Microchip Technology Incorporated Distribution Location: T10 Engineering Change Order ECO Number: 4950 Date: 1/5/2009 Originator: Aaron van Duerm Phone: 480-792-7778 Supplier Notification: No Affected Documents Product Document Number: Description: Old Rev: New Rev: DV164131 14-00842 PRODUCT TREE, PICKIT 3 DEBUG EXPRESS 1 2 Reason for Change: Added the 13-00842-2 test procedure documentation to the Product tree. Also revised the ECO page to include the 13-00842R1B document to use for testing the PICKit 3 Programmer. Description of Change: Test procedure documentation was needed for testing the 44-pin demo board. Material Disposition: Tempe: You will need to reprogram the first 100 boards from Burnon to correct the previous firmware revison. Please erase the PIC24FJ256GB106 device using a RealICE and reprogram the uniots using the test fixture and the 13-00842R1B test procedure. Please run the 13-00842-2 test procedure for the demo board after the units have been reprogrammed with the correct firmware. CM: Please rework existing stock by erasing the part, and reprogramming the PICKit 3 using the 13-00842R1B test procedure. We found an issue in the previous revision that we sent and we want to ensure that this is fixed before it becomes a major problem. Implement testing the demo board using test procedure and the 13-00842-2R1 test procedure documentation into process using MPLAB 8.15.11 for the initial build. Document Control: Please ensure that the test procedure 13-00842 is Rev 1B when it is finalized to avoid confusion for our Tempe test team and our CM. HW Engineering SW Engineering Marketing Documentation RMA/TEST Quality Production BaaN Originator 1/7/2009 1/7/2009 Revs were updated Description of change was implemented Packlist is correct All necessary drawings are in PDF file Page 1 of 1
Microchip Technology Incorporated Q.C. Inspection ASSEMBLY NUMBER: 14-00842 REV: 2 LAST ECO: 4950 Part No: DV164131 ASSEMBLY NAME: PRODUCT TREE, PICKIT 3 DEBUG EXPRESS MPCode: Date: Product Tree Part Number Rev Type Description 12-00842 1 BQ FINAL ASSY, PICKIT 3 DEBUG EXPRESS 10-00424 1 B ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 10-00424-D 1 B ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER 09-00227-D 1 D MECH PART DWG, PICkit 2 ENCLOSURE TOP 09-00228-D 1 D MECH PART DWG, PICkit 2 ENCLOSURE BOTTOM 02-02038 C B PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 02-02038-D C D PCB ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER 03-02038 C D SCHEMATIC, PICkit 3 MICROCONTROLLER PROGRAMMER 04-02038 C D PCB FABRICATION, PICkit 3 MICROCONTROLLER PROGRAMMER 08-00126 6 LBL LABEL, NEED HELP WITH ASSY/SERIAL 02-01924-03 1 B PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) 02-01924-D 2.2 D PCB ASSY DWG, PICkit 2 44-PIN DEMO BOARD 03-01924 2.1 D SCHEMATIC, PICkit 2 44-PIN DEMO BOARD 04-01924 2.2 D PCB FABRICATION, PICkit 2 44-PIN DEMO BOARD 05-01924 2.2 DISK PCB ARTWORK, PICkit 2 44-PIN DEMO BOARD 08-00126 6 LBL LABEL, NEED HELP WITH ASSY/SERIAL 08-00237 3 LBL LABEL, PRODUCT, FINAL ASSY, SERIAL NO. OPTIONAL 13-00842 * TEST TEST PROCEDURE, PICKIT 3 MICROCONTROLLER PROGRAM 13-00842-2 * TEST TEST PROCEDURE, Pickit 3 Debug Express 44-pin Demo Board * Revision of the Test Procedures are controlled in the Specification Index Page 1 of 1
