Chapter 3 The Integrated Requirements Management Framework (IREQM)



Similar documents
Requirement Management with the Rational Unified Process RUP practices to support Business Analyst s activities and links with BABoK

CMMI KEY PROCESS AREAS

Capability Maturity Model Integration (CMMI SM ) Fundamentals

Plan-Driven Methodologies

Requirements Definition and Management Processes

Chap 1. Introduction to Software Architecture

CMMI: Specific Goals and Practices

Software Engineering. Session 3 Main Theme Requirements Definition & Management Processes and Tools Dr. Jean-Claude Franchitti

Business Analysis Essentials

Appendix 2-A. Application and System Development Requirements

Using Rational Software Solutions to Achieve CMMI Level 2

Requirements Management Practice Description

BAL2-1 Professional Skills for the Business Analyst

Program Lifecycle Methodology Version 1.7

Time Monitoring Tool Software Development Plan. Version <1.1>

JOURNAL OF OBJECT TECHNOLOGY

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.

Managing Process Architecture and Requirements in a CMMI based SPI project 1

Reaching CMM Levels 2 and 3 with the Rational Unified Process

The Configuration Management process area involves the following:

Develop Project Charter. Develop Project Management Plan

How To Understand The Business Analysis Lifecycle

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

Software Requirements, Third Edition

MKS Integrity & CMMI. July, 2007

ájoƒ ùdg á«hô dg áµلªÿg Yesser Overall SDLC Process Definition

Developing CMMI in IT Projects with Considering other Development Models

Truly Managing a Project and Keeping Sane While Wrestling Elegantly With PMBOK, Scrum and CMMI (Together or Any Combination)

CMMI Asset Library: Maturity Level 2

The Unified Software Development Process

COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF HEALTH AND HUMAN SERVICES

Draft Requirements Management Plan

Enterprise Test Management Standards

CONTENTS. Preface. Acknowledgements. 1. Introduction and Overview 1 Introduction 1 Whatis the CMMI"? 2 What the CMMI* is Not 3 What are Standards?

Minnesota Health Insurance Exchange (MNHIX)

Partnering for Project Success: Project Manager and Business Analyst Collaboration

A Guide to the Business Analysis Body of Knowledge (BABOK Guide) Version 2.0

Practice Overview. REQUIREMENTS DEFINITION Issue Date: <mm/dd/yyyy> Revision Date: <mm/dd/yyyy>

Requirements Engineering Process

System Development Life Cycle Guide

Project Management. 06 Requirements Management. IT M a t u r i t y. S e r v i c e s

Towards a new approach of continuous process improvement based on CMMI and PMBOK

CDC UNIFIED PROCESS PRACTICES GUIDE

An Integrated Quality Assurance Framework for Specifying Business Information Systems

The 10 Knowledge Areas & ITTOs

Redesigned Framework and Approach for IT Project Management

G-Cloud Service Description. Atos: Cloud Professional Services: Requirements Specification

Project Management Guidelines

Software Configuration Management Plan

Steve Masters (SEI) SEPG North America March Carnegie Mellon University

Using the Agile Methodology to Mitigate the Risks of Highly Adaptive Projects

Role and Skill Descriptions. For An ITIL Implementation Project

Surveying and evaluating tools for managing processes for software intensive systems

Software Quality Assurance Plan

Software Quality Management II

IO4PM - International Organization for Project Management

Examination SUBJECT. Version:

This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA.

Business Analyst Work Plan. Presented by: Billie Johnson, CBAP CSM

ESTABLISHING A MEASUREMENT PROGRAM

Roles: Scrum Master & Project Manager

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Classical Software Life Cycle Models

Managing Small Software Projects - An Integrated Guide Based on PMBOK, RUP, and CMMI

Software Project Management and Support - Practical Support for CMMI -SW Project Documentation: Using IEEE Software Engineering Standards

wibas Team CMMI-ITIL IT Maturity S e r v i c e s

Software Development Methodologies

Syllabus. REQB Certified Professional for Requirements Engineering. Foundation Level

Department of Administration Portfolio Management System 1.3 June 30, 2010

Comparing Scrum And CMMI

Business Analysis Standardization & Maturity

Supporting Workflow Overview. CSC532 Fall06

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Project Integration Management

