SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, 2010. SpaceX



Similar documents
NASA ISS Research Academy and Pre-Application Meeting. Erin Beck Mission Integrator August 4, 2010

System Engineering: A Traditional Discipline in a Non-traditional Organization

Falcon 9 Launch Vehicle Payload User s Guide

SpaceX CRS-5 Mission Press Kit

SpaceX SES-8 Mission Press Kit

NASA Independent Review Team Orb 3 Accident Investigation Report

Can Hubble be Moved to the International Space Station? 1

IAC-15-D2.1 NASA S SPACE LAUNCH SYSTEM PROGRAM UPDATE. Todd May NASA Marshall Space Flight Center, USA, todd.may@nasa.gov

BUILDING TRANSATLANTIC PARTNERSHIPS IN SPACE EXPLORATION THE MPCV-SM STUDY

Developing Metrics in Systems Integration (ISS Program COTS Integration Model)

2015 Small Satellite Market Observations. Copyright 2015, SpaceWorks Enterprises, Inc. (SEI)

Case 1:14-cv SGB Document 53 Filed 05/19/14 Page 1 of 38 IN THE UNITED STATES COURT OF FEDERAL CLAIMS BID PROTEST

The Threat of Orbital Debris and Protecting NASA Space Assets from Satellite Collisions 28 April 2009

Launch Services Program Earth s Bridge to Space

Space Launch System Status Briefing to NAC Space Operations Committee

Space Technology Mission Directorate

How Long Do You Need To Achieve Your Scientific Objectives?

HSF Transition: A focus on the next steps in cislunar space

The Elwing Company THE ELWING COMPANY. EPIC Workshop Products and Systems

TOPO Trajectory Operations Officer

June VV 05. Sentinel-2A LOGOTYPE COMPLET (SYMBOLE ET TYPOGRAPHIE) 294C

The Space Shuttle: Teacher s Guide

SpaceLoft XL Sub-Orbital Launch Vehicle

DEOS. Deutsche Orbitale Servicing Mission. The In-flight Technology Demonstration of Germany s Robotics Approach to Service Satellites

IV. Rocket Propulsion Systems. A. Overview

National Aeronautics and Space Administration. NASA s. Pioneering Next Steps in Space Exploration

Iodine RF Ion Thruster Development Busek Co. Inc. Vlad Hruby PhD, President

The µtorque Momentum-Exchange Tether Experiment

Overview of the Orbiting Carbon Observatory (OCO) Mishap Investigation Results For Public Release

Space Shuttle Mission SPACE SHUTTLE SYSTEM. Operation. Luca d Agostino, Dipartimento di Ingegneria Aerospaziale, Università di Pisa, 2010/11.

Mars Sample Return Campaign: An Overview. Dr. Firouz Naderi Associate Director NASA s JPL

Regolith-Derived Heat Shield for Planetary Body Entry and Descent System with In-Situ Fabrication

SPACE OPERATIONS, INC. Executive Summary October 2013

Space Exploration. A Visual History. Philip Stooke

ELECTRODYNAMIC PROPULSION SYSTEM TETHER EXPERIMENT (T-REX)

EUCASS EUROPEAN CONFERENCE FOR AEROSPACE SCIENCES (EUCASS) Study Trade-Offs on Future European Expendable Launchers

Revision history. Version Date Action. 1.0 Oct 1, 2015 Initial release. Moonspike - Feasibility Study - October Page 1 of 35

History of the Titan Centaur Launch Vehicle

Delimitation and Commercial Use of Outer Space. Sang-Myon Rhee Seoul National University March 28, 2011

Technologies for Re-entry Vehicles. SHEFEX and REX FreeFlyer, DLR s Re-Entry Program. Hendrik Weihs. Folie 1. Vortrag > Autor > Dokumentname > Datum

PLANETARY PROBE DESIGN WORKSHOP: COLLABORATIVE HANDS-ON SMALL SATELLITE TRAINING FOR ENGINEERING STUDENTS

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL TWO INSTRUCTIONAL GUIDE SECTION 6 EO C IDENTIFY PARTS OF A ROCKET PREPARATION

Genetic Algorithm Optimization of a Cost Competitive Hybrid Rocket Booster

HOW TO BUILD A NANORACKS PAYLOAD: NANOLABS

SpaceÊ ShuttleÊ Program Artifacts

IAC-08-B PROPOSAL FOR MODIFICATION OF ISS. Japan,Tokyo

Solar Electric Propulsion

National Aeronautics and Space Administration Washington, DC NASA ADVISORY COUNCIL. Human Exploration and Operations Committee.

