APPLICATION BY SYNCRUDE FOR Decision No THE AURORA MINE Application No

OIL SANDS CONSERVATION RULES

The Role of Groundwater in Alberta s Tight Water Supply Environment. Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol.

How To Calculate 2007 Administration Fees In Alberta Energy And Utilities Board

MINERAL RIGHTS COMPENSATION REGULATION

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves

Savannah North Scoping Study Looking into the future 3 February 2016

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Focusing on Near Term Production and Exploration in Quebec

Detour Gold Provides New Life of Mine Plan for Detour Lake

TD Securities Calgary Energy Conference July 2014

Measurement Requirements for Oil and Gas Operations. The Alberta Energy Regulator has approved this directive on May 28, 2015.

ALCYONE REPORTS JORC SILVER RESOURCES

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines

Frequently Asked Questions

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

INTERNAL AUDIT REPORT ON THE FINANCIAL MANAGEMENT CONTROL FRAMEWORK FOR INITIATIVES RELATED TO CANADA S ECONOMIC ACTION PLAN (EAP) REPORT.

Incident Reporting Requirements

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

For personal use only ABN

Appendix A Use of Supporting Studies in Process for NI Documentation

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

PRESS RELEASE. November 12, 2013

Mako Project, Eastern Senegal Completion of Scoping Study

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

POWER ENGINEERS REGULATION

The Point Rousse Project - An Economic Analysis

Merlin Diamonds Limited

North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada. Resource Summary

TALKING POINTS: CUBA CASE STUDY

Reserve Definitions Total Petroleum-initially-in-place Discovered Petroleum-initially-in- place

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Report for the Quarter Ended 30 September 2015

OIL AND GAS CONSERVATION ACT

Establishing the feasibility of your proposed mining venture

SUBDIVISION AND DEVELOPMENT REGULATION

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

DeeThree Exploration Ltd. Announces Corporate Reorganization to Create Two Oil-Focused Companies

Richland Resources Limited ("Richland" or "the Company") (AIM: RLD) Resource Upgrade

Lalor Project Base Metal Zones and Gold Mineralization January 2009

NOVEMBER January 2013

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

MINERALS LAW OF MONGOLIA June 5, 1997 Ulaanbaatar CHAPTER ONE. General Provisions

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

Accounting for stripping costs in the production phase costs of waste removal and the associated benefit

Acquisition of Rice Lake. December 2015

Appendix 25. Content of a Competent Person s Report for Petroleum Reserves and Resources

Australian Pine Log Price Index

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

Exploration. Exploration methods

Development Variance Permit Application Package

Cannon Big Pit Given the Green Light

LOS ANGELES UNIFIED SCHOOL DISTRICT Policy Bulletin

AGRICULTURAL PESTS ACT

For personal use only

ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta

Directive 001: Requirements for Site-Specific Liability Assessments in Support of the ERCB s Liability Management Programs

REPORTING OF RESERVES AND RESOURCES IN CANADA DISCLAIMER

Frequently Asked Questions on the Alberta Tier 1 and Tier 2 Soil and Groundwater Remediation Guidelines. February 2008

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) Submission to WorkCover Western Australia. Legislative Review 2013

TIGER RESOURCES LTD ACN

REU Houston 2014 Enhanced Reserve and Resource Estimates. Trevor J. Rix Senior Engineer August 12, 2014

Chapter 5 Departments of Health and Justice and Consumer Affairs Health Levy

New technology and new approach uncovers new opportunities in WA s Fraser Range

number 2) proposed well's type, location, elevation, total depth, etc. 3) site inspection, 2) assess the adequacy of the proposed engineering

Corporate ICT Change Management

APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY

For personal use only

(A) There are other available remedies that the complainant can reasonably be expected to pursue;

PA PROMISe 837 Institutional/UB 04 Claim Form

The City of Calgary, 2009 PSC Operational Review Final Report

For personal use only

Transcription:

