Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com



Similar documents
Hanson Building Products. precast basement solutions

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Services Enclosures and Protected Shafts - Maintaining Compartmentation

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Planning Information. Passenger and Freight Elevators.

Number of Sides Required to Have a Handrail

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

CHAPTER 11 STORM DRAINAGE

S WORK CATALOGUE FAA29100H_BWC

Installation Guide. DEVIreg 530. Electronic Thermostat.

Preventing water damage in the basement

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

P.A.L. S SPECIFICATIONS

Mechanical Engineering and Material Handling Aspects of NSDF

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Conlift1, Conlift2, Conlift2 ph+

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts

Basement Moisture Problems

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

WATERPROOFING OF WET ROOMS

LANDSCAPING AQUA SPORT. Rainwater treatment using filter substrate channel. DIBt approval applied for

PERFORMANCE GUIDELINES

Operating Instructions

Brochure EX

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Technical requirements

What Causes Foundation Leaking?

Morgue refrigeration unit

Asphalt Shingle Application Requirements

EC DECLARATION OF CONFORMITY FOR MACHINES

Saferand easierinstallation

ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT

GYPSUM AREA SEPARATION FIREWALLS GA

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

18. SKATES, PLATFORM HAND TRUCKS, LIFTING TABLES AND HAND TROLLEYS

Gas Meter Clearances and Service Installation Requirements

MERO Floor Systems - CleanRoom

Free Stall Cleaner System with Cable. A new generation of equipment and systems. GEA Farm Equipment Houle

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS ELECTRIC HEATING UNITS MODEL: ETA / EKI

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Heating, air-conditioning, cooling

CHAPTER 11 STORM DRAINAGE

Asset Management Guide For Project Design Format

Freezer Floor Heaving and Solution

CEILING SYSTEMS. CI/SfB (35) Xy April [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design

Portable Air Conditioner

Technical handbook Panel Anchoring System

Ergo-Pro Single Line Solar Station Installation and Operating Instructions

Please also see 10 golden rules for correct Saniflo installation on

1 DESCRIPTION OF THE APPLIANCE

16. Storm water drainage

Confort 160. Sliding Systems. Sapa Building System

KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE

Lödige Goods Passenger Lifts

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Fire Safety In High Rise Building

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

RPV - RP - RA air handling units

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

39HQ Airovision Air Handling Units

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

ECOCIAT. Domestic hot water heat recovery unit

Lighthouse Engineering, L.L.C.

Pre-installation Manual. CONCEPT Processor 305 DW / 405 DW / 505 DW 505 DW XP

Confort 26. Sliding Systems. Sapa Building System

How To Read A Pipe From A Sensor

Elegant ECM. ELEGANT ECM air conditioners allow. The range is made up of 12 models: Ceiling Air Conditioner

Integrated Solar Radiant Systems

HERZ-Thermal Actuators

STR-600 Plate Dryer. 1. What it s meant for?

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

Concrete Waterproofing Systems. Integral Protection.

Insulated Roof & Wall Panels. Product Data Sheet. Trapezoidal Insulated Roof Panels KS1000 RW

Site Planning Guide Aug 2011

The kva RAnge

MODEL INSTALLATION INSTRUCTIONS

1.1 DIMENSIONS AND WEIGHT PAG LOAD CENTRE FOR LIFTING PAG STORAGE CONDITIONS PAG. 2

V1504 Vertical Platform Lift OWNER S MANUAL

To suit Daikin FDY "F" Series and FD "F" Series. (and other models incorporating BRC1B62/52 Remote Controller)

ITEM DESCRIPTION SPECIFICATION TENDER OFFER

BARRIER LIFT SYSTEM 2 BARRIER LIFT SYSTEM

Suffolk County Department of Health Services. Division of Environmental Quality

R E S I D E N T I A L H O U S I N G

Clinic Washer-Disinfectors. Washer-Disinfector Line

When considering Roof drainage design the following should be taken into account:

Fire Pump Plan Review March 2010

MERO Access Floor / Floor systems for data centers * *Ready for Cloud-Computing

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

301.7D. Mini Hydraulic Excavator

ArcticStore. product guide environmentally friendly storage solutions

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

Reticulation sewers in basements Technical guidelines

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

TARIFF CODE and updates standard

Transcription:

CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property

Dimensions: (Built to measure, all dimensions can be changed and adapted upon request and following acceptance) Technical zone: Need to provide a space of min. 2.0m 2 for technical area, accessible at all times for maintenance. When several Cardok systems are installed, one single hydraulic power pack will be sufficient to lift each platform separately. Need to install 2 watertight conduits for hydraulic pipes and electric cables, one separate conduit for each of them. The min diameter is 80mm (they can be cast in the concrete)