ASSEMBLY NUMBER: 12-00842 REV: 1 ASSEMBLY NAME: FINAL ASSY, PICKIT 3 DEBUG EXPRESS 1 1 Qty Microchip Technology Incorporated CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type 10-00424 1 ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER Y B KEY 2 1 02-01924-03 1 PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) Y B 3 1 CAB0019 CABLE, USB, A TO MINI-B, 1.8m/6ft Y PART Red cable DELPHI 15431480-030 DIGIKEY 167-1012-ND RoHS Compliant Avail: JUL-06 HIROSE ELECTR UX40-MB-5PA-1000-2003(01) RoHS Compliant Avail: 4 1 DS30030 * DOC, WARRANTY/REGISTRATION CARD Y DOC 5 1 DS30210 * DOC, "IMPORTANT INFORMATION" MICROCHIP INFORMATION Y DOC 6 1 DS51123 * SOFTWARE, MPLAB CDROM Y DOC 7 1 DS51792 * DOC, USING PICKIT 3 POSTER Y DOC 8 1 09-00217 PACKAGING, PICkit DEBUG EXPRESS CLAMSHELL PART 9 1 DS51782 * DOC, PICkit 3 DEBUG EXPRESS PACKAGING FILLER DOC 10 1 08-00237 3 LABEL, PRODUCT, FINAL ASSY, SERIAL NO. OPTIONAL LBL * In Rev Field: Part Rev is controlled in the Specification Index Page 1 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 10-00424 REV: 1 ASSEMBLY NAME: ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 1 1 Qty 10-00424-D CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type 1 ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER B KEY 2 1 09-00227 1 MECH PART, PICkit 3 ENCLOSURE TOP PART 3 1 09-00228 1 MECH PART, PICkit 3 ENCLOSURE BOTTOM PART 4 1 02-02038 C PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER B 5 1 08-00126 6 LABEL, NEED HELP WITH ASSY/SERIAL LBL * In Rev Field: Part Rev is controlled in the Specification Index Page 2 of 16
ASSEMBLY NUMBER: 09-00228 REV: 1 ASSEMBLY NAME: MECH PART, PICkit 3 ENCLOSURE BOTTOM 1 1 Qty 09-00228-D Microchip Technology Incorporated CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type 1 MECH PART DWG, PICkit 2 ENCLOSURE BOTTOM D KEY * In Rev Field: Part Rev is controlled in the Specification Index Page 3 of 16
ASSEMBLY NUMBER: 09-00227 REV: 1 ASSEMBLY NAME: MECH PART, PICkit 3 ENCLOSURE TOP 1 1 Qty 09-00227-D Microchip Technology Incorporated CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type 1 MECH PART DWG, PICkit 2 ENCLOSURE TOP D KEY 2 1 DS51772 * MECH PART ART, PICkit 3 TOP ENCLOSURE DESIGN DOC * In Rev Field: Part Rev is controlled in the Specification Index Page 4 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 1 1 Qty 02-02038-D CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type C PCB ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER KEY D 2 1 03-02038 C SCHEMATIC, PICkit 3 MICROCONTROLLER PROGRAMMER D 3 1 04-02038 C PCB FABRICATION, PICkit 3 MICROCONTROLLER PROGRAMMER D 4 1 5 1 6 1 7 1 8 1 9 1 MIC0272 IC SMT, MCP1525T-I/TT, 3L SOT-23 Y PART U10 MICROCHIP MCP1525T-I/TT A7BQ1TCQXA00 RoHS Compliant Avail: MICROCHIP MCP1525T-I/TT A7BQ1TC6XA00 RoHS Compliant Avail: MIC0430 IC SMT, ANALOG OP-AMP, SNGL SUPPLY R-R, MCP601 SOT-23-5 Y PART U5 MICROCHIP MCP601T-I/OT AB009TC7XA00 RoHS Compliant Avail: MIC0506 IC SMT, MCP1727T-3302E/MF, 1.5A, LOW VOLTAGE, LDO REG 8P DFN Y PART U7 MICROCHIP MCP1727T-3302E/MF GEAG1YA7XA33 RoHS Compliant Avail: MIC0401 IC SMT, 25LC256, 128K/256K-BIT SPI SERIAL EEPROM 8L SOIC Y PART U3 MICROCHIP 25LC256-I/SN D5AH17C2XA00 RoHS Compliant Avail: MIC0526 IC SMT, PIC24FJ256GB106-I/PT MICROCONTROLLER 64L TQFP 10x10 Y PART U1 MICROCHIP PIC24FJ256GB106-I/PT RoHS Compliant Avail: CAP0005 CAP SMT, 0.01uF 0603 CER 