Technology services for existing facilities



Similar documents
Preferred partner. Investor Day London, March 17, 2015 Luis Araujo, CEO Svein Stoknes, CFO

Aker Drilling Riser Brazil

The 5th INTERNATIONAL CONFERENCE ON INTEGRATED OPERATIONS

New contract for jacket to the Johan Sverdrup Process Platform. 8 October 2015 Sverre Myklebust, Executive Vice President, Jackets

Direkte elektrisk røroppvarming

Windfarm Installation Barge. a novel approach to installing foundations in offshore wind

Aker Solutions Splits Into Two Companies

Northern Norway Subsea Value Chain

Third quarter results 2012

Third quarter results 2014

TECHNIP IN NORWAY GENERAL PRESENTATION

The Competitive Edge. The Foundation For Competing

Welcome at Aker Wirth

Det norske a new large independent. Odd Ragnar Heum, Det norske oljeselskap ASA

Capital efficiency and execution. London, 7 February 2014 Margareth Øvrum, EVP, Technology, projects and drilling

Norwegian Operators Conference Bernd Schrimpf Managing Director Wintershall Norge AS Stavanger 19 th November 2014

DNO ASA Corporate Presentation and Update

How To Profit From Oil And Gas

Monitor Oil PLC (incorporated under the laws of the Cayman Islands) (formerly Monitor Oil Production, Limited) Registered Number: HL (MONI)

FIELDS UNDER DEVELOPMENT. Ga p fr FACTS 111

Pareto Securities Oil & Offshore Conference

Ageing and life extension

Topsides, Floaters & Onshore Facilities

Bergen Group -positioned for growth

SWEDBANK SUMMIT. Det norske presentation. Oslo, 20 March 2014

Always finding new solutions. modulesolutions.no

Decommissioning and P&A in the Future

Odfjell Drilling Ltd.

How To Get Gas From A Boat

HOIS JIP for Improved NDT in the oil, gas & petroleum industries

BOARD OF DIRECTORS REPORT 2005

Agenda. Det norske always moving forward Ivar Aasen project learning points Field development what will it take? Observations

The Norwegian Model: Evolution, performance and benefits

How To Make A Profit From Oil And Gas

RAISED ACCESS FLOOR KAPP ALUMINIUM TRETUM OFFSHORE

Edvard Grieg Anders Henriksson, Lundin Petroleum Prosjektleder.

Worldwide Technip in Norway

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

Riser less Light Well Intervention (RLWI) - "A success for reducing OPEX - cost and increasing oil recovery for subsea completed fields"

Pipelines and land facilities

Certification of Materials and Components

Subsea Power Grid The key enabler for increased oil recovery IOR

Technip in Norway. 1 Technip in Norway

Total Subsea Services

NCS on track. London, 7 February, 2013 Øystein Michelsen, Executive Vice President, Development and Production Norway

To enable transport of wellstream over long distances. Compressor located by the wellheads.

Risk management and major accident potential in a safe late phase. Experience from Supervisory Activities.

Hydraulic Solutions keep your operations running specialist services

OFFSHORE FIELD DEVELOPMENT

GRANULAR POLYSILICON TECHNOLOGY

PIPELINES AND ONSHORE FACILITIES. ruc FACTS 127

Murchison Snorre A Gullfaks C. Kvitebjørn. N. Alwyn Oseberg. Bruce. Heimdal Jotun B. Alvheim. Ringhorne Grane. Glitne Volve Sleipner.

Fourth Quarter 2010 CEO Sverre Hurum CFO Erik Stubø

Subsea Market Review. Subsea 2011 February 9 10, Quest Offshore Resources, Inc. 1

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

OG21 - Oil and Gas in the 21st Century for the 21st Century Strategy DoCument

Oil and gas fields in norway Industrial Heritage plan

Efficient Operations for Inventory

Subsea Engineering Days 2015

Market Update. 27 th of May August 2013

NFLB. Kristiansand, June 12, Site Manager, Stein Espen Bøe

Erfaringer med GSM i Nordsjøen

Sandvik Materials Technology

Structural integrity management framework for fixed jacket structures

Heerema Fabrication Group Zwijndrecht Yard. Bart Pluijmers Asset & Facility Manager 03 oktober 2014

Focused Seismic Monitoring (FSM) on Snorre

DELIVERY THROUGH TECHNOLOGY Parque das Conchas Project

Havbunnsproduksjon. NTNU, 15 april 2013 Eldar Lundanes System Responsible for Controls and Data Management, Eastern Region.

