BEST PRACTICE GUIDE 4 ON PROCUREMENT BID EVALUATION



Similar documents
BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS

BEST PRACTICE GUIDE 2: TENDER SPECIFICATION WRITING. RDTL MINISTRY OF FINANCE Procurement Service

BEST PRACTICE GUIDE 3: TENDER PROCESSES AND TENDER DOCUMENTS. RDTL MINISTRY OF FINANCE Procurement Service

Procurement guidance Prequalifying suppliers

MODEL REQUEST FOR PROPOSALS (RFP) TEMPLATE Generalized for professional services.

GUIDE ON HOW TO DO BUSINESS WITH LIVERPOOL JOHN MOORES UNIVERSITY

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

How to do Business with the London. Borough of Sutton

Bonding for Contractors. Barrie Construction Association September 17, 2015

LSB Procurement Framework

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO

White paper. Reverse e-auctions. A Recipe for Success

Length of Contract: 2 months (with an option to extend for a further 5 months).

Surety Bonding Solutions for Risk Management GFOABC May 31, 2012, Kelowna

REQUEST FOR BIDS. Project Management Technical Services

Project Management Procedures

Tendering to Public Sector Organisations

Procedures for Tenders and Contracts. October Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14

REQUEST FOR PROPOSAL

Procurement driving better value for money. Supplying New Zealand Government. A guide for suppliers on how to bid for government contracts

GUIDANCE ON PROVISIONS THAT SUPPORT MARKET ACCESS FOR SMALL BUSINESSES

Aerospace & Defense Spotlight The Converged Revenue Recognition Model Has Landed

Draft Service Level Agreement. for IT consultancy for advice, studies, software development and software maintenance Framework service contract

King Fahd University of Petroleum and Minerals

International Accounting Standard 11 Construction Contracts

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions

Suppliers Guide to Tendering Products and Services. Guide to Tendering with Western Australian Public Authorities. (January 2015)

CONSTITUTION PART 4 CONTRACT PROCEDURE RULES

HOW MUCH MONEY HAVE YOU WASTED ON G-CLOUD?

Step by Step Project Planning

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

EXTERNAL POLICY PROCUREMENT

Construction Risk Management Presentation. Government of Yukon & Yukon Construction Sector February 24, 2016 Surety Bonds &Construction Risk

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Impacts on the construction industry of the new revenue standard

Guidance on the template contract for social impact bonds and payment by results

Construction Contracts

Training Management Guidelines

DoE Supply Chain Management Processes

G-Cloud. Lifting the digital cloud

DRAFT 2009FL-0004/018

Canadian Evaluation Society. Request for Proposal. Intermediate-Level. Professional Learning Program. (Stage Two)

How to get value for money from service providers on major projects

Good Practice Framework. Performance Management

Manager, Procurement and Contracts

Becoming Tender Ready

CENTRAL BANK OF SOMALIA

BANKA SOCIETE GENERALE ALBANIA

BUY LOCAL POLICY A Western Australian Government commitment to supporting local businesses

Doing Business with the UN System. Practical Tips. January Published by

SPECIFICATIONS AND CONDITIONS FOR THE PROVISION OF GRIT BLASTING SERVICES

Guidance on Framework Agreements

Project Implementation: Procurement & Contract Management. April 2012

Supply Chain Plan Final Guidance

How To Manage A Contract

The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors

Procurement of Goods, Services and Works Policy

On-Call Management and Economic Development Consulting Services RFP (Project #2664) Questions and Answers Summary

REFERENCE FRAMEWORK FOR THE PREPARATION OF BUSINESS PLANS

F BATHYMETRIC SURVEYS MAGDALEN ISLANDS AMENDMENT 002

The Transport Business Cases

REQUEST FOR PROPOSALS For HEALTH INSURANCE AGENT/BROKER SERVICES. FOR THE Town of Vernon, Connecticut. Contract # /15/2012

BUILDING MAINTENANCE. Tender for Supply and Installation of Inverter Based AC Units (Split Units) for PWD Workshop Store Room and Office

