Project Cost Management



Similar documents
Profesor: Francisco Javier Sanz Pérez. by fjspsv, PMP Test C07_01

Unit 5: Cost Management (PMBOK Guide, Chapter 7)

Earned Value Exercise. Su-Cheng Wu. MET AD 644: Project Risk, and Cost Management. Paul B. Cook, PhD PMP

An introduction to Earned Value Analysis

INSE 6230 Total Quality Project Management

Earned Value Management Changes to the Glossary and Chapter 7 of the PMBOK Guide Third Edition.

Earned Value Formulae

Project Cost Management. Richard Boser

Procurement Management S# What? Formula Additional Notes CPPC CPFF CPAF CPIF T&M FPEPA FPAF FPIF FFP

Brainstorm. What is Cost and Project Cost Management?

Rules on using templates. MECH 896 Professional Development for MEng Students. Assignment #6A: Questions. Homework Discussion

700 Analysis and Reporting

Project Cost Management

COINS EVA Earned Value Analysis

Net Present Value (NPV)

IST 302 : Project Cost Management

PMP PREP QUICK STUDY GUIDE BY THE PERSIMMON GROUP

Chapter 7. (PMBOK Guide)

Chapter 7: Project Cost Management. Munawar

Net Present Value and Capital Budgeting. What to Discount

Earned Value Management (EVM) is a technique that is used to track the progress and status of a project and forecast its likely future performance.

How To Manage A Project

Week- 1: Solutions to HW Problems

Managing Project Budgets with MS Project. Sonja Streuber, PMP, SSBB

Project Cost Management

Chapter 9. Year Revenue COGS Depreciation S&A Taxable Income After-tax Operating Income 1 $20.60 $12.36 $1.00 $2.06 $5.18 $3.11

CHAPTER 7: NPV AND CAPITAL BUDGETING

Tracking Budgets and Schedules

EARNED VALUE MANAGEMENT. CASE STUDY USING MICROSOFT PROJECT

Why Use Net Present Value? The Payback Period Method The Discounted Payback Period Method The Average Accounting Return Method The Internal Rate of

Adjust MS Project default settings to meet the needs of your project. Loading Analysis is an iterative process. Where are you overloaded?

PROJECT COST MANAGEMENT

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

PROJECTS SCHEDULING AND COST CONTROLS

CPM -100: Principles of Project Management

MODULE 2. Capital Budgeting

Earned Value. Valerie Colber, MBA, PMP, SCPM. Not for duplication nor distribution 1

Using Earned Value Management for Improving Processes. By Cynthia K. West

Earned Value Management Tutorial Module 6: Metrics, Performance Measurements and Forecasting. Prepared by:

Performing Net Present Value (NPV) Calculations

CHAPTER 14 COST OF CAPITAL

Introduction to earn value management in Civil Engineering

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

The Two Most Useful Earned Value Metrics: the CPI and the TCPI

CHAPTER 7 MAKING CAPITAL INVESTMENT DECISIONS

CAPITAL BUDGETING. Definition. Time Value of Money [TVM] TVM is the reward for postponement of consumption of money.

Module 5 Cost Management PMP Exam Questions

CARNEGIE MELLON UNIVERSITY CIO INSTITUTE

The Time Value of Money

Which projects should the corporation undertake

Capital Budgeting: Decision. Example. Net Present Value (NPV) FINC 3630 Yost

Chapter 9 Cash Flow and Capital Budgeting

$1, , ,900 = $4,700. in cash flows. The project still needs to create another: $5,500 4,700 = $800

AACE International Recommended Practice No. 86R 14

Chapter 7: Project Cost Management. Information Technology Project Management, Fourth Edition

Integration of Income Management and Cost Management: A Complementary for Financial Analysis of Projects. Abstract. Introduction

Chapter 5: Project Cost Management

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

Oklahoma State University Spears School of Business. Capital Investments

technical tips and tricks

CHAPTER 11. Proposed Project. Incremental Cash Flow for a Project. Treatment of Financing Costs. Estimating cash flows:

Solutions to Chapter 8. Net Present Value and Other Investment Criteria

How To Get A Profit From A Machine

L10: Budgeting and Cost Control. Olivier de Weck

Chapter 11 Cash Flow Estimation and Risk Analysis ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS

PMP Exam Preparation Answer Key

Estimating Cost at Completion - Judgment & EV Information

PMP Exam Tips on Cost Management, Fourth Edition. Parallels between Cost and Time estimating:

Chapter 7: Net Present Value and Capital Budgeting

PMI Lexicon of Project Management Terms

Planning for Capital Investments

Project Management Seminars. Financial Management of Projects

Towards a Multi-Dimensional Framework for Assessing the Value of. Software Projects

Earned Value Management Guidelines

Project Control with ProTrack

Simple Earned Value (Using MS Project 2010)

Lecture Slides for Managing and Leading Software Projects. Chapter 8: Measuring and Controlling Work Processes

( ) ( )( ) ( ) 2 ( ) 3. n n = = =

Investment Decision Analysis

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION

The table for the present value of annuities (Appendix A, Table 4) shows: 10 periods at 14% = = 3.93 years

Problems on Time value of money January 22, 2015

Earned Value Management and the Government Program Office. Blair Alan Knapp Jr. MSPM PMP

Bank: The bank's deposit pays 8 % per year with annual compounding. Bond: The price of the bond is $75. You will receive $100 five years later.

Towards a Complete Earned Value Analysis. Sam Sharp and Peter Hall. Paper # 166

Session #5 Capital Budgeting - II Damodaran - Chapter 9: 6,12,16,18 Chapter 10: 2,10,16(a&b) Chapter 11: 6,12,14

Appendix D Glossary Of Terms

Earned Value and Agile Reporting

1.040 Project Management

Project Management: Tracking Progress and Earned Value with MS Project 2003

PERCEPTION. Tracking Progress & EAC

Chapter 5 Capital Budgeting

What is the net present value of the project (to the nearest thousand dollars)?

Capital Budgeting Further Considerations

Capital Budgeting continued: Overview:(1) Estimating cash flows (2) CB examples (3) Dealing with uncertainty of cash flows

Project Management. ZEUS Student Seminar on 14 th November 2003 by Riko Wichmann. Riko Wichmann, MPY Zeus Student Seminar - PM,

Chapter 13 Capital Budgeting: Estimating Cash Flow and Analyzing Risk ANSWERS TO END-OF-CHAPTER QUESTIONS

Tools for Project Evaluation. Nathaniel Osgood 1.040/1.401J 2/11/2004

EVM.01. Earned Value Analysis Why it Doesn't Work

Transcription:

Project Cost Management Guide to Mathematical Questions PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc.

Present Value and Net Present Value (NPV) Present Value Present Value is the future value (FV) of a payment discounted at a discount rate (r) for the delay in payment. Example of Present Value: Assume that $ 1,100 (FV) is going to be invested one year (n) from now. The discount rate (e.g. inflation) is 10% (r). What is the Present Value? Answer: Present Value = FV. = $ 1,100. = $ 1,100 = $ 1,000 (1 + r/100) n (1 + 10/100) 1 1.1 What this means: The future value of today s $1000 is $1100 after one year. Thus, there is a decrease in the value of money. Net Present Value (NPV) Net Present Value (NPV) = (Present Value of All Cash Inflows) - (Present Value of All Cash Outflows) Project Selection Criteria: Select the project with the maximum Net Present Value. The time value of money is already taken into account while calculating NPV. Example: There are 2 projects. Project A has as NPV of $ 1,000 and will be completed in 5 years. Project B has a NPV of $ 800 and will be completed in 1 year. Which project will you select? Answer: Project A will be selected. The fact that project B has a lesser duration than project A does not matter because time is already taken into account in NPV calculations. 2

Internal Rate of Return (IRR) Discount Rate on an investment which makes present value of cash inflows equal to present value of cash outflows Project selection criterion: Select a project with higher IRR Example: There are 2 projects. Project A has an IRR of 15% and will be completed in 5 years. Project B has an IRR of 10% and will be completed in 1 year. Which project will you select? Answer : Project A will be selected. (The fact that project B has a lesser duration than Project A does not matter because time is already taken into account in IRR calculations.) 3

Payback Period and Life Cycle Cost Payback Period Number of years required for an organization to recapture an initial investment Discount rate is not taken into account in payback period calculations Project selection criterion: Select a project with a shorter payback period Example: There are 2 projects. Project A has an investment of $ 500,000 and payback period of 3 years. Project B has an investment of $ 300,000 and payback period of 5 years. Using the payback period criterion, which project will you select? Answer : Project A will be selected. (The fact that project B has a lower investment than project A will not impact the selection.) Life Cycle Cost The overall estimated cost of a particular project alternative over the time period corresponding to the life of the project. Includes Direct and Indirect Costs Periodical or continuing costs of operation and maintenance Project selection criterion : For 2 projects having the same investment, select a project with lower Life Cycle Cost. 4