GLOBAL INSPECTION AND CERTIFICATION

Subsea processing. Oslo 8. September 2011 Håvard Eidsmoen, Statoil

Non-Destructive Testing

DEEPSEALSM SERVICE SOLUTIONS

CBM, Big Data and the Proactive Enterprise

Maersk Drilling Annual Result 2014

Not getting any younger - a perspective on Ageing Rigs

The Norwegian Petroleum Directorate Annual Report. Offshore Norway 2001

Efficient Operations for Maintenance

Professionals in oil, gas and power projects LEADING IN OIL, GAS AND POWER PROJECTS

havard.bo[at] gmail.com

Total Subsea Solutions

Transcription:

part of Aker Kristian Risdal SVP C&T MMO 2010 Aker Solutions

MMO - Field life solutions 1992 Tie-in 1997 Decommissioning 1999 Satellite tie-in 1998 Platform integrity Statfjord B 2001 Compression modification Maureen 2004 Duty holder Gullfaks C 2005 Conversion to gas production Veslefrikk 2008 Reanalysis and studies Sleipner 2009 Drilling upgrade AH-001 2010 Swivel replacement Aker Solutions delivers: 2010In-service inspection Statfjord Low pressure A, B, C high value added 2010 production Ekofisk technologies and Oseberg B services in selected niches, Norne complex facility upgrade solutions, and Mongstad decommissioning technologies and services. Kristin Photo copyright Statoil, ConocoPhillips, Talisman, Total Slide 2 2010 Aker Solutions part of Aker

Mature fields is a growing market for Aker Solutions Debottelnecking Process improvements IOR Water injection Low Pressure Production Satellite tie-backs Drilling upgrades EOR Next step New technology Increased field life Safety solutions Technical integrity Inspection technology Field development Concept and technology > Facility upgrades Decommissioning 0,5-4 years Up to 40 years 1-4 years Examples of projects that can increase oil recovery Process improvement Gudrun tie-back Oseberg B Rig renewal Åsgard gas compression to Januar edit this 2011 text Slide 3 2010 Aker Solutions part of Aker

Concept and Technology (C&T) MMO; Locations and capacity Concept and technology Inspection and maintenance technology 494 168 149 Trondheim 25 110 Bergen 278 Aberdeen 35 25 35 Stavanger 149 Stavanger Bergen Trondheim Aberdeen Slide 4 2010 Aker Solutions part of Aker

MMO C&T Offering Stavanger Bergen Trondheim Aberdeen Front end Front end Front end Front end Flow assurance and dynamic simulations New technology Coabis Structural analysis and decommissioning Riser solutions Risk and decision making Laser scanning and modelling Structural analyses Flow assurance Asset management Inspection and maintenance technology Hazop Floater solutions SIL Computational fluid dynamics (CFD) Structural inspection and maintenance programme (SIMP) Technical integrity management services (TIMS) Slide 5 2010 Aker Solutions part of Aker

Existing technology services IOR projects Structural Fire Design / Structural Integrity Laser scanning and 3D Remodeling Inspection and maintenance technology (Advanced NDT Technology) Decommissioning Slide 6 2010 Aker Solutions part of Aker

IOR; Concept Selection, Feed and EPCI Photo: Statoil Photo: Statoil Illustration: Eni Norge Kristin low pressure production (LPP) Oseberg B drilling upgrade Marulk tie-in Slide 7 2010 Aker Solutions part of Aker

Structural Fire Design Integrated Analyses Kameleon FireEx analysis based on realistic leakage scenarios Corresponding non-linear structural response analysis Sufficient need for mitigating measures is found (e.g. fire protection, deluge, sectionalisation) KFX fire simulations Non-linear structural response Slide 8 2010 Aker Solutions part of Aker

Specialist Service - Laser scanning and 3D remodeling Laserscanner Pointcloud TruView 3D model PDMS Internet accessible Engineering Study Phase Engineering Phase Result: -Saved offshore trips, reduced POB -508 000 points/sec (surveyor 1 point/sec) -TruView`s, 360 panorama useful for all disciplines -Improved quality in engineering -Early involvement and scanning beneficial Slide 9 2010 Aker Solutions part of Aker

Decommissioning market Experiences from Maureen GBS and Frigg & MCP01 Huge growing market Cost per year (Bn NOK) No. of platform removals 35 30 25 20 15 10 Cost NCS Cost UKCS No. of platforms NCS No. of platforms UKCS 350 installations (UK/N 290/60) Market value 160-200 bn NOK Key prospects; Brent Valhall Statfjord A Large jackets UK 5 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Year of platform removal FMRD Model (FEED-Modification-Removal-Disposal) Close-down FEED Modification (Engineering & Preparation) Removal Disposal Offshore preparation can be regarded as an modification task without fabrication/installation (AKSO key competence) Slide 10 2010 Aker Solutions part of Aker

