COPY. General: Corrected any typographical, grammatical, and/or editorial errors.



Similar documents
COPY. SESDPROC-006-R3, Competency and Proficiency Testing, replaces SESDPROC-006-R2

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history.

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history.

Training Guide. An Introduction to Well Drawdown

COPY. Revision History

Water pumps. SQ2 3 / SP1 4 / SP2 4 Complete pump package

CHAPTER 3 PROJECT CONTROL

MINIMUM STANDARDS OF ACCURACY, CONTENT AND CERTIFICATION FOR SURVEYS AND MAPS ARTICLE I. TYPES OF SURVEYS

ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells

TEST PLAN SUPERSEDES: None

Chapter 9. Bonding and Grounding

Interface Level And Point Level Analyzers & Sensors

Global Water Instrumentation, Inc.

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations

Chair: David Kroon Vice-Chair: Chuck Lawrence

PART 1 - INTRODUCTION...

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

TELEDYNE BATTERY PRODUCTS. INSTRUCTIONS FOR CONTINUED AIRWORTHINESS and COMPONENT MAINTENANCE MANUAL. For

Case Study: Groundwater Contamination

REMOTE TELEMETRY UNITS FOR CONTINUOUS WATER QUALITY MONITORING: AN EXAMPLE FROM SILVERSTREAM LANDFILL Mike Millar, Geotechnics Ltd ABSTRACT

Installation and Operating Instructions (for chargers shown below)

Conventional Fire Detection and Extinguishant Control System Specification

Water-Table and Potentiometric-Surface Altitudes in the Upper Glacial, Magothy, and Lloyd Aquifers Beneath Long Island, New York, April May 2010

Model Virginia Map Accuracy Standards Guideline

Practical Alignment Tools and Techniques

Shunt lock function 3066

EDD-600 FLOW TOTALIZER RATE INDICATOR OPERATION MANUAL. P.O. Box Odessa, Texas USA.

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Town House Center Highway North Huntingdon, PA 15642

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

OPL BASIC. Dosing System for Professional Laundry machines. Contents

DIGIPASS Cradle Assembly instructions

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

Doing Inventory Control Right For Underground Storage Tanks

Owner s Manual

Solar Power Systems Models: PVS220W-24 and PVS220W-48 Installation Manual

Recommendations for Marking Communication Facilities with Use of 3M EMS Electronic Markers

NATIONAL FLOOD INSURANCE PROGRAM TRANSITION TO NAVD 88. Elmer C Knoderer, P. E. Dewberry & Davis 8401 Arlington Boulevard Fairfax, VA

I.S :2013 Fire Detection & Alarm Systems

Electronic Flow Switches

Pro-Lift Steel Pile Foundation Repair

Field Application Note

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

SECTION SIGNAL WIRE AND CABLE

SOLAR PV SYSTEM MAINTENANCE GUIDE

SECTION 1 GENERAL REQUIREMENTS

I.S :2013 Fire Detection & Alarm Systems

ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL

SECTION GROUND WATER STORAGE TANKS

Wind Direction Smart Sensor (S-WDA-M003)

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

LOWEST FLOOR GUIDE I. LOWEST FLOOR DETERMINATION

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

NMI R 125 Measuring Systems for the Mass of Liquids in Tanks

Underground Storage Tanks

What is a multimeter?

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

Global Water Instrumentation, Inc.

AMERICAN SOCIETY OF CIVIL ENGINEERS. Standards Writing Manual for ASCE Standards Committees. Prepared by ASCE Codes and Standards Committee

The table below lists the symbols used on the Clamp and/or in this manual. Important Information. See manual.

Conductivity Sensor Calibrations to Meet Water Industry Requirements

Installation and Operating Instructions (for chargers shown below)

4.03 Vertical Control Surveys: 4-1

Index-Velocity Rating Development for Rapidly Changing Flows in an Irrigation Canal Using Broadband StreamPro ADCP and ChannelMaster H-ADCP

theory FTHPL, T-RATED

Straight Talk On Tanks Leak Detection Methods For Petroleum Underground Storage Tanks And Piping

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

ACL 395 Resistivity Meter

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23

Chapter 12 - HYDROLOGICAL MEASUREMENTS

u-traq autopro GPS Vehicle Tracking System Product # 1020-PRO User s Guide Installation and Operating Instructions