50V 20% X7R Y PART C17 KEMET C0603C103M5RAC RoHS Compliant Avail: NIC COMPONEN NMC0603X7R103K50TRPF RoHS Compliant Avail: CAL-CHIP GMC10X7R103K5NTLF RoHS Compliant Avail: PANASONIC ECJ-1VF1H103Z DIGIKEY PCC1801CT-ND RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 5 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER Qty 10 19 CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type CAP0012 CAP SMT, 0.1uF 0603 CER 25V +80/-20% Y5V Y PART C3, C8, C12, C13, C14, C16, C19, C20, C21, C24, C25, C26, C28, C29, C30, C31, C32, C33, C34 PANASONIC ECJ-1VF1E104Z DIGIKEY PCC1794TR-ND RoHS Compliant Avail: ROHM MCH182FN104ZK RoHS Compliant Avail: CAL-CHIP GMC10Y5V104Z25NTLF RoHS Compliant Avail: KEY NIC COMPONEN NMC0603Y5V104Z25TRPF RoHS Compliant Avail: 11 2 12 1 13 2 14 4 CAP0425 CAP SMT, 2.2uF 0805 CER 25V 10% X5R Y PART C9, C15 PANASONIC ECJ-2FB1E225K DIGIKEY PCC2320TR-ND RoHS Compliant Avail: CAP0117 CAP SMT, 47pF 0603 CER 50V 5% NP0 Y PART C22 KEMET C0603C470J5GACTU DIGIKEY 399-1056-1-ND RoHS Compliant Avail: PANASONIC ECJ-1VC1H470J DIGIKEY PCC470ACVTR-ND RoHS Compliant Avail: CAP0200 CAP SMT, 27pF 0603 CER 50V 5% NP0 Y PART C4, C5 PANASONIC ECJ-1VC1H270J DIGIKEY PCC270ACVTR-ND RoHS Compliant Avail: CAP0265 CAP SMT, 1.0uF 0603 CER 16V 10% X5R Y PART C2, C6, C7, C27 AVX CORP 0603YD105KAT2A DIGIKEY 478-1249-1-ND RoHS Compliant Avail: MURATA ELECT GRM185R61C105KE44D DIGIKEY 490-3894-1-ND RoHS Compliant Avail: MURATA ELECT GRM188R61C105KA93D DIGIKEY 490-1536-1-ND RoHS Compliant Avail: PANASONIC ECJ-1VB1C105K DIGIKEY PCC2224CT-ND RoHS Compliant Avail: TAIYO YUDEN EMK107BJ105KA-T DIGIKEY 587-1251-1-ND RoHS Compliant Avail: 15 3 CAP0306 CAP SMT, 10uF 3216 (A) TANT 10V 20% PART C10, C11, C18 NICHICON F931A106MAA DIGIKEY 493-2351-1-ND RoHS Compliant Avail: KEMET T491A106M010AG RoHS Compliant Avail: KEMET T491A106M010AT RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 6 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 16 1 Qty CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type CAP0311 CAP SMT, 47uF 7343 (D) TANT 20V 10% PART C23 KEMET T491D476K020AG RoHS Compliant Avail: KEMET T491D476K020AS DIGIKEY 399-1619-2-ND RoHS Compliant Avail: KEMET T491D476K020AT RoHS Compliant Avail: KEY 17 1 18 1 CAP0372 CAP SMT, 10uF 0805 CER 10V 10%, X5R Y PART C1 TAIYO YUDEN LMK212BJ106KD-T DIGIKEY 587-1299-1-ND RoHS Compliant Avail: CON0170 CONN, RECPT, 1x6 PIN.025 SQ, RA. (0.100") PART J4 SAMTEC SSW-106-02-G-S-RA RoHS Compliant Avail: MILL-MAX 801-13-006-20-001000 RoHS Compliant Avail: 19 1 20 1 21 1 22 1 23 3 24 3 CON0276 CONN SMT, RECPT, USB 2.0 MINI 5POS PART J1 HIROSE ELECTR UX60-MB-5ST DIGIKEY H2959TR-ND RoHS Compliant Avail: DIODE0101 DIODE SMT, SCHOTTKY BAT54C 30V 200MA SOT-23 PART D3 FAIRCHILD BAT54C DIGIKEY BAT54CFSTR-ND RoHS Compliant Avail: DIODE0104 DIODE SMT, SCHOTTKY 40V 1A SOT-23 PART D1 ZETEX ZHCS1000TA DIGIKEY ZHCS1000TR-ND RoHS Compliant Avail: DIODE0116 DIODE SMT, SCHOTTKY 20V 0.5A SOD-123 PART D8 FAIRCHILD SEMI MBR0520L DIGIKEY MBR0520LCT-ND RoHS Compliant Avail: DIODE0121 DIODE SMT, ZENER 5V 1.5W SMA PART TR1, TR2, TR3 ON SEMI 1SMA5918BT3G DIGIKEY 1SMA5918BT3GOS RoHS Compliant Avail: FUSE0019 FUSE SMT, POLYSWITCH 0.05A 30V RESETTABLE (0.135" x 0.110" x 0.025") PART PTC2, PTC3, PTC4 TYCO/RAYCHEM MICROSMD005 RoHS Compliant Avail: TYCO/RAYCHEM MICROSMD005F RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 7 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 25 1 Qty CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type FUSE0026 FUSE SMT, POLYSWITCH 0.5A 13.2V RESETTABLE (0.135" x 0.110" x 0.025") PART PTC1 TYCO/RAYCHEM MICROSMD050F-2 DIGIKEY MICROSMD050FTR RoHS Compliant Avail: TYCO/RAYCHEM MICROSMD050F-2 DIGIKEY MICROSMD050FCT RoHS Compliant Avail: KEY 26 3 27 1 28 1 29 1 IC00270 IC SMT, 74LVC1T45 1BIT DUAL BUS TXRX SOT23-6 PART U8, U9, U11 TEXAS INSTRU SN74LVC1T45DBVR DIGIKEY 296-16843-2-ND RoHS Compliant Avail: APR-05 IC00393 IC SMT, 74AHC1G125, SOT-23-5 Y PART U12 Texas Instrument SN74AHC1G125DBVR DIGIKEY 296-8744-2-ND RoHS Compliant Avail: IC00408 IC SMT, AT25DF041A, 4M-BIT SPI FLASH SERIAL EEPROM 8L SOIC Y PART U4 ATMEL AT25DF041A-SH-B DIGIKEY AT25DF041A-SH-B- RoHS Compliant Avail: ATMEL AT25DF041A-SSH-B DIGIKEY AT25DF041A-SSH- RoHS Compliant Avail: IND0024 INDUCTOR SMT, 680uH, 50mA 30-OHM 5% 1812 PART L1 COILCRAFT 1812LS-684XJLB RoHS Compliant Avail: JW MILLER PM1812-681J DIGIKEY M6078TR-ND RoHS Compliant Avail: JW MILLER PM1812-681J-RC RoHS Compliant Avail: 30 1 LED0034 LED SMT, 0805 GREEN CLEAR 2x1.25mm PART D2 KINGBRIGHT APT2012QGC-F01 RoHS Compliant Avail: LITE-ON LTST-C170GKT DIGIKEY 160-1179-2-ND RoHS Compliant Avail: KINGBRIGHT APT2012QGC RoHS Compliant Avail: CHICAGO MINAT 7012X5 DIGIKEY L61105TR-ND RoHS Compliant Avail: LITE-ON LTST-C170GKT DIGIKEY 160-1179-1-ND RoHS Compliant Avail: 31 1 LED0046 LED SMT, 3x2.5mm BI-COLOR RED/GREEN, LOW POWER PART D4 KINGBRIGHT APB3025ESGC NEUMANN RoHS Compliant Avail: KINGBRIGHT APB3025ESGC-F01 RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 8 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 32 1 Qty CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type LED0059 LED SMT, 0805 BLUE CLEAR 2x1.25mm PART D5 LITE-ON LTST-C170TBKT DIGI-KEY 160-1579-2-ND RoHS Compliant Avail: KEY 33 1 34 2 OSC0087 OSC SMT, 12.000MHz CRYSTAL 18PF FUND SMD (HC49) PART Y1 ABRACON COR ABLS-12.000MHZ-B2-T DIGIKEY 535-9067-1-ND RoHS Compliant Avail: RSMT0001 RES SMT, 0-OHM 0603 PART R59, R60 PANASONIC ERJ-3GSY0R00V DIGIKEY P0.0GTR-ND RoHS Compliant Avail: PANASONIC ERJ-3GEY0R00V DIGIKEY P0.0GTR-ND RoHS Compliant Avail: NIC COMPONEN NRC06Z0TRF RoHS Compliant Avail: SEI RMCF 1/16 0 5% R RoHS Compliant Avail: 35 5 RSMT0022 RES SMT, 100-OHM 1/10W 5% 0603 Y PART R16, R26, R42, R43, R45 SEI RMCF1/161005%R RoHS Compliant Avail: NIC NRC06J101TRF RoHS Compliant Avail: ROHM MCR03FZHJ1000 RoHS Compliant Avail: PANASONIC ERJ-3GEYJ101V DIGIKEY P100GTR-ND RoHS Compliant Avail: 36 1 RSMT0026 RES SMT, 100K-OHM 1/10W 5% 0603 Y PART R37 PANASONIC ERJ-3GSYJ104V DIGIKEY P100KGTR-ND RoHS Compliant Avail: KOA RK73B1JTTD104J RoHS Compliant Avail: SEI RMCF 1/16 100K 5% R RoHS Compliant Avail: ROHM MCR03EZPJ104 DIGIKEY RHM100KGTR-ND RoHS Compliant Avail: PANASONIC ERJ-3GEYJ104V DIGIKEY P100KGTR-ND RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 9 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER Qty 37 18 CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type RSMT0034 RES SMT, 10K-OHM 1/10W 5% 0603 Y PART R1, R6, R8, R9, R10, R12, R13, R15, R21, R27, R28, R32, R35, R38, R39, R47, R56, R57 ROHM MCR03FZHJ1002 RoHS Compliant Avail: PANASONIC ERJ-3GSYJ103V DIGIKEY P10KGTR-ND RoHS Compliant Avail: PANASONIC ERJ-3GEYJ103V DIGIKEY P10KGTR-ND