CMMI and IBM Rational Unified Process

A Business Analysis Perspective on Business Process Management

Using Business Process Management Technology to Implement a CMMI-compliant Agile Software Development Approach

Increasing Development Knowledge with EPFC

RTI Software Development Methodology and CMMI

5.2 A Software Process Improvement Solution for Small and Medium-Size Enterprises

Requirements Engineering Processes. Ian Sommerville 2006 Software Engineering, 8th edition. Chapter 7 Slide 1

IT Project Management Methodology. Project Scope Management Support Guide

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

Modellistica Medica. Maria Grazia Pia, INFN Genova. Scuola di Specializzazione in Fisica Sanitaria Genova Anno Accademico

Vito Madaio, PMP, TSPM 2015, September, 24th

Software Engineering. Requirements elicitation - Facts finding. Software Engineering Requirements Elicitation Slide 1

How To Adopt Rup In Your Project

Project Management and Business Analysis Maturity Assessments

EXHIBIT L. Application Development Processes

Agile SW Siemens

Manager Domain Experts. Delivery Team. C h ic a g o

Towards a CMMI-compliant Goal-Oriented Software Process through Model-Driven Development

The Software Development Life Cycle (SDLC)

Sparx Systems Enterprise Architect for Team Players

CMMI with Digité Universal Process Framework

The Rap on RUP : An Introduction to the Rational Unified Process

Transcription:

Chapter 3 The Integrated Management Framework (IREQM) During the software requirements development process, customer and development team meet together for many times to obtain customer and product requirements from customer need, but they usually hold different views because of the different background and expertise. Therefore, the customer needs are usually ambiguous for development team and need to be elicited and documented by a useful requirements development technology. In contemporary software development methodologies like RUP, the customer or product requirements are developed and validated iteratively. While the approved and documented requirements are evolving and changed, a continuous requirements change management is necessary. The requirements generated by the Requirement Development (RD) process are usually reviewed jointly and documented as a Software Specification (SRS), as well as some other documents such as vision, stakeholder requests. A Requirement Management (REQM) process is also needed to manage those formal documentations, the agreements obtained from requirements providers such as customer, and the commitments from requirements implementers. The process also needs to maintain the traceability among the documents, agreements, and commitments (CMU/SEI, 2002). 3.1 The Framework Description This study proposes an integrated process tailored from requirements activities in RUP to better meet the joint objectives of RD and REQM process areas in CMMI. An activity diagram, as shown in Figure 6, represents the framework of integrated requirements management, called IREQM, composed of RMP ( Management Planning), RD ( Development) and RCM ( Change Management). In order to make the accessibility for the stakeholders, a CMMI support system is built along with the proposed IREQM framework to tackle the requirements problems during the software development process. The proposed IREQM framework is shown in Figure 6. IREQM focuses on the requirements activities. Other system development activities, such as Background Analysis, OOAD, Implementation, and Testing, are included in the figure to exhibit their relationships to the IREQM activities. Table 10 exhibits the 5W1H analysis for the IREQM process, illustrating the why, when, what, how, who, and where of the IREQM process details. 20

Backgroud Analysis RMP ( Management Planning) RD ( Development) OOA OOD RCM ( Change Management) Implemen tation Testing Figure 6 IREQM Framework 21

Table 10 5W1H Analysis for the IREQM Framework Why To meet the RD and REQM goals in CMMI to help enhancing the quality of requirements management. When What How Who (artifacts) (activities) Where After a project is initiated Text Description, Business Rules, Business Goals Stakeholder, PM, System Analyst Background Analysis (workshop, session) Management Plan PM, System RMP Development After RMP When a change is requested Questionnaires, Interviews, Vision, Stakeholder Requests, Workflow Activity Diagram, 5W1H Analysis Matrix, Use Case Model, Use Case Description, Supplementary Specification, Integrated Glossary, SRS, Requirement Dependencies Requirement Change Request Form, Requirement Change Request Impact Assessments, Document for approvals and commitments to Change, Change Summary Table, Review Record, Traceability Table, Change History, Statistic Chart/Report Analyst Stakeholder, PM, Developer, Software Architect, Specifier, Technical Reviewer End User, Stakeholder, Developer RD RCM (See the 5W1H analysis for RD) (See the 5W1H analysis for RCM) 3.1.1 Background Analysis and Management Planning (RMP) An effective requirements management relies on the complete background understanding and requirements management planning. The Background Analysis navigates the project from the business perspective at the beginning of software development. The understandings of these business-related issues can help develop and analyze the requirements fulfilling the business goals. During the RMP activity, some important items should be planned and taken into consideration first, including incorporating the requirements management planning into the project plan, establishing objective criteria for the acceptance of requirements, establishing related tables, and defining requirements change process. All of above are described in Management Plan, as well as other concerned items about requirements management such as requirements types/attributes, traceability items and their criteria. The Management Plan predefines these items to be collected and mechanisms to control requirements change for subsequent RD and RCM activities. In the implementation of IREQM framework, some templates or 22