The SME Engagement Handbook

Unsolicited Unique Proposals

PART VI METHODS OF PROCUREMENT AND THEIR CONDITIONS FOR USE

Sri Lanka Accounting Standard -LKAS 11. Construction Contracts

City of Calgary Prequalification For Prime Contractor. January 17, 2012

Construction Contracts

NYCC SCHOOL LOANS SCHEME TERMS AND CONDITIONS

Frequently Asked Questions About Federal Procurement

PROCUREMENT STANDARD OPERATING PROCEDURES (SOP)

NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS

The Public Procurement Rules, 2064 (2007)

Public Procurements. Where rules are defined. Tirana May27-28, ADRIARadNet 2nd Meeting

ANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1

How to do Business with the Province of British Columbia

The Small Business Friendly Concordat. A statement of principles for Basingstoke and Deane Borough Council

SCARBOROUGH BOROUGH COUNCIL

INVITATION TO TENDER SUPPY, INSTALLATION AND TRAINING ON THE USAGE OF COMPUTER ASSISTED AUDIT TOOLS & TECHNIQUES (CAAT) TENDER No.

Management and Leadership. Level 5 NVQ Diploma in Management and Leadership (QCF)

CONTRACT MANAGEMENT ACTIVITIES

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Need for the scheme. The project will bring a number of benefits to road users including:

NOT FOR PUBLICATION By virtue of paragraph 3 of Part I of Schedule 12A of the Local Government Act 1972.

Small Business introduction to Prequalification

POLICY STATEMENT AND GUIDANCE NOTES ON: (1) OUTSOURCING; AND

Supplier Performance Management Program. CEA Edmonton Buildings Committee November 13, 2012

BANKA SOCIETE GENERALE ALBANIA

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

CHAPTER Verification of non-existence of the grounds for exclusion. Article 1

Request for Proposal (RFP) Reference No: AUAF-RFP Issue Date: April 10, Deadline: April 20, :00 AM. Project:

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.


Large Sites Infrastructure Programme - CME. Prospectus. October 2015 Department for Communities and Local Government

Construction Contracts

Liverpool City Region Local Enterprise Partnership Request for Written Quotation. for. Mobile telephone contract. July 2015

Schedule 11. The Transfer of Undertakings (Protection of Employment) Regulations 2006

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION JULY Department for Culture, Media & Sport. The rural broadband programme

Transcription:

RDTL - MINISTRY OF FINANCE BEST PRACTICE GUIDE ON PROCUREMENT BID EVALUATION This Best Practice Guide is for Government Procurement Managers and senior officers. It explains how tender bids should be evaluated when procuring goods, services, construction and consultancies on behalf of the Government of Timor Leste. 1

Background The Government of Timor Leste wants to encourage and support local businesses in their access to working with government and in the provision of long term supply of goods and services to the government through procurement processes. This will stimulate local economic and employment growth, develop district suppliers and therefore have a positive economic impact in Dili and the districts. This policy can be partially implemented through the revised procurement bid evaluation system explained in this guide. Decisions on government procurement should be made on the basis of value for money. The tendered purchase price alone is seldom an accurate indicator for comparison of either the potential contractor s ability to perform the required task, or the total cost of performing the task over time. Value for money requires a comparison of costs, benefits and alternative outcomes. An assessment of the best net overall outcome for government is to take account of all relevant whole of life costs and benefits, that is the full cost of each good, service, construction or consultancy over its expected useful life, not just at time of purchase. Example 1: Whole of Life Costs $$ Whole of Life Criteria Supply: Ba Futura Supply: Sunrise Island Purchase Price $100 $10 Life of the asset (warranty period) 5 years 10 years Maintenance Cost per year (whole of life cost) Operating Cost per year (whole of life cost) Total Cost of Asset--whole of life $10 per year OR $50 (over 5 years) $20 per year OR $100 (over 5 years) ($100+$50+$100=) $250 (over 5 years) OR ($250 x 2 supply) $500 (over 10 years) $10 per year OR $100 (over 10 years) $10 per year OR $100 (over 10 years) ($10+$100+$100=) $0 (over 10 years) In this example, if both assets provide the same service a 10 year supply then, Asset B would provide the better value for money because it has the lower whole of life cost when we compare costs, even though it is initially more expensive to purchase. However this quantitative whole of life cost is only one consideration when selecting a government contractor. Other qualitative factors such as, the financial strength of the contractor s business, their past performance and capacity for customer service, along with boosting local economic development are important matters which also must be considered when evaluating bids. The supplier must be able to provide the Government with a good and reliable service to ensure the smooth running of government and lower the risk of any disruption or delay to public services. A detailed technical or professional capability assessment and a commercial and financial analysis of the bids, and the businesses tendering, must be made to determine which tender represents best value for government and the public interest. To make this analysis, it is necessary to obtain all information on the goods or services tendered, and details of all significant costs associated, not just with the initial purchase, but also during the use or application of the goods and services along with any associated future costs. 2