Directive 082 Release date: April 11, 2016 Effective date: April 11, 2016 Replaces previous edition issued February 13, 2013 Operating Criteria: Resource Recovery Requirements for Oil Sands Mine and Processing Plant Operations The Alberta Energy Regulator has approved this directive on April 11, 2016. <original signed by> Jim Ellis President and Chief Executive Officer Contents 1 Introduction... 2 1.1 Purpose of This Directive... 2 1.2 What s New in This Edition... 2 1.3 AER Requirements... 2 2 Bitumen Recovery... 2 3 Sterilization... 3 4 Annual Mine Plan... 4 5 Drilling Requirements... 4 5.1 Drilling Data Quality... 5 5.2 Drilling Density... 5 Directive 082: Operating Criteria: Resource Recovery for Oil Sands Mine and Processing Plant Operations (April 2016) 1

1 Introduction 1.1 Purpose of This Directive This directive identifies the operating criteria used by the Alberta Energy Regulator (AER) to identify the oil sands that an operator is required to mine as part of its operation and specifies the volume of bitumen that an operator is required to recover from its mining and processing operations. These criteria allow industry greater operational flexibility, while at the same time fulfilling the AER s mandate to effect conservation and prevent waste of the oil sands resources. 1 Although the criteria define minimum requirements, industry has committed to a program of continuous improvement. This directive applies to all oil sands mine and processing plant operations. 1.2 What s New in This Edition In this edition of Directive 082, all references to Directive 019: Compliance Assurance, which has been rescinded, and related information have been removed. 1.3 AER Requirements Following AER requirements is mandatory for the responsible duty holder, as specified in legislation (e.g., licensee, operator, company, applicant, approval holder, or permit holder). The term must indicates a requirement, while terms such as recommends and expects indicate a recommended practice. Each AER requirement is numbered. Information on compliance and enforcement can be found on the AER website. 2 Bitumen Recovery Four criteria will be used together to establish the volume of bitumen that an operator is required to recover each year from its mining and processing operations. The criteria will not be enforced individually. The criteria are as follows: The in situ oil sands cutoff grade is defined as the minimum bitumen content of the oil sands that would be classified as ore. It has been set at 7 weight per cent bitumen. The minimum mining thickness (mining selectivity) is defined as the minimum thickness of ore that can be separated from waste or waste that can be separated from ore. It has been set at 3 metres (m). 1 Oil Sands Conservation Act, section 3(a). 2 Directive 082: Operating Criteria: Resource Recovery for Oil Sands Mine and Processing Plant Operations (April 2016)

The ratio of cutoff total volume to bitumen in place (TV/BIP) 2 is defined as the minimum value for TV/BIP that would be used to determine the pit crest limits. It has been set at 12. Processing plant recovery is a variable factor based on the average bitumen content of the asmined ore. 3 The factor is determined as follows: If the average bitumen content of the as-mined ore is 11 weight per cent bitumen or greater, the recovery factor is 90 weight per cent. If the average bitumen content of the as-mined ore is less than 11 weight per cent bitumen, recovery is determined by the following equation, where x is the average weight per cent bitumen content of the as-mined ore: Recovery = 202.7 + 54.1(x) 2.5(x 2 ) The AER will conduct an annual compliance review and calculate the volume of bitumen an operator is required to recover using the above four criteria and other data provided by the operator. 1) Each calendar year, an operator must recover the volume of bitumen from its mining and processing operations that is equal to or greater than the volume of bitumen calculated by the AER and reported to Petrinex. 2) To ensure accuracy, an operator must submit to the AER its nonlicensed drillhole data. 3) An operator must provide quality mine survey data to allow the total volume of material mined during the reporting period to be calculated to within an accuracy of 1 per cent. It is critical to the success of operating criteria that each operator have in place an appropriate system to measure and report on its actual bitumen recovery for comparison against the calculated recovery. As stated in the Oil Sands Conservation Rules, it is an operator s responsibility to demonstrate to the satisfaction of the AER that it has the necessary measurement and reporting systems in place. 3 Sterilization The AER will use these operating criteria to identify the oil sands that an operator must mine from a given project area. It will also use these criteria to identify oil sands that may be affected by a proposed development but are outside the project area. 2 TV/BIP = (Ore Volume + Interburden Volume + Overburden Volume) (Volume of Bitumen in Place) where ore, interburden, and overburden volumes are in bank cubic metres and bitumen in place is in cubic metres and refers to the volume of bitumen in zones passing the minimum mining thickness and cutoff grade criteria. 3 A 0.5 m swap thickness at the base of each ore or waste zone will be allowed for to account for the impact of dilution/reduction on in situ grade and to convert ore to as-mined ore. Directive 082: Operating Criteria: Resource Recovery for Oil Sands Mine and Processing Plant Operations (April 2016) 3