Why Invest in Space Technology?

Modular Approach to Launch Vehicle Design Based on a Common Core Element

Dawn - Overview, Science Objectives, Mission Progress. Hap McSween For PI Chris Russell

US ACTIVE DEBRIS REMOVAL (ADR) EFFORTS

Robotic Pre-Cursor Contribution to Human NEA Mission. H. Kuninaka JSPEC/JAXA

2015 Commercial Space Transportation Forecasts

Commercial Crew Program Status

Inspiration Mars. International Student Design Competition WUT. Dream Team

IAC-04-V.4.03 DELTA IV LAUNCH VEHICLE GROWTH OPTIONS TO SUPPORT NASA S SPACE EXPLORATION VISION

Technology & Innovation Committee

Shuttle Variations And Derivatives That Never Happened - An Historical Review

VIETNAM ACADEMY OF SCIENCE AND TECHNOLOGY VIETNAM NATIONAL SATELLITE CENTER CUBESAT PICO DRAGON. Presenter Name: Do Xuan Phong

The 2013 MAVEN Mission To Mars. Bruce Jakosky MAVEN Principal Investigator University of Colorado

How To Understand The Brazilian Sounding Rocket Vbso 30

ACTIVE DEBRIS REMOVAL MISSION WITH SMALL SATELLITE

The Future of Space Commerce

Leveraging Performance-Based Cost Modeling

Does currently available technology have the capacity to facilitate a manned mission to Mars?

NASA Space Technology Programs ISS Research and Development Conference June 27, 2012 Richard B. Leshner, Ph.D. Program Executive SBIR/STTR

Launch Vehicle Mission Capability Enhancement through Global Positioning System Metric Tracking

RD-180 Availability Risk Mitigation Study Summary

Point to point transportation as an alternative to convey supplies to isolated

Fleet Ballistic Missile Eastern Range Operations Supporting Navy Testing and Deployment

NuSTAR Ground Systems and Operations Approach Lessons Learned

Solar Power for Outer Planets Study

Description of the AAU satellite Project. CubeSat Concept. Financing. Organization

Navy Communications Satellite Program Office (PMW 146)

Japanese Space Industry s Efforts regarding Long-term Sustainability of Space Activities. 14 Feb The Society of Japanese Aerospace Companies

National Aeronautics and Space Administration. NASA Centers Small Business Acquisition Guide

Core Capabilities and Services

Mars Earth Return Vehicle (MERV) Propulsion Options

Magnetospheric Multiscale (MMS) Mission EDUCATOR S INSTRUCTIONAL GUIDE

Transcription:

SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, 2010

SpaceX Vehicles Falcon 1 Falcon 9 Dragon Spacecraft 2

SpaceX Overview Founded in mid-2002 with the singular goal of providing highly reliable, low cost space transportation for both cargo and crew Over 1180 employees and growing 51,000 sq m (550,000 sq ft) of offices, manufacturing and production in Hawthorne (Los Angeles), California 700 acre state-of-the-art Propulsion and Structural Test Facility in central Texas Launch sites at Kwajalein and Cape Canaveral Developing launch site at Vandenberg Omelek, Kwajalein Atoll Hawthorne (Los Angeles) Headquarters Central Texas SLC-40, Cape Canaveral 3

Falcon 1 Capabilities World s lowest-cost dedicated orbital mission: ~$9M 28 Sep 2008: 1 st privately developed liquid fuel rocket to orbit 14 July 2009: Delivered 1 st commercial customer to orbit Two-stage light-lift launch vehicle 1st Stage: Merlin engine, LOX / RP-1, ~95k lbf vac. 2nd Stage: Kestrel engine, LOX / RP-1, ~7k lbf vac. Diameter: 1.7 m (5.5 ft); Length 21 m (68 ft) Falcon 1 Enhanced (F1e) block upgrade starting in 2010 Payload capability to 185 km, 9.1 circular LEO: Falcon 1 (2008-09): 420 kg (925 lb) Falcon 1e (2010+): 1010 kg (~2,220 lb) for ~$11M Highly Responsive Mission Integration and Operations Falcon 1 21 m (70 ft) Falcon 1e 25 m (81 ft) All structures, engines, most avionics and all ground systems designed and mostly built by SpaceX 4