Atomic Force Microscope and Magnetic Force Microscope Background Information

SAFETY AND HEALTH PROGRAM

u-traq autopro GPS Vehicle Tracking System Product # 1020-PRO User s Guide Installation and Operating Instructions

Single Station Remote Alarm

Section 6 Fire Detection and Alarm Systems Russell Porteous Chief Executive Officer Firewize Services

DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN VOLUNTARY CLEANUP AND PROPERTY REDEVELOPMENT PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN

Document number RS-PRD Revision 05 Date 20/10/2009 Page 1/30

LOW-VOLTAGE TRANSFORMER QUICK START GUIDE PLANNING GUIDE INSTALLATION GUIDE

2014 NEC Analysis Part 1

Infrared Thermometer Calibration A Complete Guide

Measuring Soil Moisture for Irrigation Water Management

PPB Dissolved Oxygen Measurement - Calibration and Sampling Techniques

METHOD OF TEST FOR SAMPLING AND TESTING CRUMB RUBBER MODIFIER

LST In-Dash Digital Sonar Gauge. Installation & Operation Instructions

This course may be taught by any active TDI Cave Diving Instructor

LOWEST FLOOR GUIDE I. LOWEST FLOOR DETERMINATION

LOWEST FLOOR GUIDE I. LOWEST FLOOR DETERMINATION. Previous Section Table of Contents

Specifications for Residential Property Owners Connection to New Public Sewer

DOSISYS DMC Dosimeters S, X, XB. User's Manual

YSI Meter Protocol: Specific Conductivity, ph, & Dissolved Oxygen

Wilo SP Series Submersible Sump Pumps ECS. ECS ECS ECS Installation and operating instructions

Risk-Based Decision Making for Site Cleanup

Survey Ties Guidelines

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Standards Designation and Organization Manual

Transcription:

Revision History This table shows changes to this controlled document over time. The most recent version is presented in the top row of the table. Previous versions of the document are maintained by the SESD Document Control Coordinator. History SESDPROC-105-R2, Groundwater Level and Well Depth Measurement, replaces SESDPROC-105-R1 Effective Date January 29, 2013 General: Corrected any typographical, grammatical, and/or editorial errors. Title Page: Changed the Author from Don Hunter to Brian Striggow Changed the EIB Chief from Antonio Quinones to Danny France. Changed the FQM from Laura Ackerman to Bobby Lewis. Revision History: In the 3 rd sentence, changed Field Quality Manager to Document Control Coordinator. Section 1.2: Added the following statement: Mention of trade names or commercial products does not constitute endorsement or recommendation for use. Section 1.3: Omitted reference to the H: drive. Changed Field Quality Manager to Document Control Coordinator. Section 1.4: Updated references. Section 2, 1 st bullet: Replaced references to calibration of groundwater level measuring devices to verification of such devices. In the 1 st sentence, updated the language to reflect that devices used to measure groundwater levels will be verified annually against a NISTtraceable measuring tape instead of an Invar steel surveyor s chain. In the 2 nd sentence, added with an allowable error of 0.03 feet in the first 30 feet. Added the last sentence (reference to SESDFORM-043, Well Sounder Function Check and Verification form). Section 3.1, 1 st paragraph, last sentence: Rewrote the sentence for clarity. Added the 4 th paragraph regarding equilibration of water levels. Added new Section 3.3, Special Considerations for Water Level Measurements at Low Groundwater Gradient. Re-numbered following subsections. Section 3.4: Added the 5 th sentence and the last sentence. SESD Operating Procedure Page 2 of 9 SESDPROC-105-R2

SESDPROC-105-R1, Groundwater Level and Well Depth Measurement, replaces SESDPROC-105-R0 November 1, 2007 General Updated referenced procedures due to changes in title names and/or to reflect most recent version. Title Page Changed title for Antonio Quinones from Environmental Investigations Branch to Enforcement and Investigations Branch. Section 1.3 Updated information to reflect that procedure is located on the H: drive of the LAN. Section 1.4 Alphabetized and revised the referencing style for consistency. SESDPROC-105-R0, Groundwater Level and Well Depth Measurement, Original Issue February 05, 2007 SESD Operating Procedure Page 3 of 9 SESDPROC-105-R2

