health infrastructure projects and make recommendations for contract payments.

Introduction Building project management

David Watkins RIBA Part 3 Course Cost Control and Management

Guide to Procuring Construction Projects

The South African Council for the Project and Construction Management Professions (SACPCMP)

Project Management Handbook "To Understand the Causes of Things"

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Chartered Architectural Technologists: Client information for domestic projects

PROGRAMME REGULATIONS Programme Schedule Bachelor of Construction

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

REGULATIONS FOR THE DEGREE OF MASTER OF SCIENCE IN CONSTRUCTION PROJECT MANAGEMENT (MSc[ConstProjectMan])

Government of the Kingdom of Lesotho. Ministry of Public Works and Transport. Principal Building Agreement

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS. (Ref No. Secy/PPC/CVL/01)

LUONNOS. Client s representatives In contract matters In matters related to project execution

Appendix 23. Sample of Invitation Letter for Submission of Fee Proposal for Acting as a Project Consultant for Maintenance and Improvement Works

A Guide to Small Works. A brief explanation

PROFESSIONAL PRACTICE EXAM 27 MARCH 2014

Initial Professional Development (IPD) - A Guide for Graduates seeking registration

Commercial Management/Quantity Surveying

NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES


Consultancy Services Proposal

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

Briefing document: Understanding the Royal Institute of British Architects (RIBA) Building Contracts. 5 November 2014

Health and safety policy

ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU

EXPRESSION OF INTEREST DESIGN, DOCUMENTATION AND PROJECT MANAGEMENT UNIT COMPLEX - LOT 8955 PALMERSTON

Chiropractic Boards response 15 December 2008

Project Managing TUPE transfers when outsourcing to a Contractor An overview of pension implications and procedures for LGPS Scheme Employers

An owner s guide to the new Building Control Regulations

Programme Specification. Course record information. Admissions requirements. Aims of the course

CONTRACT MANAGEMENT FRAMEWORK

M.Arch (Sem. III & IV) SEMESTER : III 301 :- Project Management III

Engineering Council of South Africa

Regulations for the award of Taught Master s Degrees, Postgraduate Diplomas and Postgraduate Certificates

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26

GUIDELINES FOR INDUSTRIAL TRAINING ECM 598 BACHELOR OF ENGINEERING (HONS) CIVIL FACULTY OF CIVIL ENGINEERING UITM MALAY SIA

Procurement Capability Standards

Calendar DEGREES, DIPLOMAS AND CERTIFICATES AWARDED IN CONJUNCTION WITH THE GLASGOW SCHOOL OF ART

Calendar DEGREES AWARDED IN CONJUNCTION WITH EDINBURGH THEOLOGICAL SEMINARY

Let us help you build your dream home

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS

Work with your prospective supervisors to complete your application.

Calendar DEGREES AWARDED IN CONJUNCTION WITH EDINBURGH THEOLOGICAL SEMINARY

CIOB Awarding Organisation. CIOB Level 4 Certificate and Diploma in Site Management (QCF) Syllabus. October 2013

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows

Calendar DEGREES AWARDED IN CONJUNCTION WITH THE FREE CHURCH OF SCOTLAND COLLEGE

Independent Development Trust JOB DESCRIPTION

Commission for Public Infrastructure & Others

ENGINEERING COUNCIL OF SOUTH AFRICA

POSITION INFORMATION DOCUMENT

Improving the ACT Building Regulatory System

LEGAL INDEMNITY POLICY OF TITLE INSURANCE FOR COMMERCIAL PROPERTY COVERAGE FOR KNOWN RISK

Calendar DEGREES, DIPLOMAS AND CERTIFICATES AWARDED IN CONJUNCTION WITH THE GLASGOW SCHOOL OF ART

CHARTERED ACCOUNTANTS and ASSOCIATE CHARTERED ACCOUNTANTS TRAINING LOG

PROJECT MANAGEMENT GUIDELINES NATIONAL TRANSPORT AUTHORITY

Invitation to Tender

CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED

It is hereby notified that the President has assented to the following Act which is hereby published for general information:-

Your guide to the residential architectural process. A step-by-step guide from Context Architects

Calendar DEGREES AWARDED IN CONJUNCTION WITH SRUC (SCOTLAND S RURAL COLLEGE)

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors

Examination Regulations

REGULATION 5.1 HIGHER DOCTORATES, THE DEGREE OF DOCTOR OF PHILOSOPHY, PROFESSIONAL DOCTORATES AND MASTERS DEGREES BY RESEARCH

LafargeHolcim Ltd. Finance & Audit Committee Charter Review date: July 28, 2015

Rules governing masters studies at the Reykjavík University School of Law

Calendar DEGREES, DIPLOMAS AND CERTIFICATES AWARDED IN CONJUNCTION WITH THE GLASGOW SCHOOL OF ART

1. Regulations for Professional Doctorate Qualifications These regulations apply to all Professional Doctorate degrees at Unitec.

