Horizon 2020 Call "Automated Road Transport"



Similar documents
Smart Electromobility Opportunities at European level

European GNSS Applications in Horizon 2020

IoT* : Large Scale Pilots. Pilot 5: Autonomous vehicles in a connected environment

ICT : Internet of Things and Platforms for Connected Smart Objects

FOT-Net Final Event. Myriam Coulon-Cantuer European Commission DG CONNECT Smart Cities and Sustainability

H2020-EUJ-2016: EU-Japan Joint Call. EUJ : IoT/Cloud/Big Data platforms in social application contexts

The Photonics Strategy in Europe in a Changing Landscape

Space Work Programme 2015

HORIZON ENERGY context and Calls 2014/15. Ljubljana, 23 January 2014 THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND INNOVATION

Sofware Engineering, Services and Cloud Computing

Internet of Things Value Proposition for Europe

HORIZON Energy Efficiency and market uptake of energy innovations. Linn Johnsen DG ENER C3 Policy Officer

Workprogramme 2013 objective 1.2. Sandro D Elia. Software & Service Architectures and Infrastructures

MIBE 2015 Overview of H2020. Louise Mothersole Innovate UK

A PLATFORM FOR SHARING DATA FROM FIELD OPERATIONAL TESTS

INTERNET OF THINGS FOCUS AREA

INTERNET OF THINGS FOCUS AREA

INTERNET OF THINGS FOCUS AREA

CONNECTing to the Future

NMBP calls in Leadership in Enabling and Industrial Technologies Work Programme

Introduction to the 2015 Horizon 2020 Energy Call for Proposals. 14 July 2014

COMMISSION RECOMMENDATION. of

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME. Terms of reference

Factories of the Future Horizon 2020: LEIT ICT WP FoF : Digital Automation

Sensing, monitoring and actuating on the UNderwater world through a federated Research InfraStructure Extending the Future Internet SUNRISE

Call to Action on Smart Sustainable Cities

ICT PSP Call Theme 1: ICT for a low carbon economy and smart Mobility

EU-Japan Joint Call. EUJ1 2016: 5G Next Generation Communication Networks. 7 October 2015 NCP Training

9360/15 FMA/AFG/cb 1 DG G 3 C

Smart Cities in the European context

European Innovation Partnership Smart Cities and Communities Henriette VAN EIJL, European Commission, DG MOVE-C2

Crucial Role of ICT for the Reinvention of the Car

Horizon Work Programme Smart, green and integrated transport

H2020-LEIT-ICT WP Big Data PPP

Factories of the Future Horizon 2020: LEIT ICT WP FoF : Digital Automation

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

Opportunities for the Automotive Sector in Horizon Cliff Funnell UK FP7/H2020 Surface Transport NCP FP7UK

Horizon Research e-infrastructures Excellence in Science Work Programme Wim Jansen. DG CONNECT European Commission

8970/15 FMA/AFG/cb 1 DG G 3 C

Research Infrastructures in Horizon 2020

EUK : South Korea: IoT joint research

The deployment of public transport innovation in European cities and regions. Ivo Cré, Polis

September 8th 8:30 AM 10:00 AM PL1: Reinventing Policy to Support the New ITS

ALICE Working Groups Descriptions. WG1: Sustainable Safe and Secure Supply Chains. Vision. Mision. Scope: Research and Innovation Areas and Challenges

ICT 6: Cloud computing

CEDR TRANSNATIONAL ROAD RESEARCH PROGRAMME Call Mobility & ITS

Horizon Work Programme Leadership in enabling and industrial technologies - Introduction

Horizon 2020 Secure Societies

Contribution of Automated Vehicles to Reduced Fuel Consumption and Air Pollution

Wireless traffic Safety network between Cars. CoMoSeF TULEVAT TRENDIT AUTOJEN M2M KOMMUNIKAATIOSSA WISAFECAR JA COMOSEF PROJEKTIT

Smart Grids development in Europe

INTERNET OF THINGS FOCUS AREA

Overview. EU Energy Focus. Key aspects of Horizon EU Energy Focus. Funding Actions eligibility and funding rates

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:


IoT R&I on IoT integration and platforms INTERNET OF THINGS FOCUS AREA

Smart Cities - A European Initiative

Automated road transport in Finland

High Performance Computing in Horizon February 26-28, 2014 Fukuoka Japan

Head of Unit Network Technologies DG CONNECT European Commission

Matthijs SOEDE Research Programme Officer Unit G3 Renewable Energy Sources DG Research and Innovation

H2020-LEIT-ICT WP ICT 14, 15, 17,18. Big Data PPP

Challenge 2: Cognitive Systems and Robotics

Litsa Kountouridou National Contact Point for ICT and FET. Tel:

The SESAR programme: Making air travel safer, cheaper and more efficient

OUTCOME OF PROCEEDINGS

HeERO First steps towards ecall deployment

SME support under HORIZON 2020

ETIP Wind Steering Committee meeting Monday 7th March :00 16:45 EWEA office, Rue d Arlon 80 6th floor Bruxelles AGENDA

