SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)



Similar documents
Shotcrete Quality Control and Testing for an Underground Mine in Canada

Example Specification for Concrete using Current Building Code Requirements

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

C. Section TESTING LABORATORY SERVICE.

PROPERTIES AND MIX DESIGNATIONS

Construction Specification for Concrete Curb and Concrete Curb and Gutter

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

1.5 Concrete (Part I)

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT

CA-48 TECHNICAL SPECIFICATION

Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

Guide Specification Precast Concrete Products

Lab 1 Concrete Proportioning, Mixing, and Testing

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING General Materials Equipment...

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

SPECIFICATIONS FOR REINFORCED CAST-IN-PLACE CONCRETE

SECTION PRECAST CONCRETE UTILITY STRUCTURES

GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 848 BRIDGE DECK REPAIR AND OVERLAY WITH CONCRETE USING HYDRO-DEMOLITION

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

Guide to Specifying Concrete Performance

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

Proposed Revision to Bridge Design & Drafting Manual

Recycled Concrete Pavement and Other Recycled Materials in Concrete Pavements

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS

Division 4 Section Concrete Masonry Specifications

Rapid Chloride Permeability Testing

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Wecryl Waterproofing System under surfacing supplied by others

MeltonStone Cast Stone Product Specifications

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

Construction Specifications for Keyhole Pavement Coring and Reinstatement

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

INDEX DESCRIPTION MATERIALS APPROVAL OF SUBBASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE

SECTION PRECAST CONCRETE STRUCTURES

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

SafetyBuletin. Concrete101 Aguidetounderstandingthequalitiesofconcrete andhowtheyaffectpumping

Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

Concrete Waterproofing Systems. Integral Protection.

Quality control: Annex-A.

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

Sustainable Concrete: The Role of Performance-based Specifications

Chapter 8 Design of Concrete Mixes

EXPERIMENTAL INVESTIGATION ON BEHAVIOUR OF NANO CONCRETE

Advancements in Permeable Pavements

Construction. Pre-Bagged Structural Waterproofing System. Product Description. Product Data. Tests. Form

Section Polished Concrete Finishing. Vexcon

PC-Concrete Injectable Concrete Anchoring and Repair System

(T indicates a Tropicalised version with extended workability. No change has been made to the formulation)

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Life-365 Service Life Prediction Model Version 2.0

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Moisture and Resilient Floor Covering

EFFECT OF NANO-SILICA ON CONCRETE CONTAINING METAKAOLIN

BRIDGE REHABILITATION. Maintaining and Repairing Existing Structures

MODEL CLAUSES FOR CIVIL ENGINEERING WORKS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

Wastewater Capital Projects Management Standard Construction Specification

Mass Concrete. Robert Moser CEE8813A Material Science of Concrete. Definitions & Standards, Thermal Cracking, and Temperature Rise

Concrete Specification for Cooling Tower and Basin

Division 9. SignaFlor Pad and Pour Flooring System

Quality Assurance Concepts. Outline

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

Division 2 Section Section 02795

4-02 Gravel Base Ballast and Crushed Surfacing

Standard Specification for Cold Weather Concreting ( ) Reported by ACI Committee 306. Nicholas J. Carino, Chairman* David A.

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

AGREGADOS RECICLADOS MITOS Y REALIDADES

HIGH-PERFORMANCE CONCRETE IN A BRIDGE IN RICHLANDS, VIRGINIA. Celik Ozyildirim, Ph.D. Principal Research Scientist

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description

MASONRY INFORMATION. Selecting and Specifying Mortar and Grout for Unit Masonry. Introduction. Desirable Mortar Properties. Selection of Mortar

Effects of Temperature and Fly Ash on Compressive Strength and Permeability of High-Performance Concrete*

Concrete Repair. Applications and Procedures

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM

SPECIFICATION Section Insulated Precast Concrete Wall Panels

SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Transcription:

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC) 1.0 DESCRIPTION This section details the requirements for materials and methods in the proportioning, mixing, transporting, placing, finishing and inspection of Cast in Place High Performance Concrete (HPC). 2.0 REFERENCES All reference standards shall be current issue or latest revision at the first date of tender advertisement. This specification refers to the following standards, specifications or publications: ASTM C1202, Electrical Indication of Concrete s Ability to Resist Chloride Ion Penetration Division 5 Section 7, Cast in Place Concrete 3.0 SUBMISSIONS AND DESIGN REQUIREMENTS Submission and design requirements shall be governed by the provisions found in Division 5 Section 7 of the Standard Specification, except that additional requirements as specified herein shall apply. At tender closing the Contractor shall advise the Department of the qualified ready mix concrete supplier, sources of fine and coarse aggregate, cement, fly ash and admixtures proposed for the project. The Contractor shall not be permitted to change the concrete supplier or alter mixture proportions without written permission from the Department. 3.1 Mixture Proportions/Test Requirements. Mixture proportions shall be selected on the basis of a 75 year design life and all concrete in the structure shall have a minimum compressive strength of 45 MPa in 28 days. In addition to the test requirements found in Division 5 Section 7, the Contractor shall perform all necessary tests indicated in this specification to demonstrate the long term performance and durability of the materials and concrete mixtures. The Contractor shall provide the following information, at least two weeks in advance of concrete placement, on the concrete mixture design proposed. Plastic Concrete Tests Slump (CSA A23.2-5C) Air Content of Plastic Concrete by Pressure Method (CSA A23.2-4C) Mass Density and Yield (CSA A23.2-6C) Compressive Strength Testing (CSA A23.2-9C) 2 cylinders to be tested at 28 days Air Void Analysis on Hardened Concrete (ASTM C457) tested at 7 days Electrical Indication of Concrete s Ability to Resist Chloride Ion Penetration (ASTM C1202) tested at 28 days Alkali Reactivity Test Results 4.0 MATERIALS 4.1 Aggregates. The fine and coarse aggregates shall be normal density and conform to the requirements of CSA A23.1, except as modified herein. Upon acceptance of the aggregates, the source and method of manufacture shall not be altered for the duration of the contract. Aggregates shall be stored and maintained in such a manner to avoid the inclusion of foreign materials in the concrete and such that no equipment will be operated on the storage piles. The stockpiles shall be constructed to prevent segregation or contamination. Prior to the start of any concrete placement, the ready mix concrete supplier shall have at the place of production, sufficient quantity of aggregates to complete the entire concrete section scheduled for that day. Fine aggregate shall be washed and classified to conform to the gradation limits specified in CSA Standard A23.1. Coarse aggregates shall consist of washed crushed stone having a nominal size of 20 mm. The use of Alkali-Silica Reactive Aggregates will not be permitted. Coarse aggregates shall be non-reactive with respect to alkali aggregate reactivity (AAR). When tested in accordance with CSA A23.2-14A, the expansion of the test samples incorporating the aggregate source shall not exceed 0.04 percent at one year. In the absence of test data developed using the test method of CSA A23.2-14A, existing coarse aggregate sources having a satisfactory history of conformance, when tested in accordance with CSA A23.2-25A and having expansions not exceeding 0.150 percent, shall be acceptable. A satisfactory history of conformance shall be considered to consist of at least five (5) consecutive tests performed over a period not to exceed ten (10) years. Aggregate sources without a satisfactory history of conformance shall be evaluated for potential contribution to AAR using the test method of CSA A23.2-14A.. The maximum combination of flat, elongated and flat and elongated particles, as defined in CSA A23.2-13A, shall not exceed 10% of the mass. 4.2 Water/Admixtures. Water used in concrete production and curing shall conform to CSA A23.1 and be clean and free from injurious amounts of oil, acid, alkali soluble chlorides, organic matter, sediment or any deleterious substances. February 1, 2011 5-18-1