JOB DESCRIPTION ASSET MANAGEMENT OFFICER

Thames Water Utilities Limited. Settlement deed

Certificate in Building Information Modelling (BIM) - Project Management

Transcription:

EAST AFRICA INSTITUTE OF ARCHITECTS INTERNSHIP TRAINING SCHEME (Rules & Guidelines) As Adopted by Council January 26 th 2013 Arusha Tanzania Fee: UGX.2500 KES.85 TZS.1,600 RWF. 650

Table of Contents. Section 1: Objectives & Rules Section 2: Guidance notes for graduate architects. Section 3: How to complete the Practical Training Record. Section 4: Sample Internship Logbook

Section 1: Objectives & Rules Objectives The main objectives of the East Africa Institute of Architects (EAIA) Internship Training Scheme (ITS) are to ensure: i. a harmonized approach to practical training of post qualification graduate architects in the East African Community. ii. iii. iv. that through learning by doing with responsibility in an architectural office, those entering the profession should have a practical understanding of all aspects of professional architectural practice in the Partner States of the East African Community. That graduate architects grasp the importance of their legal and ethical responsibility as arises from the relationship between the architect and all stakeholders. that graduate architects with the appropriate academic knowledge and qualifications are properly prepared to be tested in professional examinations to be sat in any of the Partner States as pre-requisites for formal registration with the respective registration Boards. Rules. 1. The minimum period of internship training is two years, both of which must be after the proper completion of a professional architectural degree course and the award of the appropriate qualification. (can one year after the first tier count?) 2. Internship training shall be under the supervision of a registered, experienced and practicing architect in the East African Community. 3. The Supervising Architect shall present their trainee(s) for the professional exam. This shall be done through a letter of recommendation to the Professional Examination examiner. 4. A period of less than six months continuous duration in an architect s office will not be accepted as part of the required two years practical training. However, if under the circumstances listed below, the trainee is unable to have six months continuous duration in one office, the supervising architect shall second them formally to an appropriate office. i. Force majeure ii. Market Force iii. Illness of the intern, or supervising architect (discretion clause) 5. A Board at its discretion may admit for a professional exam, a trainee with the requisite experience but with less than six months duration in any one office, if such trainee has other

valid reasons out of their control or that of the supervising architect, which constrained the accumulation of the required timeframe. 6. Part-time employment of less than 20 hours per week is inadequate for internship training purposes and is therefore not acceptable as part of the minimum two years practical training. 7. Normal leave should be counted as working time. 8. Freelance work or experience as a principal is NOT acceptable as part of the requisite two years although any such experience is well worth drawing to the Professional Practice Examiner s attention as additional experience. 9. Insofar as internship training work may involve activities other than those set out in the Practical Training Record, the additional activities should be entered in one or more of the five blank spaces in Section 3 of the Record under concise and unambiguous headings. 10. Taught postgraduate courses will NOT count for the purposes of this Scheme. 11. Internship training must be fully recorded on the approved EAIA Practical Training Record sheet. 12. The Practical Training Record must be signed monthly by the Supervising Architect. 13. A supervising architect shall immediately notify the EAIA when they employ or release a trainee in their office.

Section 2: Guidance notes for graduate architects. 1. Links with the Registration Boards / Regulators The status of an internship trainee is that of an employee. However, the Registration Board with jurisdiction over the area in which the intern is employed shall monitor this internship through a member of its staff known as the Internship Training Adviser. The Adviser will keep in touch by various means and may visit the office at least once during the year. The trainee shall take the initiative to: a. Notifying the responsible Registration Board of the office address and any subsequent change, and be assigned an Internship Training Adviser, and b. Send the Practical Training Record sheets to the Adviser for inspection and signature every three months. c. Keep in touch with the Adviser, especially if the trainee thinks that they are not getting the right experience. 2. Planning the practical training. In planning their practical training, the trainee shall bear in mind that the rules and time limits are simply minimums intended to guide the pattern of training that are likely to prove most effective, but it is the Registration Board, or where these powers are delegated, the professional examination examiner, who will decide whether your practical training has been adequate.. 5. The range of professional activities During the minimum two year period the trainee should seek opportunities whenever possible to participate in or at least observe the following activities: a. Meeting with clients, including discussions of the brief, procurement and project drawings. b. Preliminary site investigations, meetings with officers of statutory bodies. c. Preparation or design and production drawings, d. Preparation of specifications and schedules. e. Meetings with contractors, quantity surveyors, other consultants and specialists. f. Pre-contract job management g. contract procedures, h. Correspondence and reports. i. Site visits and inspection of building works j. Site meetings and minute taking k. Post-completion procedures, defects liability inspections and final accounts; and l. Office procedures, programming and organization. Not all these activities are always available in one office, but the trainee should aim to exploit for educational ends the particular kinds of experience which the office is able to provide and to make up the inevitable gaps by working in a contrasting kind of office where they need to. Employment as a technician will not satisfy the requirements of a supervised year in an architect s office under flute 2 of the Scheme. Such employment may, however, be accepted for the first year of practical training if it involves activities appropriate to the Record.