ANNEX Removing bottlenecks and bridging missing links; Ensuring sustainable and efficient transport in the long run;

Future Internet Public-Private Partnership Call 3 (Objectives ) European Commission Communications Networks, Content and Technology DG

UN Global Working Group (GWG) on Big Data for Official Statistics. Presented by: Gemma Van Halderen

Danubius Basic NetWork

Strategy. Strategy for Lorry Parking Provision in England

CEN and CENELEC response to the EC Consultation on Standards in the Digital Single Market: setting priorities and ensuring delivery January 2016

Information on the move

Workprogramme

5G Network Infrastructure for the Future Internet

Agenda. The Digital Agenda for Europe Instruments to implement the vision EC actions to promote ehealth interoperability

ICT applications for safe cycling in Europe

The European Alliance for IoT Innovation

Common platform for automated trucks and construction equipment

RFIDs and European Policies

SUMMARY OF THE IMPACT ASSESSMENT

Transcription:

Horizon 2020 Call "Automated Road Transport" ERTRAC - Information Day Brussels, 06 November 2015 Liam Breslin Ludger Rogge Patrick Mercier Handisyde Unit Surface Transport DG Research & Innovation European Commission

Automated Road Transport Detect vehicle location and environment Vehicle-driver interface R&I priorities User and social acceptance Connectivity for advanced level of automation Safe AD systems in complex traffic situations Road infrastructure Automation Pilots 2

Call on "Automated Road Transport" Key priority in the H2020 Transport Research programme Indicative budget: 114 Mio Publication date: 14 October Priorities of this new call are fully in line with the Automated Driving Roadmap of ERTRAC Focus of the Call Support the short term introduction of automated driving systems for passenger cars, trucks and urban transport "Large-scale Field Operational Tests" to test technologies in complex traffic and driving conditions 3

Call "Automated Road Transport" topics and budget Stages Topic Title Action type ART-02 Automation pilots for passenger cars IA 2 ART-04 ART-05 ART-06 ART-01 ART-03 ART-07 Safety and end-user acceptance aspects of road automation in the transition period Road infrastructure to support the transition to automation and the coexistence of conventional and automated vehicles on the same network Coordination of activities in support of road automation ICT infrastructure to enable the transition towards road transport automation Multi-Brand platooning in real traffic conditions Full-scale demonstration of urban road transport automation CSA = Coordination and Support Action IA = Innovation Action; RIA = Research and Innovation Action RIA 2 Budget (EUR Mio) 2016 2017 48 RIA 2 13 CSA 1 3 IA 2 IA 2 IA 2 50 4

2017 2016 2015 Key dates Date Call "Automated Road Transport" 2016-2017 14 October Opening of 2016 call (ART-02, ART-04, ART-05, ART-06) 20 January 26 January 29 September 20 September Deadline of 2016 call Deadline for CSA (ART-06) 2nd stage deadline of 2016 call Opening of 2017 call (ART-01, ART-03, ART-07) 26 January 27 September Deadline of 2017 call 2nd stage deadline of 2017 call 5

Road vehicle automation - Funding opportunities in H2020 Call: Automated Road Transport Call: Mobility for Growth Large-scale demonstration(s) on cooperative ITS (MG-6.2-2016) Call "Internet of Things" (ICT Workprogramme) Large Scale Pilots (IoT-01-2016): Pilot on "Autonomous vehicles in a connected environment" Call "Applications in Satellite Navigation Galileo" (Space Workprogramme_ GALILEO-1-2017:EGNSS Transport applications Calls of ECSEL Joint Undertaking Topic ECSEL-10-2015:Smart Mobility (on ICT components e.g. sensors, microsystems, data fusion) 6

Automation pilots for passenger cars Challenge Test automated cars in mixed traffic situations on public roads Scope Test readiness and reliability of automated driving technologies for passenger cars in Field Operational Tests (FOTs) Evaluate effects of AD systems in a mixed traffic environment and under different conditions FOTs are possible for all driving situations Focus on Level 3! Testing in at least 3 countries Connectivity issues can be included in the FOTs Data collected should be made available through data sharing frameworks Expected impact Demonstrate impacts in terms of road safety, transport management, energy use, etc. Better knowledge about user acceptance and behaviour Estimated budget per proposal: EUR 18-36 Mio Topic ART-02-2016 (IA) 7

Safety and end-user acceptance aspects Challenge Develop automated driving technologies which are fully accepted by the users Ensure safety of automated driving systems (level 3) in all kinds of traffic situations. Scope Analyse user requirements, expectations and concerns related to the use of automated driving systems. Design safe human-machine interface and driver monitoring strategies Develop fail-safe/fault tolerant systems and solutions for safe operations of AV in complex and mixed traffic situations. Expected Impact Topic ART-04-2016 (RIA) AD systems which are fully safe, reliable and in line with user expectations Proper validation procedures for automated driving systems to test functional safety and performance Estimated budget per proposal: EUR 3-6 Mio 8

