NY State Rail Summit Alstom Transportation Inc.



Similar documents
HVAC units for tramways, trains and metros Proven performance, high reliability and low life cycle cost

AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility

Table 10-1 Travel Times Between Stations OPERATING & MAINTENANCE PLAN

Integrated Services Workshop Services

2010 SFMTA TRANSIT FLEET MANAGEMENT PLAN

SYSTEMWIDE REQUIREMENTS

Automated Container Handling in Port Terminals

AASHTO RR101 Webinar Equipment

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes

Analysis of fuel cell

III. Roof Mount AC Mobile Climate Control 19 MCC Reference Manual 2014

California Climate Challenge Methodology April 25, 2013

State of Good Repair Assessment Dallas Area Rapid Transit

Innovative technologies and solutions for (e-)buses

NOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS

History of the Interurban Railway System and Monroe Shops. Dallas Area Rapid Transit

Passenger Rail Service

Impact of Reliability Centered Maintenance Program

City of Santa Ana Sustainability Accomplishments. January 2012

Massachusetts Bay Transportation Authority

TRAMS TROLLEY-BUSES SUBWAY

Kinetic energy recovery on railway systems with feedback to the grid

ROLLING STOCK MAINTENANCE REPAIR & OVERHAUL (MRO) Turbo Power Systems Capability & Services

March ALSTOM in Spain. Contents. ALSTOM in Spain. Power. Transport

Northeast Corridor State of Good Repair Spend Plan

National Transit Database - NTD

The Gateway Program and Hudson Tunnel Project

PATH Industrial Engineering Study Overview

PRICES AND COSTS IN THE RAILWAY SECTOR

Impact of Hurricane Ike

Rail Modernization Study REPORT TO CONGRESS. April Prepared by: Federal Transit Administration

Memberships. W.F. Welding & Overhead Cranes Ltd. Since W.F. Welding & Overhead Cranes Ton Overhead Cranes. Jib Cranes.

Heavy-Duty Air-Conditioning Installation and Repair

Facts and figures for the Siemens Nuremberg Vogelweiherstrasse location

Federal Transit Administration. Options for Financing Public Transportation in the United States

Electric Process Heaters & Engineered Systems

Virtual sales. assistant. Navigating within ABB to find complete Industrial IT solutions

Proposed Capital Improvement Program (CIP) for FY

March 2015 Prepared by the Department of Finance & Performance Management Regional Peer Review PERFORMANCE MEASURES

Hybrid shunter locomotive

Chapter 8 Funding Considerations

2014 SFMTA Transit Fleet Management Plan March 2014

Rules of Thumb Energy Efficiency in Buildings

Bombardier Transportation. Facilities in China. Three Manufacturing Joint Ventures

Alstom in India & South Asia

hybrid fuel cell bus

Table of Contents TABLE OF CONTENTS

Whiting Equipment Canada Inc. Whiting Overhead Cranes

Procurement & Contracting Division. Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock")

Passenger & Freight Rail = Less Energy & More Choices. NATIONAL CONFERENCE of STATE LEGISLATURES

MONORAIL. Scomi Rail THE REVOLUTION OF URBAN TRANSIT. A smooth ride quality. Higher passenger capacity. Energy efficiency. Lower operating costs.

Fleet Health Monitoring and Machine Learning Technology for CBM+

Power Supply Systems. Performance guaranteed. Power Supply Systems single-voltage UIC-systems multi-voltage UIC-systems

For Sale N. Knox Ave., Chicago, IL $1,350,000 27,600 sq.ft.

Amtrak s s Vehicle/Track Interaction Measuring System Integrating the Control Strategies of Engineering, Mechanical and Operations

CITY OF EL PASO: SUN METRO Legislative Update Briefing

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety.

Budget Used Balance Obligation Based Budget: Infrastructure Renewal Program $290.1 $251.2 $38.9

U.S. System Summary: EMPIRE CORRIDOR

A Review of Transit Technology Specifications

Briefing On New Jersey High Speed Rail Improvement Program. October 10, 2012

ATTACHMENT K 5310 ELIGIBLE COST

Construction Services. Furnishing Energy Solutions

The Future is Made of Ideas. Power Converters Included.