Falcon 1 Launch Highlights 5

Falcon 9 Capabilities June 4, 2010: reached orbit on inaugural mission Lowest mission price in this vehicle class Over 40 launches on contract through 2016 Two-stage EELV-class launch vehicle Designed from inception to be crew-capable Engine-out reliability 1 st Stage powered by 9 Merlin engines Over 4.9 MN (1.1 million lbf) thrust in vacuum 2 nd Stage powered by Merlin Vacuum engine 42.7 kn (96,000 lbf) thrust in vacuum Diameter 3.6 m (12 ft); Length 55 m (180 ft) Payload capability 11,500 kg to LEO; 5.2 m (17 ft) fairing All structures, engines, most avionics and all ground systems designed and mostly built by SpaceX 6

Falcon 9 Flight 1 Highlights Total Running Time: 3 min 28 sec 06-Aug-10 7

Dragon Spacecraft Nosecone Jettisoned after stage separation. Capsule fully recoverable Contains pressurized cargo, experiments or crew, hatches, thrusters & propellant, parachutes and heat shield. Trunk not recoverable Contains unpressurized cargo and small deployable satellites. Supports solar panels, thermal radiator. Jettisoned before reentry. Passive Common Berthing Mechanism (PCBM) Pressurized Section Service Section (Unpressurized) Heat Shield Trunk (Unpressurized) Designed from inception to be crew-capable Total Payload Capacity: 6,000 kg to LEO Capsule Down-mass Capability: 2500 kg 8

Dragon Spacecraft Nosecone Jettisoned after stage separation. Capsule fully recoverable Contains pressurized cargo, experiments or crew, hatches, thrusters & propellant, parachutes and heat shield. Trunk not recoverable Contains unpressurized cargo and small deployable satellites. Supports solar panels, thermal radiator. Jettisoned before reentry. Passive Common Berthing Mechanism (PCBM) Pressurized Section Service Section (Unpressurized) Heat Shield Trunk (Unpressurized) Designed from inception to be crew-capable Total Payload Capacity: 6,000 kg to LEO Capsule Down-mass Capability: 2500 kg 8

SpaceX Manifest Customer Date Vehicle Launch Site NASA COTS - Demo C1 2010 Falcon 9/Dragon Cape Canaveral NASA COTS - Demo C2 2011 Falcon 9/Dragon Cape Canaveral NASA COTS - Demo C3 2011 Falcon 9/Dragon Cape Canaveral Falcon 1e Inaugural Flight 2011 Falcon 1e Kwajalein ORBCOMM Multiple Flights 2011 to 2014 Falcon 1e Kwajalein MDA Corp (Canada) 2011 Falcon 9 Cape Canaveral NASA CRS ISS Resupply Flight 1 2011 Falcon 9/Dragon Cape Canaveral DragonLab Mission 1 & 2 2012 & 2013 Falcon 9/Dragon Cape Canaveral Spacecom (Israel) 2012 Falcon 9 Cape Canaveral* CONAE (Argentina) Two Flights 2012 & 2013 Falcon 9 Vandenberg* NSPO (Taiwan) 2013 Falcon 1e Kwajalein Space Systems/Loral 2014 Falcon 9 Cape Canaveral* Astrium (Europe) 2014 Falcon 1e Kwajalein Bigelow Aerospace 2014 Falcon 9 Cape Canaveral NASA CRS ISS Resupply Flights 2 thru 12 2011 to 2015 Falcon 9/Dragon Cape Canaveral Iridium Multiple Flights 2015 to 2017 Falcon 9 Vandenberg 9

Launch Vehicle Evolution Falcon 1 Falcon 1e (2011) 1050 kg to LEO Falcon 9/Dragon crew transportation (~30mths after ATP) Falcon 9 Falcon 9 Heavy (net 2013) 32k kg to LEO Merlin 2 booster engine: ~1.7M lbf LOX/RP-1 Raptor upper stage engine LOX/LH2 Falcon X All RP Heavy Lift 38k kg to LEO Falcon X Heavy Falcon 1/1e All RP Super Heavy Lift 125k kg to LEO Saturn V 10

Dragon Evolution ISS Cargo Delivery Rendezvous & Inspection Boost/ De-Orbit Cargo Dragon DragonLab Micro-gravity Robotic Servicing ISS Crew Service Crewed Servicing Crew Dragon Life-boat Orbital Tourism 11

Future Vehicles 12

The Dawn of Commercial Space 13