Benefit Cost Ratio (BCR) BCR = Benefits (or Payback or Revenue) Costs Selection criterion: Select project with a higher BCR BCR > 1 means that benefits (i.e. expected revenue) is greater than the cost. Hence it is beneficial to undertake the project. Project selection criterion: Select a project with a higher BCR Example: There are 2 projects. Project A has an investment of $ 500,000 and a BCR of 2.5. Project B has an investment of $ 300,000 and a BCR of 1.5. Using the Benefit Cost Ratio criterion, which project will you select? Answer : Project A will be selected. (The fact that project B has a lower investment than project A will not impact the selection.) Benefit / Payback / Revenue = Cost + Profit earned or Cost Loss incurred 5

Opportunity Cost and Sunk Cost Opportunity Cost: This is the cost of passing up the next best choice while making a decision. Once the best option is decided, the opportunity cost of not choosing the other option is determined. Example: There are 2 projects. Project A has as NPV of $ 1,000. Project B has a NPV of $ 800. What is the opportunity cost if Project A is selected? Answer : If project A is selected, NPV is $ 1,000. If Project A is selected and Project B is rejected, project with NPV of $ 800 will not be executed. Hence the opportunity cost of Project A = $ 800. Sunk Cost: This is the cost that has already been incurred therefore cannot be avoided. Project selection criterion: When deciding on the best option, ignore the sunk cost, because it has already been incurred and cannot be avoided. Example: Project A had an initial budget of $ 1,000 out of which an amount of $ 800 has already been spent. To complete Project A, we still need an additional $ 500. Project B requires $ 1200 to complete. Which project do you select? Answer : $ 800 spent in Project A is sunk cost hence should be ignored. So: Cost of completing project A = $ 500 Cost of completing project B = $ 1200 Hence, we should select project A. 6

Depreciation Depreciation is the decrease in value of an asset over a period of time and is considered for accounting and tax purposes. Depreciation Methods: Straight Line Depreciation: The asset depreciates by the same amount every year Initial Cost Salvage Value Accelerated Depreciation: The asset depreciates more rapidly in this method during the initial years as compared to the Straight Line method. Other methods of depreciation are: Double Declining Balance Sum of the Year s Digits Initial Cost Salvage Value time time 7

Earned Value Management Acronym Term Description Formula PV (BCWS) Planned Value (Budgeted Cost of Work Scheduled) The authorized budget assigned to the schedule work to be accomplished for a schedule activity or WBS component. EV (BCWP) Earned Value (Budgeted Cost of Work Performed) The value of work performed expressed in terms of the approved budget assigned to that work for a schedule activity or WBS component. AC Actual Cost Actual Cost of work completed that is incurred and recorded. SV Schedule Variance A measure of schedule performance on a project. Negative SV: Behind schedule Positive SV: Ahead of schedule EV PV CV Cost Variance A measure of cost performance on a project. Negative CV : Over budget; Positive CV : Under budget EV AC CPI Cost Performance Index A measure of cost efficiency on a project. Value got for 1 $ of actual cost EV = (BAC) AC (EAC) SPI Schedule Performance Index A measure of schedule efficiency on a project. Progress as a % of planned progress EV PV 8

Earned Value Management (continued) Acronym Term Description Formula EAC Estimate at Completion The expected total cost when the defined scope of work will be completed. 1. AC + ETC 1. Original estimating assumptions no longer valid 2. Current variances are atypical; similar variances will not occur in the future 3. Current variances are typical; similar variances may occur in the future 4. EAC taking both CPI and SPI into account 2. AC + BAC-EV 3. AC+ {(BAC-EV)/CPI} Or BAC/CPI 4. AC+ {(BAC-EV)/(CPI*SPI)} BAC Budget at Completion Budget for the whole project EAC * CPI ETC Estimate to Complete From a particular point in time, how much more time is required to complete the project EAC AC VAC Variance at Completion Over or under budget BAC EAC TCPI To-Complete Performance Index The work remaining divided by the funds remaining. Equation expressed in terms of EAC: (BAC-EV) / (EAC-AC) Equation expressed in terms of BAC: (BAC-EV) / (BAC-AC) (BAC-EV) / (EAC-AC) (BAC-EV) / (BAC-AC) 9

Earned Value Management (Tips) Points to note: Positive Variances (e.g., SV, CV) are desirable All ratios greater than 1 (e.g., CPI, SPI) are desirable 10