Transit, Rail, Program, Project & Construction Management Experience

Experts in Rail Maintenance and Infrastructure

Nationwide Fixed Guideway

ETIHAD RAIL. Corporate Presentation

HANDOUT CLIMATIC WIND TUNNEL MAHLE BEHR GMBH & CO. KG STATUS: FEBRUARY 2014

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

our team training is simulated the

Contracting Authority for On Call Engineering and Architectural Service for FY08

Twenty Year Capital Needs Assessment. September 16, 2013 Briefing to CPOC

Speedsensors for Railways Applications

Passenger transport. Traction service. Vehicle maintenance

DECEMBER 10, 2014 FINAL AGENDA PUBLIC COMMENTS ON AGENDA ITEMS AND OTHER MATTERS

For Sale - $11,000,000 - Negotiable Excellent User Opportunity -

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

School & Commercial Bus Climate Control Design Manufacture Install Service. A Bus Air Conditioning Informational Bulletin by

KATHIE CANNING EXECUTIVE DIRECTOR

ATS Overhead Table Shelf System INSTRUCTION MANUAL

Streetcar Technology. Today the definition of these terms is becoming. Mexico Horse Drawn Streetcar. Wilbur Smith Associates. Streetcar Technology

Owner s Procurement Forum

PROPANE AUTOGAS REPAIR AND MAINTENANCE FACILITY REQUIREMENTS

VRE SYSTEM PLAN SUMMARY

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

National Railroad Passenger Corporation AMTRAK. Fiscal Years Five Year Plan. May 2013

SUCCESS EPCOS Capacitors

work2future Snapshot of The Construction Sector in Santa Clara County work2future Special Projects Team

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS

Transit Technology Alternatives

FRA High-Speed Intercity Passenger Rail Program Technical Assistance Webinar. FRA Buy America and Related Requirements

Enterprise Asset Management

16. APTA PR-IM-S Standard for Pantograph Current Collection Equipment Periodic Inspection and Maintenance

Notice of Comment Period

VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.

ENVILINE Reliable and efficient solutions for DC rail transportation

Frequently Asked Questions (FAQs) about DART

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)

Transcription:

NY State Rail Summit Alstom Transportation Inc. Chuck Wochele 06/14/2010

Two main activities 19.7 Billion Euro s in Sales (2009 FY) 81,500 Employees 70 countries Power Sector 13 Billion Euro Transport Sector 6.7 Billion Euro Equipment & services for power generation and distribution Equipment & services for rail transport --P 2

An extensive range of products and services Rolling Stock: from trams to very high speed DISTANCE Locomotives Very High Speed Metro Tram Train Interurban Regional High Speed SPEED Tram --P 3

signaling, services & maintenance and infrastructure An extensive range of products and services Infrastructure Signalling --P 4 Services and maintenance

Rolling Stock USA Hornell Facilities Overview/Capabilities

Hornell Manufacturing Facilities Plant 2 - ELECTRICAL SHOP (75,000 sq.ft.) Plant 3 - PARTS, SERVICE AND TRUCK SHOP (133,000 sq.ft.) Plant 1 - CAR SHOP (420,000 sq.ft.) New Car Facility (70,000 sq.ft.) --P 6 698,000 sq. ft. under roof on 52 acres at 3 separate locations within a 1 mile radius

Plant 1 New Car Facility Depot Scale Strip & Wash Water Test Test Track Roundtable Project Management/ Engineering Bldg. Climate Chamber High Bay Paint Administrative, Procurement & Quality Offices --P 7 Fully Integrated Rolling Stock Project & Production Facility (North View - 30 acre site 420,000 sq. ft)

Plant 1 Paint High Bay Project Management/ Engineering Bldg. Roundtable Water Test Climate Chamber Strip & Wash New Car Facility Scale Test Track --P 8 Fully Integrated Rolling Stock Project & Production Facility (South View - 30 acre site 420,000 sq. ft)

Hornell Site - 25 Year Shipment & Census History Hornell Shipments & Employment History Total # Car / Loco Shipments / Yr. 600 550 500 450 400 350 300 250 200 150 100 50 0 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 0 # Employees / Yr. Remfg. Car New Car Remfg. Loco New Loco CRAFT NON-CRAFT TOTAL EMPLOYEES --P 9

Hornell Experience New Build CTA 257 Cars -- 3200 Series Metro-North 48 Cars -- M6 Amtrak 50 Cars -- Viewliner Metra 173 Cars -- Gallery BART 80 Cars -- C2 Caltrans 66 Cars -- California Cars Amtrak 62 Cars -- Surfliner NJ Transit 265 Cars -- Comet V NJ Transit 33 Loco -- PH 42 WMATA 184 Cars -- 6000 Series NYCT 1002 Cars -- R160 --P 10 Over 2000 New Cars

Experience New Cars NYCT R160 NJ Transit PL42 New Jersey Transit --P 11

Experience - New cars CTA 3200 Transit Car 257-48 SS Cars - EMU Metro North M6 Commuter Car 48-85 SS Cars - EMU --P 12

Experience - New cars AMTRAK/Caltrans Surfliner Intercity Cars 62-85 Bi-Level SS Cars - Coach New Jersey Transit Comet-V Series Cars 265-85 SS Cars - Coach & Cab --P 13

Experience - New cars WMATA 6K Loco Painted & Tested for EMD --P 14

Experience - New cars Caltrans Intercity Cars Bi-Level SS Cars Coach BART Commuter Cars Aluminum Cars- EMU Amtrak Viewliner SS Cars- Coach --P 15