Air entraining admixtures shall meet the requirements of ASTM C260. Other chemical admixtures shall meet the requirements of ASTM C494. Admixtures shall be stored above freezing temperatures at all times and in accordance with the manufacturer's recommendations. Calcium chloride or any admixtures containing chlorides shall not be used. 4.3 Cementing Materials. Portland cement, blended cements and supplementary cementing materials shall meet the respective requirements of CSA Standard A3001. 4.4 Concrete Mixture Design and Properties. All mixture designs shall be proportioned as normal density concrete in accordance with CSA Standard A23.1, Alternative #1, and the Contractor shall accept responsibility for the concrete mixture and its properties. Concrete shall be proportioned using Portland cement, Type SF silica fume, fine and coarse aggregates, air entraining, water reducing, and superplasticizing and/or set retarding admixtures. Other supplementary cementing materials may include Class F fly ash and or Type S ground granulated blast furnace slag. Set retarding admixtures may be used as ambient and site conditions warrant. Concrete mixtures shall be designed to meet the following: Min. cementing materials content 420 kg/m 3 Max. water/cementing materials ratio 0.35 Nominal size coarse aggregate 20 mm Max. slump before superplasticizer 60 mm Slump after superplasticizer 180 +/- 30 mm Min 28 day compressive strength 45 MPa Maximum spacing factor of hardened concrete not to exceed 250μm Rapid Chloride ion penetrability at 28 days <1000 coulombs Maximum concrete temperature (from delivery equipment) thickness > 2 metres 18 o C thickness < 2 metres 25 o C Maximum concrete temperature(insitu) 70 o C Maximum temperature gradient 20 o C/metre Superplasticizer shall be used in all concrete. The mass of Type S silica fume, if added as a separate component to the mixture during the batching process, shall consist of full packages of the silica fume, rounded up to the next full package as required by the batch volume. 4.5 Curing and Finishing Materials. Curing compounds shall conform to ASTM C309 Type 2. Burlap shall be free from holes, clay or other substances which would have a deleterious effect on concrete. Evaporation reducer forming a monomolecular film which retards evaporation, shall be Confilm by Master Builders or an approved equivalent. The mixing ratio for Confilm shall not be less than one part of evaporation reducer to four parts of water. 4.6 Concrete Sealer. Concrete sealer shall be Type 1C silane penetrating transparent sealer and approved by Alberta Ministry of Infrastructure. The Contractor shall supply proof of acceptance to the Department prior to use. 5.0 CONSTRUCTION 5.1 General. Concrete shall be mixed, transported, placed and finished in accordance with Division 5 Section 7 except as modified herein. The depositing of concrete shall be a continuous operation until the placing of the section is completed. To ensure that the concrete is continuous and monolithic in nature, the time between previously placed concrete and newly deposited concrete shall not exceed 30 minutes. Concrete shall not be placed when the air temperature exceeds 25 o C or is likely or predicted to rise above 25 o C during placement. The temperature of the formwork, reinforcing steel or other material on which concrete is to be placed shall not exceed 25 o C. Concrete placing methods and equipment shall be such that the concrete is conveyed and deposited at the specified slump, without segregation, and without changing or affecting the other specified qualities of the mixture. Vibrators shall be used to consolidate the concrete in all phases of construction. The deck shall be finished using a mechanical screed machine followed by bullfloating and final texturing. Final finishing, texturing and curing shall be completed within 1.5 metres behind the screed machine. A work bridge (mobile catwalk) shall be used following the screed machine for bullfloating and finishing operations. An evaporation reducer shall be used directly after initial screeding and/or between finishing operations as needed. Decks overlayed with a wearing surface shall be textured as indicated in Division 5 Section 7 of the Standard Specification. If concrete placement in the bridge deck is carried out with pumps or cranes, the Contractor shall be required to have available on site, at all times during placement, a minimum of two pumps or cranes or combination thereof. Concrete placement in bridge decks shall not February 1, 2011 5-18-2