The EAIA Internship Training Scheme expects a trainee to work in a responsible manner as though personally accountable to the client, even though the employer may have the ultimate responsibility..

Section 3: How to complete the Practical Training Record. Guidance Notes to the Trainee. Section 1. Trainee Particulars Enter your own name and that of your employer. Enter the correct period of practical training (e.g. months 1-6, months 7-12, etc.) Enter the calendar month and year. Only one sheet will normally be used for each month. Section 2: Role Enter a tick in line with the appropriate activity listed, and in the column which best indicates your level of involvement (i.e. as an observer gaining experience at second hand, or a participant gaining experience at first hand). Section 3: Activities The Record lists twenty-five activities most generally found in an architect s office, all of which could be covered during the practical training years. Five spaces allow for the entry of special headings to identify additional activities in which you might be involved, especially in associated professional offices. The activities should be defined in a concise, unambiguous way. Section 4: Duration Enter the duration of the activities in line with the description and in the appropriate column. Duration will normally be expressed as hours per, month and will probably be a summary of your diary entries. Activities of less than one hour s duration may be indicated by a tick. The record lists two main categories. Either non-project experience (e.g. office R and D work, administration and organization work, not directly related to one building project) or project experience. The latter is subdivided into the four main phases of a building project. Project phase Pre-design Design Production information Contract administration Plan of work stage A, B C,D,E F,G H,J,K,L,M Section 5: In collaboration Enter a tick in the appropriate column if the activity described was carried out in collaboration with other parties having an interest in the project. The sheet lists client organization, consultant engineer (e.g. structural or services), consultant surveyor (e.g. building, land, quantity) and contractors organizations, as possible interested parties. These is also room to add one additional heading. Section 6: Project details The monthly Record sheet table calls for the total of time spent under various activity headings, without distinguishing the projects involved. To compensate for this it is necessary to write in

details of the projects overleaf. You should give details of building projects (e.g. building type, contract type, value and phase of completion). Section 7: Points of special interest This will normally be an abstract from diary entries and allows entry of a fuller description of the activities for the month. Should there be any peculiar circumstances which affect the activities or if they should have noteworthy points of special interest then these matters should be entered, The entries in this section will be of consideration value to the Professional Practice Examiner and should list problems encountered and responsibilities undertaken. Section 8: Office practical training Supervisor Enter the name of the person acting as your Supervising Architect. The Supervising Architect should be asked to sign the completed sheet at the end of each month, following discussion with you as to your progress. Trainees should be exposed to a wide range of standard documents relating to building and construction activities, contractual issues, construction law, the practice of architecture, architects activities, activities of allied professionals, etc. as published by professional bodies / organisations from within and outside the Partner State. Analysis When you have undertaken sufficient practical training periods, and you are ready to submit your Practical Training Record for the Examination in Professional Practice, complete the analysis sheet. This requires you to enter details of successive employments and also to list any further experience which, although not admissible under the EAIA Internship Training Scheme, will be of interest to Professional Practice Examiners (e.g. pre-course employment in an office, casual employment overseas. postgraduate research, private commissions etc.).

