SECTION 01311 - CONSTRUCTION SCHEDULE B. Part 1 - General... 1. 1.01 Work Included... 1. 1.02 Related Requirements... 1. 1.03 Reference Standards...



Similar documents
MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SCT AND MCAS MIRAMAR FOTS SOUTHERN CALIFORNIA TRACON

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

PN /16/ CRITICAL PATH METHOD PROGRESS SCHEDULE

Memorandum. Jeff Jasper, P.E. Director, Division of Design. Technical Support TEBM, Division of Construction. From: Jeremiah Littleton, P.E.

Spec. Standard: 11/27/ Revision: 11/27/06

SECTION a - CONSTRUCTION PROGRESS DOCUMENTATION

EXHIBIT 2-2-C PROGRESS SCHEDULES

Alexandria National Cemetery SECTION NETWORK ANALYSIS SCHEDULE

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

SECTION CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION COST LOADED CRITICAL PATH SCHEDULE

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised )

MODEL SCHEDULING SPECIFICATION

CRITICAL PATH METHOD (CPM) SCHEDULES

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

SECTION PROJECT PLANNING AND SCHEDULING PART 1: GENERAL 1.1 DEFINITIONS

Scheduling Glossary Activity. A component of work performed during the course of a project.

Operational Research. Project Menagement Method by CPM/ PERT

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

REQUEST FOR PROPOSALS FOR BANKING SERVICES

U.S. Department of Veterans Affairs. Facilities Management. Critical Path Method. Guidelines for Preparation of CPM Schedule Volume I

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

Managing programme change on an NEC3 form of contract

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

Document Comparison. AIA Documents A and A131CMc 2003

ADMINISTRATIVE PROCEDURES

Critical Path Analysis

Project Planning and Scheduling

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Use project management tools

Chapter 2: Project Time Management

ME 407 Mechanical Engineering Design Spring 2016

Region of Waterloo Stage 1 Light Rail Transit Project. Design and Construction Performance Output Specifications Article 19 Project Schedule

Project Time Management

TABLE OF CONTENTS Insuring of Industrial Mortgages

Section 100 Contractor Quality Control Program

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

The management of the projects with MS Project

A Short Introduction to Project Management

Chapter 1.7 Project Management. 1. Project financing is one of the step of project management- State True or False

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER

Construction Contract

MECH 896 Professional Development for MEng Students. Homework Discussion. Scheduling Overview. Winter 2015: Lecture #5 Project Time Management

CITY OF LANCASTER RFP NO LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE. July 24, 2015 BY 11:00 A.M.

(A) A mutual savings bank shall not convert to a stock savings bank unless the following conditions are satisfied:

Project Time Management

How project management software can smooth the way

CRITICAL PATH METHOD (CEE 320 VDC SEMINAR)

PURCHASE ORDER TERMS AND CONDITIONS

ITEM DOCUMENT CONTROL MANAGEMENT DESCRIPTION:

WORK PROGRAM GUIDELINES

PROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS. Table of Contents. Introduction Why Do We Need Schedules?...

MnDOT Project Management Office Presents: Schedule Updates. Presenter: Eric Costantino Senior Schedule Consultant DRMcNatty & Associates, Inc.

Time Planning and Control

Producing a programme under the NEC form of contract

California Department Of Transportation. Class # G0C094

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CHAPTER FIVE THE PROJECT SCHEDULE

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

THIS AGREEMENT is made effective as of this day of in the year of.

CONSTRUCTION CONTRACT TERMINOLOGY

Collaborative Scheduling using the CPM Method

A GUIDE TO NETWORK ANALYSIS by MICHAEL C GLEN

CONSTRUCTION PROJECT AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER

WEST VIRGINIA OFFICES OF THE INSURANCE COMMISSIONER Medical Malpractice Insurance Review Standards Checklist

Bond Form Commentary and Comparison

ADVERTISEMENT FOR BIDS

LR Case management pilot program for criminal cases. A. Scope; application. This is a special pilot rule governing time limits for criminal

Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas

Egypt Scholars Presented by Mohamed Khalifa Hassan Jan 2014

Professional Services Agreement

Protocol of the "procedure to follow in case of loss" pro forma (Text THB Mx 09/10 "A")

Cambridge International AS and A Level Computer Science

Time Management. Part 5 Schedule Development. Richard Boser

7.4.1 Be required to make exhaustive or continuous on-site reviews;

ARCHITECTURAL SERVICES CONTRACT. THIS CONTRACT FOR ARCHITECTURAL SERVICES is made by and between the County of Nueces, hereinafter called County and

Common File Server The secure common file server provided by the Department for storage of all contract documents.