be permitted between December 1st and March 31st unless otherwise advised by the Engineer. The Contractor shall take appropriate measures required to minimize defects in the concrete. These measures include but are not limited to: installation of wind breaks, installation of shelters, covering, protection from premature drying, timing of placements, additional workforce, and/or equipment. Upon completion of the work, the Engineer will conduct a survey to determine the extent, if any, of defects present in the structure. The method of repair for defects identified, requiring remedial action, shall be dependent upon the location and extent of the defect. Defects identified may result in repair, or rejection and replacement. 5.1.1 Cracks All cracks 0.15 mm and greater shall be repaired within the warranty period, regardless of location, size or cause in accordance with the following methodology. Cracks identified for repair shall be filled with a low viscosity epoxy resin such as Sika Canada s Sikadur 52, Sikadur LV55, or BASF S Epoxeal GS Structural, or an approved equal. The resin shall be applied by pressure injection or by gravity feed into the crack and allowing the sealant to be absorbed. A second application may be required, depending on the absorption and crack depth. The second application, if required by the Engineer, shall be made as soon as possible after the first application has set. All use and placement of resin materials shall be in accordance with the manufacturer s written instructions. Wider cracks, as identified from the survey may require a higher viscosity resin for repair. The Contractor shall submit manufacturer's data for the proposed resin in this case for approval prior to use. Excess resin in the vicinity of the crack shall require removal by grinding and/or abrasive blast cleaning at the Engineer's direction. 5.2 Curing: Decks shall be cured by fogging prior to covering with wet burlap. Fogging shall commence within 20 minutes after initial screeding and shall continue until the concrete achieves initial set to allow for the placement of the wet burlap. Water curing may be used in lieu of fogging, however, curing shall commence immediately to prevent the occurrence of cracking or drying of the surface. Burlap shall be pre-soaked by immersing in water for a period of 24 hours prior to placing. Two layers of burlap shall be applied to the surface overlapping each strip by 150 mm. Burlap shall be maintained in a continuously wet condition for seven consecutive days. Burlap shall be covered with a layer of moisture vapour barrier immediately following the placement of the burlap. The deck shall be maintained wet for a period of not less than 7 days. If work is conducted on other sections of the superstructure, before the 7 day curing period is completed, the contractor must ensure that the deck is maintained wet at all times during this work. All other sections of the structure may be cured with two(2) applications of curing compound (water based) applied within 20 minutes of initial screeding. Each application shall be applied at twice the manufacturer s suggested rate with the second application applied perpendicular to the first. Where bonding is critical between finished surfaces, concrete sections shall be moist cured only as described above for the deck. If formwork is used to aid curing, it shall not be removed until seven days after the concrete placement. In addition to the forms, areas exposed shall be cured in accordance with Division 5 Section 7. 5.3 Concrete Sealer. The Contractor shall apply two (2) coats of a silane penetrating sealer to all exposed concrete surfaces on the bridge, excluding the bridge deck driving surface, soffit, approach slabs, prestressed girders (if applicable), and surfaces covered with a waterproofing membrane or an asphalt concrete pavement wearing surface. Sealer shall be applied to all vertical surfaces to a depth of 600 mm below proposed finish grade. The sealer shall be applied in accordance with the manufacturer s written instructions. As a minimum, surface preparation shall consist of high pressure water or abrasive blast cleaning to provide a uniform texture and appearance removing curing compounds, dirt, oil, grease, tar, and other deposits which may affect the absorption of the sealer. Prior to the application of the sealer, concrete shall be moist cured for a period of 7 days prior to air drying for an additional 14 days. A Manufacturer s representative shall be present during the application of the sealer. 6.0 QUALITY CONTROL / QUALITY ASSURANCE Concrete shall be tested as per Division 5 Section 7 except as modified herein. The Department or it s representative shall have the right to sample and test all materials used in the mixture design and given access to the production facilities of the ready mix concrete supplier. Materials failing to meet this specification shall be immediately rejected. Concrete shall be tested for slump, air content and temperature prior to and after the addition of superplasticizer (if added on site ). Testing shall be carried out at the point of discharge from the truck and as close as possible to final deposit into the forms. The February 1, 2011 5-18-3