RoHS Compliant Avail: KEY NIC COMPONEN NRC06J103TRF RoHS Compliant Avail: SEI RMCF 1/16 10K 5% R RoHS Compliant Avail: YAGEO RC0603JR-0710KL DIGIKEY 311-10KGRTR-ND RoHS Compliant Avail: 38 5 39 2 RSMT0052 RES SMT, 2.2K-OHM 1/10W 5% 0603 Y PART R22, R25, R33, R34, R55 PANASONIC ERJ-3GSYJ222V DIGIKEY P2.2KGTR-ND RoHS Compliant Avail: PANASONIC ERJ-3GEYJ222V DIGIKEY P2.2KGTR-ND RoHS Compliant Avail: NIC NRO6J222TRF RoHS Compliant Avail: SEI RMCF1/162.2K5%R RoHS Compliant Avail: RSMT0058 RES SMT, 2.7K-OHM 1/10W 5% 0603 Y PART R14, R17 PANASONIC ERJ-3GEYJ272V DIGIKEY P2.7KGTR-ND RoHS Compliant Avail: PANASONIC ERJ-3GSYJ272V DIGIKEY P2.7KGTR-ND RoHS Compliant Avail: ROHM MCR03EZHJ2.7K RoHS Compliant Avail: 40 3 RSMT0092 RES SMT, 4.7K-OHM 1/10W 5% 0603 Y PART R36, R49, R50 SEI RMCF 1/16 4.7K 5% R RoHS Compliant Avail: KOA RK73B1JTTD472J RoHS Compliant Avail: YAGEO/PHYCO 9C06031A4701JLHFT DIGIKEY 311-4.7KGTR-ND RoHS Compliant Avail: PANASONIC ERJ-3GEYJ472V DIGIKEY P4.7KGTR-ND RoHS Compliant Avail: ROHM MCR03EZHJ4.7K RoHS Compliant Avail: YAGEO/PHYCO 9C06031A4701JLPFT RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 10 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 41 5 Qty CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type RSMT0138 RES SMT, 1.0K-OHM 1/10W 1% 0603 Y PART R7, R18, R23, R54, R58 VISHAY DALE CRCW06031K00FKEA NEWARK 52K8015 RoHS Compliant Avail: PANASONIC ERJ-3EKF1001V DIGIKEY P1.00KHTR-ND RoHS Compliant Avail: ROHM MCR03EZPFX1001 DIGIKEY RHM1.00KHCT-ND RoHS Compliant Avail: KEY 42 10 RSMT0166 RES SMT, 330-OHM 1/10W 5% 0603 Y PART R2, R5, R24, R29, R30, R31, R44, R46, R51, R52 KOA RK73B1JTTD331J RoHS Compliant Avail: SEI RMCF 1/16 330 5% R RoHS Compliant Avail: PANASONIC ERJ-3GEYJ331V DIGIKEY P330GTR-ND RoHS Compliant Avail: 43 1 RSMT0189 RES SMT, 33-OHM 1/10W 5% 0603 PART R48 PANASONIC ERJ-3GEYJ330V DIGIKEY P33GTR-ND RoHS Compliant Avail: YAGEO/PHYCO RC0603JR-0733RL RoHS Compliant Avail: YAGEO/PHYCO 9C06031A33R0JLHFT DIGIKEY 311-33GTR-ND RoHS Compliant Avail: YAGEO/PHYCO 9C06031A33R0JLPFT RoHS Compliant Avail: KOA RK73B1JTTD330J RoHS Compliant Avail: SEI RMCF 1/16 33 5%TR RoHS Compliant Avail: 44 3 45 2 46 1 RSMT0209 RES SMT, 200K-OHM 1/16W 5% 0603 Y PART R3, R4, R19 PANASONIC ERJ-3GEYJ204V DIGIKEY P200KGTR-ND RoHS Compliant Avail: RSMT0382 RES SMT, 2.00K-OHM 1/16W 1% 0603 Y PART R40, R41 PANASONIC ERJ-3EKF2001V DIGIKEY P2.00KHTR-ND RoHS Compliant Avail: RSMT0561 RES SMT, 3.9K OHM 1/10W 5% 0603 Y PART R20 KOA SPEER RK73B1JTTD392J MOUSER 660-RK73B1JTTD3 RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 11 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 47 1 Qty CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type RSMT0098 RES SMT, 470-OHM 1/10W 5% 0603 PART R53 PANASONIC ERJ-3GEYJ471V DIGIKEY P470GTR-ND RoHS Compliant Avail: SEI RMCF1/164705%R RoHS Compliant Avail: NIC NRC06J471TRF RoHS Compliant Avail: KEY 48 1 SWITCH0059 SWITCH, PUSH BUTTON MOM 6mm LIGHT TOUCH, BLACK 7mm 260gF Y PART S1 PANASONIC EVQ-22707K DIGIKEY P12230SCT-ND RoHS Compliant Avail: PANASONIC EVQ-11U07K DIGIKEY P8084STB-ND RoHS Compliant Avail: 49 1 TRA0010 TRANS SMT, NPN, 2N2222A, SOT-23 Y PART Q3 ON SEMI MMBT2222ALT1G RoHS Compliant Avail: FAIRCHILD SEMI MMBT2222A_NL RoHS Compliant ZETEK UFMMT2222A RoHS Compliant Avail: ZETEK FMMT2222ATA DIGIKEY FMMT2222ATR-ND RoHS Compliant Avail: Avail: FAIRCHILD SEMI MMBT2222A DIGIKEY MMBT2222AFSTR- RoHS Compliant Avail: ON SEMI MMBT2222ALT1 DIGIKEY MMBT2222ALT1OS RoHS Compliant Avail: DIODES INC MMBT2222A-7-F DIGIKEY MMBT2222A-FDITR RoHS Compliant Avail: 50 3 51 1 52 1 TRA0035 TRANS SMT, NPN, 2N3904, SOT-23 Y PART Q2, Q5, Q7 ON SEMI MMBT3904 RoHS Compliant Avail: ON SEMI MMBT3904LT1G RoHS Compliant Avail: FAIRCHILD SEMI MMBT3904_NL RoHS Compliant FAIRCHILD SEMI MMBT3904 DIGIKEY MMBT3904FSTR-N RoHS Compliant Avail: TRA0048 TRANS SMT, HEX/MOS P-CH -20V -3.7A SOT-23 PART Q1 INTERNATIONAL IRLML6402TR DIGIKEY IRLML6402TR-ND RoHS Compliant Avail: INTERNATIONAL IRLML6402TRPBF DIGIKEY IRLML6402PBFTR- RoHS Compliant Avail: TRA0049 TRANS SMT, MOSFET N/P-CH 20V, SSOT-6 PART U6 FAIRCHILD SEMI FDC6420C MOUSER 512-FDC6420C RoHS Compliant Avail: Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 12 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-02038 REV: C ASSEMBLY NAME: PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 53 1 Qty CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type TRA0066 TRANS, SMT PNP 20V 4A MED PWR SOT-23 PART Q4 ZETEX ZXTP25020CFH DIGIKEY ZXTP25020CFHTR- RoHS Compliant Avail: KEY 54 1 TRA0068 TRANS SMT, PNP, 2N3906, SOT-23 PART Q6 FAIRCHILD SEMI MMBT3906 DIGIKEY MMBT3906FSTR-N RoHS Compliant Avail: ON SEMI MMBT3906LT1G DIGIKEY MMBT3906LT1GOS RoHS Compliant Avail: 55 1 56 22 -JUMPER- -JUMPER- PART (24 AWG BARE WIRE SOLID) @ R11 WIRE-BW-22-1/2 RoHS Compliant Avail: -SPARE- -SPARE- LOCATION DO NOT INSTALL PART DB0, DB1, J2, R61, R62, SCK, SDI, SDO, TB, TP1-TP6, TP9-TP10, TP12-TP15, VBUS * In Rev Field: Part Rev is controlled in the Specification Index Page 13 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-01924-03 REV: 1 ASSEMBLY NAME: PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) 1 1 Qty 02-01924-D CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type 2.2 PCB ASSY DWG, PICkit 2 44-PIN DEMO BOARD D KEY 2 1 03-01924 2.1 SCHEMATIC, PICkit 2 44-PIN DEMO BOARD D 3 1 04-01924 2.2 PCB FABRICATION, PICkit 2 44-PIN DEMO BOARD D 4 1 6 1 7 3 08-00126 6 LABEL, NEED HELP WITH ASSY/SERIAL LBL bottom side of board MIC0587 IC SMT, PIC18F45K20 44 TQFP (REV A4 OR LATER) Y PART U1 MICROCHIP PIC18F45K20-I/PT LEAB17T4XB04 RoHS Compliant Avail: CAP0013 CAP SMT, 0.1uF 0805 CER 50V 10% X7R PART C1, C2, C3 TAIYO UMK212BJ104KG-T DIGIKEY 587-1279-2-ND RoHS Compliant Avail: KEMET C0805C104K5RACTU DIGIKEY 399-1170-1-ND RoHS Compliant Avail: CAL-CHIP GMC21X7R104K50NTLF RoHS Compliant Avail: KEMET C0805C104M5RAC RoHS Compliant Avail: NIC COMPONEN NMC0805X7R104K50TRPF RoHS Compliant KEMET C0805C104M5RACTU DIGIKEY 399-1169-1-ND RoHS Compliant Avail: XICON CC501B104K MOUSER RoHS Compliant Avail: PANASONIC ECJ-2YB1H104K DIGIKEY PCC1840TR-ND RoHS Compliant Avail: KEMET C0805C104M5RAC RoHS Compliant Avail: YAGEO 08052R104K9B20D DIGIKEY 311-1140-2-ND RoHS Compliant Avail: Avail: 8 8 RSMT0444 RES SMT, 750-OHM 1/8W 5% 0805 PART R5-R12 YAGEO RC0805JR-07750RL DIGIKEY 311-750ARTR-ND RoHS Compliant Avail: VISHAY/DALE CRCW0805750RJNEA DIGIKEY 541-750ATR-ND RoHS Compliant Avail: PANASONIC ERJ-6GEYJ751V DIGIKEY P750ATR-ND RoHS Compliant Avail: ROHM MCR10EZPJ751 DIGIKEY RHM750ARTR-ND RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 14 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-01924-03 REV: 1 ASSEMBLY NAME: PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) 9 2 Qty CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type RSMT0008 RES SMT, 1.0K-OHM 1/8W 5% 0805 PART R1, R3 YAGEO/PHYCO 9C08052A1001JLHFT DIGIKEY 311-1.0KACT-ND RoHS Compliant Avail: KOA RK73B2ATTD102J RoHS Compliant Avail: SEI RMCF 1/10 1k 5% TR RoHS Compliant Avail: NOW PANASONIC ERJ-6GEYJ102V DIGIKEY P1.0KATR-ND RoHS Compliant Avail: YAGEO/PHYCO 9C08052A1001JLPFT RoHS Compliant Avail: KEY 10 1 RSMT0027 RES SMT, 10K-OHM 1/8W 5% 0805 PART R2 ROHM MCR10EZHJW10K RoHS Compliant Avail: YAGEO/PHYCO 9C08052A1002JLHFT DIGIKEY 311-10KATR-ND RoHS Compliant Avail: PANASONIC ERJ-6GEYJ103V DIGIKEY P10KACT-ND RoHS Compliant Avail: SEI RMCF 1/10 10k 5% TR RoHS Compliant Avail: NOW KOA RK73B2ATTD103J RoHS Compliant Avail: YAGEO/PHYCO RC0805JR-0710KL DIGIKEY 311-10KARTR-ND RoHS Compliant Avail: YAGEO/PHYCO 9C08052A1002JLPFT RoHS Compliant Avail: 11 1 12 8 RPOT0019 RES POT, 10K-OHM THUMBWH CERM ST PART RP1 BOURNS 3352E-1-103LF RoHS Compliant Avail: BOURNS 3352E-1-103 DIGIKEY 3352E-103-ND RoHS Compliant Avail: LED0033 LED SMT, 0805 RED CLEAR 2x1.25mm PART DS1-DS8 LITE-ON LTST-C170CKT DIGIKEY 160-1176-1-ND RoHS Compliant Avail: LITE-ON LTST-C170EKT DIGIKEY 160-1178-2-ND RoHS Compliant Avail: CHICAGO MINAT 7012X1 DIGIKEY L61101TR-ND RoHS Compliant Avail: * In Rev Field: Part Rev is controlled in the Specification Index Page 15 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 02-01924-03 REV: 1 ASSEMBLY NAME: PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) 13 1 Qty CR: Cross CS: Consign PL: Pack List D: Drawing B: BOM LBL: Label Q: Quality Check Bill of Materials C C P Part Number Rev Description Manufacturer Vendor / Part No R S L Type SWITCH0003 SWITCH SMT, PUSH BUTTON SPST MOM 6MM 160GF/230GF PART SW1 OMRON B3S-1002 DIGIKEY SW416-ND RoHS Compliant Avail: E-SWITCH TL3301NF260QG/TR DIGIKEY EG1868CT-ND RoHS Compliant Avail: E-SWITCH TL3301NF260QG DIGIKEY EG1868TR-ND RoHS Compliant Avail: E-SWITCH TL3301NF160QG/TR DIGIKEY EG1867CT-ND RoHS Compliant Avail: OMRON B3S-1000 DIGIKEY SW415-ND RoHS Compliant Avail: KEY 14 1 CON0107 CONN, HDR, 1x6 BREAKAWAY, 0.100" PITCH, 0.025 SQ, RA, (0.230/0.090) PART P1 AMP/TYCO 9-103325-0-06 DIGIKEY A32702-06-ND RoHS Compliant Avail: MILL-MAX 800-40-006-20-001000 RoHS Compliant Avail: MILL-MAX 800-10-006-20-001000 RoHS Compliant Avail: TYCO/AMP 103765-6 RoHS Compliant Avail: SAMTEC HTSW-106-08-G-S-RA RoHS Compliant Avail: JAMECO 677548 RoHS Compliant Avail: 15 1 16 1 CON0149 CONN, HDR, 1x2 BREAKAWAY, 0.100" PITCH, 0.025 SQ POST (0.100"/0.230") PART JP1 SAMTEC TSW-102-07-S-S RoHS Compliant Avail: SAMTEC TSW-102-07-G-S RoHS Compliant Avail: CON0084 CONN, SHUNT, 2-PIN SHORTING SHUNT (.100" SPACING) PART @JP1 SAMTEC SNT-100-BK-G RoHS Compliant Avail: HARWIN M7567-05 FARNELL 150410 RoHS Compliant Avail: TYCO/AMP 382811-6 DIGIKEY A26227-ND RoHS Compliant Avail: SULLINS SSC02SYAN DIGIKEY S9002-ND RoHS Compliant Avail: 17 4 18 11 MISC0041 MISC, RUBBER FEET, 0.40 SQ x 0.1 THK BLACK PART place on bottom side of board 3M SJ-5007 DIGIKEY SJ5007-0-ND RoHS Compliant Avail: -SPARE- -SPARE- LOCATION DO NOT INSTALL PART AUX, C4-C7, Cext, P2, Rext, Rf, X1, X2 * In Rev Field: Part Rev is controlled in the Specification Index Page 16 of 16