MnDOT Project Management Office Presents: Schedule Float. Presenter: Jonathan McNatty, PSP Senior Schedule Consultant DRMcNatty & Associates, Inc.

EdExcel Decision Mathematics 1

MAINTENANCE AND PERFORMANCE BONDS

CSC 443: IT Project Management Midterm 1 exam - Spring semester March 21 st, 2012

Department of Banking, Insurance, Securities & Health Care Administration Vermont Insurance Division

Chapter 6: Project Time Management

3426. Commercial lines insurance; cancellation and renewal provisions. (a) Definitions. As used in this section: (1) "Covered policy" means, for

Devising new Software Project Risk Management Model: MARUNA

AGREEMENT FOR SERVICES

Construction Project Scheduling: Keys to Success

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS M. D. ANDERSON CANCER CENTER SERVICE PROVIDER for A PROJECT OF LIMITED SIZE OR SCOPE

Notes on the Critical Path Method for project planning and management.

Project Time Management

Unit 1: Project Planning and Scheduling

THE CORPORATION OF THE CITY OF BURLINGTON D1 - AGREEMENT

Additional Terms And Conditions E-2D Advanced Hawkeye (AHE) Pilot Production (Prime Contract No. N C-0057)

PROJECT TIME MANAGEMENT

Transcription:

SECTION 01311 - CONSTRUCTION SCHEDULE B CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment... 1 Part 2 - Products... 1 Part 3 - Execution... 1 3.01 Schedule of Operations... 1 3.02 Time Impact Analysis for Changes, Delays, Time Extensions, and Contractor Requests... 5 (06/23/03) Section 01311 TOC 1

SECTION 01311 - CONSTRUCTION SCHEDULE B PART 1 - GENERAL 1.01 WORK INCLUDED A. Provide a schedule of major construction activities. 1.02 RELATED REQUIREMENTS A. Section 01340, "Submittals" 1.03 REFERENCE STANDARDS 1.04 QUALITY ASSURANCE 1.05 MEASUREMENT AND PAYMENT PART 2 - PRODUCTS PART 3 - EXECUTION 3.01 SCHEDULE OF OPERATIONS The Contractor shall submit to the Engineer a Preliminary Progress Schedule and a Critical Path Method (CPM) Schedule (along with updates) as described below: A. Preliminary Progress Schedule - The Contractor shall submit to the Engineer, within ten (10) working days after date of the contract award, a Preliminary Progress Schedule covering the Contractor's activities during the first ninety (90) calendar days of the contract. The Preliminary Progress Schedule shall be subject to favorable review by the Engineer, and shall be amended as required by the Engineer. (06/23/03) Section 01311-1