results obtained from testing as close as possible to final deposit into the formwork will be used for the purpose of acceptance and rejection. Sufficient superplasticizer shall be added to produce a consistency as indicated in Section 4 of this specification. Superplasticizer, added on site, shall be mixed into the load a minimum of five minutes prior to retesting. Concrete shall also be randomly tested for air content and rapid chloride permeability(rcp) in the hardened state. The frequency of testing for hardened air void and RCP shall be one (1) test for every 150 m 3, of the same class concrete, unless otherwise specified by the Engineer. The hardened air voids shall be tested at 7 days and the RCP shall be tested at 28 days. A minimum of two hardened air void and RCP tests shall be conducted on each project with one of each carried out at the start of the project and one of each carried out near the end of the project. 7.0 METHOD OF MEASUREMENT 7.1 General. Measurement shall be made at the contract unit price per cubic metre for HPC. The quantity of concrete for payment shall be the volume in cubic metres computed from the dimensions shown on the drawings or as revised by the authority of the Engineer. No deductions shall be made for the volume of concrete displaced by steel reinforcement, joint material, structural shapes, chamfers, tops of piles, or cylindrical voids of 110 mm diameter or less. 8.0 BASIS OF PAYMENT 8.1 General. Payment will be made at the contract unit price bid per cubic metre for HPC or price adjusted as described below. The payment for HPC shall be considered full compensation for the cost of furnishing all materials, aggregates, cement, supplementary cementing materials, water, admixtures, including superplasticizers, and other materials, non-metallic expansion joint materials, tools, equipment, falsework, forms, bracing, labour, curing, surface finish, damp-proofing and all other items of expense required to complete the concrete work as shown on the plans, and as outlined in the specifications. All costs associated with the crack repair, or removal and replacement including additional testing, inspection, and/or reporting, as the result of the presence of defects, shall be borne by the Contractor. 8.1.1 Penalty/Bonus Adjustment. The penalty or bonus adjustment will apply to the calculated quantity of cubic metres of concrete incorporated into the work and accepted by the Engineer. The total adjustment added to or subtracted from payments due to the Contractor shall be the algebraic sum of all penalties and bonuses calculated for all the sub-lots (as described in Division 5 Section 7) in excess of 2 m 3. A Penalty/Bonus adjustment shall not apply if the sub-lot is less than 2 m 3. 8.1.2 Penalty Adjustment for Compressive Strength. Concrete which fails to meet the required 28 day compressive strength, by 5 MPa or less and is proven to be structurally adequate, may be accepted at an adjusted price. The penalty adjustment will be calculated based on the following formula: where PA = V x ($10 (SS - TS)) PA = Penalty Adjustment ($/m 3 ) V = Volume placed (m 3 ) SS = Specified strength (MPa) TS = Tested strength,(mpa) 8.1.3 Bonus Adjustment for Compressive Strength. When the sub-lot exceeds the specified strength the Department will pay a bonus adjustment up to 5 MPa above the specified strength. The bonus adjustment will be calculated based on the following formula; BA = V x ($2 (TS - SS)) where BA = Bonus Adjustment ($/m 3 ) V = Volume placed (m 3 ) SS = Specified strength (MPa) TS = Tested strength,(mpa) The bonus adjustment shall not exceed $10/m 3. If there is an individual strength result more than 5 MPa less than the specified strength, no bonus will be assigned for the sublot. 8.1.4 Penalty Adjustment for Hardened Air Voids Concrete which fails to have a total air content of 3% or more and a spacing factor of more than 0.250 μm or more, may be accepted at an adjusted price. The penalty adjustment will be calculated based on the pay factor for the core from Table 2. 8.1.5 Bonus Adjustment for Hardened Air Voids The bonus values, in $/m3 of concrete, are given in Table 1. 8.1.6 Penalty Adjustment for Chloride Ion February 1, 2011 5-18-4

Penetrability The payment reduction shall be calculated and applied as follows: PA = (C-1000)/5 where: PA = Penalty Adjustment in $/m3 C = average chloride ion penetrability of the sub-lot. to meet the original completion date, additional payment will not be made for the Cold Weather Concreting but t h e precautions taken shall follow the methods outlined herein. The Contractor must receive an extension, prior to the original completion date, if the contract exceeds the original completion date, before consideration will be given to the payment of Cold Weather Concreting. 8.3 Payment for Concrete Sealer. Payment for 8.2 Payment for Cold Weather Concreting. If it is considered necessary by the Department to place concrete in cold weather, additional payment for Cold Weather Concreting will be paid. Payment shall be as detailed in the Appendix C and shall be considered payment in full for the complete protection, as outlined in this specification. If, in the opinion of the Engineer, the placing of concrete under cold weather conditions is a result of unjustified delays, negligence, etc. on the part of the Contractor, the precautions described herein shall be followed and the cost thereof shall be borne in full by the Contractor. If the Contractor wishes to place concrete during cold weather, but if in the opinion of the Engineer, this is not required Concrete Sealer will be made at the contract lump sum price, which shall be full compensation for surface preparation, high pressure water and abrasive blast cleaning, installation, including labour, tools, equipment and incidentals necessary to complete the work to the satisfaction of the Engineer. Prior to the payment for this item the Manufacturer s representative shall provide to the Department a written report confirming that the s e a l e r was applied in accordance with the manufacturer s instructions. 9.0 WARRANTY February 1, 2011 5-18-5