Aker Solutions Inspection and Maintenance Technology Asset Integrity Management Technical Integrity Management Service (TIMS ) Maintenance Engineering Structural Integrity Advanced NDT Phased Array Eddy Current & RFT Thermo Scale mapping Vibration/Fatigue/Stress Digital Radiography Rig Inspection Structures Equipment Rope Access In Service Inspection Fabrication and Weld Inspection Inspection Strategy Inspection planning Weld and Surface inspection Weld Inspection Welder certification Welding Procedure Qualification Corrosion under insulation Non Intrusive Inspection (NII) to February edit this 2011 text Slide 11 2010 Aker Solutions part of Aker

Advanced NDT technology Heat Exchanger Tube Inspection Advanced Ultrasonic Phased Array ultrasonic Thermographic Inspection Thermographic scale mapping Gas find Vibration & Stress Measurement 42,4 C 40 35 30 Temperatureline 1 25 20 16,1 C Slide 12 2010 Aker Solutions part of Aker

Buoyancy Tank Assemblies (BTA) for large jacket removal 48 large jackets UK/N weighing more than 8 000 tons Competition with HLVs (subsea sectionalizing and multiple lifts) BTA technology proven on Frigg DP2for transport to shore Reversed launching method to shore to be further developed Standardization of friction clamps to replace lifting brackets Removal of Frigg DP2 in 2009 Reversed launching Slide 13 2010 Aker Solutions part of Aker

Decommissioning technologies Large Demolition Excavators for piece small removal of integrated topsides Jack-up rig with relocatable deck and LQ (AKSO patent) Weighing membranes for weighing of modules FlexSeaFast for transport of large structures Key subcontracted technology areas; Subsea; cutting, ROV, dredging, debris removal Cleaning & flushing Large Demolition Excavators External/internal lifting tools Heavy lifting Slide 14 2010 Aker Solutions part of Aker

New technology services TIMS 3D visualisation and simulation IPort EOR Slide 15 2010 Aker Solutions part of Aker

Technical Integrity Management System An Aker Solutions initiative within Integrity Management Services. Slide 16 2010 Aker Solutions part of Aker

Use of 3D visualisation and simulation drilling rigs Some reference cases BP s Valhall IP Performance Optimisation Phase 1 All deliveries on time and budget Offshore commissioning time reduced with 70% for new TFM Each day in simulator = one day saved NPT rig time ROI for simulator within the first 6 months of operation First well after upgrade fastest ever drilled at Valhall IP Simulator has been a major contribution to Rig NPT decrease from 8%-2% Vantage (TMT 1) Platinum explorer, Drillhship newbuild Simulator used for Trouble shooting during commissioning Pre commissioning of CTRL systems Contributed to commissioning and delivery on time to Statoil edit this NCS text Rig CAT D Slide 17 2010 Aker Solutions part of Aker

IPort facilities Crew Changeover Briefing/Training Well Construction and Drilling Management Operator Simulator Training Mission Control and Support Rig Constructio n E support - Condition Based Monitoring Rig Concept Phase Upgrade and Modification to Statoil edit this NCS text Rig CAT D Slide 18 2010 Aker Solutions part of Aker

EOR How do we get more oil from the Norwegian Continental Shelf? Illustration: The Norwegian Oil Directorate Slide 19 2010 Aker Solutions part of Aker

The last drop Slide 20 2010 Aker Solutions part of Aker

Aker Solutions is part of the EOR future Aker Solutions has high ambitions to play an proactive role in future EOR challenges. Aker Solutions have started initiatives with NTNU EOR challenges Technology development and pilots to be focused The oil business has an common goal in reducing the EOR cost Projects with high risk will in many cases be replaced by other good IOR projects. Building on total Aker Solutions capabilities to become the preferred partner: Aker Offshore Partner Aker Geo Aker Process Systems Aker Well Services Aker Engineering & Technology Slide 21 2010 Aker Solutions part of Aker

Thank you for your attention! Don t hesitate to contact us if you have any questions. Heia Norge! Slide 22 2010 Aker Solutions part of Aker

Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Slide 23 2010 Aker Solutions part of Aker

Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Aker Solutions ASA s (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as expects, believes, estimates or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Aker Solutions businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Aker Solutions ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. Aker Solutions consists of many legally independent entities, constituting their own separate identities. Aker Solutions is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use Aker Solutions, we or us when we refer to Aker Solutions companies in general or where no useful purpose is served by identifying any particular Aker Solutions company. Slide 24 2010 Aker Solutions part of Aker