samples for the concerned items can be provided to be chosen during the RMP activity. 3.1.2 Development (RD) The workflow in RUP is a complete framework with the well-defined documentation, artifacts, activities, roles or relationships among them. Following the previous studies (Sung, 2001; Chu, 2002; Fang, 2003; Object Dynamics, 2003), a set of improved Development activities is described in Figure 7, and the elaborative workflow details is expressed in Table 11. This table exhibits the 5W1H analysis for the RD process, illustrating the why, when, what, how, who, and where of the RD workflow details. Dev elopment Develop Vision Understand Stakeholder Needs and Elicit Stakeholder Requests Analyze Functions (Features) Analyze Operational Workflow Find and Prioritize Use Cases Detail Use Cases Analyze Supplementary Specification Validate Capture Common Vocabulary Figure 7 Insititutionalized RD Process On the first phase Develop Vision activity develops vision, system goal and analyzes strategic goal by SWOT matrix. Vision document is specified in terms of the high-level stakeholder key needs and features and provides the contractual basis for the more detailed technical requirements such as use cases. On the Understand Stakeholder Needs and Elicit Stakeholder Requests, relevant stakeholders are engaged for eliciting needs, expectations, constraints and external interfaces. Analyze Functions activity lists the system s functional requirements. The purpose of Analyze Operational Workflow is to link up these functions from the business operational process perspective. The major consultation with stakeholders in the joint meeting has 23

been continued till this phase. During the later stage of the RD process, the primary works are imposed on the requirements development group. Find and Prioritize Use Cases structures use cases model including use cases, use case package, and use cases description. Analyze Supplementary Specification activity analyzes supplementary requirements that can not be described in individual use cases. The traceability dependencies and common vocabulary are also established when the requirements are specified. Capture Common Vocabulary activity integrates the previous glossary items to provide document for reference to the subsequent software development works. The final activity Validate ensures that the resulting requirements meet the stakeholder needs and expectations. Table 11 5W1H Analysis for the RD Process Why To elicit, organize, and document the requirements of the system in software development When What(artifacts) Who How(activities) Where After RMP Vision (SWOT Matrix, Problem Statement, Stakeholder Description) Questionnaire, Interviews, Stakeholder Need (described in Vision), Stakeholder Requests, Dependencies (Traceability) Feature List, Feature Description (described in Vision), Dependencies (Traceability) Workflow Activity Diagram, 5W1H Analysis Matrix Use Case Model (Use Cases, Use Cases Package, Use Case Diagram), Prioritized Use Cases, Glossary, Dependencies (Traceability) Use Case Description, Glossary Supplementary Specification (for those not defined in Use Case), Glossary, Dependencies (Traceability) Stakeholder, PM, System Analyst Stakeholder, End User, PM, System Analyst End User, Customer, Other Stakeholder, Developer End User, Customer, Other Stakeholder, System Analyst Software Architect Specifier, System Analyst Specifier Develop Vision Understand Stakeholder Needs and Elicit Stakeholder Requests Analyze Functions (Features) Analyze Operational Workflow Find and Prioritize Use Cases Detail Use Cases Analyze Supplementary Specification Integrated Glossary System Analyst Capture Common Vocabulary (Validated) SRS Stakeholder, PM, Specifier, Technical Reviewer Validate Development Development Development Development Except for vision, the other artifacts produced through the process can be 24