Outline plan of work Stage Purpose of work and decisions to be reached A. Inception To prepared general outline of requirements and plan failure action B. Feasibility To provide the client with an appraisal and recommendation in order that he may determine the form of which the project is to proceed, ensuring that is feasible, functionally, technically and financially. Tasks to be done Set up client organization for briefing. Consider requirements, appoint architect Carry out studies of user requirement, site conditions, planning, design, and cost, etc. as necessary to reach decisions. People directly involved All client interests architect Clients representatives architects, engineers and QS according to nature of project. Stage C begins when the architect s brief has been determined in sufficient details C. Outline To determine general approach to layout, design and construction in order to obtain authoritative approval of the client on the outline proposals and accompanying report. Develop the brief further, carry out studies on user requirements, technical problems, planning, design and cost, as necessary to D. Scheme Design To complete the brief and decide on particular proposals, including planning arrangement appearance, constructional method, outline specification, and cost, and to obtain all approvals. Brief should not be modified after this point E. Detail Design To obtain final decision on every matter related to design, specification, construction and cost. teach decisions. Final design development of the brief full design of the project by architect, preliminary of cost plan and full explanatory report, submission of proposals for all approvals. Full design of every part and component of the building by collaboration of all concerned complete cost checking of designs. All client interests architects, engineers QS and specialists required. All client interests architects, engineers QS and specialists and all statutory and other approving authorities. Architects, QS, engineers and specialists, contractor (if appointed) Any further change in location, size shape, or const after this time will result in abortive work F. Production Information To prepare production information and make final detailed decisions to carry out work. Preparation of final production information i.e. drawings schedules and specifications. Architects, engineers and specialists, contractor (if appointed) Commonly used terminology Briefing Sketch plans Working drawings

G. Bills of Quantities To prepared and complete all information and arrangements for obtaining tender. H. Tender Action Action as recommend in relevant Statutory Procedures J. Project Planning To enable the contractor to programme the work in accordance with contract conditions, brief site inspectorate and make arrangements to commence work on site. K. Operations on Site To follow plans through to practical completion of the building. L. Completion To hand over the building to the client for occupation, remedy any defects, settle the final account, and complete all work in accordance with the contract. M. Feedback To analyze the management, constriction and performance of the project. Preparation of Bills quantities and tender documents Action as recommend in relevant Statutory Procedures Action in accordance with the EAIA Practical training Record Action in accordance with the EAIA Practical training Record Action in accordance with the EAIA Practical training Record Analysis of job records inspections of completed building studies of building in use. Architects, QS, contractor (if appointed) Architects, QS engineers. Contractor client. Contractor, sub contractors Architects engineers, Contractor, contractors, sub contractors, QS, client Architects, engineers contractors, QS, client Architects, engineers, QS contractors, client Site operations Feedback

Section 4: Sample Internship Logbook Practical Training Record. Name of Trainee: Employer: Employer Address: Internship Training Period: Month 1-6 Month 7-12 Month 13-18 Month 18-24 Date: Month: Year: Role: (please tick) Participant Observer Item Areas of Professional Experience Description ACTIVITIES 1 Practice Forms of Association: Benefits and Management extent of liability; taxes 2 Practice Management Office Management 3 Practice Management Job management 4 Procurement Procurement Systems & Procedures 5 Procurement Marketing Strategies & Procedures 6 Procurement Preparation of Expressions of Interest (EOI) 7 Procurement Preparation of proposals 8 Procurement Architectural Competitions 9 Procurement Forms of Contract: Types, procedures & applicability 10 Procurement Contractual Obligations and Responsibilities of the architect 11 Procurement Professional Indemnity Insurance 12 Procurement Architects Fees & Fee negotiation 13 Predesign Brief preparation / development 14 Predesign Site survey / report 15 Predesign Building survey / report 16 Predesign Feasibility Studies 17 Predesign Office programming 18 Predesign Procurement strategy 19 Design Concept development 20 Design Meetings with client/consultants 21 Design Meetings with consultants 22 Design Drawings / reports /models 23 Design Environmental analysis /tests 24 Design Cost awareness and control 25 Design Quality Assurance & Management Duration (Hrs per month) In collaboration with: (Please tick whether its 1. Client organization. 2. Structural Engineer, 3. M& E Engineer 4. Surveyor 5. Contractor s organization 6.Specify other 1 2 3 4 5 6

26 Legal Statutory Consents / Requirements Legal Planning Legislation 27 Legal Environmental Issues 28 Legal Legislation health and safety 29 Legal Regional / International Laws 30 Legal Common law aspects 31 Production Working Drawings 32 Production Detail drawings/ drawn schedules 33 Production Specifications / bills / schedules 34 Production Liaisons with Consultants / specialists 35 Contract Preparation of tender documents 36 Contract Review of tenders 37 Contract Tender action 38 Contract Building Contracts 39 Contract Site handover 40 Contract Project planning and Clerk of Works 41 Contract Inspection / quality management 42 Contract Progress meetings, reports / minute taking 43 Contract Instructions and variations 44 Contract Valuation and certification 45 Contract Extension of time / loss & damages Records / maintenance/health &safety 46 Contract file 47 Contract Site Hand over 48 Contract Dispute resolution 49 Contract As built drawings and documentation Involvement in professional association 50 Other activities 51 Other 52 Other 53 Other 54 Other 55 Other

PROJECT DESCRIPTION NOTES: Project Details: Points of Special Interest to Intern: Office Supervisor s Comments Office Supervisor: Signature: Date: