Contents General Requirements Location Size Inlet and Outlet Piping Protection Security Electrical Automatic Meter Reading (AMR)



Similar documents
Gas Meter Clearances and Service Installation Requirements

Element D Services Plumbing

Gas Meter Clearances and Service Installation Requirements

Electric Service Conversion Overhead-to-Underground. Minnesota

Current as of 11/10/08 1 of 1

The City of Basehor, Kansas

2. What building projects are exempted? (permit not required)

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

IRRIGATION PUMPING Table of Contents - Section 900

2010 Residential Water Heater Replacement Check List

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

Residential Building Permits Information

Electrical Service Guidelines

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

Meter Box Location Handbook

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

G SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Development Services City of Lawrence, KS

General Fire Code Requirements Within Commercial Tenant Spaces

BOROUGH OF OAKLAND COUNTY OF BERGEN STATE OF NEW JERSEY ORDINANCE 13-CODE-685

Fiberstars Mini Lighted Laminar Flow Fountains

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Elevating Your House. Introduction CHAPTER 5

MOBILEHOME PARK INSPECTION RESIDENT INFORMATION BOOKLET

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Installation of Underground LP-Gas Systems

Builder/developer gas service application

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

SUBJECT CAN: Temporary Systems, Utilities and Equipment. Effective: 4/09/2013. CODE SECTION 2010 California Building Code (CBC)

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

Suffolk County Department of Health Services. Division of Environmental Quality

Building Code Clarifications - 7. Fire Resistance

Automatic Fire Sprinkler Submittal Requirements

How To Build A Power Plant For Cps Energy

TOWN OF BRENTWOOD TH PLACE BRENTWOOD, MD (301) FENCE PERMIT APPLICATION

Single Family Residential Building Permit Questions & Answers

Element D Services Plumbing

`Fall Protection Guidelines in Construction

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

Cold Weather Concrete Practices

PERMITS REQUIRED & PERMIT EXEMPTIONS

Please check with your local inspection authority for any additional requirements before installation.

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Section 2 Gas Service

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Rev E Page 1 of 10

WHEN IS A PERMIT REQUIRED?

FORENSIC INVESTIGATION QUESTIONNAIRE

Underground Service Requirements and Instructions

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Gas Appliances and Gas Piping

City of Riverside Building & Safety Division Residential Electric Vehicle (EV) Charger Guidelines

Name Of Occupancy Date. Yes No Describe

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Solar Panel Installations

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Hyperlinks are Inactive

Questions Regarding Proposed Utility Undergrounding in Kensington

ENGINEERED DRAWINGS FOR PETROLEUM STORAGE TANKS

NTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS

Electrical. This section applies to the design and installation of building power distribution systems.

INSTALLATION OF A BAY WINDOW

Charter Township of Shelby Harry Reese Building Director

Walking and Working Surface Checklist:

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

Questions and Answers for Heating and A/C Contractors

June July 18, of 7

FALL PROTECTION PROGRAM

Town of Beaumont. Lot Grading Guidelines

STANDARD OPEN PATIO COVER

ASX7-4-IOM-7 J

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Basement Development Construction requirements for the development of basements in residential dwellings.

Architectural Processing and Inspections for Home Mortgage Insurance

TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE

Chapter 3 Pre-Installation, Foundations and Piers

How to secure your property after a disaster

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

Services Enclosures and Protected Shafts - Maintaining Compartmentation

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

POST AND FRAME STRUCTURES (Pole Barns)

METERING INSTALLATION REQUIREMENTS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

Utilities and existing services

Transcription:

The information in this booklet is provided to assist in planning your meter area requirements. Actual field conditions may result in additional requirements. For more information, please contact the ATCO Gas office in your area. Contents General Requirements 1 Location 1 Size 1 Inlet and Outlet Piping 4 Protection 4 Security 5 Electrical 5 Automatic Meter Reading (AMR) 5 For Additional Information 6

General Requirements Legal description and service address of the property/building to be serviced is required. An adequate meter area must be provided at no cost to ATCO Gas to install metering and regulating equipment, regardless of whether it is a new facility or an expansion to an existing facility. A meter area is the space set aside outside the building for metering and regulating equipment. The meter area must not be used for any other purpose. The meter area must be accessible at all times to authorized ATCO Gas personnel. The installation of the meter, regulator and house line must conform to the Alberta Building Code, CAN/CSA-Z662, CAN/CGA-B149.1, the Alberta Safety Codes Act and the Alberta Gas Code Regulations. Prior approval must be obtained from ATCO Gas when a Header Set is required. All meters, regulators, reliefs, bypasses, pipe and fittings installed by ATCO Gas remains the property of ATCO Gas. Location Meter must be outside The meter area must be adjacent to the building within the customer s property. Clear, unobstructed access is required to the meter area at all times. Location of the meter area at final grade is critical. Suitable provision, if required, must be made by the Mechanical Contractor to extend the regulator and/or relief vent lines to meet the specifications in the CAN/CSA B149.1,Natural Gas and Propane Installation Code. Size The minimum size of the meter area will be determined by ATCO Gas for each installation, based on gas load, inlet and outlet pressure, regulation equipment, and the number and type of meters. Special applications require consultation with ATCO Gas prior to continuing with the installation. Using the meter size for the appropriate flow rate, the required meter area size can be determined. 1