packaged in SRS, a major deliverable during the software development process. The SRS is a formal documentation to be agreed upon and approved by requirements providers and receivers. Once the SRS is validated, any change in requirements must rest on the SRS as the basis of requirements management. 3.1.3 Change Management (RCM) Figure 8 shows the institutionalized RCM process in the proposed IREQM framework. The process is further illustrated by another 5W1H matrix, as presented in Table 12, to define the why, when, what, how, who, and where of the RCM workflow details. Jonit Meeting Record the stakeholder request for requirement change with rationale Assess the impact of the stakeholder request for requirement change Negotiate and Audit the stakeholder request for requirement change [ Rejected ] [ Approved/Passed ] Record the changed requirements to requirements change summary table Review its consistency [ inconsistent ] Record the source of inconsistency with rationale and Initiate corrective actions Validate [ Unresolved ] [ Resolved ] [ consistent ] Maintain the requirements tracking table Maintain the changed requirements and history with rationale Create statistical charts for report Figure 8 Insitutionalized RCM Process 25

The most commonly causes of project failure include lack of user input, incomplete requirements, and changing requirements (Rational Software Corporation,, 2003). By applying the RD activity in the IREQM process, the development team could elicit, organize, and document the requirements of the system in software development. Afterward, a successful requirements management is to avoid the disturbance of requirements change on resource consumption, and to maintain the consistencies among those requirements and the project's plans and work products. Table 12 5W1H Analysis for the Institutionalized RCM Why To manage all changes to the requirements, and maintain the consistencies among the requirements, the project plans, and work products. When What(artifacts) Who How(activities) Where When a change is requested Requirement Change Request Form End User, Customer, PM, REQM Personnel, Developer Record the stakeholder request for requirement change with rationale When request is passed and approved When inconsist encies exist When changed requirem ents are validated Requirement Change Request Impact Assessments Audit Results (including Approvals and Commitments) Change Summary Table Review Record (Inconsistence rationale, Corrective Actions), Traceability Table Review Record (Resolution) Traceability Table Requirement Change History PM, REQM Personnel, Developer, System Analyst, Technical Reviewer, REQM Personnel PM, REQM Personnel, Customer, End User, Developer REQM Personnel PM, REQM Personnel, System Analyst, Technical Reviewer REQM Personnel REQM Personnel REQM Personnel 26 Assess the impact of the stakeholder request for requirement change Negotiate and Audit the stakeholder request for requirement change Record the changed requirements to requirements change summary table Review its consistency Record the source of inconsistency with rationale and Initiate corrective actions Maintain the requirements tracking table Maintain the changed requirements and history with rationale Statistic Chart/Report REQM Personnel Create statistical charts for report (Review Team) Strategies to RCM include baselining the requirements, establishing a single channel to control change and maintaining a change history (Rational Software Corporation, 2003). The institutionalized RCM process contributes to a record of

decisions, during their assessment process, which ensure that change impacts are understood across the project within a standard/documented change control mechanism. These benefits depend on the baselined requirements and approved artifacts generated from RD process and the recorded requirements change history to control and monitor project schedule or budget. These artifacts provide the contractual basis for tracking requirements, managing requirements change or maintaining agreements and commitment from project participants. Once the requirements providers and the requirements receivers reach an agreement and the commitments to the requirements are obtained from the project participants, it is necessary to manage those formal commitments and identify any inconsistencies among the project plans, work products, and requirements. The results of requirements change are derived from the stakeholder requests for changing artifacts or process (change request), adding a new functionality (enhancement request), or updating anomaly /flaw of product (defect), and so on. All of them should be collected throughout the project's lifecycle continually. 3.2 CMMI Goals and Practices Achieved by IREQM The IREQM framework proposed in this study is developed to meet generic goals GG2 and all the generic practices GP2.1~GP2.10 of REQM in CMMI and therefore complements the requirements management practices in RUP. The framework also intend to meet GG3, GP2.1~GP2.10 and GP3.1~GP3.2 of RD in CMMI. The IREQM should also help to achieve all the specific goals SG1 and specific practices SP1.1~SP1.5 of REQM in CMMI level 2, and the SG1~SG3 and most SPs of RD in CMMI level 3. The proposed IREQM process is planned to help achieving all the GGs, GPs, SGs and SPs of REQM in CMMI maturity level 2, and all the GGs, GPs, SGs and most SPs of RD in CMMI maturity level 3. In the following description of this study, we will discuss the feasibility of our framework via the system implementation and use appraisal checklists to self-check the compliance between the IREQM activities with those specified in GGs, GPs, SGs and SPs of process areas REQM and RD in CMMI. 27