Characteristics: Standard option Lower platform load: 3000kg 2000kg / 2500kg / other Upper platform load: 3000kg Static 2000kg / 2500kg / other (Dynamic movement available upon request) Dimensions available for lower platform: 2800 x 5800 mm 2700/3100 x 5000/6000 / other Dimensions available for upper platform: 3000 x 6000 mm 2900/3300 x 5200/6200 / other Available height: 2000-4500mm other Concrete pit: (built by customer) The thickness of the walls needs to be defined by an engineer depending on the quality of the land. The walls of the pit must be formed of concrete and must to be perfectly flat and vertical without any protrusions. The weight of the entire installation together with the maximum load is borne by the concrete pit floor in 4 areas of 400 x 400mm. The static force of each of them is +30kN. The size can be increased, upon demand. Concrete quality according to the static requirement of the building but for the dowel fastening we require a concrete quality of min. C20/25. It s important to ensure that the pit edge remains watertight to avoid water entering the concrete cast. This can be achieved with asphalt for example. If the land has low permeability we recommend installing a draining system. Provision of a watertight passage is necessary for electrical supply of min. 80mm in diameter. Provision of a watertight passage is necessary for water drainage. (see drainage ) (made to measure, all dimensions can be changed upon request and upon acceptance by Cardok) A1 A2 B C D E F : standard 5860mm : standard 2860mm : standard 3000 mm : standard 670mm

Drainage: (to be performed by the customer) A circular gutter system around the upper platform will prevent water entering the pit. Need to install draining pipes in each corner. For locations with particularly exposed conditions we recommend an additional drainage changed around the outside pit. Need to install a drainage grid at the bottom of the pit. Where this is not possible, it s necessary to create a slope and a drainage area to install a small sump pump. The necessary dimensions are min 200x100mm and 50mm deep. To prevent any possibility of contamination of the ground water we recommend giving the pit floor an oil resistant coating as a means of protecting the environment and to facilitate cleaning. Installation: The client needs to provide a fixed or mobile crane which will serve to install the system in the pit as well as to unload the truck. Min. hook height and weight requirements are 4m / 6t. (Depend of the site configuration) Protection: (to be performed by the customer) It is necessary to install a manual or automatic gate in the underground, coordinated with Carlift to prevent access to the platform when it moves up or down. We recommend Eraflex doors which need only 1.8-4 seconds to lift up. We can also recommend an option with protective bellows installed around the bottom part of the lift. Finish: The finishing of the upper platform is up to the customer s wish and is not included in the price. We recommend a coating matching the surrounding land which can be asphalt, tiles, gravel, grass or aluminium. It must be determined before the system is built as the weight and the thickness of the coating needs to be taken into account. The standard coating will be 40mm thick and its weight will not exceed 70kg/m2. Other options are possible upon request. Electricity: The electrical components supplied by the manufacturer must be connected in accordance with the appropriate wiring diagram and local regulations. 400VAC / 20A (without options) 3PH+N+ PE (three-phase current) protected by FI Power of hydraulic pack 9.5kW Two electrical boxes must be installed outside with an emergency switch and key push buttons to lift or lower the platform. The boxes must be installed close to the platform. Noise: The electric motor is equipped with a noise protection case. The lifting system does not produce any noise except for some friction noise. Light: There are LED lights installed on the upper platform. If the technical zone is installed away from the concrete pit, it is necessary to install additional lights for maintenance.

Ventilation: We recommend providing a ventilation system in consultation with heating/ventilation/air conditioning engineers with the aim of obtaining continuous air exchange, reducing air humidity, preventing condensation and reducing moisture from cars (rain, snow, ice etc.). This helps considerably to reduce or to prevent corrosion and malfunctions due to corrosion. Maintenance: Regular maintenance by qualified personnel can be provided by means of an Annual Service Contract, included during the warranty period (without travel). Temperature: The installation is designed to operate between -5 C and +50 C. Atmospheric Humidity: 50% at +40 C. The electrical control panel must be installed in dry local between +3 C and +30 C Systems are designed for snow load zone II with up to 0.75 kn/m2 in accordance to DIN 1055-5. If the local circumstances differ from the above please contact us to provide it. Conformity test: All our systems are checked according to EC machinery directive 2006/42/EC and EN 14010. Notes: In case higher loading is required e.g. passage for fire brigade or delivery fuel oil, please contact us. The manufacturer reserves the right to modify or alter above specifications.