B. Critical Path Method (CPM) Schedule - The Contractor shall submit an acceptable CPM Schedule to the Engineer within thirty (30) calendar days after the receipt of the Notice to Proceed. Subsequent revisions to said schedule shall be submitted as set forth hereinafter. The requirement for the CPM Schedule is included to assure adequate planning and execution of the work and to assist the Engineer in appraising the reasonableness of the proposed schedule and evaluating progress of the work. The CPM Schedule submitted under this Specification shall utilize a critical path method (CPM) format, either the precedence or arrow diagramming method with schedule showing completion of contract completion date, with neither Contractor nor the City owning "float." No more than one (1) progress payment will be made prior to submission and acceptance of the CPM Schedule. 1. The CPM Schedule system shall consist of diagrams and accompanying mathematical analyses. The diagrams shall show elements of the project in detail and an entire project summary. Diagrams shall show the order and interdependence of activities and sequence in which the work is to be accomplished as planned by the Contractor. The basic concept of a network analysis diagram shall be followed to show how the start of a given activity is dependent on the completion of preceding activities and its completion restricts the start of following activities. Detailed network activities shall include, in addition to construction activities, the submittal and approval of samples and equipment, fabrication of special material and equipment and their installation and testing. Cost value of each activity shall be included. All activities of the Owner and the Engineer that affect progress and required contract dates for completion of all or parts of the work shall be shown. The selection and number of activities shall be subject to favorable review by the Engineer. Summary networks shall be time-scaled. Duration shall be in working days and shall not exceed fifteen (15) working days, except for submittal and delivery items. Where the duration of continuous work exceeds fifteen (15) working days, work items in the Construction Schedule shall be subdivided by location, approximate stationing or other sub-element of the work. The graphic network diagram shall include for each activity, the description, activity number, the estimated duration in working days, and all activity relationship lines. The network diagram shall be drawn for the early start of all activities. If the precedence technique is utilized, the schedule report shall include a calendar in working days, a network report sorted by early start and a logic table report sorted by preceding work item. If the arrow technique is utilized, the schedule report shall include a calendar in working days, a network report sorted by early start, a network report sorted by I-J numbers, and a network sorted by slack time and I-J numbers. 2. The critical path shall be shown on all reports and on the graphic network diagram. The activities that constitute the critical path shall be identified. 3. The mathematical analysis of the network diagram shall include a tabulation of each activity. The following information shall be furnished as a minimum for each activity: Section 01311-2 (06/23/03)

a. preceding and following event numbers b. activity description and number c. estimated duration of activities d. earliest start date (by calendar date) e. earliest finish date (by calendar date) f. actual start date (by calendar date) g. actual finish date (by calendar date) h. latest start date (by calendar date) i. latest finish date (by calendar date) j. slack or float k. percentage of activity completed l. cost value of each activity 4. The program shall be capable of accepting revised completion dates as modified by approved time adjustments and re-computations of all tabulation dates and float accordingly. 5. Submission and review of the system shall be as follows: a. The complete network analysis system, consisting of the detailed network mathematical analysis and network diagrams, shall be submitted within thirty (30) calendar days after receipt of Notice to Proceed. b. The Contractor shall participate in a review and evaluation of the proposed network diagrams and analysis by the Engineer. Any revisions necessary as a result of this review shall be resubmitted for review by the Engineer within ten (10) calendar days. When completed, the favorably reviewed schedule shall then be the schedule to be used by the Contractor for planning, organizing, and directing the work, and for reporting progress. If the Contractor thereafter desires to make significant changes in his method of operating and scheduling, he shall notify the Engineer in writing stating the reasons for the change. (06/23/03) Section 01311-3

c. The Contractor shall submit at monthly intervals a report of the actual construction progress. Each monthly report shall cover a period of approximately thirty (30) days ending around the 30th of each month. The monthly reports shall be submitted within ten (10) calendar days of the end of the reporting period. i. If the project is proceeding on schedule, the monthly update report may consist of a marked-up copy of the graphical network diagram. This submittal shall clearly indicate the status of any minor shifts in sequence or schedule and the estimated completion date or percent complete of all activities currently in progress. The contract completion date shall also be indicated. The Contractor shall submit a narrative report relating to status of construction, the schedule, and factors that may affect the remainder of the schedule. The report shall show the activities or portions of activities completed during the reporting period. The report shall state the percentage of the work actually completed and scheduled as of the report date and the progress along the critical path in terms of days ahead or behind the allowable dates. ii. iii. If, in the opinion of the Engineer, the project is behind schedule, the monthly report shall include a revised network diagram and/or mathematical analysis showing the Contractor's proposed revised schedule. An analysis of the effect that the delay has on progress along other paths shall also be included in the report. The Contractor shall also submit a narrative report with each updated analysis which shall include but not be limited to a description of current and anticipated problem areas, delaying factors and their impact, and an explanation of corrective actions taken or proposed. A minimum of eight (8) copies of the periodic reports shall be submitted to the Engineer, who shall return two (2) copies to the Contractor after their approval. 6. To the extent that the favorably reviewed initial Construction Schedule, or revisions thereto, indicate anything not jointly agreed upon, it shall be deemed to be not favorably reviewed by the Engineer. Any omission of work from the detailed schedule, otherwise required for Contract compliance, will not excuse the Contractor from completing such work within any applicable completion date. The CPM Schedule shall be generated by computer methods. C. Schedule Review - Once each month, on a date mutually agreed upon, but no later than seven (7) working days after the monthly schedule progress report date, a jobsite meeting will be held to review the Construction Schedule and job progress. The Contractor shall also attend weekly meetings scheduled by the Engineer to review the progress of the work in the preceding week and in the subsequent work, coordinate the work with public agencies or other contractors as required, and allow the Engineer to plan his activities for testing, inspection, etc. Section 01311-4 (06/23/03)