Meter Area Size (Elevated Pressure) Total Load Distance Between Service Riser and House Line K Unobstructed Area Required Length G Width H Width of Space to Right of House Line /Left of Riser J House Line Distance from Finished Wall I Height of House Line from Finished Grade 28 m³/h (1,000 cfh) 24-36 (0.6-0.9 m) 48-60 36 (1.2-1.5 m) (0.9 m) 12 (0.3 m) 6 (0.15 m) 28-142 m³/h (1,001-5,000 cfh) 36 - (0.9-1.2 m) 88 36 (2.2 m) (0.9 m) 142-228 m³/h (5,001-8,000 cfh) 72-84 (1.8-2.1 m) 112-124 60 (2.8-3.1 m) (1.5 m) Requires site visit by ATCO Gas 228-651 m³/h (8,001-23,000 cfh) 96-144 (2.4-3.6 m) 136-184 60 (3.5-4.7 m) (1.5 m) 24 (0.6 m) Requires site visit by ATCO Gas Meter Area Size (Low Pressure) Total Load Distance Between Service Riser and House Line K Unobstructed Area Required Length Width G H Width of Space to Right of House Line/Left of Riser J House Line Distance from Finished Wall I Height of House Line from Finished Grade 0-13 m³/h (0-450 cfh) 16 (0.4 m) 40 24 (1.0 m) (0.6 m) 12 (0.3 m) 4 (0.1 m) (1.2m) 13-21 m³/h (451-750 cfh) 44 24 (1.1 m) (0.6 m) 12 (0.3 m) 4 (0.1 m) (1.2m) 21-28 m³/h (751-1,000 cfh) 24 (0.6 m) 36 (0.9 m) 12 (0.3 m) 6 (0.15 m) 28-142 m³/h (1,001-5000 cfh) 80 36 (2.0 m) (0.9 m) 16 (0.4 m) 142-228 m³/h (5001-8,000 cfh) 84 (2.1 m) 132 60 (3.4 m) (1.5 m) Requires site visit by ATCO Gas 228-651 m³/h (8,001-23,000 cfh) 108 (2.7 m) 1 60 (3.7 m) (1.5 m) 24 (0.6 m) Requires site visit by ATCO Gas 2

Outside Set Area INSIDE BUILDING WALL HOUSE LINE OUTSIDE SERVICE RISER I J K J H G METER AREA REQUIRED The above meter space requirements are for one meter and one outlet pressure per location. Special applications including loads over 651 m³/h (23,000 cfh) or twin regulator runs require a mandatory site visit for specific spacing requirements. A concrete pad is required before the installation of any meter with a minimum capacity greater than 28 m³/h (1,000 cfh) or if any part of the meter set has to rest on the ground. The concrete pad must be finished, ground level and tied into the building foundation. Using the minimum space requirements for the meter set, required size of the concrete pad can be determined. 3

Meter Site Specifications Total Load 0-13 m³/h (0-450 cfh) 13-28 m³/h (451-1,000 cfh) 28-142 m³/h (1,001-5,000 cfh) 142-651 m³/h (5,001-23,000 cfh) Riser & Meter Protection Unobstructed Distance from Wall 24 (0.6 m) 36 (0.9 m) 36 (0.9 m) 60 (1.5 m) Concrete Pad Required Roof Chain Link Fence Required No No No No No No Yes No May be required Yes May be required May be required Inlet and Outlet Piping The customer must indicate the desired meter location on a plan to be submitted to ATCO Gas. The final location of inlet and minimum outlet pipe sizes will be determined by ATCO Gas. The inlet piping must enter directly into the meter area on special applications. If the house line is larger than two inches, install a two-inch threaded-one end (TOE) fitting to allow for the connection of regulating and metering equipment. Protection ATCO Gas metering and regulating equipment must be protected from potential physical damage. Where there is potential for vehicular damage (including forklifts and other moveable equipment), the customer must provide a vehicle barrier or fencing. The meter area must be in a location that is free from falling ice or snow hazards. Snow must not be piled directly in front of or on the meter set. ATCO Gas will provide protection for piping, meter and regulating equipment where applicable. When a meter is located on a building, where the exterior is stucco or corrugated metal siding, ATCO Gas requires backing support on the inside wall (i.e. plywood) to attach riser brackets to keep single and multi-header meters secure. 4

Security ATCO Gas reserves the right to require a security enclosure to prevent tampering and vandalism. Enclosures must be closed and locked at all times when not occupied by ATCO Gas employees. The gates of these enclosures need to be six inches (0.15 m) above the finished grade for access during winter months. Enclosures may be locked by means of a conventional lock set, provided by ATCO Gas to ensure that employees can obtain access at all times to the area. Warning signs provided by ATCO Gas shall be attached to the outside of the enclosure. Electrical There must be a minimum of three feet (0.9 m) separation between any part of the gas meter/regulation installation and any sources of ignition (i.e. open flames, electrical panels, switches, meters, etc.). Automated Meter Reading (AMR) ATCO Gas may supply and install an Automated Meter Reading (AMR) device for your natural gas meter. This is simply a modem which may connect to the telephone system. A telephone line may be required for AMR purposes. A common analog loop start extension from an existing in house line is adequate; a dedicated service is not required. The telephone line must terminate as close as possible to the meter, but no closer than three feet (0.9 m) from the meter set equipment and piping. The cable is to be encased in weatherproof mechanical protection. It is recommended, where possible, that the cable be routed from the main phone panel in half-inch conduit. After telephone service has been provided to the meter area, ATCO Gas may install and commission the AMR device. 5

The information in this booklet is provided to assist in planning your meter area requirements. Actual field conditions may result in additional requirements. For more information, please contact the ATCO Gas office in your area. Notes 6

Notes 7