Microchip Technology Incorporated ASSEMBLY NUMBER: 14-00842 REV: 2 Product No: DV164131 ASSEMBLY NAME: PRODUCT TREE, PICKIT 3 DEBUG EXPRESS Pack List 12-00842 FINAL ASSY, PICKIT 3 DEBUG EXPRESS Rev: 1 Qty Part Number Description 1 DS51792 DOC, USING PICKIT 3 POSTER 1 DS51123 SOFTWARE, MPLAB CDROM 1 DS30210 DOC, "IMPORTANT INFORMATION" MICROCHIP INFORMATION 1 DS30030 DOC, WARRANTY/REGISTRATION CARD 1 CAB0019 CABLE, USB, A TO MINI-B, 1.8m/6ft 1 02-01924-03 PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) 1 10-00424 ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER Page 1 of 1
M w
Label Definition Need Help Label with Serial Number 08-00126 Rev 6 Assy# 10-00157-R2 Need Help? http://support.microchip.com Label Information Label Size: 0.5 x 2.0 Serial # JIT971217076 Text Size Need Help? (8pt, Bold) Assembly Number, Serial Number, Revision: (7pt) Graphics Microchip Logo provided as a true type font. (~24pt) Label Data Need Help? (10pt, Bold, Centered) http://support.microchip.com (7.5pt, centered) Assy# (7-9pt, Left) Serial# (7-9pt, Right) Part Number Part Number of the assembly that calls out the label Revision R1 - Revision of the assembly that calls out the label Serial Number: JIT- Manufacturer ID 95 - Year (95...) 28 - Work week product shipped (01-52) 1 Lot number (0-9) 0001 - Sequence Piece Number (0001-9999) Starts over with each new lot number. Location The 08-00126 label is to be located on the assembly that calls out the label.
Finished Goods Product Label with Barcode 08-00237 Rev 3 MPLAB ICD 2 IN-CIRCUIT DEBUGGER (1P) DV164005 US (1T) JIT070120001 Label not to scale Label Information Label Size: Customize to fit packaging Min Label Dimensions: 1 x 3 (ex. Brady: THT-18-423-3) Max Label Dimensions: 1-5/6 x 3-1/6 (ex. Avery: 5199) Color: White Text (Not Formatted Bold) Font: Arial (or other Sans Serif font) Size: Customize font size to fit label Min Font Size: 8 pt (Label identifier min 6pt) Max Font Size: 12 pt Label should, for the most part, contain information in the following order: Product Description: Part Number Identifier: Part Number: Country Code: Date Code Identifier: Serial Number: MPLAB ICD 2 IN-CIRCUIT DEBUGGER (1P) Precedes Part Number. Not included in bar code. Smaller font than Part Number. DV164005 US (1T) Precedes Serial Number. Not included in bar code. Smaller font than Serial Number. JIT070190001 For non-serialized/bulk product such as cables and accessories, this field is intentionally left blank. Product Description and Part Number are listed in the Bill of Materials (BOM) provided by Product Engineering. Graphics Country Code: CE Logo (if necessary) US United States Filename: CE-Logo.jpg CN China China e label TH Thailand Filename: RoHS-China.jpg Serial Number: JIT Manufacturer ID (designated by Microchip Development Systems) 0701 Date Code: Last two digits of year and two digits of work week (01-52) (underlined) 2 Lot number. This digit indicates the lot # (0-9). 0001 Sequence Piece Number (0001-9999) Starts over with each new lot number. Barcode Information: Barcode is Code 39 format (3 of 9) Barcode Height: size to fit label (provided it is still scannable) Min Ratio is 1:1 Max Ratio is 2.5:1 Font: Arial (or other Sans Serif font) Location: This label is attached to the outside of the product case. Vendor to insure that the serial number corresponds to the serial number assigned to the main electro-mechanical assembly contained in this product case.