BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

Similar documents
City of Riverside. Building & Safety Division Phone: (951)

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity

BUILDING DIVISION CONSTRUCTION PERMIT FEES

CITY OF BAYTOWN Building Inspections

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each

Schedule B to By-law

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

City of Elk River BASEMENT Office Use Only

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated.

SCC NO AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES

2016 BUILDING PERMIT FEES*

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

Schedule B to By-law Part A Fees Payable for Permits

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

2. What building projects are exempted? (permit not required)

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

HOMEOWNER S PERMIT GUIDE

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Development Services Guidelines

EXPRESS PERMITS (No Plan Check Required)

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Building Permits: When are they required?

Applications for building permits will not be reviewed until all of the required information has been submitted.

BUILDING INSPECTION DEPARTMENT FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

BUILDING PERMITS. Santa Rosa County Building Inspection

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) Fax: (508)

How To Get A Building Permit In Florida

city of edmonds development information

Guideline for Implementation of California Civil Code Sections Water-Conserving Plumbing Fixtures

WHEN IS A PERMIT REQUIRED?

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings

Development Services Permit Application

2-1 TITLE 7 CONSTRUCTION REGULATIONS 2-4

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

City of St. Charles Basement Finish or Remodel

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

(1) (a) through (1) (e) (iv) Remain the same.

APPLICATION FOR NEW CONSTRUCTION

SECTION 5 - COMMERCIAL CONSTRUCTION MECHANICAL, ELECTRICAL, PLUMBING AND SOLAR OTHER TECHNICAL CODES

County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION

CITY OF CRESTVIEW. TRADES PERMIT APPLICATION (Mechanical, Electrical, Plumbing, Irrigation, Fire Alarm & Gas Permits)

Botetourt County, Virginia. Frequently Asked Questions

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

C I T Y O F P E A R S A L L

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

The City of Basehor, Kansas

DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES

Development Services City of Lawrence, KS

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Single Family Residential Basement Finish

LICENSE CATEGORIES. (2) A demolition contractor class II may demolish any building not more than three stories in height.

PROPOSED Plumbing Fee Ordinance Amendment

TENANT DESIGN MANUAL UPDATED JULY 2015

MODERATE INCOME HOUSING UNIT PROGRAM PRICE & RENT SUMMARY FOR LOW INCOME ALTERNATIVE January 1 through June 30, 2016*

Plumbing Code Statutes and Regulations February 2011 Labor Standards and Safety Division Mechanical Inspection

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

( Staple Upper Right Corner ) MINNEAPOLIS TRUTH-IN-SALE OF HOUSING DISCLOSURE REPORT

DPIE FY2016 Fee Schedule (Effective July 1, 2015)

City of Hill Country Village Residential Construction/Development Packet

Building and Other Permits Fee Schedule Effective Date: July 1, 2016 BUILDING PERMIT FEE

BUILDNG PERMIT FEES Resolution # Effective October 1, 2011

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

Building Permit Application

The purpose of this document is to provide standards for persons requesting or subject to County building inspections.

29 Broadway- 14 th Fl Tel: New York NY Fax: Due Diligence Report. New York, New York

An Applicant s Guide to Residential Building Permits

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

RESIDENTIAL PLUMBING & MECHANICAL PERMIT SUBMITTAL REQUIREMENTS

Contractor Information 2011

APPLICATION FOR BUILDING PERMIT. Date of Birth: City: State: Zip: City: State: Zip: Asbestos Removal Vacant Non-Residential

CITY OF SURREY BY-LAW NO. 6569

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

A Homeowner s Guide to Building Permits

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

Third Party Plan Review and Inspection Procedures

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Transcription:

Development Services Department A. Building Permit Fees For New Construction, Tenant Improvements and Residential Remodels For Production Homes See Page 2 TOTAL VALUATION (Materials and Labor) FEE $1 to $500 $29.77 $501 to $2000 $29.77 for the first $500 plus $3.87 for each additional $100 or fraction thereof, to and including $2000 $2,001 to $25,000 $87.82 for the first $2000 plus $17.74 for each additional $1000 or fraction thereof, to and including $25,000 $25,001 to $50,000 $495.68 for the first $25,000 plus $12.80 for each additional $1000 or fraction thereof, to and including $50,000 $50,001 to $100,000 $815.70 for the first $50,000 plus $8.87 for each additional $1000 or fraction thereof, to and including $100,000 $100,001 to $500,000 $1259.15 for the first $100,000 plus $7.09 for each additional $1000 or fraction thereof, to and including $500,000 $500,001 to $1,000,000 $4097.18 for the first $500,000 plus $6.02 for each additional $1000 or fraction thereof, to and including $1,000,000 $1,000,001 and up $7109.14 for the first $1,000,000 plus $4.00 for each additional $1000 or fraction thereof BUILDING PERMITS ADMINISTRATIVE ISSUANCE FEE: BASE PERMIT FEE From Calculation Above: $ $81.00 per permit BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ PLAN REVIEW FEES AND INCLUSIVE SUB-PERMIT FEES *Covers 2 back checks. The third back check will be $125 / hour. 1. Plan review fees including two BASE back PERMIT checks FEE x.15 = ELECTRICAL INSPECTION 80% of the FEE: building $ permit fee 2. Additional plan review fee for revisions and beyond two back checks $109.00 per hour BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ 3. Plan check fee for compliance with the State Title 24 12% of the building permit fee Energy Regulations (all occupancies) BASE PERMIT FEE x.12 = PLUMBING INSPECTION FEE: $ 4. Additional fees are required for Plumbing, Mechanical and Elcectrical 37% of the building permit fee BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $ (Individually multipliers are Electrical 15%, Plumbing 12%, Mechanical 10% -- depending on scope of work) ENTER PRODUCTION HOME FEE HERE (SEE NEXT PAGE) BASE PERMIT FEE x.03 = TECHNOLOGY FEE: $ SMIP FEE RESIDENTIAL:.01% OF VALUATION SMIP FEE COMMERCIAL:.021% OF VALUATION CA BUILDING STANDARDS FEE: $1.00 (Valuation $1-25k) $2.00 (Valuation $25-50k) $3.00 (Valuation $50-75k) $4.00 (Valuation $75-100k) Add $1 per every 25k over 100k SMIP: $ CA BLDG. STANDARDS $ Administrative Fee (APPLIES TO ALL PERMITS): $ 109 PERMIT FEE: $ 10

BUILDING PERMIT FEES FOR NEW PRODUCTION HOMES (TRACTS) Plan Check Fee Occupancy Type IBC/CBC R-2/ R-3 Dwellings Models, First Master Plan 1,500 $5,036 $51 - - 2,500 $5,548 $39 - - 3,500 $5,941 $55 - - 4,500 $6,492 $30 - - 6,500 $7,081 $18 - - 10,000 $7,711 $77 Inspection Fee IBC/CBC Occupancy Type R-2/ R-3 Dwellings Models, First Master Plan 1,500 $3,726 $56-2,500 $4,288 $51-3,500 $4,798 $56-4,500 $5,360 $41-6,500 $6,177 $22-10,000 $6,942 $69 Plan Check Fee Occupancy Type IBC/CBC R-2/ R-3 Dwellings Production Phase (Plot Plan) 1,500 $1,013 $10 - - 2,500 $1,116 $8 - - 3,500 $1,194 $11 - - 4,500 $1,306 $6 - - 6,500 $1,424 $4 - - 10,000 $1,551 $16 Inspection Fee IBC/CBC Occupancy Type R-2/R-3 Dwellings Production Phase (Plot Plan) 1,500 $3,726 $56-2,500 $4,288 $51-3,500 $4,798 $56-4,500 $5,360 $41-6,500 $6,177 $22-10,000 $6,942 $69 NOTE: Enter the combined fee for plan check and inspection from these tables on the previous page at the arrow to calculate total fees. 11

MISCELLANEOUS PERMIT FEES Not Calculated by Valuation These are package permits. Plan Check fees and Sub-Permit fees are added separately (unless otherwise noted). Work Item Unit Fee STANDARD HOURLY RATE (or fraction thereof) for Plan Check / Inspections hour $109 Miscellaneous Item Permit Fee (for items not shown) each $109 ADMINISTRATIVE FEE (Permit, processing, Issuance and Documentation Fee) EACH PERMIT $109 Address Assignment Single (1.5 hours) each $163 Multiple each $54 Demolition Commercial/Residential 0-3000 sf $374 each additional 3000sf. each $174 Equipment Installation first piece $240 additional equipment each $174 Equipment Pad each $174 Fire Damage Survey $174 Patio Covers Patio Cover (requires drawings and hourly plan check) each $240 Enclosed Patio each $503 Photovoltaic Systems Residential (for systems that are not flush mounted, hourly plan check fees apply) each $300 Commercial, up to 50 kilowatts (hourly plan check fees apply) each system $1,000 Commercial, each additional kilowatt 51kw-250kw (hourly plan check fees apply) each kw $7 Commercial, each additional kilowatt over 250kw (hourly plan check fees apply) each kw $5 Rooftop Units (includes all sub trades) Note: Hourly structural review may be required each $274 Remodel / Repair-Residential Remodel-Minor Bathroom Shower/Bath Walls (includes trades) $109 Remodel- Complete Bathroom (includes trades) $339 Remodel- Kitchen (includes trades) $359 Revisions hourly rate $109 Storage Racks over 8' (up to 100lf) first 100lf $634 each additional 100lf each 100lf $130 Residential Storage Sheds over 120 square feet $503 12