Example 2: Evaluating All Criteria: Qualitative and Quantitative $$ The Government Procurement Office was required to purchase five new trucks for the Water and Sanitation Department. Ten tenders were recieved and three were selected for consideration: Mobil Biru Motors (US$50,500); Truk Bot (US$65,000); Maria and Jose Imports (US$88,550). Even though the last bid was the most expensive it contained a significant number of benefits. They could supply quickly a central requirement of Government, the trucks included the latest model with tipping technology. The company also offered to set up a truck service centre that would employ and train 20 Timorese mechanics. This bid was recommended dependent upon checks being made on the company s compliance with local laws, financial strength and their having existing shipping orders for the latest model vehicles underway. The Issues for Evaluation 1. Evaluate: Technical capability or professional competence of contractor A technical or professional analysis includes an assessment of the suitability of the product or service offered in comparison to the functional, performance and technical requirements as laid out in the tender documents. A particular account of the following must be made: Ability to meet essential and desirable requirements of the tender customer service, including whole of life servicing and maintenance Quality assurance capacity to perform task Past performance Strategic issues (eg location, network) Prospective suppliers must provide details on the products and services they are offering and other information about themselves and their business. Documentation from suppliers is the foundation for subsequent bid evaluation. This technical evaluation of the good or service tendered in the bid is important: it must be clear that the supplier can provide or perform the service required. An assessment is necessary to determine how well it will perform that function in comparison with the others tendered, and over what life span it will continue to operate efficiently. It is important that representatives of those who will be the end users of the product or service participate as part of the evaluation team. 2. Evaluation: Commercial analysis The commercial viability of bidders and their business needs close analysis. A business must be viable and have the resources it needs to carry out a government contract efficiently and effectively. When evaluating suppliers their assets and resources must be compared and those with the most capacity to fulfil the contract should be given a higher score. Other issues to be assessed include: Risk management (including insurance, and use of authorized sub-contractors) Compliance to conditions of contract Conflicts of interest Ownership and substance of the business Financial strength of the business Past record in dealings with the Government

. Evaluation: Industry or local development Industry or local development should also be a standard key assessment criterion as outlined above. As appropriate to supply requirements, the following claimed impacts are also to be considered in the bid and weighted accordingly in the evaluation: a) Enhancement of industry and business capability in Timor Leste b) Supporting small to medium size Timor Leste firms accessing the government marketplace and their provision of whole of life support for goods or services they are contracted to provide c) Proposed number of jobs that will be available to Timor Leste citizens d) Level of skills and technology transfer e) Local content which is the proportion of both goods and services purchased from local suppliers f) Regional and district development opportunities g) Training activities or programs supported by the bidder. For tenders with a value estimated in excess of $100,000 a standard Local Development Statement is to be completed by bidders. This should outline their commitments to local job creation; skills and technology transfer to local workers and local content (the proportion of both goods and services sourced locally). This will become a formal attachment to the contract with the successful bidder.. Evaluation: Financial analysis Financial analysis must be made for the entire life cycle, that is the full cost of each good, service or construction over its expected useful life, not just the initial purchase price. This is to avoid cheaper or inferior products or services which may actually cost more in the long term as maintenance costs may well be greater. This criteria would include: Capital costs purchase price, installation, commissioning and training costs and operating costs labour, maintenance and energy costs and licence fees. These whole of life costs should be reduced to a set of common factors to allow rational comparison between tenders. The financial assessment of cost is not weighted. TWO ENVELOPE TENDERING SYSTEM Government procurement officers are to develop specific tender evaluation criteria, based on the principles outlined in the Decree Law, which are appropriate to the supplies being tendered for. Numerical scores or points are to be attributed to each evaluation criteria. The financial analysis, outlining the cost, is not weighted. The standard and supply-specific tender evaluation criteria are to be included in all Request for Tender documentation. The numerical scores are also to be disclosed as part of the Request for Tender documentation. Tenderers are to submit bids in two envelopes. Envelope One responds to the criteria on technical/professional analysis; commercial analysis and industry/local development. Envelope Two details the firm s costs. Bidders will be shortlisted based on their ability to meet or exceed preset threshold scores for Envelope One. This demonstrates the Government s overriding priority to obtain value (rather than focus on price) delivered through a firm s technical/professional capability; their commercial soundness and ability to enhance local/regional development in Timor Leste. Only then will the evaluation team consider the whole-of-life cost of the bid in Envelope Two. For the top two shortlisted bidders only, Envelope Two will be opened. The successful tenderer will be selected based on an evaluation of the bidder s scores for Envelope One, and the cost tendered in Envelope Two.

