Course of Construction Questionnaire



Similar documents
Risk Management Guidelines

Fire Safety Log Book

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

A. Fire Protection Plan. B. Access and Parking

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

The terms hazard and risk are often used, which we define as the following:

Health and Safety: A code of practice for Approved Contractors

HOT WORK PERMIT PROGRAM TRAINING. John Braun

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

1. Fire Safety Policy and Responsibilities. Consult the Employer s Fire Safety Policy and establish responsibilities of staff for fire safety.

Safe Operating Procedure

Contract works questionnaire

Flammable and Combustible Liquids. Slide 1 (of 23)

Building contract works questionnaire

HOT WORK PERMIT PROCEDURES

FIRE RISK ASSESSMENT

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Unoccupied Property Insurance Proposal Form

FIRE PREVENTION PLAN

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

Bastille Court 2 Paris Garden London SE1 8ND Telephone: Fax: training@thefpa.co.uk Web:

Unoccupied Property Insurance Proposal Form

OSHA Office of Training and Education 1

27 February To Whom It May Concern. Dear Sirs,

THE QUEEN S COLLEGE OXFORD

NORTH BIRMINGHAM ACADEMY

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

FLA S FIRE SAFETY INITIATIVE

FLAMMABLE LIQUIDS COMPLIANCE NOTE

Property Owners Insurance Proposal Form

FIRE Insurance PROPOSAL / INSPECTION FORM

SITE CONTRACTOR PROCEDURES

EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM

Fire Safety Risk Assessment Checklist for Residential Care Premises

1.0 Purpose Definitions Hot Work Operations. 5

Fire Safety Requirements for Child Care Centre

Fire Risk Assessment For Simple Premises

LANCASTER UNIVERSITY. MANUAL OF SAFETY Section 29 POLICY ON FIRE RISK ASSESSMENTS

Action required (Please tick) If you answered YES, record Action Points at STEP 4

An inventory of hazardous materials used in your workplace will prove useful.

FIRE SAFETY GUIDANCE NOTE Regulatory Reform (Fire Safety) Order 2005

RSA SuppoRt questionnaire

Property Owners Insurance Proposal Form

STCC Contractor/Vendor Rules and Regulations

FIRE SAFETY RISK ASSESSMENT

Fire Risk Assessment Safety Checklist

RESIDENTS FIRE SAFETY INFORMATION PACK

Safety and Health Office WORKPLACE SAFETY CHECKLIST

Wilkins Safety Group

Method Statements. Debenham House, 8 Addison Road, London, W1J 8DJ Debenham House 8 Addison Road Holland Park W14 8DJ.

Please use a separate sheet for each location Date Notes taken / / By. Name of Company: Tel No: Mobile: Contact at Company: E mail Fax:

FIRE RISK ASSESSMENT

Independent Contractor Policy

Notes. Material 1. Appropriate Flammable Liquids

General Fire Code Requirements Within Commercial Tenant Spaces

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

RESIDENTS FIRE SAFETY INFORMATION PACK

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

MARSH BIZSECURE INSURANCE PROPOSAL FORM

Presented by: Rich Perry Marsh Risk Consulting

Contractors and Suppliers Code of Conduct. June 2013

STORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders

How To Write A Fire Risk Assessment

Welding, Brazing & Cutting Guidelines

Town of Horseheads Code Enforcement Vacant and At- Risk Property Registration

WORKING IN CONFINED SPACES GUIDELINES

For use by landlords of small premises Premises Address

16 STEPS TO FIRE SAFETY. Promoting best practice on Timber Frame construction sites, July 2008

PRACTICAL FIRE SAFETY GUIDANCE FOR FACTORIES AND STORAGE PREMISES

Guidance on the use of Marquees, Tents and other Temporary Structures

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

Risk Engineering Guideline

Fire Alarm and Protection Impairment Policy and Procedures

Service Level Agreement/Specification

HealthandSafetyOntario.ca. Introduction. Storage Containers. Storing Flammable Liquids

For use by landlords of small premises Premises Address

RESIDENTS FIRE SAFETY INFORMATION PACK

PRACTICAL FIRE SAFETY GUIDANCE FOR EDUCATIONAL AND DAY CARE FOR CHILDREN PREMISES

Fire Risk Assessment for Simple Premises Guidance Notes

A&E PRACTICE BUSINESS OFFICE PACKAGE APPLICATION

CITY OF LONDON SCHOOL FOR GIRLS FIRE SAFETY, PROCEDURE AND RISK ASSESSMENT POLICY

RISKSTOP CONTROLLING RISKS IN UNOCCUPIED COMMERCIAL PROPERTIES

Safety and Environmental Information for External Companies Koehler Oberkirch

RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE

INSURANCE/ RISK EXPOSURE SURVEY

1.0 APPOINTMENTS 2.0 FIRE RISK ASSESSMENTS

Transcription:

Course of Construction Questionnaire CLIENT DETAILS Broker: Contact: Insured s name: Policy number: Address undergoing works: Insured s contact phone number: 1) Name and address of Contractor: 2) Contractor s Public Liability Insurers: Policy No: 3) Limit of Indemnity: Hot works Certificate no: 4) Contract signed? If Yes, which JCT clause has been agreed? Yes No 5) Is there a Contractors All Risk Policy covering the works and materials? If Yes, who are the Contractors Insurers: (if different from above) Yes No 6) Policy No: (if different from above) 7) Please confirm contract limit that applies: 8) Start date of works: Finishing date: 9) Works Contract value: ( ) 10) Full description of works to be carried out: 11) Do the works include the application of heat? (Give details) 12) Occupancy during works: 13) If unoccupied, who will inspect the property, and how often: 14) What fire protection devices will be in operation during works: 15) What security protection devices will be in operation during works: Chubb Insurance Company of Europe SE UK January 2009