TABLE 1 Bonuses for Air Void System Parameters in All Hardened Concrete $/m 3 Spacing Factor, μm Total Hardened Air Content 3.9 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7.0 7.1 <0.100 0 1 2 3 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 3 2 1 0 0.100 0 1 2 3 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 3 2 1 0 0.110 0 1 2 3 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 3 2 1 0 0.120 0 1 2 3 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 3 2 1 0 0.130 0 1 2 3 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 3 2 1 0 0.140 0 1 2 3 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 3 2 1 0 0.150 0 1 2 3 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 3 2 1 0 0.160 0 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 2 1 0 0.170 0 1 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 1 0 0.180 0 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 0 0.190 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0.200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 When a core has a total air content of 3% or higher and a spacing factor of 0.250 mm or less but its air void system parameters are outside the range given in Table 1, it shall be assigned a value of 0 $/m 3 for the purpose of calculating a bonus. February 1, 2011 5-18-6

TABLE 2 Pay Factor for Air Void System Parameters of Hardened Concrete for HPC Pay factor in % of Tender Item Price per Lot Total Hardened Air Content, % Spacing Factor, μm 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 >2.9 <0.100 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.100 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.110 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.120 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.130 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.140 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.150 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.160 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.170 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.180 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.190 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.200 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.210 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.220 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.230 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.240 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.250 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 100 0.260 50 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 95 0.270 47 50 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 95 0.280 45 47 50 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 93 0.290 42 45 47 50 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 90 0.300 39 42 45 47 50 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 88 0.310 36 39 42 45 47 50 52 55 57 59 62 64 67 69 71 74 76 79 81 83 86 0.320 33 36 39 42 45 47 50 52 55 57 59 62 64 67 69 71 74 76 79 81 83 0.330 30 33 36 39 42 45 47 50 52 55 57 59 62 64 67 69 71 74 76 79 81 0.340 27 30 33 36 39 42 45 47 50 52 55 57 59 62 64 67 69 71 74 76 79 0.350 24 27 30 33 36 39 42 45 47 50 52 55 57 59 62 64 67 69 71 74 76 0.360 21 24 27 30 33 36 39 42 45 47 50 52 55 57 59 62 64 67 69 71 74 0.370 19 21 24 27 30 33 36 39 42 45 47 50 52 55 57 59 62 64 67 69 71 0.380 16 19 21 24 27 30 33 36 39 42 45 47 50 52 55 57 59 62 64 67 69 0.390 13 16 19 21 24 27 30 33 36 39 42 45 47 50 52 55 57 59 62 64 67 0.400 10 13 16 19 21 24 27 30 33 36 39 42 45 47 50 52 55 57 59 62 64 0.410 7 10 13 16 19 21 24 27 30 33 36 39 42 45 47 50 52 55 57 59 62 0.420 5 7 10 13 16 19 21 24 27 30 33 36 39 42 45 47 50 52 55 57 59 0.430 3 5 7 10 13 16 19 21 24 27 30 33 36 39 42 45 47 50 52 55 57 0.440 0 3 5 7 10 13 16 19 21 24 27 30 33 36 39 42 45 47 50 52 55 0.450 0 0 3 5 7 10 13 16 19 21 24 27 30 33 36 39 42 45 47 50 52 >0.450 0 0 0 3 5 7 10 13 16 19 21 24 27 30 33 36 39 42 45 47 50 Note:. Thick line between 0.250 and 0.260 mm spacing factor indicates maximum spacing factor. February 1, 2011 5-18-7