SUB-PERMIT FEES PLUMBING, MECHANICAL and ELECTRICAL These are individual permits that typically are not associated with drawings General Items for Sub Permits Stand Alone Plumbing / Mechanical or Electrical Plan Check (only applies to permits with plans) $109/hr. Miscellaneous Item Permit Fee (up to 2 inspections) $109 ADMINISTRATIVE FEE (Permit, processing, Issuance and Documentation Fee for all permits) $109 PLUMBING PERMIT FEES: Residential Water Heater (Repair or Replacement) $54 Fixtures Covers 2 inspections (for bathroom and kitchen remodels that have multiple fixtures, use the package permit on the previous page. This will cover all remodeling work in the bathroom or kitchen including other subs) $109 Water Service Repair/Replacement $54 Water Pipe Repair/Replacement $109 Sewer (on property) or Cleanout $54 Sewer Ejector System $109 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $109 Residential Gas Piping $109 Residential Gas Test / Meter Reset $109 PLUMBING PERMIT FEES: Commercial Water Heater (Repair or Replacement) $109 Water Service Repair/Replacement $109 Sewer (on property) or Cleanout $54 Sewer Ejector System $218 Industrial & Commercial Process Piping System (per 100 lf, or fraction thereof) $109 Commercial Gas Piping (per 100 Linear ft, or fraction thereof) $109/ lf 13

PLUMBING PERMIT FEES: Commercial (continued) Gas Test / Meter Reset $109 Sewer (on property) or Cleanout $109 Grease Trap $109 Grease Interceptor $218 Vacuum Breaker, Backflow Preventer, Pressure Regulator () $109 MECHANICAL PERMIT FEES: Residential Residential Heating Equipment (not including duct work) or Wall furnace $54 Forced air Furnace (including duct work) $109 Residential Kitchen Hood, Bathroom Vents $54 MECHANICAL PERMIT FEES: Commercial Heater (Unit, Radiant, etc.) $109 HVAC UNITS - See Rooftop Units Permit on page 2 (This will cover all sub trades PME) Structural Plan Review fees may apply for units 400# or more. Air Handler (less than 400#) $109 Evaporative Cooler (replacement less than 400#) $109 Vent System $109 Exhaust Hood Replacement $218 ELECTRICAL PERMIT FEES: Commercial + Residential Misc. Residential Electrical Permit (covers 2 inspections of any type of work) $218 Misc. Commercial Electrical Permit (covers 2 inspections of any type of work that does not require plans). Major electrical projects will be plan checked and the fees will be calculated under the valuation table on page 1 $327 Residential Service Upgrade $109 Additional Commercial Meter Reset ($327 for first) $109 Temp power $109 14

ADDITIONAL SERVICES and OTHER FEES FEES FOR ADDITIONAL SERVICES Expedited Plan Check fee (covers Building, PME, Structural, Energy and CalGreen) 200% of plan check fee Administrative costs to process deferral requests and Phased Approval Permits $500 Microfilm Reproduction Laserfiche Reproduction $3 first page, $1 each additional $10 per sheet FEES FOR WORK NOT COVERED BY INITIAL PERMIT COST Re-inspection fee when unusual number of inspections required Additional plan check fee for revision and beyond two back checks $125 / hour $125 / hour Permit reprint $65 Change of Contractor (includes updating records and verifying credentials) $135 VIOLATION FEES Permit fee for inspection of work done without permits 2X the regular permit fee Code violation / illegal project (each day a separate violation fee) $125 Filing of Notice of Substandard or Hazardous Structure Fee $103 Removal of Notice of Substandard or hazardous Structure Fee $103 Placards for condemnation, substandard building, dangerous building, hazardous condition, cease and desist or similar placards (processing /posting) $125 Notice and Order (processing/posting) $324 15

AFFORDABLE HOUSING IMPACT FEES 1. Ownership Residential s 20 units or More a. Detached Dwelling Units: $4.00/Square Foot of Habitable Space* b. Attached Dwelling Units: $3.24/Square Foot of Habitable Space* 2. Rental Residential s 20 units or More a. s Receiving All Discretionary Approvals Prior to Dec. 31, 2015 and All Building Permits Prior to Dec 31, 2017: No Fee b. All Other s: $3.24/Square Foot of Habitable Space* Notes: Affordable housing impact fees shall be paid either prior to issuance of a building permit or prior to approval of a final inspection or issuance of an occupancy permit. Fees paid at occupancy shall be increased 10 percent, to $4.40/ sq. ft. of habitable space for attached dwelling units and to $3. 56/ sq. ft. of habitable space for attached dwelling units and rental residential projects. Habitable Space" means floor area within a dwelling unit designed, used, or intended to be used exclusively for living and sleeping purposes and exclusive of vent shafts, eaves, overhangs, atriums, covered entries and courts and any portion of a structure above ground used for parking, parking aisles, loading areas, or accessory uses. 16