Step 1: Tender Planning--Score Importance of Evaluation Criteria GUIDE TO IMPORTANCE SCORING 1 = Minimum requirement 2 = Of benefit, will add some value to contract = High levels of performance = Superior level of performance required 5 = Absolutely required, critical to contract performance EXAMPLE: Evaluation Criteria Table EVALUATION CRITERIA 1. TECHNICAL/PROFESSIONAL COMPETENCE 1.1 Compliance to Tender Specifications meets requirements meets standards 1.2 Customer Service policy and practice surveys customers systems to measure customer satisfaction backup and advice 1. Quality system for deliverables certification documented system 1. Capability staffing structure availability of experienced staff previous work state of technology 1.5 Past Performance experience in the industry previous public sector experience referee s view 1.6 Strategic location networking HOW IMPORTANT SCORE 2. COMMERCIAL 2.1 Financial viability-- Satisfies key financial ratios for industry 2.2 Risk and Insurance adequate insurance allocate and acceptance of risk 2. Compliance to Conditions of Contract complies to the terms and conditions ease of legal recourse 2. Conflict of Interest existing or potential process for protection against. LOCAL DEVELOPMENT.1 Enhancement of industry and business capability in Timor Leste 5.2 Regional and district development opportunities 5 5 5 2. FINANCIAL.1 Tendered price.2 Disbursements. Price variations (through contact period). Contingencies. Total Cost $ 5

Step 2: Evaluate Tenders Assess Compliance with Evaluation Criteria CRITERIA ASSESSMENT SCORING 0 Not acceptable, has not met any reasonable criteria 1 to Has only met some minimum requirements, and may not be acceptable 5 Acceptable 6 to 9 Acceptable, has met all requirements and exceed some 10 Acceptable, has well exceeded all requirements Example: Evaluation Table EVALUATION CRITERIA Importance Score Compliance Score SUPPLIER A TENDER: BA FUTURA Compliance Score X Importance Score Compliance to specification 5 6 5 x 6= 0 Capability 5 5 5 x 5 25 Quality Assurance 2 6 2 x 6 12 Past Performance 5 x 5= 20 Financial Strength 5 6 5 x 6= 0 Local Development 7 x 7= 28 TOTAL for BA FUTURA -- -- 15 6

STEP : Comparison of Tenders by TOTAL SCORE and PRICE Example: Final Tender Comparison and Decision COMPARISON OF TENDER SUPPLIERS SUPPLIER A: BA FUTURA SUPPLIER B SUNRISE ISLAND** TOTAL SCORE 15 17 PRICE $$ $100, 000 $120, 000 Sunrise Island wins the tender as it represents the best value for money bid (scoring high in terms of technical, commercial, and local development) with a cost marginally higher than the lower cost bid. Therefore the benefits related to better outcomes, and lower risk, justify paying the higher cost in this case. This bid is recommended if the price is within the budget, and the company passes all checks. 7