TABLE OF CONTENTS 1 General Information... 5 1.1 Purpose... 5 1.2 Scope/Application... 5 1.3 Documentation/Verification... 5 1.4 References... 5 1.5 General Precautions... 5 1.5.1 Safety... 5 1.5.2 Procedural Precautions... 6 2 Quality Control Issues... 7 3 Water Level and Depth Measurement Procedures... 8 3.1 General... 8 3.2 Specific Groundwater Level Measurement Techniques... 8 3.3 Special Considerations for Water Level Measurements at Sites with Shallow Groundwater Gradient... 9 3.4 Total Well Depth Measurement Techniques... 9 3.5 Equipment Available... 9 SESD Operating Procedure Page 4 of 9 SESDPROC-105-R2

1 General Information 1.1 Purpose This document describes general and specific procedures, methods and considerations to be used and observed when determining water levels and depths of wells. 1.2 Scope/Application The procedures contained in this document are to be used by field investigators to measure water levels and depths of wells. On the occasion that SESD field investigators determine that any of the procedures described in this section are either inappropriate, inadequate or impractical and that another procedure must be used for water level or depth determination, the variant procedure(s) will be documented in the field logbook and the subsequent investigation report, along with a description of the circumstances requiring its use. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. 1.3 Documentation/Verification This procedure was prepared by persons deemed technically competent by SESD management, based on their knowledge, skills and abilities and has been tested in practice and reviewed in print by a subject matter expert. The official copy of this procedure resides on the SESD Local Area Network. The Document Control Coordinator is responsible for ensuring the most recent version of the procedure is placed on the LAN and for maintaining records of review conducted prior to its issuance. 1.4 References SESD Operating Procedure for Equipment Inventory and Management, SESDPROC-108, Most Recent Version SESD Operating Procedure for Field Equipment Cleaning and Decontamination, SESDPROC-205, Most Recent Version SESD Operating Procedure for Logbooks, SESDPROC-010, Most Recent Version US EPA. Safety, Health and Environmental Management Program Procedures and Policy Manual. Region 4 SESD, Athens, GA, Most Recent Version 1.5 General Precautions 1.5.1 Safety Proper safety precautions must be observed when measuring water levels in wells and determining their depths. Refer to the SESD Safety, Health and SESD Operating Procedure Page 5 of 9 SESDPROC-105-R2

Environmental Management Program Procedures and Policy Manual and any pertinent site-specific Health and Safety Plans (HASPs) for guidelines on safety precautions. These guidelines, however, should only be used to complement the judgment of an experienced professional. Address chemicals that pose specific toxicity or safety concerns and follow any other relevant requirements, as appropriate. 1.5.2 Procedural Precautions The following precautions should be considered when measuring water levels and depths of wells: Special care must be taken to minimize the risk of cross-contamination between wells when conducting water level and depth measurements. This is accomplished primarily by decontaminating the sounders or other measuring devices between wells, according to SESD Operating Procedure for Field Equipment Cleaning and Decontamination, (SESDPROC-205) and maintaining the sounders in clean environment while in transit between wells. Water levels and well depths measured according to these procedures should be recorded in a bound logbook dedicated to the project as per SESD Operating Procedure for Logbooks (SESDPROC-010). Serial numbers, property numbers or other unique identification for the water level indicator or sounder must also be recorded. SESD Operating Procedure Page 6 of 9 SESDPROC-105-R2

2 Quality Control Issues There are several specific quality control issues pertinent to conducting water level and depth measurements at wells. These are: Devices used to measure groundwater levels will be verified annually against a National Institute of Standards and Technology (NIST) traceable measuring tape.. These devices should check to within 0.01 feet per 10 feet of length with an allowable error of 0.03 feet in the first 30 feet. Before each use, these devices should be prepared according to the manufacturer s instructions (if appropriate) and checked for obvious damage. All verification and maintenance data should be documented electronically or recorded in a logbook maintained at the Field Equipment Center (FEC) as per the SESD Operating Procedure for Equipment Inventory and Management (SESDPROC-108). The functional check and tape length verification should be performed according to the instructions included in SESDFORM-043, Well Sounder Function Check and Verification, which also includes the form for recording the required information. These devices should be decontaminated according to the procedures specified in the SESD Operating Procedure for Field Equipment Cleaning and Decontamination (SESDPROC-205) prior to use at the next well. SESD Operating Procedure Page 7 of 9 SESDPROC-105-R2