Declaration: I declare that the information given in this questionnaire is, to the best of my knowledge and belief, correct and complete. I agree that the risk information presented to my broker and this questionnaire shall be the basis of the contract between me and Chubb Insurance Company of Europe SE Signature of Insured Date: Brokers please save the completed Quotation form and email or fax to: Existing Business: masterpiece-ukexistingbusiness@chubb.com New Business: masterpiece-uknewbusiness@chubb.com Fax: 020 7956 5982

Guidelines for Broker s regarding JCT Contracts If the Insured has signed a contract relating to the works, within this there will be a section relating to the insurance of the existing structure and the works. Dependant on the contract and the year of the edition which has been used by the contractor, there are two more commonly standard clauses used. Insurance of the works by the Contractor This clause will state that our Insured (referred to as the Employer) will need to maintain responsibility for insurance cover of the existing structure only, with the works, materials and resultant damage being covered by a Contractors All Risks policy (CAR) Insurance in Joint Names with the Insured and Contractor This clause will also require that our Insured (referred to as the Employer) will need to maintain responsibility for insurance cover of the existing structure, but in addition stipulates the Contractors interest is to be placed under our insurance as a Joint Policyholder. This waives Chubb s subrogation rights against the Contractors (as we cannot legally sue our own insured) and any damage caused by the Contractors that is covered by our policy must be met. In addition, under certain clauses, we are also required to cover the works in progress. This greatly increases our exposure as underwriters and any losses made by the Contractor will affect the insureds claims history. Therefore, whenever a client enters into a JCT contract relating to the works it is vital that Chubb retain our subrogation rights against the Contractor. We are not willing to cover works in progress or to amend the policy into joint names. If this clause has already been signed, we ask that the relevant parties agree to amend the contract.

Guidelines for our Policyholders whose properties are undergoing renovations, refurbishments and / or redecoration: During the course of any renovation, refurbishment or redecoration period your property is statistically at a greater risk from factors outside of your control, which may result in a claim being presented under your insurance policy. For this purpose, we have created the following guidelines, which we recommend both our policyholders and the Contractors who have been employed to follow, in order to help minimise the risk of a claim: Do not allow smoking inside the structure by contractors, sub-contractors or visitors to the site. Ensure all Jewellery, Precious Metals, Cash etc. is kept out of sight, preferably in a safe with the safe key kept in a secure place. Move any Furniture, Fine Art, Antiques etc. which may get knocked or damaged, out of the way of the areas being worked on (e.g. sofas, tables, electrical goods, carpets, rugs, pictures and paintings). Ensure your house, car and any safe keys are kept out of sight in a secure place. Where possible, keep doors to your outbuildings locked when not in use and preferably keep any quad bikes and garden machinery locked away, out of sight. If the property is to be unoccupied throughout the works period, we recommend you personally carry out regular site visits and make sure there is an action plan in place to ensure that the property is made secure before being left vacant overnight. We recommended that a nominated individual is given the responsibility for securing the property each night including boarding up where required, securing all door and window locks, setting burglar, fire and /or scaffolding alarms and securing any perimeter fencing. If you supply spare keys to your contractors we strongly recommend that you change the relevant locks once the works are complete, so as to ensure any duplicate copies which may have been made, are ineffective. Ensure your Contractors have placed Fire Extinguishers in the areas which are being worked on, especially so where any hot works involving naked flames or flammable goods are being undertaken.

Guidelines for contractors working on renovations and / or refurbishments: Fire is a real and dangerous risk on a building site. Please help us safeguarding the property by adhering to some simple rules: Avoid portable heaters. Initiate a no smoking policy, to be carried out inside the structure and to be enforced in respect of all visitors and sub-contractors. The fire fighting equipment such as fire extinguishers, hoses, hydrants and emergency water tanks etc. must be readily accessible and must not be obstructed by building materials, equipment or scaffolding. Employees should be shown how to use the equipment. You should draw up your own hot works guide lines based on recommendations by the health and safety authorities, if you plan to do jobs involving cutting, welding, soldering, brazing, grinding and the use of any equipment producing a naked flame. Hot works should not be undertaken in flammable or dusty atmospheres. Before starting hot works the surrounding area should be cleared of all lose combustible material. If the works take place on one side of a wall or partition, the opposite side must also be examined to ensure no combustible material will be ignited. All hot works should preferably be undertaken in the morning. Fire extinguishers must be on hand regardless of whether any hot works are being undertaken All exposed wooden flooring and other items of combustible material which cannot be removed should be covered with sand or other non combustible material. You should appoint one employee with authority to stop the work if the precautions outlined are not being carried out. This person must also check the area regularly, particularly during lunch and rest periods, on completion of the work, and thirty minutes after completion. You should ensure that the workmen know the fire alarm procedure. Determine who calls the fire brigade, who deals with the fire and who sets the plan of evacuation into operation. Gas cylinders must be safely secured in an upright position and fitted with a regulator and flash back arrester. The site must be kept clean and tidy. Waste material, packing materials, wood shavings and oily rags must be removed daily. Flammable paints or materials must be kept off the site where possible. Rubbish is not to be burned on the site. Good housekeeping is very important. Thank you for your help and consideration.