Hornell Facility Experience Rehabilitated Cars NYCT - 3023 Cars -- Various Metro MNRR - 317 Cars -- M2 EMU Commuter NJT - 100 Cars -- Commuter Coach MBTA - 143 Cars -- Commuter Coach & LRV s SEPTA - 58 Cars -- EMU Commuter SF Muni - 17 Cars -- PCC Trolley CTA - 598 Cars -- 2600 Series Metro NJT - 124 Cars -- Comet II Commuter Coach MMTA - 96 Cars -- B-1 Metro MARTA - 238 Cars -- CQ 310 & 311 Metro WMATA - 364 Cars -- 2000 & 3000 Series Metro --P 16 Over 5,000 Cars Rehabilitated

Experience, Overhaul WMATA 2000/3000 Series CTA 2600 Series --P 17

Experience Rehabilitated Cars MBTA Pullman SEPTA Silverliner NYCT R46 MMTA - Baltimore --P 18

Experience, Overhaul Metra Highliner San Francisco MUNI PCC Historic Overhaul --P 19

Manufacturing Capabilities New Metro, LRV and Commuter Passenger Rail Vehicles Complete Rehabilitation of Passenger Rail Vehicles New and Rehabilitation of Diesel Locomotives New AC Propulsion Systems and Equipment Truck assembly - New Truck rehabilitation ISO 2000 & ISO 14001 Certified --P 20

Engineering Capabilities Vehicle systems integration Vehicle systems engineering Vehicle mechanical design, 2D and 3 D Vehicle electrical design Propulsion design and integration Vehicle system acceptance testing Propulsion combine testing RAMS analysis and reporting --P 21

Product Test Capabilities Testing: Plant 1- Water Test: Car Shells and Completed Vehicles DITMCO Test: Electrical Subsystems & Vehicles Static Test: Stand alone Inline Stations Dynamic Test: Traction wheel rotation Dynamic Track Test: Catenary, Third Rail Power and ATO Vehicles Weighing: On Track Scales Climate Chamber Test: Complete Vehicles Testing Plant 2 and 3 - Combined test: Full range of Propulsion Equipment Testing - Motors, Control Units, including complete Car Propulsion Package --P 22

Interior View of New Build Facility 2ea 35 Ton Bridge Cranes 2ea 5 Ton Equipment Cranes 3 Tracks With 2 Pit Areas --P 23

Hornell - High Bay --P 24

--P 25 Hornell - Car Shop, Strip & Wash

Hornell - Car Shop, Paint booth Vehicle Paint Booth Well Lighted Controlled Environment Personnel lifts --P 26

Hornell - Car Shop Water Testing State-of-the-art water test facility Adjustable nozzle velocities and water pressure Compliant with the Major US specifications --P 27

Hornell - Test Track Total length: 2,200 feet Speed Supported up to 50 MPH 3rd Rail: Up to 1,000 VDC @ 3,000 Amps DC --P 28

Hornell - Climate Chamber Dimensions: 140 X 28 X 23 Temp Range: -20 F to +140 F Maintains +/- 2 F Variance 200 Channels of data acquisition Heating 2 Natural Gas Boilers = 850,000 Btu/hr Capacity Humidity range 0-95% RH --P 29

Hornell Plant-2, Electrical Shop Electrical Equipment / Propulsion Equipment Land Area, 480,000 sq. ft. Covered Area, 6,000 sq. ft. --P 30

Plant 2 - Manufacturing New and Remanufacture: Propulsion Equipment Auxiliary Equipment AC & DC Motors Trucks NYCT Metro Motors CTA Aux Inverter NYCT Metro Propulsion NEC Locomotive Bloc CTA DC Motor Roof Mount LRV Propulsion Trolley Bus Propulsion --P 31

Plant 2 - Combined Test Can test 2 independent car sets of Propulsion and Auxiliaries The Facility is capable of providing the following Power 1000 kw at nominal 750V, 4MW peak System integration testing Stability/Performance tuning EMC Validation Customer Validation Extreme / transient conditions Thermal Validation Fault Handling --P 32

Hornell Plant-3, Truck Shop Truck New and Overhaul Final assembly Land Area - 400,000 sq. ft. Covered Area -133,000 sq. ft. --P 33

Hornell Plant-3, Truck Shop Material Storage and Assembly Area (WMATA 6K wheels and frames shown) Component Installation Station for frames (WMATA 6K shown) WMATA 6K completed truck in truck press for simulated height adjustments prior to shipping AC Rotation and Inspection Station (NJT Loco on test) --P 34

Experience Over 2000 New Cars NYCT R160 1002 Cars WMATA 6K 184 Cars New Jersey Transit --P 35

Experience Over 5000 Remanufactured Cars NYCT 3023 Cars CTA 598 Cars --P 36

Rochester, NY Signaling Manufacturing Facility 150,000 sq. ft. under roof 500 Employees --P 37

Thank You Roelof van Ark 10/20/2009