Any action of an operator that results or tends to result in a reduction in the volume of oil sands mined (as identified by operating criteria) may be a case of sterilization. Such actions could include the location of permanent surface facilities on oil sands, bypassing oil sands located outside the mine site, or bypassing oil sands within the mine site. While the AER recognizes that some oil sands may be sterilized due to valid environmental, technical, economic, or operational reasons, it is the AER s objective to minimize such sterilization. 4) An operator must apply to the AER for an approval in all cases of potential sterilization. Any economic evaluation submitted in support of an application will be based on the principles previously established under Resource Recovery Economics. 4 Each application for sterilization will be subject to a detailed review by the AER, and the AER may approve or deny the application. 4 Annual Mine Plan Pursuant to section 30 of the Oil Sands Conservation Rules, an operator must submit to the AER, for its approval, details of its annual mine plan for the next calendar year of operation. This is required in order for the AER to maintain an awareness of development activity, identify potential issues that may affect resource recovery, and address areas of uncertainty that may be identified at the time of an application. 5) An operator must submit its annual drilling plan for approval. Submission of the drilling plan will provide the AER with a better opportunity to assess resource recovery issues such as the establishment of final pit limits and the impacts of out-of-pit developments on resource recovery. If the AER is of the opinion that the proposed drilling plan will not provide sufficient high-quality geological data to determine an operator s compliance with bitumen recovery requirements, the AER will identify the deficient areas and will require that the operator address them through additional drilling. Drilling requirements for ongoing operations may be specified by the AER on a case-by-case basis. 5 Drilling Requirements The following drilling requirements allow the AER to evaluate an application for a new mine or processing plant site or an extension in project area at an approved mine or processing plant site. The AER may consider requests by an applicant to vary the drilling requirements if the applicant demonstrates that circumstances warrant. However, to minimize the risk of the application being declared incomplete on the basis of inadequate drilling data, it is the applicant s responsibility to 4 As per letter to industry from the Energy Resources Conservation Board (predecessor to the AER) dated August 28, 2000. 4 Directive 082: Operating Criteria: Resource Recovery for Oil Sands Mine and Processing Plant Operations (April 2016)

meet with the AER well in advance of filing an application if it intends to request any variance in drilling requirements. 5.1 Drilling Data Quality 6) All new drilling must contain a suite of quality resistivity, gamma, and density logs; qualitycontrolled Dean/Stark core analysis; no more than 15 per cent evenly distributed lost core within the bitumen-bearing zone; and identifiable McMurray Formation top and base markers. 7) Older drilling results contain various qualities and combinations of the above information over all or portions of the McMurray Formation. Each of these older drillholes must have no more than 20 per cent evenly distributed lost core within the complete McMurray Formation and quality-controlled Dean/Stark core analysis. Drillholes whose analysis coverage and quality is suspect and log-only results are not accepted unless an applicant justifies their inclusion. 5.2 Drilling Density 8) An applicant must delineate the bitumen resource base under the mine and processing plant sites in accordance with the following: a) For all areas subject to development within the first ten years and for a 1 kilometre (km) buffer around these areas, the maximum spacing between drillholes meeting the drilling data quality requirements must be 350 m as determined by triangulation. If any one side of the triangle is greater than 350 m, the AER will determine if additional drilling is required. b) For all other areas subject to development after the first ten years and for a 1 km buffer around these areas, the maximum spacing between drillholes meeting the drilling data quality requirements must be 700 m as determined by triangulation. If any one side of the triangle is greater than 700 m, the AER will determine if additional drilling is required. Directive 082: Operating Criteria: Resource Recovery for Oil Sands Mine and Processing Plant Operations (April 2016) 5