D. Schedule Revisions - The conditions under which the Engineer will require revisions of the Construction Schedule include the following: 1. When delay in completion of any work item or sequence of work items results in an estimated extension of project completion by either twenty (20) working days or by five percent (5%) of the remaining duration of time to complete the Contract, whichever is less. 2. When delays in submittals or deliveries make re-planning or rescheduling of the work necessary. 3. When the schedule does not represent actual prosecution and progress of the work. 4. When any change to the sequence of activities, the completion date for major portions of the work, or when changes occur which affect the critical path. 5. When Contract modification necessitates schedule revision, the Contractor shall submit a schedule analysis of all change order work with his proposal. E. Cash Flow Projection - A cash flow projection shall be submitted with the Construction Schedule. This cash flow projection shall be revised and resubmitted when revisions of the Construction Schedule will result in changes to the projected cash flow. 3.02 TIME IMPACT ANALYSIS FOR CHANGES, DELAYS, TIME EXTENSIONS, AND CONTRACTOR REQUESTS A. When change orders are initiated, delays are experienced or the Contractor, desires to revise the logic, the Contractor shall submit to the Engineer a written Time Impact Analysis illustrating the influence of each change, delay, or Contractor request on the current contract schedule completion date. Each Time Impact Analysis shall include a fragment (fragmentary network analysis) demonstrating how the Contractor proposes to incorporate the change order, delay, or Contractor request into the Detailed Network. The analysis shall demonstrate the time impact based on the date of occurrence of the change, delay, etc., the status of construction at the point in time, and the event time computation of all affected activities. The event times used in the analysis shall be those included in the latest update copy of the Detailed Network or as adjusted by mutual agreement. (06/23/03) Section 01311-5

B. Activity time delays will not automatically mean that an extension of contract time is warranted or due the Contractor. It is possible that a strike or contract modification will not affect existing critical activities or cause non-critical activities to become critical, i.e., a strike or modification may result in only absorbing a part of the available total float that may exist within an activity chain of the network, thereby not causing any affect on the contract completion date or time. Float or slack is not for the exclusive use of or benefit of the Owner, Engineer, or the Contractor. Extensions of time or performance will be granted only to the extent that the equitable time adjustments for the activity or activities affected exceeds the total float along the activity chain involved at the time the change was ordered or delay occurred. C. Each Time Impact Analysis shall be submitted in triplicate and within fifteen (15) calendar days after a delay occurs or notice of direction for a change is given to the Contractor. In cases where the Contractor does not submit a Time Impact Analysis for a specific change order delay, or Contractor request within the specified period of time, then it is mutually agreed that particular change order, delay or Contractor request has no time impact on the contract completion date and no time extension is required. Approval or rejection of each Time Impact Analysis is by the Engineer and Owner and shall be made within fifteen (15) calendar days after receipt of each Time Impact Analysis unless subsequent meetings and negotiations are necessary. Upon approval, a copy of the time Impact Analysis signed by the Engineer and Owner will be returned to the Contractor. Upon mutual agreement by both parties, fragmentary network(s) illustrating the influence of change orders, delays, and/or Contractor requests will be incorporated into the detailed Network during the first update after agreement is reached. End of Section Section 01311-6 (06/23/03)