Road infrastructure to support Automated Driving Challenge Establish road infrastructure conditions to allow safe automated driving in the transition period Scope New methods of traffic flow modelling Design, upgrading and adaptation of hybrid infrastructure. Required forms of visual and electronic signalling and optical guidance Best ways to enlarge the electronic road horizon for AVs New safety performance criteria for road infrastructure Due consideration of CEDR-funded projects expected Expected impact Topic ART-05-2016 (RIA) Support stepwise introduction of automated driving by innovative modelling, design and engineering of road infrastructure Estimated budget per proposal: EUR 2-5 Mio 9

Challenge Coordination of activities in support of road automation More coordinated approach of Automated Vehicles testing More efficient sharing of data and experiences of different FOTs Scope (proposals should address area 1, area 2 or both areas) Area 1 Solid knowledge base on all ongoing R&D; Forum for National & European stakeholders; Support international cooperation activities (USA, Japan) Area 2 Platform of data exchange of FOT Strategy for sharing and exploiting collected data in National, European and international FOTs Expected impact Provide comprehensive picture of the state of the art in terms of R&D in automated road transport Better visibility, comparability and transferability of available results and data from FOTs Foster better cooperation between researchers and other stakeholders in Europe and beyond Estimated budget per proposal: EUR 0,5-3 Mio Topic ART-06-2016 (CSA) 10

ICT infrastructure for road transport automation Challenge Improve connectivity required for advanced level of automation Scope Development, testing and real-life validation of conncected ICT infrastructure architectures Functional & technical requirements for connectivity Architecture, functional & technical requirements for data generation, processing, storage and retrieval Tamper-proof in-vehicle platforms Dynamic and accurate localisation and mapping Expected impact Topic ART-01-2017 (IA) Provide input for standardisation Demonstrate progress regarding real time control systems for automated driving and more reliable processing of information Opening up of services market Estimated budget per proposal: EUR 5-15 Mio 11

Multi-Brand platooning in real traffic conditions Challenge Foster Europe-wide deployment of platooning in real-life, mixedtraffic conditions. Scope Develop, test and validate platooning concepts, technologies and functionalities Demonstrate feasibility and reliability of multi-brand platooning using C-ITS communication on a real corridor Expected impact Topic ART-03-2017 (IA) Increase energy efficiency of heavy duty traffic by about 15% Improve traffic management due to more efficient utilisation of road capacity Better safety of heavy duty vehicles in mixed traffic Estimated budget per proposal: EUR 15-20 Mio 12

Full-scale demonstration of urban road transport automation Challenge Proving reliability, safety, robustness of fully automated road transport in complex scenarios in urban areas Scope Demonstrate fully automated vehicles in urban areas in full-scale tests at Pan-European level Fully integrated into existing public transport systems To be tested in urban/suburban areas in complex traffic scenarios Assess user acceptance and effects on transport demand and modal transfer Expected impact Contribute to the development of modern, more efficient urban transport systems with reduced impacts on climate change, air pollution, noise, health, accidents. Estimated budget per proposal: EUR 10-15 Mio SMEs participation encouraged Topic ART-07-2017 (IA) 13

Road vehicle automation - Twinning EC and US DOT encourage twinning to exchange knowledge and experience and exploit synergies Twinning activities are on voluntary basis Full flexibility for defining twinning activities Examples for twinning activities: exchanges of information, data, visits, methodologies, researchers, results, joint workshops, publications etc. In the proposal phase: 1st stage proposal: broadly outline planned areas for twinning with US organisations 2nd stage proposal: specify the workpackages and tasks for "twinning" activities with US organisations No need to specify US organisations in the proposal FAQ will be available Twinning is foreseen only for a selected number of topics 14

Road vehicle automation - Proposed areas for twinning Automation topics Topic Title Action type ART-02 Automation pilots for passenger cars IA ART-04 ART-05 Safety and end-user acceptance aspects of road automation in the transition period Road infrastructure to support the transition to automation and the coexistence of conventional and automated vehicles on the same network RIA RIA ART-06 Coordination of activities in support of road automation CSA ART-01 ICT infrastructure to enable the transition towards road transport automation IA ART-03 Multi-Brand platooning in real traffic conditions IA ART-07 Full-scale demonstration of urban road transport automation IA ITS topics MG-6.1 Innovative concepts, systems and services towards 'mobility as a service' RIA MG-6.2 Large-scale demonstration(s) of cooperative ITS IA MG-6.3 Roadmap, new business models, awareness raising, support and incentives for the roll-out of ITS CSA 15

Thank you for your attention! Find out more: www.ec.europa.eu/research/horizon2020 www.ec.europa.eu/research/participants/portal/page/home 16