3 Water Level and Depth Measurement Procedures 3.1 General The measurement of the groundwater level in a well is frequently conducted in conjunction with ground water sampling to determine the free water surface. This potentiometric surface measurement can be used to establish ground water direction and gradients. Groundwater level and well depth measurements are needed to determine the volume of water or drawdown in the well casing for proper purging. All groundwater level and well depth measurements should be made relative to an established reference point on the well casing and should be documented in the field records. This reference point is usually identified by the well installer using a permanent marker for PVC wells, or by notching the top of casing with a chisel for stainless steel wells. By convention, this marking is usually placed on the north side of the top of casing. If no mark is apparent, the person performing the measurements should take both water level and depth measurements from the north side of the top of casing and note this procedure in the field logbook. To be useful for establishing groundwater gradient, the reference point should be tied in with the NGVD (National Geodetic Vertical Datum) or a local datum. For an isolated group of wells, it is acceptable to use an arbitrary datum common to all wells in that group, if necessary. Water levels should be allowed to equilibrate prior to measurement after removing sealing caps. There are no set guidelines and appropriate equilibration times can range from minutes to hours depending on well recharge, local geology and topography, and project objectives. 3.2 Specific Groundwater Level Measurement Techniques Measuring the depth to the free ground water surface can be accomplished by the following methods. Method accuracies are noted for each of the specific methods described below. Electronic Water Level Indicators These types of instruments consist of a spool of dual conductor wire, a probe attached to the end and an indicator. When the probe comes in contact with the water, the circuit is closed and a meter light and/or audible buzzer attached to the spool will signal contact. Penlight or 9-volt batteries are normally used as a power source. Measurements should be made and recorded to the nearest 0.01 foot. Other Methods There are other types of water level indicators and recorders available on the market, such as weighted steel tape, chalked tape, sliding float method, air line pressure method and automatic recording methods. These methods are primarily used for closed systems or permanent monitoring wells. SESD Operating Procedure Page 8 of 9 SESDPROC-105-R2

Acoustic water level indicators are also available which measure water levels based on the measured return of an emitted acoustical impulse. Accuracies for these methods vary and should be evaluated before selection. Any method not capable of providing measurements to within 0.1 foot should not be used. 3.3 Special Considerations for Water Level Measurements at Sites with Shallow Groundwater Gradient Groundwater gradients at some sites can be very shallow and if gradient and groundwater flow pattern (gradient direction) determination are part of the project objectives, it is critical that groundwater level measurements obtained from wells are as accurate as possible. Special care should be taken to allow the water level to equilibrate after removing sealing caps and the same sounder should be used for all measurements, if possible. The sounding activity should be coordinated to allow all wells to be sounded within the minimum possible time. This is particularly important in areas with potential tidal influences. 3.4 Total Well Depth Measurement Techniques The well sounder, weighted tape or electronic water level indicators can be used to determine the total well depth. This is accomplished by lowering the tape or cable until the weighted end is felt resting on the bottom of the well. Because of tape buoyancy and weight effects encountered in deep wells with long water columns, it may be difficult to determine when the tape end is touching the bottom of the well and sediment in the bottom of the well can also make it difficult to determine total depth. Care must be taken in these situations to ensure accurate measurements. The operator may find it easier to allow the weight to touch bottom and then detect the tug on the tape while lifting the weight off the well bottom. All total depth measurements must be made and recorded to the nearest 0.1 foot. As a cautionary note, when measuring well depths with the electronic water level indicators, the person performing the measurement must measure and add the length of the probe beneath the circuit closing electrodes to the depth measured to obtain the true depth. This is necessary because the tape distance markings are referenced to the electrodes, rather than the end of the probe. For electronic sounders maintained at the SESD FEC, the sounder reel will be marked with the appropriate additional length identified as the TD adder. 3.5 Equipment Available The following equipment is available for ground water level and total depth measurements: Weighted steel measuring tapes Electronic water level indicators SESD Operating Procedure Page 9 of 9 SESDPROC-105-R2